You are viewing the permanent link for the record currently in effect, published 2026-08-04.
Huachuca City building permits
VerifiedHuachuca City, Arizona — as published 2026-08-04.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family dwelling construction in Huachuca City. Reviewed against the 2018 IRC and Town of Huachuca City amendments. Applications are submitted on forms provided by the Town at the Building, Zoning & Floodplain Department (500 N. Gonzales Blvd).
Verified 2026-07-06 · Source
Requirements
- Building permit required before commencing any construction, enlargement, alteration, repair, demolition, or change of occupancy on property within Huachuca City, unless specifically exempted (Municipal Code § 15.60.010A)
- Applications for building permits must be made on forms provided by the Town; any required site plan review under Chapter 18.25 must be completed prior to building permit issuance (§ 15.60.010B)
- Plans must comply with the 2018 IRC and Town amendments, including Climatic and Geographic Design Criteria (115 mph wind, Exposure C; Seismic Design Category B; 18-20°F winter design temperature; very heavy termite potential; 0-inch frost line depth)
- Fire sprinklers are NOT required for one- and two-family dwellings (IRC § R309.5 and § R313 deleted by Town amendment)
- All accessory structures with a poured foundation require a concrete-encased electrode; service disconnecting means must be surface-mounted outside the structure, rated not less than 200 amperes 3-wire; aluminum conductors are prohibited Town-wide
- Building permits are valid for 180 days (renewable once for an additional 180 days at no charge); the entire project must be completed within one year of issuance or a new permit is required (§ 15.60.010C)
- Must conform to the Huachuca City zoning ordinance in addition to the adopted building code (§ 15.05.030)
Required documents
- RequiredBuilding Permit ApplicationTown-provided application form; as of the last verification the Town's online Forms & Applications page states all forms are 'temporarily unavailable online' while under review — request the current form by emailing hcgovforms@huachucacityaz.gov or calling 520-456-1354
- RequiredConstruction Plans / Site PlanPlans, specifications, and any other documents required to demonstrate compliance with the adopted 2018 IRC and Town amendments; any site plan review required under Chapter 18.25 must be completed before the building permit is issued
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (Proposed 2025/2026 Table) | $50.00 ($1-$1,000 valuation); $50 + $3.80 per additional $100 to $2,000; $88 + $17.65 per additional $1,000 to $25,000; $493.95 + $12.75 per additional $1,000 to $40,000; $685.20 + $9.50 per additional $1,000 to $100,000; $1,255.20 + $7.10 per additional $1,000 to $500,000; $4,095.20 + $6 per additional $1,000 to $1,000,000; $7,095.20 + $4.52 per additional $1,000 to $5,000,000; $25,175.20 + $1 per additional $1,000 above $5,000,000 | Per the Town's Notice of Intent to Increase Existing and Create New Fees for Building Permits, Plan Reviews and Related Services (proposed for Town Council consideration 12/11/2025, proposed… Show full citationHidePer the Town's Notice of Intent to Increase Existing and Create New Fees for Building Permits, Plan Reviews and Related Services (proposed for Town Council consideration 12/11/2025, proposed effective 01/01/2026 if approved; Wayback Machine snapshot 10/28/2025). NOT independently confirmed as formally adopted — no adopting resolution or post-effective-date fee schedule was locatable. Codified backstop: Municipal Code § 15.65.020 separately adopts ICC Building Valuation Data (Feb. 2009, 2006 IBC/IRC cycle) as an 'alternate' minimum-valuation floor-check, not the Town's actual current dollar chart. Confirm current fees directly with the Building Official before relying on these figures. |
| Required Plan Review Fee | 65% of the Building Permit Fee | Per the Town's proposed 2025/2026 fee table (unchanged from prior fee schedule) and Municipal Code § 15.05.020I / § 15.10.020F, which require plan review fees to reflect 'the fee schedule established by the Town,' collected at time of document submittal, before review begins. |
| Work Without a Permit (Homeowner) | Minimum $75 or 2x the otherwise-applicable Building Permit Fee | New fee per the Town's proposed 2025/2026 fee table; not independently confirmed as adopted. |
| Work Without a Permit (Contractor) | Minimum $150 or 2x the otherwise-applicable Building Permit Fee | New fee per the Town's proposed 2025/2026 fee table; not independently confirmed as adopted. |
| Board of Adjustments Appeal | $300 | New fee per the Town's proposed 2025/2026 fee table; not independently confirmed as adopted. Relevant because Municipal Code § 15.05.020K / § 15.10.020H route building-code appeals to the Town Board of Adjustment in the absence of an appointed board of appeals. |
Residential Addition / Remodel Permit
VerifiedRequired for room additions, remodels, and alterations to existing one- and two-family dwellings in Huachuca City, reviewed against the 2018 IRC as adopted and amended by the Town.
