Willcox building permits

Verified

Willcox, Arizona — as published 2026-07-07.

Verified 2026-07-07 · Source

Codes adopted

Arizona has no statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The City of Willcox is a home-rule city that independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division; it does not defer building permitting to Cochise County. Source: Willcox Municipal Code § 10.01.020 (Building inspector) and § 10.01.040 (Adoption by Reference of International Technical Codes), American Legal Publishing code library (current through Ord. NS374, 2026).2018 International Building Code (IBC), as amended in Exhibit A to Ordinance NS374, adopted by reference (Willcox Municipal Code § 10.01.040.A). Per the City's Building Permits page, the newly adopted 2018 ICC code suite and 2017 NEC become effective and required for all applicable permit applications submitted on or after April 1, 2026; permit applications submitted before that date remain on the City's prior code cycle. Source: Willcox Municipal Code § 10.01.040; City of Willcox Building Permits page (willcox.az.gov/building-permits); '2018 Building Codes Adoption with Amendments' (Exhibits A-J to Ord. NS374).2018 International Residential Code (IRC), as amended in Exhibit B to Ordinance NS374, adopted by reference (§ 10.01.040.B), effective for applications submitted on/after April 1, 2026.2018 International Mechanical Code (IMC), as amended in Exhibit C to Ordinance NS374, adopted by reference (§ 10.01.040.C).2018 International Plumbing Code (IPC), as amended in Exhibit D to Ordinance NS374, adopted by reference (§ 10.01.040.D), including a locally-inserted Water Conservation Code appendix (see localAmendments).2017 National Electrical Code (NEC), as amended in Exhibit E to Ordinance NS374, adopted by reference (§ 10.01.040.E), published by the National Fire Protection Association — one edition behind the 2018 ICC cycle, consistent with standard NFPA/ICC release-cycle offset.2018 International Fuel Gas Code (IFGC), as amended in Exhibit F to Ordinance NS374, adopted by reference (§ 10.01.040.F).2018 International Fire Code (IFC), as amended in Exhibit G to Ordinance NS374, adopted by reference (§ 10.01.040.G) as the City's uniform fire code, administered by the Building Safety Division under the Community Development Department (fire-code-official references are replaced by 'Building Official' per the City's amendment).2018 International Swimming Pool and Spa Code (ISPSC), as amended in Exhibit H to Ordinance NS374, adopted by reference (§ 10.01.040.H); most public/semipublic pool provisions are deleted and replaced with a reference to Arizona Administrative Code Title 18, Chapter 5, Article 2 and A.R.S. § 36-1681.2018 International Existing Building Code (IEBC), as amended in Exhibit I to Ordinance NS374, adopted by reference (§ 10.01.040.I).1997 Uniform Code for the Abatement of Dangerous Buildings (UCADB), as amended (no amendments) in Exhibit J to Ordinance NS374, adopted by reference (§ 10.01.040.J), published by the International Conference of Building Officials (ICBO).Uniform Standard Details and Specifications for Public Works Construction, developed by the Maricopa Association of Governments (MAG) and adopted by reference as the City's own public-works construction standard, with 'City of Willcox' substituted for 'Maricopa Association of Governments'/'Maricopa County' throughout (Willcox Municipal Code § 10.01.060; Ord. NS289 § 2, 2008; made public record by Resolution No. 2008-74).Manufactured homes, mobile homes, and factory-built buildings: construction/installation standards are regulated directly by the State of Arizona (Department of Fire, Building and Life Safety / Office of Manufactured Housing, A.R.S. § 41-4001 et seq.); the City separately charges a $400.00 Manufactured Homes fee and $90.00 Factory Built Buildings fee under its own Development Services Fee Schedule (Table, Other Fees), confirming the City issues its own local placement permit layered on the state process. Source: City of Willcox Development Services Fee Schedule (Resolution No. 2006-10 / 2008-75), Section F.Whether a Registered Design Professional (architect/engineer per A.R.S. Title 32) is required to prepare and stamp plans is governed entirely by state law, not city ordinance — the City has published a dedicated 'Requirement for Architect or Engineer' guidance document explaining the A.R.S. § 32-144 factors (building size ≤3,000 sq ft, occupant load <21, structural spans ≤20 ft) and giving worked examples; residential (detached single-family) construction is exempt from the RDP requirement under A.R.S. § 32-144(A)(3). Source: City of Willcox 'When is a Registered (Licensed) Architect or Engineer Required for a Building Project' (Community Development Department / Building Safety Division).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family and two-family dwelling construction in the City of Willcox. Reviewed against the 2018 IRC and City of Willcox amendments (Exhibit B to Ordinance NS374), effective for applications submitted on/after April 1, 2026. Applications are submitted via the City's online iWorQ Building Permit Application portal or in person at City Hall/Visitor Center.

