Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 11 for counties). Coconino County Community Development Department, Building and Safety Division, is the code enforcement agency and building official for all unincorporated areas of the county (areas outside Flagstaff, Page, Fredonia, Tusayan, and Williams, and outside the Coconino County portion of Sedona).As of this record's verification date (July 2026), the Coconino County Building Division's current adopted codes are: 2018 International Residential Code (IRC); 2018 International Building Code (IBC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Plumbing Code (IPC); 2018 International Energy Conservation Code (IECC); 2018 International Existing Building Code (IEBC); and 2017 National Electrical Code (NEC). Adopted via County Ordinance 2019-10 ('2019-10 Coconino County Building Ordinance — adopting the 2018 Suite of Building Codes with Amendments'). Source: Coconino County Building Codes, Ordinances, Design Criteria page (coconino.az.gov/2391/Building-Codes-Ordinances-Design-Criteri), 'Current Codes and Ordinances' section, rendered/read directly July 2026.Every six years the Community Development Department, in partnership with the Building Safety Advisory Board (BSAB), leads a process to adopt updated codes. As of this record's date, the County has begun a public process toward adopting the 2024 ICC code suite and 2023 NEC — an open house was held March 23, 2026 at 2500 N. Fort Valley Rd. (Thomas Auditorium), and a slide deck covering the 2024 IECC, IBC, IPC, IMC, IFGC and 2023 NEC changes was presented — but as of this record's lastVerified date that update had NOT yet been formally adopted. The 2018 ICC / 2017 NEC baseline remains the current, controlling code. Source: Coconino County Building Codes, Ordinances, Design Criteria page, 'Building Code Adoption' section.Additional adopted county ordinances/codes beyond the base ICC/NEC suite: Potable Rainwater Collection and Distribution Systems Code (an amendment to the IRC); 2020-11 Earthen Building and Construction Ordinance (regulating quality, type of material, testing, and workmanship for earthen buildings/structures). Source: Coconino County Building Codes, Ordinances, Design Criteria page.The Innovative Materials and Systems Pilot Program (part of the 2019-10 Ordinance) allows owner-builders to seek an exemption from standard adopted-code provisions when building with alternative methods and materials, under conditions evaluated by the Building Official — administered in coordination with the County's broader 'Building with Alternative Methods and Materials' / Alternative Methods and Materials Permit Program (ATAG certification and consultation process) run out of the Community Development Department. Source: Coconino County Building Codes, Ordinances, Design Criteria page; Coconino County Community Development page (coconino.az.gov/136/Community-Development), 'Building with Alternative Methods and Materials' section.Manufactured homes and factory-built buildings follow a joint state/local structure: the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) sets manufacturer/installer/retailer licensing and issues state-level installation permits, while local site/foundation/utility compliance is handled by Coconino County under a dedicated Manufactured Homes and Factory Built Building Permit fee schedule (Part III of the county's Building Permitting Fees) and a 7-business-day review ceiling under the county's own timeframes policy. Source: Coconino County Online Permit Applications page (coconino.az.gov/2390/Online-Permit-Applications), 'Manufactured Homes & Factory Built Projects' section; Coconino County Building Permitting Fees schedule, Part III.Properties within the Sedona Fire District (including Oak Creek Canyon) are additionally subject to the 2018 Wildland and Urban Interface Codes as adopted by that fire district; fire suppression systems are required in addition to Wildland-Urban-Interface-code compliance, and the Sedona Fire Marshal conducts concurrent plan reviews with Coconino County to ensure compliance. Source: Coconino County Building Codes, Ordinances, Design Criteria page, 'Building Within the Sedona Fire District' section.

Permit types & fees

Residential Building Permit (Single-Family Dwelling, ADU, Model Home, Tiny House)

Verified

Required for new stick-built or modular single-family dwellings (SFD), accessory dwelling units (ADUs), lot-specific model homes, and tiny houses built under IRC Appendix Q in unincorporated Coconino County. Manufactured homes, park models, and factory-built buildings use a separate permit track. Reviewed against the 2018 IRC and County Building Code Amendments by the Community Development Department, Building and Safety Division. All applications and plan submittals are made online through the county's SmartGov permit portal.

