Skip to main content
PermitBase

This is PermitBase’s published record for Flagstaff as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Flagstaff building permits

Verified

Flagstaff, Arizona — as published 2026-07-20.

Verified 2026-07-03 · Source

Codes adopted

Arizona has no mandatory statewide building code edition — cities and counties each adopt and amend their own codes (per Arizona Revised Statutes framework for municipal building regulation; no state building-code-adoption agency parallel to Montana's DLI exists). The City of Flagstaff independently administers its own Building Safety program within city limits, separate from Coconino County's building department, which handles unincorporated county areas. Source: City of Flagstaff Building Safety page (flagstaff.az.gov/494/Building-Safety) and Building Permits page.2018 International Building Code (IBC) — adopted by City of Flagstaff Resolution 2019-26 and Ordinance 2019-16 on June 18, 2019, effective July 19, 2019 (the '2018 Suite of Codes'). Source: City of Flagstaff 2019 Adopted Building Codes (PDF)2018 International Residential Code (IRC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 20192018 International Existing Building Code (IEBC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 20192018 International Mechanical Code (IMC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 20192018 International Plumbing Code (IPC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019 (Arizona/Flagstaff uses the IPC, not the Uniform Plumbing Code)2018 International Fuel Gas Code (IFGC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 20192018 International Energy Conservation Code (IECC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 20192018 International Swimming Pool and Spa Code (ISPSC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 20192018 International Solar Energy Provisions (ISEP) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019; a compilation of solar energy provisions from the IBC, IRC, IECC, IMC, IPC, IFC, and ISPSC2017 NFPA 70 / National Electrical Code (NEC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019ICC A117.1-2017, Accessible and Usable Buildings and Facilities — adopted per Resolution 2019-26 / Ordinance 2019-161997 Uniform Housing Code, 1997 Uniform Administrative Code, and 1997 Uniform Code for the Abatement of Dangerous Buildings (ICBO) — retained as adopted codes per Flagstaff City Code Title 4, Chapter 4-01All codes amended locally by Flagstaff City Code Title 4, Building Regulations (Chapters 4-01 through 4-11), on file with the City Clerk. Source: Flagstaff City Code Title 4 Building Regulations amendments document (2019 Amendments to the Adopted Codes, PDF, rev. 05/14/2019)Statewide overlay: Arizona Revised Statutes Section 9-468 sets mandatory statewide standards for solar photovoltaic and solar water heating construction permits (limits on required plan documentation, prohibits requiring a PE stamp absent a written justification, and caps solar permit fees at actual cost of issuance) — binding on the City of Flagstaff as a municipality. Source: azleg.gov ARS 9-468Arizona Revised Statutes Sections 9-835 and 9-836 set statutory residential building-permit plan-review timeframes (Administrative Completeness Review and Substantive Review stages) that the City of Flagstaff's published review timeframes implement. Source: City of Flagstaff Residential Building Permits Plan Review Process and Timeframes (PDF)

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for construction of new single-family and two-family dwellings in Flagstaff. Reviewed against the 2018 IRC and 2018 IECC as adopted by the City of Flagstaff (Resolution 2019-26 / Ordinance 2019-16), plus City of Flagstaff Building Design Criteria amendments (60 psf snow load, 115 mph wind, Seismic Category C). Applications are submitted through the Citizen Access Portal.

Verified 2026-07-03 · Source

Requirements

  • Building permit required for new single-family and two-family dwelling construction
  • Plans must comply with the 2018 IRC and 2018 IECC as adopted by City of Flagstaff Resolution 2019-26 / Ordinance 2019-16
  • Plans must show compliance with City of Flagstaff Building Design Criteria: 60 psf ground snow load, 115 mph wind design speed, Seismic Design Category C, 30-inch frost line depth, required ice barrier underlayment
  • New one- and two-family dwelling garages must include one dedicated 208/240-volt, 50-amp-minimum EV charging branch circuit
  • Solar-Ready Zone (2018 IRC Appendix T) provisions apply to new construction of detached one- and two-family dwellings and townhouses
  • All applications must be administratively complete at time of submittal or resubmittal per Arizona SB 1598; additional/revised documents uploaded mid-review-cycle are treated as a formal resubmittal, resetting the full review timeline
  • Application submitted online via the Citizen Access Portal (citizenaccess.flagstaffaz.gov); large residential attachments may be emailed to BuildingPermits@flagstaffaz.gov