Verified 2026-07-06 · Source
Requirements
- Building permit required for room additions, remodels, and alterations affecting structural, electrical, mechanical, plumbing, or fire-safety conditions, unless specifically exempted under § 15.60.020
- Certain minor work is exempt from a building permit under § 15.60.020, including: painting, papering, tiling, carpeting, cabinets, countertops and similar finish work; minor electrical repair (lamp replacement, connecting portable equipment to approved receptacles); replacement of branch circuit overcurrent devices of required capacity in the same location; portable heating/cooking/clothes-drying appliances; replacement of any minor mechanical part that does not alter approval or safety; clearing of plumbing stoppages/leaks not requiring replacement of valves, pipes, or fixtures; roofing repairs/coatings not involving removal of roofing material to the decking
- Attic access opening protection supports must be non-combustible material (2018 IRC as amended, § R302.6.1); where a pull-down ladder is installed, it must be a fire-rated ladder assembly
- Garage/dwelling separation upgrades (5/8-inch Type X gypsum board, no windows in separation wall) apply to alteration work affecting that assembly
Required documents
- RequiredBuilding Permit ApplicationTown-provided application form; contact hcgovforms@huachucacityaz.gov or 520-456-1354 for the current form, as the online Forms & Applications page is temporarily unavailable as of the last verification
- RequiredSite Plan / Construction PlansShowing existing structure, addition/remodel footprint, and scope of work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (Proposed 2025/2026 Table) | Same valuation table as new residential construction ($50 at $1-$1,000 scaling to $25,175.20 + $1/additional $1,000 above $5,000,000) | Per the Town's proposed 2025/2026 Building Department fee table (Wayback Machine, 10/28/2025); not independently confirmed as formally adopted. Confirm with the Building Official before relying on these figures. |
| Required Plan Review Fee | 65% of the Building Permit Fee | Per the Town's proposed 2025/2026 fee table and Municipal Code § 15.10.020F. |
| Additional Plan Review (applicant changes/additions/revisions) | $70 per hour, 1-hour minimum | New/increased fee per the Town's proposed 2025/2026 fee table (up $11/hour from the prior rate); not independently confirmed as adopted. |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Huachuca City, governed by the 2020 National Electrical Code (NEC) as adopted and amended by the Town. Residential service entry replacement/upgrade is billed as a flat-rate trade permit under the Town's proposed 2025/2026 fee table.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for service upgrades/replacements, panel work, and other hard-wired electrical installations, subject to minor exemptions under § 15.60.020 (e.g., lamp replacement, portable equipment, low-voltage/25V-or-less wiring)
- Governed by the 2020 NEC as adopted by the Town, with extensive local amendments (§ 15.15.020): aluminum conductors are prohibited Town-wide; recessed service entries are NOT permitted — service disconnecting means and risers must be surface-mounted outside the structure; one-family dwelling service disconnecting means must be rated not less than 200 amperes, 3-wire (exception: existing structures)
- All accessory structures with a poured foundation require a concrete-encased electrode (NEC § 250.52(A)(3))
- Subpanels and low-voltage boxes may not be located in a firewall, fire barrier, fire partition, or the garage-side of a wall separating a dwelling from a garage/carport
- Smoke alarms and carbon monoxide alarms must originate from a general-purpose branch circuit, not a dedicated circuit
Required documents
- RequiredBuilding/Electrical Permit ApplicationTown-provided application form; contact hcgovforms@huachucacityaz.gov or 520-456-1354, as the online Forms & Applications page is temporarily unavailable as of the last verification
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Service Entry Replacement/Upgrade | $50.00 | New flat-rate trade permit fee per the Town's proposed 2025/2026 Building Department fee table (Wayback Machine, 10/28/2025); not independently confirmed as formally adopted. |
| Other Electrical Work (Based on Valuation) | Same valuation table as new construction ($50 at $1-$1,000 scaling to $25,175.20 + $1/additional $1,000 above $5,000,000), plus 65% Plan Review Fee | Per the Town's proposed 2025/2026 fee table; Municipal Code does not separately itemize most electrical work beyond the flat-rate service-entry category, so general electrical work is billed on the standard valuation table. |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Huachuca City, governed by the 2018 International Plumbing Code (IPC) as adopted and amended by the Town. Residential water heater replacement (like-for-like) and gas-pressure-check-only work are billed as flat-rate trade permits under the Town's proposed 2025/2026 fee table.
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping, subject to minor exemptions under § 15.60.020 (e.g., clearing stoppages/leaks not requiring replacement of valves/pipes/fixtures)
- Governed by the 2018 IPC as adopted by the Town
- All building sewers connecting to a private or public system must be a minimum of 12 inches below grade regardless of freezing conditions (IRC § P2603.5.1 as amended)
- Water softeners require a trap installed in the wall, terminating in an approved box (IRC § P3201.8, new by Town amendment)
Required documents
- RequiredBuilding/Plumbing Permit ApplicationTown-provided application form; contact hcgovforms@huachucacityaz.gov or 520-456-1354, as the online Forms & Applications page is temporarily unavailable as of the last verification
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Water Heater Replacement (like-for-like) | $50.00 | New flat-rate trade permit fee per the Town's proposed 2025/2026 Building Department fee table (Wayback Machine, 10/28/2025); not independently confirmed as formally adopted. |
| Gas Pressure Checks only (no other plumbing work) | $50.00 | New flat-rate trade permit fee per the Town's proposed 2025/2026 fee table; not independently confirmed as formally adopted. |
| Sewer Tap (Residential) | $200 | Unchanged fee per the Town's proposed 2025/2026 fee table (listed 'None' under $ increase, i.e., this figure predates and survives the 2025 proposal). |
| Sewer Tap (Commercial) | $300 | Unchanged fee per the Town's proposed 2025/2026 fee table. |
| Other Plumbing Work (Based on Valuation) | Same valuation table as new construction, plus 65% Plan Review Fee | Per Municipal Code § 15.05.020I and the Town's proposed 2025/2026 fee table; applies to plumbing scope beyond the specific flat-rate categories. |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in Huachuca City, governed by the 2018 International Mechanical Code (IMC) as adopted and amended by the Town.