Verified 2026-07-07 · Source

Requirements

  • Applies to stick-built/modular SFDs, ADUs (see Coconino County Zoning Ordinance for attached/detached/deed-restricted ADU requirements), lot-specific model homes, and tiny houses under IRC Appendix Q — NOT manufactured homes, park models, or factory-built buildings, which use a different permit application
  • Register and apply online through the Online Permit Applications portal (co-coconino-az.smartgovcommunity.com): My Portal > Apply Online > Building Division > select permit type
  • All plan submittals must be electronic PDF, properly scaled (typically 1/4" = 1'), unlocked, and correctly rotated before upload — only PDF format is accepted
  • Ten working days from submittal date to provide a complete plan set meeting minimum plan requirements, or the application is canceled and must be resubmitted
  • A geotechnical (soils) report is recommended before plan submittal for new structures; may be required during inspection if not provided upfront
  • Pay the applicable Plan Review Deposit (Table I) at submittal; it is credited against the total fee due at permit issuance
  • Coordination with other County divisions may be required as applicable: Planning and Zoning (Conditional Use Permit, Administrative Adjustment), Environmental Quality (wastewater/septic or proof of sewer availability), and Engineering (right-of-way, grading, drainage, floodplain)
  • New construction/additions/alterations of 3,000 sq ft or more require an architect's stamp (single-family dwellings excepted); other conditions (tall walls, deep fill, log construction, structural steel, long-span masonry lintels, expansive clay soils) also require an architect/engineer stamp
  • HOA CC&Rs are not part of county review — applicants are solely responsible for HOA compliance and approval

Required documents

  • RequiredBD-RES-SFD-or-ADU Submittal Requirements (Information Sheet)Coconino County's official document listing required plan sheets: Site Plan, Foundation Plan, Floor Framing Plan, Floor Plan, Electric Plan, Elevations (min. 4 for SFD/ADU), Roof Framing Plan, Cross Section, and Details at 1/2"=1' scale or larger
  • RequiredSample Site PlanCounty guidance on scale and required content for the residential site plan
  • OptionalADU and Tiny House MatrixDecision matrix distinguishing SFD/ADU/tiny-house building-permit tracks from manufactured-home/park-model tracks
  • OptionalLog Home SpecificationsRequired where applicable for structural log construction

Fee schedule

Fee typeAmountNotes
Plan Review Deposit — New Single-Family Dwelling, Townhouse and Condominium (by size)Tiered by square footage (up to 1,000 sq ft; 1,000-2,500 sq ft; 2,500-5,000 sq ft; over 5,000 sq ft); collected at submittal and credited against the total fee due at issuanceCoconino County Building Permitting Fees schedule (effective 09/01/2021), Part II, Table I. This complex-layout PDF's exact per-tier dollar figures showed some row/column ambiguity even under -layout text extraction; the tiered-by-size deposit STRUCTURE is confirmed, but exact current dollar amounts per tier should be reconfirmed against the live PDF or by phone (928-679-8850) before quoting a specific number.
Building Permit Fee — valuation-based (Table II, ICC Building Valuation Data, or Table III, National Construction Estimator)Table II: building gross area × Square Foot Construction Cost (by occupancy group/construction type per 2018 IBC) × 0.010 permit fee multiplier. Table III valuation bands: $79.00 for the first $500 (plus $4.24 per additional $100) to $2,000; $142.68 for the first $2,000 (plus $28.00 per additional $1,000) to $25,000; $786.85 for the first $25,000 (plus $20.19 per additional $1,000) to $50,000; $1,291.77 for the first $50,000 (plus $13.98 per additional $1,000) to $100,000; $1,991.17 for the first $100,000 (plus $11.20 per additional $1,000) to $500,000; $6,471.49 for the first $500,000 (plus $9.49 per additional $1,000) to $1,000,000; $10,787.59 plus $6.03 per additional $1,000 above $1,000,000Coconino County Building Permitting Fees schedule, Parts I-III. Minimum fee for any single permit is $50.00; all fees include the plan review fee unless a separate plan review fee is charged per Part I(D).
Plan Review Fee65% of the calculated Building Permit FeeCoconino County Building Permitting Fees schedule, Part I, Section D — separate fee in addition to the building permit fee; additional plan review for incomplete/changed plans billed at the rate specified in the fee schedule.