Required documents

  • RequiredResidential Building Permit Application (PDF)Submitted via the Citizen Access Portal at citizenaccess.flagstaffaz.gov
  • RequiredResidential Plan Review Administrative Completeness Checklist (PDF)City of Flagstaff checklist used to determine whether a residential submittal is administratively complete (revised 09/06/2022)
  • RequiredConstruction DrawingsSite plan, foundation plan, floor plan, framing, elevations, and structural details consistent with the 2018 IRC and City of Flagstaff Building Design Criteria
  • OptionalOwner Authorization Form (PDF)Required when the applicant is not the property owner

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, ICC February 2017 Building Valuation Data methodology)Gross Area (sq ft) x Square Foot Construction Cost (by occupancy/construction type, e.g., R-3 one/two-family = $145.23-$113.85/sq ft depending on construction type) x 0.01 permit fee multiplierCity of Flagstaff Resolution 2017-21, effective August 1, 2017; plan review fee is an additional 65% of the calculated building permit fee
Plan Review Fee65% of the total calculated Building Permit FeeCity of Flagstaff Resolution 2017-21

Residential Addition / Remodel / Alteration Permit

Verified

Required for additions, remodels, and structural alterations to existing one- and two-family dwellings in Flagstaff, including decks over 30 inches high or over 200 sq ft, garages, and interior remodels affecting structural or life-safety elements. Reviewed against the 2018 IRC as adopted by the City of Flagstaff. Apply through the Citizen Access Portal.

Verified 2026-07-03 · Source

Requirements

  • Building permit required for additions, remodels, and alterations affecting structural, fire, or life-safety elements
  • Decks over 30 inches above finished grade, over 200 sq ft, or attached to the main structure require a Building Permit; smaller detached decks use the Minor Improvement Permit (Zoning) instead
  • Small Residential Plans category (per City review-timeframe schedule) explicitly includes additions, garages, decks, remodels, repairs, carports, storage sheds greater than 200 sq ft, ramadas, greenhouses, and sun rooms
  • Plans must comply with City of Flagstaff Building Design Criteria (60 psf ground snow load, 115 mph wind, Seismic Category C, 30-inch frost depth)
  • Additions/alterations to existing 1-2 family dwellings are exempt from the new-construction EV charging circuit requirement

Required documents

  • RequiredResidential Building Permit Application (PDF)Submitted via the Citizen Access Portal
  • RequiredConstruction DrawingsSite plan and framing/structural details showing scope of work and connection to the existing structure

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, ICC February 2017 BVD methodology)Gross Area x Square Foot Construction Cost x 0.01 permit fee multiplier, plus 65% plan review feeCity of Flagstaff Resolution 2017-21; BVD does not apply cleanly to alterations/repairs of existing structures per ICC guidance, but the City uses this methodology as its general fee basis

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Flagstaff, governed by the 2017 NFPA 70 / National Electrical Code (NEC) as adopted and locally amended by the City of Flagstaff (copper-only conductors; EV-charging circuit requirement for new 1-2 family garages). Minor electrical work (service entrance/subpanel upgrades, circuits) can use the Over-the-Counter permit; larger work requires a full Building Permit.

Verified 2026-07-03 · Source

Requirements

  • Electrical permit required for installation, change, or repair of any hard-wired electrical system
  • Governed by the 2017 NEC as adopted and amended by City of Flagstaff (copper-only current-carrying conductors; aluminum permitted only for feeders/service-entrance conductors)
  • Over-the-Counter (OTC) permit available for service entrances/subpanels up to 400 amps, circuits, and similar minor work; service entrances or subpanels over 400 amps require a full residential or commercial Building Permit application with site plan, 1-line/3-line electrical diagram, load calculation, and panel schedules
  • New one- and two-family dwelling garages must include a dedicated 208/240-volt, 50-amp-minimum EV charging branch circuit (new construction only; additions/alterations exempt)
  • Apply through the Citizen Access Portal, or use the Over-the-Counter Permit Application for qualifying minor electrical work

Required documents

  • RequiredOver-the-Counter Permit Application (PDF, Rev. 06/10/2025)Used for electrical, plumbing, mechanical, and roofing work not involving structural changes
  • OptionalBuilding Permit Application (for service entrances/subpanels over 400 amps)Requires site plan, electrical plan with 1-line or 3-line diagram, load calculation, and panel schedules