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems, subject to minor exemptions under § 15.60.020 (e.g., portable heating/cooling/ventilation equipment, minor part replacement not affecting approval/safety)
- Governed by the 2018 IMC as adopted by the Town
- Mechanical systems in existing buildings undergoing repair, alteration, addition, or change of occupancy may comply with the IEBC in lieu of full IMC compliance (§ 15.35.020, exception 2)
- Duct installation may not be joined with screws or similar fasteners that protrude into the inside of the duct (IRC § M1502.4.2 / § G2439.7.2 as amended)
Required documents
- RequiredBuilding/Mechanical Permit ApplicationTown-provided application form; contact hcgovforms@huachucacityaz.gov or 520-456-1354, as the online Forms & Applications page is temporarily unavailable as of the last verification
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical/HVAC Work (Based on Valuation) | Same valuation table as new construction ($50 at $1-$1,000 scaling to $25,175.20 + $1/additional $1,000 above $5,000,000), plus 65% Plan Review Fee | Per the Town's proposed 2025/2026 fee table (Wayback Machine, 10/28/2025); no separate itemized flat-rate HVAC/AC-replacement fee line was found in the Town's Municipal Code or proposed fee table — mechanical work is billed on the standard valuation table. |
Demolition Permit
VerifiedRequired for demolition of any structure in Huachuca City, billed as a flat-rate trade permit under the Town's proposed 2025/2026 fee table.
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Huachuca City town limits (§ 15.60.010A covers demolition alongside construction, enlargement, alteration, repair, and change of occupancy)
- Must conform to the Huachuca City zoning ordinance in addition to the adopted building code (§ 15.05.030)
Required documents
- RequiredBuilding Permit Application (Demolition)Town-provided application form; contact hcgovforms@huachucacityaz.gov or 520-456-1354, as the online Forms & Applications page is temporarily unavailable as of the last verification
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition | $50.00 | New flat-rate trade permit fee per the Town's proposed 2025/2026 Building Department fee table (Wayback Machine, 10/28/2025); not independently confirmed as formally adopted. |
Manufactured Home Anchoring and Skirting Permit
VerifiedRequired for placement of manufactured/mobile homes within Huachuca City town limits, in addition to the separate State of Arizona-mandated installation permit. The Town charges its own local anchoring/skirting fee layered on top of the state process.
Verified 2026-07-06 · Source
Requirements
- Construction/installation standards for the manufactured home itself are regulated directly by the State of Arizona (Department of Fire, Building and Life Safety / Office of Manufactured Housing, A.R.S. § 41-4001 et seq.)
- Huachuca City charges its own local 'Manufactured Home Anchoring and Skirting' fee IN ADDITION TO the State-mandated installation fee, confirming the Town issues a separate local placement/anchoring permit
- Must conform to the Huachuca City zoning ordinance in addition to the adopted building code (§ 15.05.030)
Required documents
- RequiredBuilding Permit Application (Manufactured Home)Town-provided application form; contact hcgovforms@huachucacityaz.gov or 520-456-1354, as the online Forms & Applications page is temporarily unavailable as of the last verification
- RequiredState of Arizona Manufactured Home Installation PermitSeparate state-level installation permit/insignia required from the Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing, independent of the Town's local anchoring/skirting permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Manufactured Home Anchoring and Skirting | $350.00 | New flat-rate trade permit fee per the Town's proposed 2025/2026 Building Department fee table (Wayback Machine, 10/28/2025), explicitly 'in addition to State Mandated Installation Fee'; not independently confirmed as formally adopted. |
Solar Photovoltaic (PV) Permit
VerifiedRequired for rooftop or ground-mounted solar photovoltaic installations in Huachuca City. The Town's own proposed 2025/2026 Building Department fee table (the Town's most current, granular fee document) contains no separate solar-specific fee line item — solar is billed under the same general valuation-based Building Permit Fee table used for all other construction, plus a separate Electrical Permit for the interconnection. Arizona A.R.S. § 9-468 statewide caps municipal solar permit/plan-check fees at the actual cost of issuing the permit.
