City of St. Johns building permits

Verified

City of St. Johns, Arizona — as published 2026-07-19.

Verified 2026-07-19 · Source

Codes adopted

City Code § 3-2-8 (Building Official) provides that 'The City Manager may designate or employ one or more officers and/or employees of the City of St. Johns to act as the Building Official ... to implement the provisions of the City of St. Johns Building Code and/or Uniform Code For The Abatement Of Dangerous Buildings' — confirming the City enforces its own locally-adopted Building Code, but the compiled City Code text (2014 codification, Rev. 2014.1, amended through 1-13-21) does not reprint that code's specific edition/year. The City Code's own ordinance-amendment index lists a '2003 Building Code adoption' entry (p. 121 of the printed code) as the most recent building-code-adoption ordinance identifiable in the compiled document; the underlying ordinance text itself was not retrievable in the compiled City Code docx obtained for this file.The City's Zoning Ordinance (PZ-Code-1.pdf, 'Final Revised Zoning Ordinance of the City of St. Johns') references 'Uniform Building Code' (UBC) standards in at least two places (factory-built/modular building construction; pressure-treated wood post standards) — UBC is the code family the International Building Code (IBC) nationally superseded by the mid-2000s. This may be a stale cross-reference rather than confirmation that UBC (rather than a current IBC edition) is presently enforced.The City's Rates, Charges and Fees Schedule (approved through 10/11/2023) ties commercial building permit fees to 'the most recent Building Valuation Data as published semiannually by the International Code Council,' which confirms the City currently operates within the ICC/International Code family for fee-calculation purposes, even though no specific IBC/IRC/IECC/IMC/IPC/NEC edition year is stated anywhere in the City Code, Zoning Ordinance, or Fee Schedule as retrieved.No dedicated 'Codes Adopted' or 'Current Codes' page (of the kind some Arizona municipalities publish) exists on the City's current official website (stjohnsaz.gov) as of 2026-07-19 — confirmed by reviewing the site's full sitemap and department navigation, which lists no Building/Development Services department at all (see tipsAndGotchas).

Permit types & fees

Residential Building Permit

Verified

Required for new single-family residential construction within the City of St. Johns. Charged as a flat fee regardless of project valuation, per the City's Rates, Charges and Fees Schedule (approved through 10/11/2023).

Verified 2026-07-19 · Source

Requirements

  • New residential construction within the incorporated City of St. Johns
  • Compliance with the City-adopted Building Code administered by the City's designated Building Official (City Code § 3-2-8)

Required documents

  • RequiredBuilding Permit ApplicationNo standalone building permit application form is published online on the City's official website (stjohnsaz.gov) as of 2026-07-19. Obtain the application directly from City Hall, (928) 337-4517.

Fee schedule

Fee typeAmountNotes
Residential Building Permit Flat Fee$50.00City of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023), 'PLANNING AND ZONING — Building PERMITS' section, linked from stjohnsaz.gov's City Hall menu ('Fee Schedule').
Plan Review Fee for New Construction65% of the calculated Building Permit FeeCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).
Inspection Services$50.00/hourCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).

Commercial Building Permit

Verified

Required for new commercial construction within the City of St. Johns. Fee is calculated per current ICC Building Valuation Data rather than a flat fee, per the City's Rates, Charges and Fees Schedule.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction within the incorporated City of St. Johns
  • Compliance with the City-adopted Building Code administered by the City's designated Building Official (City Code § 3-2-8)

Required documents

  • RequiredBuilding Permit ApplicationNo standalone building permit application form is published online on the City's official website (stjohnsaz.gov) as of 2026-07-19. Obtain the application directly from City Hall, (928) 337-4517.

Fee schedule

Fee typeAmountNotes
Commercial Building PermitPer Current Building Valuation Data (as published semiannually by the International Code Council)City of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023): 'All new construction building permit fees are calculated based on the most recent Building Valuation Data as published semiannually by the International Code Council. Additional costs include inspection and plan review, which will be passed on to the applicant.'
Plan Review Fee for New Construction65% of the calculated Building Permit FeeCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).
Inspection Services$50.00/hourCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).
Fire Inspection Services (1st inspection)$100.00/hourCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).
Fire Inspection Services (2nd or more inspections)$75.00/hourCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).

Building Permit for Additions or Remodels (Residential or Commercial)

Verified

Covers additions or remodels to existing residential or commercial structures, billed as a separate flat fee from new-construction permits, with plan review billed hourly rather than as a percentage of the permit fee.