Fee schedule

Fee typeAmountNotes
Electrical Over-the-Counter Base Fee$29.90City of Flagstaff Over-the-Counter Permit Application (Rev. 06/10/2025); base fee plus itemized charges below
Green Tag (No Repair/Work Done)$18.90City of Flagstaff Over-the-Counter Permit Application
Service Entrance less than 200 amps$38.85City of Flagstaff Over-the-Counter Permit Application
Service Entrance 200 to 399 amps$74.25City of Flagstaff Over-the-Counter Permit Application
Service Entrance to 400 amps$79.15City of Flagstaff Over-the-Counter Permit Application; over 400 amps requires a full Building Permit
Service Pole or Pedestal, all mounted$29.90City of Flagstaff Over-the-Counter Permit Application
Subpanels to 200 amps$38.85City of Flagstaff Over-the-Counter Permit Application
Subpanels 201 to 400 amps$79.15City of Flagstaff Over-the-Counter Permit Application; over 400 amps requires a full Building Permit
Circuits (each)$6.05City of Flagstaff Over-the-Counter Permit Application
Temporary Electric Event Generator$50.00 flat feeCity of Flagstaff Over-the-Counter Permit Application

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Flagstaff, governed by the 2018 International Plumbing Code (IPC) as adopted and locally amended by the City of Flagstaff (max 1.3-gallon flush water closets; 12-inch minimum roof vent termination above grade). Minor plumbing work can use the Over-the-Counter permit.

Verified 2026-07-03 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of any plumbing system, fixture, water heater, gas piping, or sewer/water service line
  • Governed by the 2018 IPC as adopted by City of Flagstaff (Resolution 2019-26 / Ordinance 2019-16), amended locally for maximum flush volumes and vent terminations
  • Backflow preventers and grease/oil interceptors must be applied for as a full Building Permit, routed to City of Flagstaff Water Services Industrial Waste Section for review
  • Tile shower enclosures must be applied for as a Building Permit, not an Over-the-Counter permit
  • Replacement waterline material must be specified on the Over-the-Counter application per EPA 40 CFR 141.84(b)(2) and the ADEQ Lead and Copper Rule
  • Apply through the Citizen Access Portal, or use the Over-the-Counter Permit Application for qualifying minor plumbing work

Required documents

  • RequiredOver-the-Counter Permit Application (PDF, Rev. 06/10/2025)Used for plumbing fixture/appliance work not requiring a full building permit

Fee schedule

Fee typeAmountNotes
Plumbing Over-the-Counter Base Fee$29.90City of Flagstaff Over-the-Counter Permit Application (Rev. 06/10/2025); base fee plus itemized fixture charges below
Water Heater w/vent$15.70City of Flagstaff Over-the-Counter Permit Application
Water Closet (toilet), Lavatory, Shower, Kitchen Sink/Disposal, Bathtub/Shower Enclosure, and most individual fixtures$12.50 eachCity of Flagstaff Over-the-Counter Permit Application
Water/vent/drain piping$6.05City of Flagstaff Over-the-Counter Permit Application
Yard Line Replacement (water/gas/sewer)$15.70City of Flagstaff Over-the-Counter Permit Application
Gas Piping System, 1 to 5 outlets$7.80City of Flagstaff Over-the-Counter Permit Application
Gas Piping System, over 5 outlets$1.45 per additional outletCity of Flagstaff Over-the-Counter Permit Application
Gas Pressure Test, No Repair/Work Done$18.90City of Flagstaff Over-the-Counter Permit Application
Hydronic Water Boiler >100K BTU, Residential only$23.20City of Flagstaff Over-the-Counter Permit Application

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, air conditioning, and related mechanical installations in Flagstaff, governed by the 2018 International Mechanical Code (IMC) and International Fuel Gas Code (IFGC) as adopted by the City of Flagstaff. Minor mechanical work can use the Over-the-Counter permit; rooftop unit replacements on structures over 50 years old or in historic overlay areas are routed to Current Planning for review.

Verified 2026-07-03 · Source

Requirements

  • Mechanical permit required for installation or relocation of furnaces, AC units, appliance vents, and similar mechanical equipment
  • Governed by the 2018 IMC and 2018 IFGC as adopted by City of Flagstaff (Resolution 2019-26 / Ordinance 2019-16)
  • Replacement and new rooftop units must be applied for as a full Building Permit and are routed to Current Planning for review if the structure is over 50 years old or in a historic overlay area
  • Apply through the Citizen Access Portal, or use the Over-the-Counter Permit Application for qualifying minor mechanical work

Required documents

  • RequiredOver-the-Counter Permit Application (PDF, Rev. 06/10/2025)Used for furnace/AC/appliance-vent replacement work not requiring a full building permit