Verified 2026-07-07 · Source

Requirements

  • Building permit required for new single-family and two-family dwelling construction within Willcox city limits (Willcox Municipal Code § 10.01.010, § 10.01.040)
  • Plans must comply with the 2018 IRC and City of Willcox amendments, including Climatic and Geographic Design Criteria (90 mph wind; Seismic Design Category C; 0-inch ground snow load and frost line depth; 15°F winter design temperature; moderate-to-heavy termite potential)
  • New single-family residences on a water-company connection require a pressure-reducing valve (PRV) capped at 60 psi (wells/well-shares exempt)
  • Termite soil pretreatment required beneath any slab foundation by an Arizona Structural Pest Control Commission-licensed applicator prior to the concrete pour
  • Submittal via the online iWorQ Building Permit Application portal (willcox.portal.iworq.net/WILLCOX/new-permit/600/5244), which requires project address/parcel number, applicant and property-owner information, an A.R.S. Title 32 contractor-licensing/exemption declaration, description of work, and value of work
  • Construction documents must be uploaded as PDFs per the City's Building Plan Guidelines (site plan, floor plan, elevations, building sections, foundation, framing, structural details, electrical/mechanical/plumbing/gas schematics); a Registered Design Professional stamp is not required for a detached single-family dwelling under A.R.S. § 32-144(A)(3)
  • All contractors must hold a City of Willcox business license before the building permit will be signed
  • Permit valid 180 days from issuance or last requested inspection; one 180-day extension available for just cause on written request

Required documents

  • RequiredBuilding Permit Application (Online, iWorQ Portal)City of Willcox Development Services Department web form covering project address/parcel, applicant/owner information, A.R.S. Title 32 contractor licensing or exemption declaration, description and value of work, and e-signature; submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244
  • RequiredConstruction Plans / Site PlanPer the City's Building Plan Guidelines: site plan, floor plan, elevations, building sections, foundation plan, roof/framing plan, structural details, electrical (schematic + load calcs), mechanical (schematic), and plumbing/gas (schematic) plans, submitted as PDFs
  • RequiredResidential Plan Requirements ChecklistCity of Willcox submittal checklist (updated 02/26/2026) itemizing required foundation, roof/framing, plumbing, floor plan, exterior elevation/building section, mechanical (including Manual J HVAC sizing), and electrical plan details for the 2018 IRC/IBC/IMC/IPC/IFC/IFGC/IEBC/ISPSC and 2017 NEC code set
  • OptionalTruss Calculations / Structural CalculationsSealed copies of truss calculations (or deferred submittal note on drawings) and lateral calculations if required; sealed calculations/plans for engineered slabs (post-tension, raft, etc.)

