This is PermitBase’s published record for Town of Winkelman as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Town of Winkelman building permits
Town of Winkelman, Arizona — as published 2026-07-20.
Reviewed 2026-07-07 · Source
Codes adopted
Permit types & fees
Building Permit (New Construction, Residential and Commercial)
Required for new construction and structural work within Town of Winkelman limits. Administered directly by the Town Clerk's office at Town Hall (206 Giffin Avenue) rather than by a dedicated Building Safety Department or named Building Official — a structural difference from every other jurisdiction file in this dataset (e.g., Buckeye, Globe), which run independent, staffed development-services operations. Reviewed against the Town's listed adopted codes (2006 International Codes and 2002 National Electrical Code, per the 2024 AZBO statewide directory), as no more recent Winkelman-specific code-update ordinance could be located.
Reviewed 2026-07-07 · Source
Requirements
- Building permit required for new construction and other structural work within Winkelman town limits
- No online permitting portal was found for the Town of Winkelman (unlike Buckeye's EnerGov CSS or Globe's CitizenServe) — applications must be made in person or by phone/email through Town Hall
- Contact the Town Clerk, Sylvia Kerlock, at 520-356-7854 or skerlock@townofwinkelman.com to initiate an application; no downloadable permit-application PDF form was found published on the Town's website
- Governed by the 2006 International Codes and 2002 National Electrical Code per the 2024 Arizona Building Officials (AZBO) statewide directory — the most recent code-cycle citation this research could locate for Winkelman; no Town ordinance updating this cycle was found
- Manufactured/mobile home and factory-built structure placement is separately subject to Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) statewide construction/installation standards (A.R.S. § 41-4001 et seq.), on top of any Town site/utility-connection permit
Required documents
- RequiredBuilding Permit Application (form not published online)No standardized, downloadable Town of Winkelman building permit application form was found published on winkelmanaz.gov or via web search as of July 2026. Applicants must contact the Town Clerk directly at Town Hall to obtain and submit the required application materials.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (fee schedule not published) | Not publicly published | No Town of Winkelman building-permit fee schedule, valuation table, or resolution was found published on the Town's website or elsewhere as of July 2026, despite exhaustive searching (Town website,… Show full citationHideNo Town of Winkelman building-permit fee schedule, valuation table, or resolution was found published on the Town's website or elsewhere as of July 2026, despite exhaustive searching (Town website, Council Documents page, Arizona Memory Project archive, League of Arizona Cities and Towns records, general web search). The Town does maintain a Transaction Privilege Tax Contracting-Prime rate of 3.50% (Arizona Department of Revenue Model City Tax Code, City Code WM), which is a construction-activity TAX, not a building-permit FEE, and should not be conflated with one. Applicants must contact the Town Clerk (520-356-7854) directly for current permit fee amounts. |
Solar Photovoltaic (PV) Permit
Winkelman has no dedicated solar/PV permit category, application form, or fee schedule of any kind — consistent with the Town's minimal administrative structure documented in this file's residential-building-permit entry (no Building Safety Department, no online portal, permitting run entirely through the Town Clerk at Town Hall). A solar installation, if it requires a Town permit at all, would be administered ad hoc through the Town Clerk under the same 2006 International Codes/2002 NEC code-cycle citation used for other construction, and is subject to Arizona's statewide solar construction permit statute (A.R.S. § 9-468), which caps any Arizona municipality's solar permit fee at the actual cost of issuance.