Fee schedule

Fee typeAmountNotes
Mechanical Over-the-Counter Base Fee$29.90City of Flagstaff Over-the-Counter Permit Application (Rev. 06/10/2025); base fee plus itemized charges below
Furnace <100,000 Btu, like-for-like replacement$18.90City of Flagstaff Over-the-Counter Permit Application
Furnace >100,000 Btu, like-for-like replacement$23.20City of Flagstaff Over-the-Counter Permit Application
Residential Air Conditioning Unit$13.60City of Flagstaff Over-the-Counter Permit Application
Appliance Vents$9.25City of Flagstaff Over-the-Counter Permit Application
Vent Fan connected to single duct$9.25City of Flagstaff Over-the-Counter Permit Application
Relocate Furnace$18.90City of Flagstaff Over-the-Counter Permit Application
Install Suspended/Wall/Floor Mounted Heater$18.90City of Flagstaff Over-the-Counter Permit Application
Wood/Pellet Stove/Fireplace$18.90City of Flagstaff Over-the-Counter Permit Application

Re-Roofing Permit

Verified

Required for residential and commercial re-roofing in Flagstaff. Governed by IRC R905.2.7.1 / IBC 1507.2.8.2 (ice barrier) as adopted, plus City of Flagstaff amendments requiring Class A/B fire-rated roofing and prohibiting wood shakes/shingles. Uses the Over-the-Counter permit for standard re-roofs.

Verified 2026-07-03 · Source

Requirements

  • Permit required for re-roofing a building; City follows IRC Section R905.2.7.1 and IBC Section 1507.2.8.2 and requires an ice barrier or ice dam membrane
  • All roofing material must be Class A or B fire-rated per City of Flagstaff amendments
  • Wood shakes or shingles are prohibited, including fire-rated shakes and shingles
  • Over-the-Counter re-roof permits limit replacement of roof decking to 1 square (100 sq ft); replacing more decking requires a residential or commercial building repair/remodel permit instead, and replacement decking must be inspected before being covered with underlayment
  • Apply through the Citizen Access Portal, or use the Over-the-Counter Permit Application (checkbox: Roofing, see footnote *R1)

Required documents

  • RequiredOver-the-Counter Permit Application (PDF, Rev. 06/10/2025)Check 'Roofing' box; used for standard re-roofs not exceeding the 1-square decking replacement limit

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, ICC BVD methodology, applied to re-roof project value)Project valuation x 0.01 permit fee multiplier, plus 65% plan review feeCity of Flagstaff Resolution 2017-21; no separate flat re-roof fee schedule was found distinct from the general valuation-based Building Permit Fee methodology

Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mount solar photovoltaic systems in Flagstaff. The City has no separate solar-specific permit type or fee schedule: a PV system is permitted and billed as a standard Building Permit (plus Electrical Permit for wiring) under the City's valuation-based fee methodology (Resolution 2017-21), and mounting-system structural design is governed by the City's general Building Design Criteria (60 psf ground snow load, 115 mph wind, Seismic Design Category C). Process/documentation limits and timeline protections are set by the statewide overlay, Arizona Revised Statutes Section 9-468, which caps required documentation, limits professional-engineer stamp requirements, and caps solar permit fees at the actual cost of issuance. The 2018 International Solar Energy Provisions (ISEP) are adopted as part of the City's 2018 code suite.

Verified 2026-07-03 · Source

Requirements

  • Photovoltaic system installation location must be indicated on construction plans, including roof plan and elevation (ARS 9-468)
  • Photovoltaic panel mounting details must be included in installation plans (ARS 9-468)
  • Electrical diagrams must include one-line or three-line diagrams, unless a qualified online automated permitting platform is used to verify code compliance (ARS 9-468)
  • For DC-to-AC conversions, inverter cut sheets and listings must be included in the plans (ARS 9-468)
  • The City may not require a professional engineer's stamp for a solar PV system unless deemed necessary, and must provide a written explanation if one is required (ARS 9-468)
  • PV mounting-system structural design (roof/rack attachment, load path) must meet the City's Building Design Criteria: 60 psf ground snow load, 115 mph wind design speed, Seismic Design Category C — there is no separate solar-only structural standard; the general Design Criteria governs
  • The PV installation is permitted and fee-calculated as a standard Building Permit (roof/rack-mounted structure) plus an Electrical Permit for the wiring/interconnection scope, using the City's valuation-based fee methodology (Resolution 2017-21); no dedicated solar permit fee schedule exists
  • Accessory Energy Systems (including PV solar) are subject to a building permit and are further limited by Flagstaff zoning ordinances for visual, design, height, and setback requirements
  • Solar-Ready Zone provisions (2018 IRC Appendix T / IECC Appendix RA) apply to new construction of detached one- and two-family dwellings and townhouses
  • Any building/permit fee for solar construction must be attributable to and not exceed the actual cost of issuing the permit, with an itemized cost list available on request (ARS 9-468(B))
  • Apply through the Citizen Access Portal