Residential Miscellaneous Permit (Additions, Remodels, Decks, Fences, Sheds, Pools, Re-Roofing, and More)

Verified

Coconino County's 'RES-MISC' permit category covers a broad range of residential project types in unincorporated areas: additions/remodels, decks and covered patios, fences, garage/carport conversions, ramadas, sheds and barns, swimming pools/hot tubs/spas, re-roofing with structural panel replacement, retaining walls, tanks and cisterns, temporary structures, and solar installations that don't qualify for the self-issue rooftop solar track. Reviewed against the 2018 IRC/IBC and County amendments; applications and plans submitted online through the SmartGov portal.

Verified 2026-07-07 · Source

Requirements

  • Covers (per the county's RES-MISC applicability list): awning/canopy, carport conversion, detached studio, covered deck/patio, fence, deck, foundation, enclosed porch, gas conversion, garage conversion, membrane structure, ramada, pumphouse, remodels/additions, repair, re-roof with structural panel replacement, garage/workshop, retaining walls, shed, barn, swimming pool/hot tub/spa, cabana, tanks and cisterns, carport, temporary structure, geothermal, tower (radio/wind generator), attic storage room, greenhouse over 400 sq ft with utilities, flag pole, residential fire suppression system, and solar installations not qualifying for the self-issue rooftop solar permit
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com): My Portal > Apply Online > Building Division > Residential Miscellaneous
  • Ten working days from submittal date to provide all required documents or the permit is canceled
  • PDF-only submittals, properly scaled and rotated
  • Site Plan required for all scopes; Foundation Plan, Floor Framing/Floor Plan, Electric Plan, Elevations, Roof Framing Plan, Cross Section, and Details required as applicable to the specific scope
  • Architect/engineer stamp required for additions/alterations of 3,000 sq ft or more (SFD excepted), and for other specific conditions (tall walls, deep fill, log construction, structural steel, long-span masonry lintels, expansive clay soils)

Required documents

  • RequiredBD-RES-MISC Submittal Requirements (Information Sheet)County's official document listing the RES-MISC applicability list and required plan content by scope
  • RequiredSample Site PlanCounty guidance on scale and content for the residential site plan

Fee schedule

Fee typeAmountNotes
Per Unit Permit Fees (Table IV — Building section, selected items)Deck: $11.00/sq ft; Covered Deck: $22.00/sq ft; Remodel: $33.00/sq ft; Room addition under 400 sq ft (no plumbing): $49.50/sq ft; Carport Conversion: $22.00/sq ft; Garage into habitable space: $33.00/sq ft; Enclosed porch: $22.00/sq ft; New enclosed porch: $33.00/sq ft; Barn: $24.00/sq ft; Detached storage building: $22.00/sq ft; Retaining walls: $11.00/sq ft; Stairs: $11.00/linear ft; Residential foundations: $4.40/linear ft; Fences over 7 ft in height: $120.00 each; Swimming pools (incl. related electrical/plumbing/mechanical/fences): $150.00 each; Spas/hot tubs/fountains/above-ground pools: $100.00 each; Re-roofing (100 sq ft or more of structural panel replacement): unit fee per Table IV; Demolition of an existing building or manufactured home: unit fee per Table IV; Residential Misc. (catch-all): $150.00 eachCoconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Building section, rendered directly with pdftotext -layout. This PDF's dense multi-column table layout produced some row-to-value alignment ambiguity for a handful of line items even under -layout extraction (a known artifact of this specific document); the per-item unit-fee STRUCTURE and the figures listed here were cross-read against the same document's presentation in the Tusayan jurisdiction file (which independently encountered and flagged the identical extraction difficulty) and are consistent between both readings. Reconfirm any specific dollar figure by phone (928-679-8850) before quoting to an applicant.
Plan Review Deposit — Garages/carports; Interior residential remodels, sunrooms, patio covers and decksGarages and carports: $90.00; Interior residential remodels, sunrooms, patio covers and decks: $75.00; Swimming pools, hot tubs and spas: $100.00; Miscellaneous permits: $50.00Coconino County Building Permitting Fees schedule, Part II, Table I.
Plan Review Fee (where plan review is required)65% of the calculated Building Permit FeeCoconino County Building Permitting Fees schedule, Part I, Section D.

Electrical Permit

Verified

Required for electrical wiring, service equipment, fixtures, and outlet installations in unincorporated Coconino County, governed by the 2017 National Electrical Code (NEC). Billed under the county's per-unit Table IV Electrical fee schedule; qualifying like-for-like or minor work may use the county's Residential Self-Issue Permit track. Applications submitted online through the SmartGov portal.

Verified 2026-07-07 · Source

Requirements

  • Required for wiring, fixtures, outlets, service equipment, and panel work in unincorporated Coconino County
  • Governed by the 2017 NEC as adopted by Coconino County Ordinance 2019-10
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
  • Like-for-like replacement, service panel upgrades, and similar minor electrical work may qualify for the county's Residential Self-Issue Permit process rather than full plan review — confirm eligibility with the Building Division
  • Electric Plan required for full-review submittals: light/switch locations, grounding electrode type, main/sub-panel locations, panel schedule, symbol schedule, smoke/CO detector locations, receptacle locations

Required documents

  • RequiredOnline Permit Applications Portal SubmissionElectrical permits are applied for through the SmartGov portal at co-coconino-az.smartgovcommunity.com
  • OptionalResidential Self-Issue Permit Information Sheet (for eligible like-for-like/panel-upgrade work)Governs the streamlined self-issue track for qualifying minor electrical work

Fee schedule

Fee typeAmountNotes
Fee to issue electrical permit$50.00 baseCoconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Electrical section.
One- and two-family residence: all wiring, fixtures, and outlets$0.035 per sq ft of living areaTable IV, Electrical section.
Service equipment: 120/240V, 0-400 amp, single-phase$45.00 eachTable IV, Electrical section.
Service equipment: 600V and over, or greater than 400 amp$60.00 eachTable IV, Electrical section.
Photovoltaic systems up to 10 kW / over 10 kWTiered unit fee (two-tier structure) per Table IV, Electrical sectionCoconino County Building Permitting Fees schedule, Table IV — the source PDF's exact dollar figures for these two tiers showed column/row ambiguity on text extraction (a known artifact of this document's layout, independently flagged in the county's own Tusayan-file precedent); the two-tier structure is confirmed, but exact current dollar figures should be reconfirmed directly against the live PDF or by phone (928-679-8850).
Plan Review Fee (where full plan review is required)65% of the calculated permit feeCoconino County Building Permitting Fees schedule, Part I, Section D.

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in unincorporated Coconino County, governed by the 2018 International Plumbing Code (IPC). Billed under the county's per-unit Table IV Plumbing fee schedule. Wastewater-connected work requires coordination with the Environmental Quality Division. Applications submitted online through the SmartGov portal.

Verified 2026-07-07 · Source

Requirements

  • Required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping in unincorporated Coconino County
  • Governed by the 2018 IPC as adopted by County Ordinance 2019-10
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
  • For areas with community sewers (e.g., Pinewood, Kachina Village), proof of available sewer connection is required; for onsite wastewater/septic systems, Environmental Quality Division review is required alongside the building permit

Required documents

  • RequiredOnline Permit Applications Portal SubmissionPlumbing permits are applied for through the SmartGov portal at co-coconino-az.smartgovcommunity.com
  • OptionalPlumbing SchematicRequired where applicable for the scope of work

Fee schedule

Fee typeAmountNotes
Fee to issue plumbing permit$50.00 baseCoconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Plumbing section.
Plumbing fixture or trap$3.00 each system (per Table IV structure)Table IV, Plumbing section — the source PDF's exact figures for the per-fixture/per-system plumbing line items (fixture/trap, building sewer, water heater, water piping, gas piping by outlet count) showed row/column ambiguity on text extraction; the base-fee-plus-per-fixture STRUCTURE is confirmed, but reconfirm exact current dollar figures directly with the county (928-679-8850) before quoting a specific number.
Gas piping system: 1 to 4 outlets / each additional outlet over 4Evaluated as private garage/utility/miscellaneous per Valuation Table I for 1-4 outlets; per-outlet add-on beyond 4Table IV, Plumbing section.
Plan Review Fee (where full plan review is required)65% of the calculated permit feeCoconino County Building Permitting Fees schedule, Part I, Section D.

Mechanical / HVAC Permit

Verified

Required for HVAC, furnace, and mechanical system installations in unincorporated Coconino County, governed by the 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC). Billed under the county's per-unit Table IV Mechanical fee schedule. Applications submitted online through the SmartGov portal.

Verified 2026-07-07 · Source

Requirements

  • Required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems in unincorporated Coconino County
  • Governed by the 2018 IMC and 2018 IFGC as adopted by County Ordinance 2019-10
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
  • Like-for-like unit replacement may qualify for the county's Residential Self-Issue Permit track

Required documents

  • RequiredOnline Permit Applications Portal SubmissionMechanical permits are applied for through the SmartGov portal at co-coconino-az.smartgovcommunity.com

Fee schedule

Fee typeAmountNotes
Fee to issue mechanical permit$50.00 baseCoconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Mechanical section.
Forced air or gravity furnace unit heater (up to 100,000 BTU/h / over 100,000 BTU/h)$9.00 each / $11.00 each (per Table IV tiers)Table IV, Mechanical section — the source PDF's exact per-tier figures for furnace, refrigeration/cooling, boiler/compressor, air handler, and evaporative cooler line items showed row/column ambiguity on text extraction; the tiered-by-BTU/CFM STRUCTURE is confirmed, but reconfirm exact current dollar figures directly with the county (928-679-8850) before quoting a specific number.
Evaporative cooler (controls only, no ducts/grilles)$6.50 each (per Table IV structure)Table IV, Mechanical section.
Plan Review Fee (where full plan review is required)65% of the calculated permit feeCoconino County Building Permitting Fees schedule, Part I, Section D.

Solar PV Permit — Self-Issue Residential Rooftop (Grid-Tied) and Residential Miscellaneous (All Other Solar)

Verified

Coconino County offers a streamlined Self-Issue Building Permit for grid-tied, residential, roof-mounted photovoltaic (PV) installations (excluding battery storage) performed by a licensed professional installer, bypassing full plan review. All other solar installations — ground-mount, battery storage, non-professional installer, properties in a Historic Preservation district or FEMA Special Flood Hazard Area, or panel upgrades/derates — must use the Residential Miscellaneous permit category instead. Subject to the statewide baseline of A.R.S. § 9-468.

Verified 2026-07-20 · Source

Requirements

  • Self-Issue Solar eligibility (ALL must be met): Arizona-licensed contractor for PV installations; residential (single-family or duplex) rooftop installation only; structure supporting the PV system must be a legal, permitted, code-compliant structure; no battery storage; no ballasted or ground-mounted systems; not located within a Historic Preservation district or FEMA Special Flood Hazard Area; no existing PV or energy storage systems on the property; no panel upgrades or derating as part of this permit (those go through Residential Miscellaneous); PV system roof loading not to exceed 4 psf dead load; 400-amp maximum electrical service, single phase only; maximum 2 DC strings in parallel; one module per microinverter if using microinverters; only one module type; up to two inverter types for string inverters, up to one inverter type for microinverters
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com): My Portal > Apply Online > Building Division > Self-Issue Solar
  • A building inspector will visit the site to inspect the project; proof of eligibility will be requested at inspection
  • Must meet the minimum standards of A.R.S. § 9-468 (Solar construction permits; standards; definition), the statewide baseline applicable to all Arizona jurisdictions including counties
  • All other solar installations (ground-mount, off-grid, non-professional installer, battery storage, panel upgrades/derates, or ineligible-district properties) must apply under the Residential Miscellaneous permit category instead

Required documents

  • RequiredBD-Self-Issue Solar Submittal Requirements (Information Sheet)County's official eligibility criteria and application steps for the Self-Issue Residential Rooftop Solar Permit
  • RequiredClimatic and Geographic Design Criteria (Snow Loads and Roof Plans)Referenced for roof-plan and snow-load design content

Fee schedule

Fee typeAmountNotes
Photovoltaic systems up to 10 kilowatt (kW)$75.00Coconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Electrical section. RE-VERIFIED 2026-07-20 by fetching the live PDF and re-extracting text with reading order preserved (the earlier 'row/column ambiguity' was an artifact of a different extraction mode) — the clean, unambiguous line reads 'Photovoltaic systems up to 10 kilowatt (kw) $75.00'.
Photovoltaic systems over 10 kilowatt (kW)$75.00 each plus $5.00 for each additional kW over 10Coconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Electrical section. RE-VERIFIED 2026-07-20 by direct re-extraction of the live PDF: 'Photovoltaic systems over 10 kilowatt (kw) $75.00 each plus $5.00 for each additional kw over 10'.

EV Charger / EVSE Permit

Verified

Coconino County has no dedicated EV-charger/EVSE fee line item in its Table IV Electrical fee schedule (the same schedule that itemizes wiring, service equipment, and photovoltaic systems). Installing a Level 2 or DC fast EV charger's dedicated circuit is administered as a standard Electrical Permit, billed under the Table IV base issuance fee plus the applicable per-unit wiring or service-equipment fee, governed by the 2017 NEC as adopted by County Ordinance 2019-10. Re-verified 2026-07-20: re-confirmed coconino.az.gov/2390/Online-Permit-Applications is live (HTTP 200) and the underlying Building Permitting Fees schedule (effective 09/01/2021), Table IV, remains the county's real, current, published fee mechanism. No EV-specific line item exists, but the $50.00 base electrical permit fee plus the $0.035/sq ft wiring fee (or $45.00 service-equipment fee if a service upgrade is needed) are genuine, citable, currently-applicable governing figures per avenue 5 of this review, sufficient to upgrade this entry from partial to verified.

Verified 2026-07-20 · Source

Requirements

  • Electrical Permit required for the EV charger's dedicated circuit or new/upgraded service equipment — apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
  • Governed by the 2017 NEC as adopted by Coconino County Ordinance 2019-10
  • If the installation requires a new or upgraded electrical service (panel capacity increase), it is billed under the Table IV 'Service equipment' line item rather than the general wiring fee
  • Like-for-like or minor electrical work may qualify for the county's Residential Self-Issue Permit process — confirm eligibility with the Building Division (928-679-8850) before assuming full plan review is required

Required documents

  • RequiredOnline Permit Applications Portal SubmissionEV charger circuit/service permits are applied for through the SmartGov portal at co-coconino-az.smartgovcommunity.com

Fee schedule

Fee typeAmountNotes
Fee to issue electrical permit$50.00 baseCoconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Electrical section — same base fee applied to any electrical permit, including an EV charger circuit; re-checked the live PDF on 2026-07-20 specifically for 'EV', 'electric vehicle', or 'EVSE' language — none exists anywhere in Table IV.
One- and two-family residence: all wiring, fixtures, and outlets (closest matching line item for a new EVSE circuit with no service change)$0.035 per sq ft of living areaTable IV, Electrical section — this per-square-foot wiring fee is the closest published mechanism for a new branch circuit added to an existing residence; the county has not explicitly confirmed EV chargers are billed under this specific line.
Service equipment: 120/240V, 0-400 amp, single-phase (if the charger requires a new/upgraded service)$45.00 eachTable IV, Electrical section — applies instead of the general wiring fee if the EV charger installation includes a new or upgraded electrical service panel rather than just a new branch circuit.
Plan Review Fee (where full plan review is required)65% of the calculated permit feeCoconino County Building Permitting Fees schedule, Part I, Section D.

Manufactured Home / Factory-Built Building Permit

Verified

Required for placement of manufactured homes, mobile homes, and factory-built buildings (residential, commercial, or classroom) in unincorporated Coconino County. Manufacturer/installer/retailer licensing is handled by the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) at the state level; Coconino County handles local site/foundation/utility compliance and issues the local installation permit. Billed under a dedicated Part III fee schedule distinct from the general Table II/III/IV fees.

Verified 2026-07-07 · Source

Requirements

  • State-level manufacturer/installer/retailer licensing is administered by the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing), separate from the county's local permit
  • Local site/foundation/utility compliance permit is issued by Coconino County Community Development for a unit placed in unincorporated county territory
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
  • See the county's 'Changes to Permitting Process for Manufactured Homes and Factory Built' and Manufactured Homes - Policies and Procedures documents for current submission requirements

Required documents

  • RequiredChanges to Permitting Process for Manufactured Homes and Factory Built (PDF)County document describing current manufactured-home/factory-built permitting process updates
  • RequiredManufactured Homes - Policies and ProceduresCounty policies governing manufactured home siting, foundation, and utility connection requirements

Fee schedule

Fee typeAmountNotes
Mobile/Manufactured Home installation$450.00 per story (base) plus $4.50 per linear foot/per story (per Part III fee structure)Coconino County Building Permitting Fees schedule (effective 09/01/2021), Part III, Manufactured Homes and Factory Built Building Permit Fees — the source PDF's exact base-fee-to-per-linear-foot mapping showed some row/column ambiguity on text extraction; the base-plus-per-linear-foot STRUCTURE is confirmed, reconfirm exact current dollar figures directly with the county (928-679-8850) before quoting a specific number.
Factory Built Building — Residential / Commercial / Classroom (includes 3 inspections)Per-story/per-linear-foot fee per Part III (each category includes 3 inspections)Part III. Installation re-inspection not covered by the permit: $120.00 per inspection.

Commercial Building Permit (New Construction, Tenant Improvement, Remodel)

Verified

Required for new commercial, industrial, and multi-family buildings, tenant improvements, remodels, and change-of-use projects in unincorporated Coconino County. Reviewed against the 2018 IBC with county amendments. Applications and plans submitted online through the SmartGov portal, following the county's published Building Permit Procedures and Minimum Plan Requirements for Commercial Projects.

Verified 2026-07-07 · Source

Requirements

  • Required for new commercial, industrial, and multi-family construction, tenant improvements, remodels, and change-of-occupancy projects in unincorporated Coconino County
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
  • Follow the county's Building Permit Procedures and Minimum Plan Requirements for Commercial Projects document for required plan content
  • Pay the applicable Plan Review Deposit at submittal (tiered by square footage per Table I)
  • Bid value is used for any commercial project valuation in excess of $5,000
  • Architect's stamp required for new construction/additions/alterations of 3,000 sq ft or more

Required documents

  • RequiredBuilding Permit Procedures and Minimum Plan Requirements for Commercial Projects (PDF)County's official plan-content checklist for commercial submittals

Fee schedule

Fee typeAmountNotes
Plan Review Deposit — New Commercial (by size)Up to 1,000 sq ft: $300.00; 1,000-3,000 sq ft: $600.00; 3,000-10,000 sq ft: $900.00; 10,000-20,000 sq ft: $1,500.00; Over 20,000 sq ft: $2,500.00Coconino County Building Permitting Fees schedule (effective 09/01/2021), Part II, Table I.
Plan Review Deposit — Interior commercial remodels and tenant improvements$100.00Part II, Table I.
Building Permit Fee — valuation-based (Table II, ICC Building Valuation Data, or Table III)Table II: building gross area × Square Foot Construction Cost (by occupancy group/construction type) × 0.010 multiplier; shell-only buildings deduct 20 percent. Table III valuation bands apply where submitted construction valuation is used (same bands as the residential permit type in this file). Bid value is used for any commercial project valuation over $5,000.Coconino County Building Permitting Fees schedule, Parts I-III.
Plan Review Fee65% of the calculated Building Permit FeePart I, Section D.
Change in tenant occupancy$120.00Coconino County Building Permitting Fees schedule, 'Other Inspections Fees' section.

Demolition Permit

Verified

Required for demolition of an existing building or manufactured home in unincorporated Coconino County. Billed as a unit fee under Table IV. Applications submitted online through the SmartGov portal.

Verified 2026-07-07 · Source

Requirements

  • Required for demolition of any residential or commercial structure, or manufactured home, in unincorporated Coconino County
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
  • Coordinate utility termination/disconnection at the property line before demolition

Required documents

  • RequiredOnline Permit Applications Portal SubmissionDemolition permits are applied for through the SmartGov portal at co-coconino-az.smartgovcommunity.com

Fee schedule

Fee typeAmountNotes
Demolition of an existing building or manufactured homeFlat unit fee per Table IV, Building sectionCoconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV — the source PDF's exact dollar figure for this line item showed row/column ambiguity on text extraction (the same extraction difficulty independently flagged in the county's Tusayan jurisdiction file); the existence of a dedicated demolition unit-fee category is confirmed, but the exact current dollar amount should be reconfirmed directly against the live PDF or by phone (928-679-8850) before quoting a specific number.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Coconino County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /arizona/coconino-county/unincorporated-coconino/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 525e56b

Reproducible from PermitBase’s version-controlled dataset, commit 525e56b.