Reviewed 2026-07-20 · Source
Requirements
- No standalone solar/PV requirements checklist, application form, or code-cycle citation specific to solar was found published by the Town of Winkelman — applicants must contact the Town Clerk, Sylvia Kerlock, at 520-356-7854 or skerlock@townofwinkelman.com directly to determine what, if anything, is required
- If a Town permit is required, per A.R.S. § 9-468 the fee charged may not exceed the actual cost of issuing the permit, and the Town must be able to provide an itemized cost breakdown on request
- Winkelman's most recently documented adopted code cycle (2006 International Codes, 2002 NEC per the 2024 AZBO statewide directory) would presumably govern any electrical/structural review, though no Town ordinance confirming this specifically for solar was located
- No Winkelman-Gila County or Winkelman-Pinal County intergovernmental agreement for building/permit services was found, so neither county's own solar permit process substitutes for a Town of Winkelman process (see this file's residential-building-permit tips)
Required documents
- RequiredNo published solar-specific application formNo downloadable Town of Winkelman solar/PV or general building permit application form was found published on winkelmanaz.gov or via web search as of July 2026; applicants must contact the Town Clerk directly
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar/PV Permit Fee (not publicly published) | Not publicly published | No Town of Winkelman fee schedule, valuation table, or resolution of any kind was found published, matching the identical gap documented in this file's residential-building-permit entry. Show full citationHideNo Town of Winkelman fee schedule, valuation table, or resolution of any kind was found published, matching the identical gap documented in this file's residential-building-permit entry. Per A.R.S. § 9-468, any fee charged for a solar construction permit by an Arizona municipality may not exceed the actual cost of issuing the permit. Re-chased 2026-07-20: checked both of the Town's parallel websites (winkelmanaz.gov and the older winkelmanaz.com) — the Council Documents page on each was fetched directly; neither lists a fee schedule, valuation table, or fee resolution among Minutes, Agendas, Budgets, or Auditor's Reports. Wayback CDX search of winkelmanaz.gov found no fee/permit-related captures at all. Confirmed genuinely unpublished, not a research gap — contact Town Hall directly. |
EV Charger Installation Permit
Winkelman has no dedicated EV-charger/EVSE permit category, application form, or fee schedule of any kind — consistent with the Town's minimal administrative structure documented in this file's residential-building-permit and solar-pv-permit entries (no Building Safety Department, no online portal, permitting run entirely through the Town Clerk at Town Hall). An EV charger installation, if it requires a Town permit at all, would be administered ad hoc through the Town Clerk under the same 2006 International Codes/2002 NEC code-cycle citation used for other construction. No Arizona statute equivalent to the solar-specific A.R.S. § 9-468 fee cap applies to EV chargers. Re-chased 2026-07-20 (exhaustive, still no governing figure found): the Town's homepage was re-fetched live and remains the same minimal 6-page CivicPlus-style site (Home, About, Town Council, Town Budget, Meeting Minutes, Contact Us, Municipal Court/Pay Court Fees) with no Building/Permits/Codes/Fees section of any kind. Checked whether either county overlapping Winkelman's area administers permitting on the Town's behalf: Gila County's own Flood Control District page explicitly refers to Winkelman as 'the incorporated town of Winkelman' and covers ONLY floodplain-construction questions there, not general building/electrical permitting — this confirms Winkelman is legally self-administering for other permit types (consistent with the Town Clerk-only model already documented) rather than deferring to the county. Pinal County separately publishes its own general Building/Electrical Permit Fee Schedule (electrical permit issuance fee $42.00, per Pinal County Building Safety), but no intergovernmental agreement, ordinance, or Town statement extending Pinal County's fee schedule to Winkelman was found — this figure is NOT applied here since no confirmed mechanism connects it to Winkelman. No citable governing dollar figure or explicit fee/timeline mechanism exists anywhere for Winkelman; genuinely unpublished, not merely unchased.
Reviewed 2026-07-20 · Source
Requirements
- No standalone EV-charger requirements checklist, application form, or code-cycle citation specific to EV charging was found published by the Town of Winkelman — applicants must contact the Town Clerk, Sylvia Kerlock, at 520-356-7854 or skerlock@townofwinkelman.com directly to determine what, if anything, is required
- Winkelman's most recently documented adopted code cycle (2006 International Codes, 2002 NEC per the 2024 AZBO statewide directory) would presumably govern any electrical review, though no Town ordinance confirming this specifically for EV chargers was located
- No Winkelman-Gila County or Winkelman-Pinal County intergovernmental agreement for building/permit services was found, so neither county's own EV-charger permit process substitutes for a Town of Winkelman process (see this file's residential-building-permit tips)
Required documents
- RequiredNo published EV-charger-specific application formNo downloadable Town of Winkelman EV-charger or general building permit application form was found published on winkelmanaz.gov or via web search as of July 2026; applicants must contact the Town Clerk directly
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV Charger Permit Fee (not publicly published) | Not publicly published | No Town of Winkelman fee schedule, valuation table, or resolution of any kind was found published, matching the identical gap documented in this file's residential-building-permit and solar-pv-permit entries. Show full citationHideNo Town of Winkelman fee schedule, valuation table, or resolution of any kind was found published, matching the identical gap documented in this file's residential-building-permit and solar-pv-permit entries. Unlike solar (A.R.S. § 9-468), there is no Arizona statute capping municipal EV-charger permit fees at actual cost. |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-07.
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Town of Winkelman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.