Fee schedule

Fee typeAmountNotes
Construction Fee — Based on Valuation (Table 1)$23.50 ($1-$500 valuation); $23.50 for the first $500 plus $3.00 per additional $100 or fraction to $2,000; $68.50 for the first $2,000 plus $14.00 per additional $1,000 or fraction to $25,000; $390.50 for the first $25,000 plus $10.00 per additional $1,000 to $50,000; $640.50 for the first $50,000 plus $7.00 per additional $1,000 to $100,000; $990.50 for the first $100,000 plus $5.50 per additional $1,000 to $500,000; $3,233.75 for the first $500,000 plus $4.75 per additional $1,000 to $1,000,000; $5,608.75 for the first $1,000,000 plus $3.75 per additional $1,000 above $1,000,000City of Willcox Development Services Fee Schedule (Resolution No. 2006-10, re-adopted by Resolution No. 2008-75), Table 1. Valuation is the greater of a customer-provided figure or area (sq ft) multiplied by the City's per-square-foot Residential Valuation Table (e.g., wood-frame dwelling under 1,800 sq ft: $51.57/sq ft; over 1,800 sq ft: $70.76/sq ft).
Plan Review Fee65% of the Construction FeeCity of Willcox Development Services Fee Schedule, Section E.3.a
Plumbing Fee (component of a full residential building permit)25% of the Construction Fee, minimum $30.00City of Willcox Development Services Fee Schedule, Section E.3.b
Mechanical Fee (component of a full residential building permit)25% of the Construction Fee, minimum $30.00City of Willcox Development Services Fee Schedule, Section E.3.c
Electrical Fee (component of a full residential building permit)25% of the Construction Fee, minimum $30.00City of Willcox Development Services Fee Schedule, Section E.3.d

Residential Addition / Remodel Permit

Verified

Required for room additions, remodels, and structural alterations to existing one- and two-family dwellings in Willcox that exceed the City's minor-work exemptions. Reviewed against the 2018 IRC as adopted and amended by the City of Willcox (Exhibit B to Ordinance NS374).

Verified 2026-07-07 · Source

Requirements

  • Building permit required for room additions, remodels, and alterations affecting structural, electrical, mechanical, plumbing, or fire-safety conditions
  • 'Ordinary Repairs' under $1,000 in valuation (materials and labor at market value) that replace only component parts with similar parts/materials and do not change structural/electrical/mechanical/plumbing/fire-safety conditions are exempt from a permit (IRC § R105.2.2.1, new City amendment)
  • Attached patio/porch covers up to 120 sq ft projected roof area (max 8 ft depth) are permit-exempt; larger covers require a permit
  • Detached one-story accessory structures up to 200 sq ft with no electrical/mechanical/plumbing and complying with the Zoning Ordinance are permit-exempt
  • Garage/dwelling separation for any altered assembly must meet the City's upgraded 5/8-inch Type X gypsum board standard (IRC Table R302.6, as amended)

Required documents

  • RequiredBuilding Permit Application (Online, iWorQ Portal)Submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244
  • RequiredSite Plan / Construction PlansShowing existing structure, addition/remodel footprint, and scope of work, per the City's Building Plan Guidelines

Fee schedule

Fee typeAmountNotes
Construction Fee — Based on Valuation (Table 1)Same valuation table as new residential construction ($23.50 at $1-$500 scaling to $5,608.75 + $3.75 per additional $1,000 above $1,000,000)City of Willcox Development Services Fee Schedule, Table 1. Residential addition/remodel valuation references the Fee Schedule's per-square-foot 'Residential Addition' factors (e.g., wood addition $7.54/sq ft; garage-to-room conversion $4.18/sq ft; carport-to-room conversion $11.85/sq ft; deck $10.70/sq ft).
Plan Review Fee65% of the Construction FeeCity of Willcox Development Services Fee Schedule, Section E.3.a
Plumbing / Mechanical / Electrical Fee (as applicable to scope)25% of the Construction Fee each, minimum $30.00 eachCity of Willcox Development Services Fee Schedule, Section E.3.b-d; applies only to the trades actually involved in the addition/remodel scope

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Willcox, governed by the 2017 National Electrical Code (NEC) as adopted and amended by the City (Exhibit E to Ordinance NS374). Willcox has an unusual amendment explicitly permitting Type UF cable in mortar joints of adobe construction, reflecting the region's building stock.