Verified 2026-07-20 · Source
Requirements
- Building permit required for the structural/mounting portion before commencing solar installation, per Municipal Code § 15.60.010A
- Plans must comply with the 2018 IRC/IBC and Town amendments, including Climatic and Geographic Design Criteria (115 mph wind, Exposure C; Seismic Design Category B) for the racking/mounting structural design
- Electrical interconnection reviewed against the 2020 NEC as adopted and amended by the Town (§ 15.15.010), including the Town-wide prohibition on aluminum conductors and the requirement that service disconnecting means be surface-mounted outside the structure (recessed service entries are not permitted)
- Per A.R.S. § 9-468 (statewide Arizona solar-permit statute), the Town may not charge a solar permit/plan-check fee exceeding the actual cost of issuing the permit, must provide a written itemized cost breakdown on request, and may not require an engineering stamp without a written explanation of why one is necessary
- Building permits are valid for 180 days (renewable once for an additional 180 days at no charge); the entire project must be completed within one year of issuance (§ 15.60.010C)
Required documents
- RequiredBuilding Permit ApplicationTown-provided application form; as of the last verification the Town's online Forms & Applications page states all forms are 'temporarily unavailable online' — request the current form by emailing hcgovforms@huachucacityaz.gov or calling 520-456-1354
- RequiredSolar Plan Set (panel layout, racking/mounting details, one-line electrical diagram)Plans sufficient to demonstrate compliance with the 2018 IRC/IBC (structural) and 2020 NEC (electrical interconnection) as adopted and amended by the Town
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (Proposed 2025/2026 Table) | $50.00 ($1-$1,000 valuation); $50 + $3.80 per additional $100 to $2,000; $88 + $17.65 per additional $1,000 to $25,000; $493.95 + $12.75 per additional $1,000 to $40,000; $685.20 + $9.50 per additional $1,000 to $100,000; $1,255.20 + $7.10 per additional $1,000 to $500,000; $4,095.20 + $6 per additional $1,000 to $1,000,000; $7,095.20 + $4.52 per additional $1,000 to $5,000,000; $25,175.20 + $1 per additional $1,000 above $5,000,000 | From the Town's Notice of Intent to Increase Existing and Create New Fees for Building Permits, Plan Reviews and Related Services (proposed for Town Council consideration 12/11/2025, proposed effective 01/01/2026; Show full citationHideFrom the Town's Notice of Intent to Increase Existing and Create New Fees for Building Permits, Plan Reviews and Related Services (proposed for Town Council consideration 12/11/2025, proposed effective 01/01/2026; Wayback Machine snapshot 10/28/2025). No published document confirms formal adoption, so treat these as proposed figures. The fee table carries no distinct 'Solar' line item — solar is billed on the general valuation schedule, subject to the A.R.S. § 9-468 statewide cap that the fee not exceed the actual cost of issuing the permit. |
| Required Plan Review Fee | 65% of the Building Permit Fee | Per the Town's proposed 2025/2026 fee table and Municipal Code § 15.05.020I / § 15.10.020F |
| Other Electrical Work (interconnection, based on valuation) | Same valuation table as new construction, plus 65% Plan Review Fee | No dedicated flat solar-electrical fee line was found on the Town's proposed 2025/2026 fee table (which does itemize a $50 flat 'Residential Service Entry Replacement/Upgrade' category, but not solar… Show full citationHideNo dedicated flat solar-electrical fee line was found on the Town's proposed 2025/2026 fee table (which does itemize a $50 flat 'Residential Service Entry Replacement/Upgrade' category, but not solar specifically) — general electrical work is billed on the standard valuation table |
EV Charger / EVSE Permit
VerifiedHuachuca City has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. The Town's proposed 2025/2026 Building Department fee table contains no EV/EVSE-specific line item, though it does itemize a flat $50 'Residential Service Entry Replacement/Upgrade' category for related electrical service work. An EV charger circuit is billed under the Town's general valuation-based Building Permit Fee table (the lowest tier, $1-$1,000 valuation, is a flat $50), plus a separate Electrical Permit for the wiring, both under the 2020 NEC as adopted and amended by the Town. Unlike solar (A.R.S. § 9-468, which caps municipal solar permit fees statewide at the actual cost of issuance), no comparable Arizona statute capping EV charger permit fees specifically has been identified.
Verified 2026-07-20 · Source
Requirements
- Electrical Permit required for the EV charger circuit installation, per Municipal Code § 15.15.010 (2020 NEC as adopted and amended by the Town)
- No EV/EVSE-specific fee line exists on the Town's fee table -- a standard install falls under the general valuation-based Building Permit Fee table (flat $50 for $1-$1,000 valuation) or the closely analogous flat $50 'Residential Service Entry Replacement/Upgrade' category if the install involves a service upgrade
- Electrical work must comply with the Town-wide prohibition on aluminum conductors and the requirement that service disconnecting means be surface-mounted outside the structure (recessed service entries are not permitted)
- Building/electrical permits are valid for 180 days (renewable once for an additional 180 days at no charge); the entire project must be completed within one year of issuance (§ 15.60.010C)
Required documents
- RequiredBuilding/Electrical Permit ApplicationTown-provided application form; as of the last verification the Town's online Forms & Applications page states all forms are 'temporarily unavailable online' -- request the current form by emailing hcgovforms@huachucacityaz.gov or calling 520-456-1354
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee -- Based on Valuation, $1-$1,000 (applies to a standard EV charger circuit install) | $50.00 | Per the Town's Notice of Intent to Increase Existing and Create New Fees for Building Permits (proposed for Town Council consideration 12/11/2025, proposed effective 01/01/2026) — treat these as proposed figures. The fee table carries no distinct EV/EVSE line item. |
| Residential Service Entry Replacement/Upgrade (if the install requires a service upgrade) | $50.00 | Town of Huachuca City 2025 Building Dept Fee Table -- closest analogous flat-fee electrical category; not itself an EV-specific line item |
| Required Plan Review Fee | 65% of the Building Permit Fee | Per the Town's proposed 2025/2026 fee table and Municipal Code § 15.05.020I / § 15.10.020F |
Commercial Building Permit
VerifiedRequired for new commercial building construction and for alterations, remodels, tenant improvements, and repairs to existing commercial buildings within Huachuca City town limits. Reviewed against the 2018 IBC (Municipal Code § 15.05.010/§ 15.05.020) as adopted and locally amended by the Town of Huachuca City -- the Town runs its OWN independent Building, Zoning & Floodplain Department and does NOT defer commercial building permitting to Cochise County. Tenant improvement work is NOT a separate permit type here: Municipal Code § 15.60.010A defines the building-permit trigger as a single undifferentiated category -- 'any construction, enlargement, alteration, repair, demolition or change of occupancy' -- and neither the codified Building Permit Fees chapter (§ 15.65.010, which states fees simply 'reflect the fee schedule established by the Town') nor the Town's proposed 2025/2026 Building Department fee table contains a distinct tenant-improvement fee line, application track, or review-timeline row of the kind some other AZ jurisdictions publish (e.g., Florence, AZ's named 'Commercial Tenant Improvement' vs. 'Commercial New Construction' rows). New commercial construction and commercial TI/alteration work are billed identically on the same valuation-based Building Permit Fee schedule.
