Skip to main content
PermitBase

Manufactured Housing Permit in City of St. Johns, Arizona

Required for manufactured/mobile home placement within the City of St. Johns.

Verified 2026-07-19 · Source

When you need this permit

  • Manufactured or mobile home placement within the incorporated City of St. Johns

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Manufactured Housing PermitCity of St. Johns Rates, Charges and Fees Schedule (approved through 10/11/2023).
$200.00

Review timeline

Plan review
Not published — contact the department

How long did your Manufactured Housing Permit permit actually take in City of St. Johns?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • The City's Zoning Ordinance (PZ-Code-1.pdf) separately defines and regulates 'factory built' and 'modular' buildings by reference to the Uniform Building Code — confirm with City Hall whether your unit is classified as manufactured housing or a modular/factory-built structure, since siting and permitting requirements may differ.

    Frequently asked questions

    City of St. Johns requires a manufactured housing permit for: Manufactured or mobile home placement within the incorporated City of St. Johns. If your project isn't listed, confirm with City of St. Johns City Hall — Planning and Zoning (Building Official designated under City Code) at (928) 337-4517 (City Hall main line); Fax (928) 337-2195 before starting work.

    Per the City's Rates, Charges and Fees Schedule (approved through 10/11/2023), the Manufactured Housing Permit fee is a flat $200.00.

    City of St. Johns does not publish a plan-review timeline for this permit. Contact City of St. Johns City Hall — Planning and Zoning (Building Official designated under City Code) at (928) 337-4517 (City Hall main line); Fax (928) 337-2195 for current turnaround.

    You'll need: Manufactured Housing Permit Application. See the required-documents checklist on this page for details on each.

    Apply through City of St. Johns City Hall — Planning and Zoning (Building Official designated under City Code) at 70 E Commercial St (PO Box 455), St. Johns, AZ 85936. Phone: (928) 337-4517 (City Hall main line); Fax (928) 337-2195, email: Not publicly listed for Planning and Zoning / building permitting as of 2026-07-19; the City's website (stjohnsaz.gov) does not publish a department-specific email for this function. Contact via (928) 337-4517.. Office hours: Not published on the City's official website as of 2026-07-19 — confirm directly with City Hall at (928) 337-4517.. Official information: https://www.stjohnsaz.gov/.

    City of St. Johns, Arizona has adopted: City Code § 3-2-8 (Building Official) provides that 'The City Manager may designate or employ one or more officers and/or employees of the City of St. Johns to act as the Building Official ... to implement the provisions of the City of St. Johns Building Code and/or Uniform Code For The Abatement Of Dangerous Buildings' — confirming the City enforces its own locally-adopted Building Code, but the compiled City Code text (2014 codification, Rev. 2014.1, amended through 1-13-21) does not reprint that code's specific edition/year. The City Code's own ordinance-amendment index lists a '2003 Building Code adoption' entry (p. 121 of the printed code) as the most recent building-code-adoption ordinance identifiable in the compiled document; the underlying ordinance text itself was not retrievable in the compiled City Code docx obtained for this file.; The City's Zoning Ordinance (PZ-Code-1.pdf, 'Final Revised Zoning Ordinance of the City of St. Johns') references 'Uniform Building Code' (UBC) standards in at least two places (factory-built/modular building construction; pressure-treated wood post standards) — UBC is the code family the International Building Code (IBC) nationally superseded by the mid-2000s. This may be a stale cross-reference rather than confirmation that UBC (rather than a current IBC edition) is presently enforced.; The City's Rates, Charges and Fees Schedule (approved through 10/11/2023) ties commercial building permit fees to 'the most recent Building Valuation Data as published semiannually by the International Code Council,' which confirms the City currently operates within the ICC/International Code family for fee-calculation purposes, even though no specific IBC/IRC/IECC/IMC/IPC/NEC edition year is stated anywhere in the City Code, Zoning Ordinance, or Fee Schedule as retrieved.; No dedicated 'Codes Adopted' or 'Current Codes' page (of the kind some Arizona municipalities publish) exists on the City's current official website (stjohnsaz.gov) as of 2026-07-19 — confirmed by reviewing the site's full sitemap and department navigation, which lists no Building/Development Services department at all (see tipsAndGotchas).. Local amendments apply — see the City of St. Johns overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-19.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of St. Johns building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.