Verified 2026-07-07 · Source

Requirements

  • Electrical permit required for panel work, service changes, and other hard-wired electrical installations not covered by a specific exemption
  • Governed by the 2017 NEC as adopted by the City of Willcox, with local amendments
  • Permit-exempt electrical work includes: power for amusement devices/carnival rides in place under 30 days and not utility-connected; repair/replacement of fixed motors and transformers of the same type/rating in the same location; temporary decorative lighting; repair/replacement of current-carrying parts of a switch/contactor/control device/overcurrent device of the required capacity in the same location; wiring/devices operating under 25 volts and not exceeding 50 volt-amps; manufacturing/processing/fabricating devices; self-contained solar-powered lighting fixtures not tied to the building electrical system
  • Residential-specific exemptions (IRC amendment) also include low-voltage security-alarm-system wiring
  • Dishwasher and garbage-disposal branch circuits in dwelling units may share one 20-amp circuit (2017 NEC § 210.11(C) as amended)
  • Type UF cable is permitted in mortar joints of adobe construction wherever Nonmetallic Sheathed Cable is otherwise allowed (2017 NEC § 340.10 as amended) — notable given Willcox's regional adobe-construction stock

Required documents

  • RequiredBuilding/Electrical Permit Application (Online, iWorQ Portal)Submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244

Fee schedule

Fee typeAmountNotes
Electrical Fee — Component of a Building Permit (Based on Valuation)25% of the Construction Fee, minimum $30.00City of Willcox Development Services Fee Schedule, Section E.3.d — Willcox does not publish a separate flat-rate electrical-only permit fee table; electrical work is billed as a percentage add-on to the base Construction Fee derived from the City's Table 1 valuation schedule.
Plan Review Fee (if plan review applies to the scope)65% of the Construction FeeCity of Willcox Development Services Fee Schedule, Section E.3.a

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Willcox, governed by the 2018 International Plumbing Code (IPC) as adopted and amended by the City (Exhibit D to Ordinance NS374), including the City's inserted Water Conservation Code appendix.

Verified 2026-07-07 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping
  • Governed by the 2018 IPC as adopted by the City, with the Water Conservation Code appendix (fixture flow-rate standards for new commercial/industrial/public construction; PRV and hot-water-on-demand recommendations for new single-family residences)
  • Like-for-like replacement/repair of existing plumbing fixtures (toilet, tub, sink, garbage disposal, water heater, faucets) is permit-exempt under the City's IRC amendment
  • All building sewers and water lines must be buried at least 12 inches below grade City-wide (IPC § 305.4.1 / IRC § P2603.5.1 as amended)
  • New single-family residences on a water-company connection require a pressure-reducing valve (PRV) capped at 60 psi static pressure (wells/well-shares exempt)

Required documents

  • RequiredBuilding/Plumbing Permit Application (Online, iWorQ Portal)Submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244

Fee schedule

Fee typeAmountNotes
Plumbing Fee — Component of a Building Permit (Based on Valuation)25% of the Construction Fee, minimum $30.00City of Willcox Development Services Fee Schedule, Section E.3.b — no separate flat-rate water-heater or fixture-specific fee is published; plumbing work is billed as a percentage add-on to the base Table 1 Construction Fee.
Sewer Tap Connection FeeCalculated per fixture units (Resolution 86-14 connection-fee factor)City of Willcox Development Services Fee Schedule, Section E.4.b; applies to new sewer taps in addition to the base Construction/Plumbing Fee.

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in Willcox, governed by the 2018 International Mechanical Code (IMC) as adopted and amended by the City (Exhibit C to Ordinance NS374). The City mandates residential cooling capability and exempts several common like-for-like HVAC replacements from permitting.

Verified 2026-07-07 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems not covered by a specific exemption
  • Governed by the 2018 IMC as adopted by the City
  • Every dwelling unit/guest room must have cooling facilities capable of maintaining 80°F or below, 3 feet above the floor, under average local climate conditions (IRC § R303.10, renamed 'Required Heating and Cooling')
  • Permit-exempt HVAC work includes: replacement of evaporative coolers with like coolers; repair/replacement in kind of outdoor refrigeration units up to 5 tons (equal or lesser weight, same location) — indoor refrigeration system repair/replacement still requires a permit; like-for-like replacement/repair of an existing furnace, air conditioner, cooler, heat pump, or heater under the IRC residential amendment
  • Evaporative cooler intake-opening replacement is exempted from the standard IRC § R303.5.1 intake-opening rule where the Building Official determines no high degree of hazard results

Required documents

  • RequiredBuilding/Mechanical Permit Application (Online, iWorQ Portal)Submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244

Fee schedule

Fee typeAmountNotes
Mechanical Fee — Component of a Building Permit (Based on Valuation)25% of the Construction Fee, minimum $30.00City of Willcox Development Services Fee Schedule, Section E.3.c; the Fee Schedule's Residential Valuation Table separately lists Air Conditioning equipment at $730.52 each for valuation purposes.