Verified 2026-08-01 · Source
Requirements
- Building permit required before commencing any commercial construction, enlargement, alteration, repair, demolition, or change of occupancy on property within Huachuca City, unless specifically exempted (Municipal Code § 15.60.010A) -- the same code section and permit category governs both new commercial construction and tenant-improvement/alteration work; no separate commercial-TI trigger or exemption list exists
- Applications for building permits must be made on forms provided by the Town; any required site plan review under Chapter 18.25 must be completed prior to building permit issuance (§ 15.60.010B)
- Reviewed against the 2018 IBC as adopted by reference and locally amended (§ 15.05.010, § 15.05.020, Ord. 22-01), plus the Arizonans with Disabilities Act / ADA Accessibility Guidelines for Buildings and Facilities, adopted as a Building Code amendment specifically applying to 'public accommodations and commercial facilities' for new construction and alterations commenced after September 3, 1996 (§ 15.05.040)
- An approved automatic fire sprinkler system is required in ALL new commercial buildings and structures of all sizes, approved by the Fire Code Official and installed by an Arizona State-licensed Fire Protection contractor (IBC § 903.2 as amended by Town Ord. 22-01) -- subject to Exception 1 (Group U occupancies), Exception 2 (buildings constructed and in use before January 8, 2009, unless later vacant 12+ months, put to a less-restrictive use, or enlarged/structurally altered), and Exception 3 (Fire Chief discretionary exemptions for specific small/unenclosed/temporary/mini-self-storage facility types)
- Climatic and Geographic Design Criteria apply to structural design the same as residential construction (115 mph wind speed, Exposure Category C, Seismic Design Category B, 0-inch frost line depth), per the 2018 IBC as adopted
- Building permits are valid for 180 days (renewable once for an additional 180 days at no additional charge or review); the entire project must be completed within one year of permit issuance, after which a new building permit is required (§ 15.60.010C)
- Must conform to the Huachuca City zoning ordinance in addition to the adopted building code (§ 15.05.030)
Required documents
- RequiredBuilding Permit ApplicationTown-provided application form — the same single form used for all permit types in Huachuca City. The Town's online Forms & Applications page states all forms are 'temporarily unavailable online' while under review, so request the current form by emailing hcgovforms@huachucacityaz.gov or calling 520-456-1354. Whether that form carries distinct commercial or tenant-improvement options, as Florence's single form does with its 'New Build'/'Tenant Improvement' checkboxes, cannot be determined while the form is offline — ask when you request it.
- RequiredConstruction Plans / Site PlanPlans, specifications, and any other documents required to demonstrate compliance with the adopted 2018 IBC and Town amendments; any site plan review required under Chapter 18.25 must be completed before the building permit is issued
- OptionalFire Sprinkler System PlansRequired for new commercial construction subject to the Town's automatic-fire-sprinkler mandate (IBC § 903.2 as amended); must be prepared for installation by an Arizona State-licensed Fire Protection contractor and approved by the Fire Code Official, unless a stated exception applies
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial Building Permit Fee -- Based on Valuation (Proposed 2025/2026 Table) | $50.00 ($1-$1,000 valuation); $50 + $3.80 per additional $100 to $2,000; $88 + $17.65 per additional $1,000 to $25,000; $493.95 + $12.75 per additional $1,000 to $40,000; $685.20 + $9.50 per additional $1,000 to $100,000; $1,255.20 + $7.10 per additional $1,000 to $500,000; $4,095.20 + $6 per additional $1,000 to $1,000,000; $7,095.20 + $4.52 per additional $1,000 to $5,000,000; $25,175.20 + $1 per additional $1,000 above $5,000,000 | The 'HC BUILDING DEPT 2025 NEW FEE TABLE' has no separate commercial valuation column and no trade-specific commercial building-fee line — the same Total Valuation / Building Permit Fees schedule… Show full citationHideThe 'HC BUILDING DEPT 2025 NEW FEE TABLE' has no separate commercial valuation column and no trade-specific commercial building-fee line — the same Total Valuation / Building Permit Fees schedule applies to all construction types. These figures come from the Town's Notice of Intent to Increase Existing and Create New Fees for Building Permits, Plan Reviews and Related Services (proposed for Town Council consideration 12/11/2025, proposed effective 01/01/2026 if approved). No adopting resolution or post-effective-date fee-schedule page confirms formal adoption, so treat these as proposed figures and confirm current fees with the Building Official before relying on them. |
| Required Plan Review Fee | 65% of the Building Permit Fee | Per the Town's proposed 2025/2026 fee table and Municipal Code § 15.05.020I, which requires plan review fees to reflect 'the fee schedule established by the Town,' collected at time of document… Show full citationHidePer the Town's proposed 2025/2026 fee table and Municipal Code § 15.05.020I, which requires plan review fees to reflect 'the fee schedule established by the Town,' collected at time of document submittal, before review begins. No distinct commercial plan-review percentage was found -- confirmed identical to the residential rate by direct read of the fee-table PDF. |
| Additional Plan Review (applicant changes/additions/revisions) | $70 per hour, 1-hour minimum | Per the Town's proposed 2025/2026 fee table (up $11/hour from the prior rate); applies to any permit type including commercial. Not independently confirmed as adopted. |