Required documents

  • RequiredResidential or Commercial Building/Electrical Permit ApplicationSubmitted via the Citizen Access Portal; solar PV plan set per ARS 9-468 documentation requirements
  • RequiredOne-Line or Three-Line Electrical DiagramRequired unless a qualified online automated permitting platform verifies code compliance
  • RequiredInverter Cut Sheets and ListingsRequired for DC-to-AC conversion equipment

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, ICC February 2017 BVD methodology, applied to solar/rack-mount project value)Project valuation x 0.01 permit fee multiplier, plus 65% plan review feeCity of Flagstaff Resolution 2017-21, effective August 1, 2017 — the same governing fee schedule used for the Residential Building Permit (no separate solar fee schedule exists); per ARS 9-468(B), any solar-specific charge must not exceed the actual cost of issuing the permit
Electrical Permit (interconnection/wiring scope)Over-the-Counter electrical fee schedule (e.g., $29.90 base fee plus itemized circuit/service charges) for minor interconnection work, or full Building Permit electrical review for larger installationsCity of Flagstaff Over-the-Counter Permit Application (Rev. 06/10/2025); governed by the 2017 NEC as adopted and locally amended

Demolition Permit

Verified

Required for demolition of a building within Flagstaff. Uses the standard Residential or Commercial Building Permit Application with a completed Demolition Questionnaire covering asbestos/NESHAP screening.

Verified 2026-07-03 · Source

Requirements

  • Demolition must use the Residential Building Permit Application or the Commercial Building Permit Application and include a completed Demolition Questionnaire
  • Residential and Commercial Demolition Asbestos/NESHAP Questionnaire must be completed and submitted with the building permit application for any demolition work
  • A 'YES' response to specified Part B questions (e.g., disturbance/removal of 260+ linear feet of pipe, 160+ sq ft of other facility components, or 35+ cubic feet of facility components, or removal of load-supporting structural members) requires submission of an asbestos survey by a certified AHERA building inspector
  • A 'YES' response may also require submission of a NESHAP Notification Form to ADEQ at least 10 working (business) days before renovation/demolition begins

Required documents

  • RequiredResidential Building Permit Application or Commercial Building Permit ApplicationUsed for demolition; select the applicable residential or commercial form
  • RequiredResidential/Commercial Demolition Requirements — Asbestos/NESHAP Questionnaire (PDF)Must be completed and submitted with the building permit application for any demolition work

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, ICC BVD methodology, applied to demolition project value)Project valuation x 0.01 permit fee multiplier, plus 65% plan review feeCity of Flagstaff Resolution 2017-21 general fee methodology; no separate published flat demolition fee schedule was found distinct from the general valuation-based Building Permit Fee

Fence and Retaining Wall Permit (Minor Improvement Permit)

Verified

Fences and retaining walls in Flagstaff are regulated by height, with most fences and shorter retaining walls handled via a Zoning-issued Minor Improvement Permit ($80 flat fee) rather than a full Building Permit.

Verified 2026-07-03 · Source

Requirements

  • Fences and walls (non-retaining) up to 7 feet high: Minor Improvement Permit (Zoning), $80 flat fee; fences over 7 feet require a full Building Permit; fences over 6 feet require a zoning variance
  • Fences in the front setback area are capped at 3 feet (solid wall/fence) or 4 feet (vinyl-coated chain link)
  • Corner lots require an intersection sight triangle per Engineering Standards Section 10-06-020 (Intersection Sight Triangles, Clear View Zones)
  • Retaining walls 4 feet or less (measured from bottom of footing to top of wall): Minor Improvement Permit (Zoning), $80 flat fee
  • Retaining walls over 4 feet high, or any wall supporting a surcharge or impounding Class I/II/IIIA liquids regardless of height, require a full Building Permit
  • Site plan required showing north arrow, property lines/dimensions, existing structures, easements, and adjacent street names