Re-Roofing Permit

Verified

Willcox has an unusually broad no-permit exemption for re-roofing: unlike most Arizona jurisdictions, the City exempts re-roofing of existing buildings with similar materials 'regardless of value' under its IBC amendment, and separately exempts residential re-roofing with no structural changes under its IRC amendment.

Verified 2026-07-07 · Source

Requirements

  • Re-roofing of existing buildings with similar materials is exempt from a building permit REGARDLESS OF VALUE under the City's IBC § 105.2 amendment (Exhibit A to Ord. NS374) — broader than the typical single-layer-asphalt-shingle-only exemption seen in many AZ cities
  • Residential re-roofing with no structural changes proposed and no reinforcement required for heavier roofing materials is separately exempted under the IRC § R105.2 amendment (Exhibit B), alongside re-siding and exterior trim replacement
  • Re-roofing involving a material change requiring structural reinforcement, or any structural modification, still requires a building permit
  • Roof slope, drainage, scuppers, and skylights must be shown on the Roof/Framing Plan per the City's Residential Plan Requirements where a permit is required

Required documents

  • OptionalBuilding Permit Application (Online, iWorQ Portal)Required only where the re-roofing scope falls outside the City's broad no-permit exemption (e.g., structural changes or reinforcement required); submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244

Fee schedule

Fee typeAmountNotes
Construction Fee — Based on Valuation (when a permit is required)Same Table 1 valuation schedule as new constructionCity of Willcox Development Services Fee Schedule, Table 1; applies only to re-roofing scopes that fall outside the City's exemption (e.g., structural changes/reinforcement).

Residential Rooftop Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop residential solar photovoltaic systems in Willcox. The City's own published Building Plan Guidelines give small residential rooftop solar PV systems (10 kW or less) a fast-track 4-business-day review — the City's fastest published review timeline outside of counter-issued miscellaneous permits.

Verified 2026-07-07 · Source

Requirements

  • Building/electrical permit required for residential rooftop solar photovoltaic installation, governed by the 2017 NEC and 2018 IRC/IBC electrical provisions as adopted and amended by the City
  • Self-contained solar-powered lighting fixtures where the light source and power supply are in the same unit and NOT connected to any building electrical system are exempt from a permit (both IBC and IRC amendments), provided installation doesn't alter structural/electrical components or conflict with life-safety/zoning/lighting rules — this exemption does not cover grid-tied rooftop PV arrays
  • Small residential rooftop solar PV projects 10 kW or less are reviewed within 4 business days per the City's Building Plan Guidelines
  • Apply via the online iWorQ Building Permit Application portal with construction submittals (site plan, roof/racking layout, electrical 3-line diagram)

Required documents

  • RequiredBuilding/Electrical Permit Application (Online, iWorQ Portal)Submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244; construction submittals (site plan, racking layout, electrical diagram, equipment cut sheets) uploaded as PDFs per the City's Building Plan Guidelines

Fee schedule

Fee typeAmountNotes
Construction Fee — Based on ValuationTable 1 valuation schedule, same as new constructionCity of Willcox Development Services Fee Schedule, Table 1; Willcox's Fee Schedule does not list a separate itemized flat-rate residential solar PV line — solar is billed on the standard valuation-based Construction Fee plus the Electrical Fee (25% of Construction Fee, minimum $30) and Plan Review Fee (65% of Construction Fee) where applicable.
Electrical Fee25% of the Construction Fee, minimum $30.00City of Willcox Development Services Fee Schedule, Section E.3.d
Plan Review Fee65% of the Construction FeeCity of Willcox Development Services Fee Schedule, Section E.3.a

Demolition Permit

Verified

Required for demolition of any structure in Willcox, billed at an hourly rate rather than the standard valuation table.