| Sewer Tap (Commercial) | $300 | A flat fee on the Town's fee table, distinct from the $200 Residential Sewer Tap fee; it applies if a commercial project requires a new sewer connection. |
| Work Without a Permit (Contractor) | Minimum $150 or 2x the otherwise-applicable Building Permit Fee | New fee per the Town's proposed 2025/2026 fee table; not independently confirmed as adopted. Commercial construction is typically performed by licensed contractors, so the contractor (rather than homeowner) rate would generally apply. |
| Board of Adjustments Appeal | $300 | New fee per the Town's proposed 2025/2026 fee table; not independently confirmed as adopted. Municipal Code § 15.05.020K routes building-code appeals (including commercial) to the Town Board of Adjustment in the absence of an appointed board of appeals. |
Sign Permit
VerifiedRequired for most permanent and non-exempt signs in Huachuca City under Municipal Code Title 18 (Zoning), Chapter 18.110 (Sign Regulations), adopted via Ord. 19-03 (2019). The Town Building Official must approve a sign application before construction, alteration, or relocation. Per § 18.110.080D, the sign permit fee is collected 'in accordance with the schedule adopted by council' -- Chapter 18.110 itself sets no dollar figure. Confirmed by direct read of the Town's proposed 2025/2026 Building Department fee table: it contains no distinct 'Sign' fee line item, so sign permits are billed under the same general valuation-based Building Permit Fee table used for other construction, the same treatment already documented in this record for solar and EV-charger permits.
Verified 2026-08-04 · Source
Requirements
- No sign may be erected, re-erected, constructed, or altered except as provided by Chapter 18.110; a separate permit is required for each business entity's sign(s) and/or for each group of sign panels on a single supporting structure (§ 18.110.080)
- Permits may include structural, electrical, or other plan review as determined by Title 15, Buildings and Construction (§ 18.110.080)
- Examples requiring a permit: a newly constructed sign (footing, pole, frame, cabinet, electric, illumination, sign face); a permanently installed in-ground flagpole; any repair/renovation that changes a sign's height, area, or location (§ 18.110.080A)
- Exceptions -- no permit required, but the sign remains subject to all other applicable Chapter 18.110 provisions: signs required under § 18.110.070; any sign under 7 square feet not otherwise prohibited/required to have a permit; signs not visible from the public right-of-way or between properties; vehicle signs (§ 18.110.140(F)); window signs (§ 18.110.240); temporary signs specifically identified in § 18.110.260 as not requiring a permit; seasonal decorations; normal repair/maintenance/painting; a business-name or wording face change (unless on a legal nonconforming sign, where the face change may not expand the nonconformity); government signs; and signs protected by Arizona Revised Statutes (§ 18.110.080B)
- Applications are submitted to the Building Inspection Department with complete plans: size, materials, method of support/attachment, name/address of the designer, and a plot plan showing the sign's location on the premises; the Town Building Official must approve the application before the sign is constructed, reconstructed, altered, repaired, used, or changed (§ 18.110.080C.1)
- A denied permit may be appealed to the Board of Adjustment within 30 days of denial, per the appeal procedure in Title 15 (§ 18.110.080C.1)
- If work has not commenced within one year of permit issuance, the permit becomes null and void (§ 18.110.080C.2)
- All signs must be designed and constructed in conformance with the Huachuca City adopted building code (§ 18.110.120), and must comply with location restrictions, area/height calculations, prohibited-sign provisions, and zoning-district-specific standards elsewhere in Chapter 18.110 (§§ 18.110.140-.220)
Required documents
- RequiredSign Permit ApplicationTown-provided application through the Building Inspection Department; as of the last verification the Town's online Forms & Applications page states all forms are 'temporarily unavailable online' while under review -- request the current form by emailing hcgovforms@huachucacityaz.gov or calling 520-456-1354
- RequiredSign Plans and SpecificationsFull dimensioned plans showing size, materials, method of support/attachment, designer's name and address, and a plot plan showing the sign's location on the premises, per § 18.110.080C.1
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Fee (Building Permit Fee -- Based on Valuation) | $50.00 ($1-$1,000 valuation); $50 + $3.80 per additional $100 to $2,000; $88 + $17.65 per additional $1,000 to $25,000; $493.95 + $12.75 per additional $1,000 to $40,000; $685.20 + $9.50 per additional $1,000 to $100,000; $1,255.20 + $7.10 per additional $1,000 to $500,000; $4,095.20 + $6 per additional $1,000 to $1,000,000; $7,095.20 + $4.52 per additional $1,000 to $5,000,000; $25,175.20 + $1 per additional $1,000 above $5,000,000 | Municipal Code § 18.110.080D states the sign permit fee is charged 'in accordance with the schedule adopted by council' but sets no dollar figure of its own. Show full citationHideMunicipal Code § 18.110.080D states the sign permit fee is charged 'in accordance with the schedule adopted by council' but sets no dollar figure of its own. Confirmed by direct read of the live 'HC BUILDING DEPT 2025 NEW FEE TABLE' PDF: no distinct 'Sign' line item exists anywhere on the table, so a sign permit defaults to the Town's general valuation-based Building Permit Fee schedule, per the Town's proposed 2025/2026 fee table (Wayback Machine snapshot 10/28/2025) -- itself NOT independently confirmed as formally adopted. Confirm current fees with the Building Official before relying on these figures. |
| Required Plan Review Fee | 65% of the Building Permit Fee | Per the Town's proposed 2025/2026 fee table (Non-Specific Building Fees) and Municipal Code § 15.05.020I / § 15.10.020F; applies to a sign permit the same as any other building-permit-triggering work, since Chapter 18.110 does not itemize its own plan-review fee. |
Fire Sprinkler and Fire Alarm System Permit
Huachuca City has no municipal fire department and has not locally adopted the International Fire Code in its own Municipal Code (Title 15, Chapters 15.05-15.80, contains no Fire Code chapter). Per the Town's own official website, 'The Town of Huachuca City has contracted out with the Fry Fire [District] to provide fire and first response services to the residents of our community,' with a Town-listed Fire Chief (Mark Savage) at 502 Gonzales Blvd. Fry Fire District's own website confirms it operates a Fire Prevention Office (Deputy Chief/Fire Marshal Billy Seamans) that reviews 'all commercial permit applications... for conformance to the [2018 International Fire Code as adopted by the Fry Fire District Governing Board],' including plan review for 'the installation of fire suppression and detection systems,' at a published flat fee. Neither the Town's own website nor Fry Fire District's website explicitly names Huachuca City on the fire-permitting pages themselves, and Fry Fire District's own 'Permit and Plan Review Services' page states its process is 'performed in conjunction with the Cochise County Building Departments' permitting process' -- language that does not cleanly describe Huachuca City's own independent Building Department. This entry is reported at 'partial' confidence because of that jurisdictional-integration gap; the underlying facts (contracted fire-service relationship, Fry Fire's adopted code and published fee) are each independently confirmed from the two agencies' own official websites.
Reviewed 2026-08-04 · Source
Requirements
- Fire code enforcement, plan review, and inspection for Huachuca City's contracted fire-service area is performed by Fry Fire District's Fire Prevention Office, not a Town of Huachuca City department; Huachuca City itself has adopted no Fire Code chapter in Title 15 of its own Municipal Code
- Governed by the 2018 International Fire Code (IFC) as adopted by the Fry Fire District Governing Board, with local amendments in the code's Appendix A (an administrative Board of Appeals procedure, per Fry Fire District's own Fire Code page)
- All commercial permit applications, including new construction and the installation of fire suppression (sprinkler) and detection (alarm) systems, are reviewed by the Fry Fire District Fire Prevention Office for conformance to the fire code
- Contractors submit three sets of plans to the fire suppression/prevention office in person; fees must also be presented in person at Fry Fire District's office (4817 Apache Ave., Sierra Vista, AZ 85650)
- Automatic fire sprinkler systems are also independently required by the Town's own amended IBC § 903.2 (Huachuca City Municipal Code § 15.05.020, Ord. 22-01) for all new commercial buildings of any size (subject to exceptions), and must be 'approved by the Fire Code Official and installed by an Arizona State-licensed Fire Protection contractor' -- neither the Town's own code nor Fry Fire District's website explicitly identifies the Fry Fire Marshal by name as fulfilling the Town's 'Fire Code Official' role, though this is the operationally consistent inference given the contracted-service relationship
- Residential fire sprinklers are NOT required in Huachuca City (IRC § R309.5/§ R313 deleted by Town amendment), so this permit type is primarily relevant to commercial construction and any voluntary residential fire alarm/detection work
- The underlying construction project also remains subject to the Town of Huachuca City's own building permit under § 15.60.010A (construction/alteration/repair), since Huachuca City's code contains no explicit 'deferred submittal' provision comparable to some other AZ jurisdictions -- coordinate the Fry Fire District permit with the Town Building Official
Required documents
- RequiredFry Fire District Permit and Plan Review ApplicationSubmitted in person, with three sets of plans, to the Fry Fire District Fire Prevention Office (4817 Apache Ave., Sierra Vista, AZ); covers commercial permit applications generally, including fire suppression and detection system installations
- RequiredFire Sprinkler / Fire Alarm System Plans and SpecificationsPlans sufficient to demonstrate compliance with the 2018 IFC as adopted and amended by the Fry Fire District Governing Board
- RequiredTown of Huachuca City Building Permit ApplicationUnderlying Town building permit for the overall construction project, per Municipal Code § 15.60.010A; as of the last verification the Town's Forms & Applications page states forms are 'temporarily unavailable online' -- contact hcgovforms@huachucacityaz.gov or 520-456-1354
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fry Fire District Permit Review | $30.00 flat | Fry Fire District's 'Permit and Plan Review Services' page (fryfiredistrictaz.gov) states: 'Fees are collected in accordance with the approved fee schedule and are currently $30.00 for a permit… Show full citationHideFry Fire District's 'Permit and Plan Review Services' page (fryfiredistrictaz.gov) states: 'Fees are collected in accordance with the approved fee schedule and are currently $30.00 for a permit review.' That is a general commercial permit review fee, which the district says covers fire suppression and detection system installations along with other commercial work. The district does not publish separate amounts for sprinkler-only versus alarm-only permits, so confirm your scope with Fry Fire District before budgeting. |