Required documents

  • RequiredApplication for Minor Improvement Permit (PDF, updated April 16, 2020)City of Flagstaff Community Development Division form for fences, walls, retaining walls, decks, accessory structures, landscape modifications, and exterior/facade modifications
  • RequiredSite PlanShowing height/location of existing and proposed fence or wall, setback from front property line, and materials

Fee schedule

Fee typeAmountNotes
Minor Improvement Permit Application Fee$80.00City of Flagstaff Minor Improvement Permit Application checklist (flat fee, covers fences/walls, retaining walls, decks, accessory structures, landscape and exterior/facade modifications)
Building Permit Fee (valuation-based, for fences over 7 ft or retaining walls over 4 ft)Project valuation x 0.01 permit fee multiplier, plus 65% plan review feeCity of Flagstaff Resolution 2017-21 general fee methodology

EV Charger / Electric Vehicle Charging Circuit Permit

Verified

Flagstaff has no standalone EV charger permit or fee line — installing an EV charger circuit is electrical work processed through the same Over-the-Counter (OTC) or full Electrical Permit pathway documented in the electrical-permit entry, billed under the generic 'Circuits (each)' or service/subpanel line items (no work item is itemized specifically as 'EV charger' on the OTC fee schedule). Separately, Flagstaff's 2019 local amendment to the 2018 IRC (Chapter 4-03) REQUIRES new one- and two-family dwelling construction to include at least one dedicated 208/240-volt, 50-amp-minimum garage branch circuit for EV charging (2018 IRC E3901.9 as amended) — this requirement is verified directly in codesAdopted/residential-building-permit, but it is a new-construction code mandate, not a separate retrofit permit type. Re-chased 2026-07-20: directly downloaded and text-extracted the live OTC Permit Application PDF, confirming the exact same fee figures verbatim ($29.90 base, $6.05/circuit, $38.85/$79.15 subpanel tiers) are still current.

Verified 2026-07-20 · Source

Requirements

  • New one- and two-family dwelling construction: at least one required garage receptacle must be a dedicated 208/240-volt, 50-amp-minimum branch circuit for EV charging (2019 Amendments to the Adopted Codes, Chapter 4-03, amending 2018 IRC E3901.9); additions/alterations to existing 1-2 family dwellings are EXEMPT from this new-construction mandate
  • Retrofitting an EV charger circuit into an existing home: apply for an Over-the-Counter (OTC) electrical permit for the circuit (and, if needed, a service entrance or subpanel upgrade) — no EV-specific line item exists, so the applicable OTC category is 'Circuits (each)' plus any panel/service upgrade required to support the load
  • Governed by the 2017 NEC as adopted and locally amended by the City of Flagstaff (copper-only current-carrying conductors; aluminum only for feeders/service-entrance conductors)
  • If the service entrance or subpanel must be upgraded above 400 amps to support the charger, a full residential or commercial Building Permit application (site plan, load calculation, panel schedule) is required instead of the OTC pathway
  • Apply through the Citizen Access Portal, or use the Over-the-Counter Permit Application for qualifying minor electrical work

Required documents

  • RequiredOver-the-Counter Permit Application (PDF, Rev. 06/10/2025)Used for the EV charger circuit itself when it qualifies as minor electrical work (not involving a >400A service/subpanel upgrade)

Fee schedule

Fee typeAmountNotes
Electrical Over-the-Counter Base Fee$29.90City of Flagstaff Over-the-Counter Permit Application (Rev. 06/10/2025); applies to the EV charger circuit permit as the base fee, same as any other OTC electrical work Re-confirmed live 2026-07-20 via direct PDF text extraction.
Circuits (each) — applies to a new dedicated EV charging circuit$6.05City of Flagstaff Over-the-Counter Permit Application; no distinct 'EV charger' line item exists on the fee schedule — a dedicated EV circuit is billed at the generic per-circuit rate Re-confirmed live 2026-07-20 via direct PDF text extraction.
Subpanels to 200 amps (if a panel upgrade is needed to support the charger)$38.85City of Flagstaff Over-the-Counter Permit Application Re-confirmed live 2026-07-20 via direct PDF text extraction.
Subpanels 201 to 400 amps$79.15City of Flagstaff Over-the-Counter Permit Application; over 400 amps requires a full Building Permit Re-confirmed live 2026-07-20 via direct PDF text extraction.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Flagstaff building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-03)Later version (2026-07-23) →View current record →All versions →

Permalink: /arizona/coconino-county/flagstaff/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: f5d9aee

Reproducible from PermitBase’s version-controlled dataset, commit f5d9aee.