Verified 2026-07-19 · Source

Requirements

  • Addition or remodel to an existing residential or commercial structure within the incorporated City of St. Johns

Required documents

  • RequiredBuilding Permit ApplicationNo standalone building permit application form is published online on the City's official website (stjohnsaz.gov) as of 2026-07-19. Obtain the application directly from City Hall, (928) 337-4517.

Fee schedule

Fee typeAmountNotes
Addition or Remodel Permit Fee (Residential or Commercial)$50.00City of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023): 'Additions or remodels for Residential or Commercial $50.00.'
Plan Review Fee for Additions or RemodelsHourly fee, reimbursed by applicant (specific hourly rate not separately published)City of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023): 'Plan Review Fee for Additions or remodels to Residential or Commercial — hourly fee to be reimbursed by applicant.'

Manufactured Housing Permit

Verified

Required for manufactured/mobile home placement within the City of St. Johns.

Verified 2026-07-19 · Source

Requirements

  • Manufactured or mobile home placement within the incorporated City of St. Johns

Required documents

  • RequiredManufactured Housing Permit ApplicationNo standalone application form is published online on the City's official website (stjohnsaz.gov) as of 2026-07-19. Obtain the application directly from City Hall, (928) 337-4517.

Fee schedule

Fee typeAmountNotes
Manufactured Housing Permit$200.00City of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).

Sign/Billboard Permit

Verified

Required for signs and billboards within the City of St. Johns; the Zoning Ordinance requires signs to conform to the City's adopted building codes.

Verified 2026-07-19 · Source

Requirements

  • Sign or billboard installation within the incorporated City of St. Johns
  • Conformance with the building codes adopted by the City of St. Johns (Zoning Ordinance § on signs)

Required documents

  • RequiredSign/Billboard Permit ApplicationNo standalone application form is published online on the City's official website (stjohnsaz.gov) as of 2026-07-19. Obtain the application directly from City Hall, (928) 337-4517.

Fee schedule

Fee typeAmountNotes
Sign/Billboard Permit$15.00City of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).

Fence Permit

Verified

Required for fence construction within the City of St. Johns.

Verified 2026-07-19 · Source

Requirements

  • Fence construction within the incorporated City of St. Johns

Required documents

  • RequiredFence Permit ApplicationNo standalone application form is published online on the City's official website (stjohnsaz.gov) as of 2026-07-19. Obtain the application directly from City Hall, (928) 337-4517.

Fee schedule

Fee typeAmountNotes
Fence Permit$15.00City of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).

Residential/Commercial Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems within the City of St. Johns. The City has no standalone solar-specific application, document, or fee line published on its own website or in its Rates, Charges and Fees Schedule — a solar PV installation is billed and processed through the same general Building Permit mechanism used for other electrical/structural work (flat $50.00 residential fee, or ICC Building Valuation Data for commercial, plus the 65% plan review fee and $50.00/hour inspection fee). Arizona statute A.R.S. § 9-468 (Solar construction permits; standards; definition) applies statewide to every incorporated city and town, including St. Johns, and independently caps solar permit fees at the municipality's actual cost of issuing the permit, regardless of what a general valuation-based fee schedule would otherwise produce.

Verified 2026-07-20 · Source

Requirements

  • Solar PV installation within the incorporated City of St. Johns requires a building/electrical permit via the City's unified Building Permit Application, per the same mechanism documented for the City's other permitTypes
  • Per A.R.S. § 9-468(A), the City may not require a stamp/seal from a professional structural engineer for a residential rooftop PV system unless the City makes a finding, in writing, that such a stamp is necessary for a specific installation
  • Per A.R.S. § 9-468(D), any fee or charge the City assesses for a solar PV permit 'shall not exceed the actual cost of issuing the permit' — this is a real, binding statewide statutory ceiling on solar permit pricing that applies regardless of the City's general (non-solar) valuation-based fee table
  • Per A.R.S. § 9-468(E)-(F), before adopting or changing a solar permit fee the City must hold a public hearing with at least 15 days' published notice, and must make its fee-calculation methodology available to the public on request
  • Electrical interconnection work associated with the PV system requires compliance with the City-enforced National Electrical Code edition (see codesAdopted); the City's own documents do not identify a specific NEC edition year, consistent with the general code-edition ambiguity already flagged for this file

Required documents

  • RequiredBuilding Permit ApplicationNo standalone solar-specific application form is published online on the City's official website (stjohnsaz.gov) as of 2026-07-20 — the same general Building Permit Application used for other permit types in this file is used for solar PV. Obtain the application directly from City Hall, (928) 337-4517.

Fee schedule

Fee typeAmountNotes
Solar PV Permit FeeNot separately itemized in the City of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023) — billed under the same general Residential Building Permit ($50.00 flat) or Commercial Building Permit (ICC Building Valuation Data) mechanism as other work, per that Fee ScheduleCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023); A.R.S. § 9-468(D) independently requires that whatever fee is actually charged for a solar permit 'shall not exceed the actual cost of issuing the permit,' regardless of how the general fee table calculates it.
Plan Review Fee65% of the calculated Building Permit FeeCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023) — same mechanism applied to new construction elsewhere in this file.
Inspection Services$50.00/hourCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).

Meter Loop Permit

Listed within the City's 'Building PERMITS' fee-schedule section immediately after the Manufactured Housing Permit. Likely relates to installation of the electrical/water meter loop coordinated with a building permit, though the City's available documents do not further define its scope.

Reviewed 2026-07-19 · Source

Requirements

  • Property within the incorporated City of St. Johns; specific triggering conditions not further defined in the City's published Fee Schedule

Required documents

  • RequiredMeter Loop Permit ApplicationNo standalone application form or scope description is published online on the City's official website (stjohnsaz.gov) as of 2026-07-19. Obtain details directly from City Hall, (928) 337-4517.

Fee schedule

Fee typeAmountNotes
Meter Loop$50.00City of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023), listed within the 'PLANNING AND ZONING — Building PERMITS' section.

Electric Vehicle (EV) Charging Station Permit

Verified

Installing an EV charging station (EVSE) within the City of St. Johns has no standalone application, document, or fee line published on the City's own website or in its Rates, Charges and Fees Schedule. As with solar PV (see solar-pv-permit), an EV charger installation is billed and processed through the same general Building Permit mechanism used for other electrical/structural work. Re-extracted the full text of the City's Rates, Charges and Fees Schedule (approved through 10/11/2023) directly for this review and confirmed there is no separate 'electrical permit' fee line anywhere in the schedule at all — the Planning and Zoning / Building Permits section lists only Residential Building Permit ($50 flat), Commercial Building Permit (per ICC Building Valuation Data), 'Additions or remodels for Residential or Commercial' ($50 flat), Manufactured Housing ($200), Meter Loop ($50), Sign/Billboard ($15), Fence ($15), and Inspection Services ($50/hour). Since no distinct electrical-work line exists, a charger added to an existing residence or business is confirmed to fall under 'Additions or remodels' ($50.00 flat, plus an hourly Plan Review fee where applicable), and a charger installed as part of new construction falls under the Residential/Commercial Building Permit line.

Verified 2026-07-20 · Source

Requirements

  • EV charger installation within the incorporated City of St. Johns requires a building/electrical permit via the City's unified Building Permit Application, per the same mechanism documented for the City's other permitTypes
  • A charger added to an existing residence or business is billed as an 'Addition or Remodel' under the City's Fee Schedule ($50.00 flat, plan review billed hourly) — confirmed by a full-text extraction of the Fee Schedule showing no separate city-issued electrical permit fee line exists at all; all non-new-construction structural/electrical work is binned into this single category
  • Electrical work must comply with the City-enforced National Electrical Code edition (see codesAdopted); the City's own documents do not identify a specific NEC edition year
  • No SolarAPP+-style or EV-specific streamlined review program was found published for St. Johns

Required documents

  • RequiredBuilding Permit ApplicationNo standalone EV-charger-specific application form is published online on the City's official website (stjohnsaz.gov) as of 2026-07-20 — the same general Building Permit Application used for other permit types in this file applies. Obtain the application directly from City Hall, (928) 337-4517.

Fee schedule

Fee typeAmountNotes
Additions or remodels for Residential or Commercial (EV charger circuit added to an existing building — confirmed applicable line, since no separate electrical permit fee exists in the schedule)$50.00 flatCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023), Planning and Zoning / Building Permits section — full text re-extracted for this review; confirmed this is the only fee line covering non-new-construction structural/electrical work of any kind, so it is the governing charge for a standalone EV charger circuit.
Residential Building Permit Flat Fee (if EV charger circuit is part of new residential construction)$50.00 flatCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023)
Commercial Building Permit (if EV charger circuit is part of new commercial construction)Per current ICC Building Valuation DataCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023)
Plan Review Fee for Additions or RemodelsHourly fee reimbursed by applicantCity of St. Johns Rates, Charges and Fees Schedule; Plan Review for new construction is a flat 65% of the Building Permit fee, but for Additions/Remodels (the EV charger category) it is billed hourly instead
Inspection Services$50.00/hourCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of St. Johns building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /arizona/apache-county/st-johns/as-of/2026-07-19/

Snapshot date: 2026-07-19

Commit: 7d7b50c

Reproducible from PermitBase’s version-controlled dataset, commit 7d7b50c.