| Fry Fire District Full Plan Review | $0.20 per square foot | Per Fry Fire District's 'Permit and Plan Review Services' page, fetched directly 2026-08-04, for 'a full plan review,' applicable to new construction and fire suppression/detection system installations. |
| Town of Huachuca City fire-specific fee | None found | Confirmed by direct read of the live 'HC BUILDING DEPT 2025 NEW FEE TABLE' PDF: the Town's own fee table contains zero fire-sprinkler, fire-alarm, or fire-code-related line items. Show full citationHideConfirmed by direct read of the live 'HC BUILDING DEPT 2025 NEW FEE TABLE' PDF: the Town's own fee table contains zero fire-sprinkler, fire-alarm, or fire-code-related line items. All fire-system permit fees identified for this jurisdiction are paid to Fry Fire District, not the Town; a separate Town building permit fee (valuation-based) would still apply to the underlying construction project. |
Change of Use / Change of Occupancy Permit
VerifiedHuachuca City has no standalone Change of Use or Change of Occupancy permit -- it is handled under the general building permit. Municipal Code § 15.60.010A folds 'change of occupancy' into the same permit trigger as new construction, enlargement, alteration, repair and demolition, one undifferentiated category (tenant improvements work the same way). Neither the codified fee chapter (§ 15.65.010/.020) nor the proposed 2025/2026 Building Department fee table carries a separate Change-of-Occupancy or Certificate-of-Occupancy fee line, unlike Apache Junction, which publishes a $150 'Change of Occupancy, no work proposed' fee. Budget the standard building permit fee and confirm scope with the Town before you apply.
Verified 2026-08-04 · Source
Requirements
- A building permit -- not a separately named 'change of use' permit -- is required whenever a building or space's occupancy classification changes, per Municipal Code § 15.60.010A, which lists 'change of occupancy' as an independent trigger alongside construction, enlargement, alteration, repair, and demolition; this applies even where no construction work is otherwise proposed, since the section does not condition the 'change of occupancy' trigger on accompanying construction
- The substantive standards a use/occupancy change must meet come from the adopted 2018 IBC (§ 15.05.010) and 2018 IEBC (§ 15.20.010, adopted 'for all buildings and structures not covered under the International Building Code'); Huachuca City's own local amendments to those codes (§ 15.05.020, § 15.20.020) do not add or modify any change-of-occupancy-specific provision -- the unamended IBC/IEBC change-of-occupancy and Certificate of Occupancy provisions apply as adopted
- Must conform to the Huachuca City zoning ordinance in addition to the adopted building code (§ 15.05.030) -- a use change may also require verification that the new use is permitted in the applicable zoning district under Title 18
- Applications are made on the same Town-provided building permit forms used for all permit types; the online Forms & Applications page states forms are 'temporarily unavailable online' as of the last verification (contact hcgovforms@huachucacityaz.gov or 520-456-1354)
- Building permits, including a change-of-occupancy permit, are valid for 180 days and may be renewed once for an additional 180 days at no charge; the project must be completed within one year of issuance (§ 15.60.010C)
Required documents
- RequiredBuilding Permit Application (Change of Occupancy)The same single Town-provided building permit application form used for all permit types in Huachuca City -- no dedicated Change-of-Use-only application variant was located; as of the last verification the online Forms & Applications page states forms are 'temporarily unavailable online' -- contact hcgovforms@huachucacityaz.gov or 520-456-1354
- RequiredPlans/Documentation Demonstrating Code Compliance for New OccupancySufficient to demonstrate the space complies with the 2018 IBC and 2018 IEBC (as adopted and amended by the Town) for the proposed new occupancy classification; unlike Apache Junction, no standalone 'Change of Use' explanation or checklist document was found published by Huachuca City
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Change of Occupancy / Building Permit Fee -- Based on Valuation | Same valuation table as new construction ($50 at $1-$1,000 scaling to $25,175.20 + $1/additional $1,000 above $5,000,000), if construction value is involved | Confirmed by direct read of the live 'HC BUILDING DEPT 2025 NEW FEE TABLE' PDF: no distinct Change-of-Occupancy, Certificate-of-Occupancy, or 'Occupancy' fee line exists anywhere on the table --… Show full citationHideConfirmed by direct read of the live 'HC BUILDING DEPT 2025 NEW FEE TABLE' PDF: no distinct Change-of-Occupancy, Certificate-of-Occupancy, or 'Occupancy' fee line exists anywhere on the table -- unlike Apache Junction, which itemizes a $150 'Change of Occupancy, no work proposed or required' fee plus separate Certificate of Occupancy tiers. For a Huachuca City change of occupancy involving no construction value, no distinct fee mechanism was found published; confirm the applicable minimum fee directly with the Building Official before applying. |
| Required Plan Review Fee | 65% of the Building Permit Fee | Per Municipal Code § 15.05.020I / § 15.10.020F and the Town's proposed 2025/2026 fee table, if plan review of the space is required for the new occupancy classification. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Huachuca City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.