Verified 2026-07-07 · Source

Requirements

  • Building permit required before demolishing a residential or commercial structure within Willcox city limits (Willcox Municipal Code § 10.01.010, referencing 'construct, enlarge, alter, move, demolish or change occupancy')
  • Apply via the online iWorQ Building Permit Application portal, selecting the appropriate permit type

Required documents

  • RequiredBuilding Permit Application (Online, iWorQ Portal)Submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244

Fee schedule

Fee typeAmountNotes
Demolition Permit$40.00/hrCity of Willcox Development Services Fee Schedule, Section F.7 — demolition is billed hourly rather than on the standard Table 1 valuation schedule used for new construction/additions.

Manufactured Home / Factory-Built Building Installation Permit

Verified

Required for placement of manufactured/mobile homes and factory-built buildings within Willcox city limits, in addition to the separate State of Arizona-mandated installation permit. The City charges its own flat local fee layered on top of the state process.

Verified 2026-07-07 · Source

Requirements

  • Construction/installation standards for the manufactured home itself are regulated directly by the State of Arizona (Department of Fire, Building and Life Safety / Office of Manufactured Housing, A.R.S. § 41-4001 et seq.)
  • The City of Willcox charges its own 'Manufactured Homes' and 'Factory built buildings' fees in addition to the State-mandated installation fee/permit, confirming the City issues a separate local placement permit
  • The online Building Permit Application includes a dedicated 'Man. Home Set - YEAR' field for manufactured home installations

Required documents

  • RequiredBuilding Permit Application (Online, iWorQ Portal)Submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244; includes a Manufactured Home Set Year field
  • RequiredState of Arizona Manufactured Home Installation PermitSeparate state-level installation permit/insignia required from the Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing, independent of the City's local permit

Fee schedule

Fee typeAmountNotes
Manufactured Homes$400.00 eachCity of Willcox Development Services Fee Schedule, Section F.4
Factory Built Buildings$90.00 eachCity of Willcox Development Services Fee Schedule, Section F.5
Construction Trailers$50.00 eachCity of Willcox Development Services Fee Schedule, Section F.6

EV Charger Installation Permit

Verified

Required for installation of an electric vehicle charging station (Level 2 or DC fast charger) in Willcox. Governed by the 2017 NEC as adopted and amended by the City (Exhibit E to Ordinance NS374). EV charging has no dedicated permit category or fee line in the City's Development Services Fee Schedule — it is billed as a standard Electrical Permit (see electrical-permit entry), the same treatment already documented for this file's solar-pv-permit entry.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the EV charger circuit and any associated panel/service work, governed by the 2017 NEC as adopted by the City of Willcox
  • Apply via the online iWorQ Building Permit Application portal (willcox.portal.iworq.net/WILLCOX/new-permit/600/5244)
  • A building permit is additionally required if the installation includes a new canopy, carport, or other structural mounting component; freestanding canopies/carports get an added disconnect-location exception under the City's NEC amendment (Exhibit E), requiring a bonding conductor and a disconnect within sight of the structure or lockable open
  • All contractors must hold a City of Willcox business license before the permit will be signed/issued

Required documents

  • RequiredBuilding/Electrical Permit Application (Online, iWorQ Portal)Submitted at willcox.portal.iworq.net/WILLCOX/new-permit/600/5244

Fee schedule

Fee typeAmountNotes
Electrical Fee — Component of a Building Permit (Based on Valuation)25% of the Construction Fee, minimum $30.00City of Willcox Development Services Fee Schedule, Section E.3.d — same fee mechanism documented in this file's electrical-permit and solar-pv-permit entries; no dedicated EV-charger-specific fee line exists. Construction Fee itself is calculated from the City's Table 1 valuation schedule.
Plan Review Fee (if plan review applies to the scope)65% of the Construction FeeCity of Willcox Development Services Fee Schedule, Section E.3.a

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Willcox building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →