You are viewing the permanent link for the record currently in effect, published 2026-08-20.
Thatcher building permits
VerifiedThatcher, Arizona — as published 2026-08-20.
Verified 2026-07-07 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family dwelling construction within Thatcher town limits. Reviewed against the 2015 IRC and 2015 IBC (for any non-residential portions) as adopted and amended by the Town of Thatcher. Applications are submitted online via the Town's iWorq Citizen Portal, with plans and a Site Plan Review Checklist uploaded as PDFs.
Verified 2026-07-07 · Source
Requirements
- Building permit required for new single-family dwelling construction within Thatcher town limits
- Plans must comply with the 2015 IRC as adopted and amended by the Town of Thatcher (residential fire sprinklers are optional, not mandatory, per the Town's 'shall' to 'may' amendment; IRC Chapter 11 Energy Efficiency is deleted; sewer depth minimum 12 inches below grade regardless of freezing conditions; Arc-Fault Circuit-Interrupter Protection sections deleted)
- Maximum building height town-wide: 45 feet from grade to the highest point, or 30 feet from grade to the top of the highest outside wall
- Automatic fire sprinklers become mandatory only if new construction (or an addition/alteration) results in total floor area exceeding 7,500 sq ft
- Submitted via the iWorq Citizen Portal (thatcherpermitting.portal.iworq.net) — requires uploaded PDF plans plus contractor documentation/licenses
- Site Plan Review Checklist: two D-size (24"x36") copies of a site plan submitted to the Building Inspector with the building plans and permit application, showing property lines/dimensions, adjacent streets/easements, existing/proposed fences or walls, an on-site benchmark, existing/proposed utilities, grading/drainage concept, elevations (benchmark, finished floor, driveway, crown of road), building setback lines, and all proposed structures with dimensions
- Must conform to the Town's Zoning Ordinance in addition to Chapter 150 building codes (Code of Ordinances § 150.14)
Required documents
- RequirediWorq Citizen Portal Building Permit ApplicationOnline application submitted at thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4522 for residential, commercial, addition, remodel, outbuilding, or pool permits
- RequiredSite Plan Review Checklist – Single ResidenceTown of Thatcher checklist requiring two D-size (24"x36") site plan copies covering property lines, easements, benchmark, utilities, grading/drainage, elevations, setbacks, and proposed structures
- RequiredConstruction DrawingsBuilding plans uploaded as PDF(s) through the iWorq portal, reviewed by the Building Inspector against the adopted 2015 IRC/IBC and Town amendments
- RequiredContractor Documentation and LicensesUploaded through the iWorq portal alongside plans
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Set by Town Council resolution — no fixed dollar figure is published in the Code of Ordinances or Zoning Ordinance | Town of Thatcher Code of Ordinances § 150.98 ('Permit fees will be set by a resolution of the Town Council from time to time') and Zoning Ordinance Article 1, Section 1.7. Show full citationHideTown of Thatcher Code of Ordinances § 150.98 ('Permit fees will be set by a resolution of the Town Council from time to time') and Zoning Ordinance Article 1, Section 1.7. No fee-schedule resolution document is published on the Town's website, in its Document Center, or in any archived capture — and the previously linked Building Permit Application document, ID 962, now returns 404 with no archived snapshot. Call the Building Inspector at 928-428-2290 or use the iWorq portal's application flow to obtain current fee figures before budgeting for a specific project. |
Residential Addition / Remodel Permit
VerifiedRequired for room additions, remodels, and outbuildings to existing one- and two-family dwellings in Thatcher, generally allowed but may require a building permit. Reviewed against the 2015 IRC and Zoning Ordinance Section 13.8 (Accessory Buildings and Uses) as amended by the Town.
Verified 2026-07-07 · Source
Requirements
- Remodels of existing residences are generally allowed but may require a building permit; remodels changing occupancy to a non-residential use (e.g., commercial) require a change-of-occupancy permit and may trigger additional Fire Department/Public Works requirements
- If a building addition/alteration results in total floor area exceeding 7,500 sq ft, automatic fire sprinklers become mandatory
- Shops, sheds, and other accessory buildings/uses (garages, barns, corrals, swimming pools, ADUs) require building permits and/or zoning clearance per Zoning Ordinance § 13.8.B.9
- Site Plan Review Checklist required with the building plans and permit application, submitted via the iWorq Citizen Portal
Required documents
- RequirediWorq Citizen Portal Building Permit ApplicationOnline application at thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4522 for addition, remodel, or outbuilding scope
- RequiredSite Plan Review Checklist – Single ResidenceTwo D-size copies showing existing structure, addition/outbuilding footprint, and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Addition/Remodel/Accessory Building) | Set by Town Council resolution — no fixed dollar figure is published | Town of Thatcher Code of Ordinances § 150.98; Zoning Ordinance § 1.7. No fee figure is published — call the Building Inspector (928-428-2290) for current pricing. |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Thatcher, governed by the 2014 National Electrical Code as adopted by the Town with no local amendments noted. Applications submitted via the same iWorq Citizen Portal used for solar, gas, and plumbing permits.
Verified 2026-07-07 · Source
Requirements
- Electrical permit required for wiring, panel work, service changes, and other hard-wired electrical work
- Governed by the 2014 NEC as adopted by the Town of Thatcher (Code of Ordinances § 150.03) with no local amendments found in the code text
- Submitted via the iWorq Citizen Portal's combined 'Solar, Electrical, Gas or Plumbing permit' application
Required documents
- RequirediWorq Citizen Portal Permit Application (Solar, Electrical, Gas or Plumbing)Online application at thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4632
- RequiredElectrical PlansPanel/service details and circuit layout uploaded as PDF supporting the application
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee | Set by Town Council resolution — no fixed dollar figure is published | Town of Thatcher Code of Ordinances § 150.98. No fee figure is published in the Code of Ordinances, the Document Center, the Forms Center, or any archived capture — call the Building Inspector (928-428-2290) for current pricing. |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Thatcher, governed by the 2015 International Plumbing Code as adopted and amended by the Town, including a Town-specific sewer-depth amendment.
Verified 2026-07-07 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, and water heaters
- Governed by the 2015 IPC as adopted by the Town of Thatcher (Code of Ordinances § 150.02), with § 101.1 retitled 'Plumbing Code of the Town of Thatcher' and § 903.1 amended to insert '12'
- Sewer depth (IRC § P2603.5.1, as amended by the Town's § 150.06 IRC amendments): all building sewers connecting to a private or public system must be a minimum of 12 inches below grade, regardless of freezing conditions
- Submitted via the iWorq Citizen Portal's combined 'Solar, Electrical, Gas or Plumbing permit' application
Required documents
- RequirediWorq Citizen Portal Permit Application (Solar, Electrical, Gas or Plumbing)Online application at thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4632
- RequiredPlumbing PlanFixture layout, water heater location/size, and sewer/cleanout details uploaded as supporting PDF
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee | Set by Town Council resolution — no fixed dollar figure is published | Town of Thatcher Code of Ordinances § 150.98. No fee figure is published — call the Building Inspector (928-428-2290) for current pricing. |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in Thatcher, governed by the 2015 International Mechanical Code as adopted and amended by the Town.
Verified 2026-07-07 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment and ventilation systems
- Governed by the 2015 IMC as adopted by the Town of Thatcher (Code of Ordinances § 150.04), with § 101.1 retitled 'Mechanical Code of the Town of Thatcher' and § 504.8.2 amended so clothes dryer exhaust ducts cannot be connected with screws/fasteners extending into the duct
- Submitted via the iWorq Citizen Portal (combined with Solar/Electrical/Gas/Plumbing, or the general building permit application depending on scope)
Required documents
- RequirediWorq Citizen Portal Permit ApplicationOnline application via thatcherpermitting.portal.iworq.net for mechanical/HVAC scope
- RequiredMechanical/HVAC Plan DetailsEquipment location, ductwork, and clearances uploaded as supporting PDF
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical/HVAC Permit Fee | Set by Town Council resolution — no fixed dollar figure is published | Town of Thatcher Code of Ordinances § 150.98. No fee figure is published — call the Building Inspector (928-428-2290) for current pricing. |
Accessory Dwelling Unit (ADU) Permit
VerifiedNewly authorized town-wide by Ordinance No. 195-2024 (passed April 2024), allowing attached and/or detached accessory dwelling units on single-family residential lots in Thatcher, subject to size, setback, height, and foundation requirements under Zoning Ordinance Section 13.8.A.
Verified 2026-07-07 · Source
Requirements
- In all zoning districts where a single-family dwelling is an allowed use: one attached ADU AND one detached ADU permitted per lot where a primary dwelling exists
- One additional detached ADU permitted on a lot one acre or larger IF at least one ADU on the lot is a restricted-affordable dwelling unit as defined by Arizona Revised Statutes
- The largest ADU on a property is capped at 1,000 sq ft or 75% of the primary dwelling's size, whichever is less; any second/third ADU is capped at 600 sq ft or 50% of the primary dwelling's size, whichever is smaller
- An attached ADU must be architecturally integrated into the primary dwelling's design (must not read as a duplex), though separate entries are allowed
- ADU must be affixed to a permanent foundation and meet all applicable residential building codes — mobile homes and RVs are explicitly NOT acceptable as ADUs
- ADU must always observe the primary dwelling's front-yard and street-side-yard setbacks
- A detached ADU in the required rear yard needs a minimum 10-ft setback from a street-side rear property line and 3-ft setback from an interior rear/side property line; height capped at 18 ft in any required yard and must otherwise meet the zoning district's height rules; may not sit between the primary dwelling and the front property line
- An attached ADU must comply with the same height regulations and setbacks as the primary dwelling
- ADU must comply with applicable lot-coverage requirements (attached garages/porches/shade structures count toward lot coverage but not floor area)
- ADU must be subordinate to the primary single-family dwelling for all addressing and utilities
Required documents
- RequirediWorq Citizen Portal Building Permit ApplicationOnline application at thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4522, selecting the residential/addition/outbuilding scope applicable to the ADU
- RequiredSite Plan Review Checklist – Single ResidenceTwo D-size copies showing the ADU's footprint, setbacks, and relationship to the primary dwelling and utilities
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (ADU) | Set by Town Council resolution — no fixed dollar figure is published | Town of Thatcher Code of Ordinances § 150.98; Zoning Ordinance § 1.7. No fee figure is published — call the Building Inspector (928-428-2290) for current pricing. |
Fence / Wall Permit (Zoning Clearance, No Building Permit Required)
VerifiedFences and walls in Thatcher are governed entirely by Zoning Ordinance Section 13.9 and do NOT require a building permit town-wide, though the Town strongly recommends a Planning & Zoning materials/location check before construction.
Verified 2026-07-07 · Source
Requirements
- No fence, wall, or hedge may exceed 3 ft above sidewalk grade in any required front yard; capped at 6 ft above lot grade in side/rear yards not immediately adjacent to a street
- Corner lots: fences/walls/hedges may not sit within a 25-ft sight-visibility-triangle from the adjacent back of sidewalk in both directions; capped at 3 ft in the front/side setback and 6 ft outside it
- 'P-I' and industrial districts allow up to 8 ft (6 ft where abutting a residential district)
- Must use conventional materials (masonry, preformed concrete, treated wood, wrought iron, vinyl, chain link) and be kept in good repair
- Must sit entirely on the builder's own property unless the adjoining owner agrees in writing to a shared division-line fence
- Must not block access to electric/gas meters
- Electric fences barred except in 'R1-43' for animal containment; barbed wire limited to 'R1-43' (agricultural) or security use in 'P-I'/industrial districts (6+ ft up, angled inward); razor/concertina wire barred except at correctional facilities
- A building permit is NOT required for wall or fence construction anywhere in Thatcher
Required documents
- OptionalPlanning & Zoning Pre-Check (Recommended, Not Mandatory)Informal review of fence/wall materials and location with Planning & Zoning staff before construction, per the Town's own recommendation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence/Wall Permit Fee | $0 — no building permit or associated fee applies to standard fence/wall construction | Town of Thatcher Zoning Ordinance, Section 13.9, and 'Wall & Fence Guidelines' flyer (9/2020): 'A building permit is not required for wall or fence construction, however, we highly recommend checking… Show full citationHideTown of Thatcher Zoning Ordinance, Section 13.9, and 'Wall & Fence Guidelines' flyer (9/2020): 'A building permit is not required for wall or fence construction, however, we highly recommend checking with planning and zoning staff for approval on fence materials and location before commencement of construction.' |
Portable Carport Zoning Clearance (No Building Permit Required)
VerifiedPortable carports in Thatcher require Site Plan Review but explicitly do NOT require a building permit under the adopted IBC, per Zoning Ordinance Section 13.8.D.
Verified 2026-07-07 · Source
Requirements
- Permitted in all residential districts
- Must remain open on all 4 sides, capped at 400 sq ft, anchored against wind uplift, NOT permanently affixed to a concrete slab/footing, limited to 1 per lot
- Must not encroach into required front/side yard setbacks unless the lot's size/configuration leaves no alternative, in which case the Zoning Administrator may authorize encroachment via an administrative use permit
- A non-portable carport instead requires a full building permit as a home addition/Accessory Building
Required documents
- RequiredSite Plan Review SubmittalShowing carport location, dimensions, and setback compliance (or the basis for a requested administrative-use-permit encroachment)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Portable Carport Site Plan Review Fee | No building permit fee applies since a building permit is not required; any applicable site-plan-review or administrative-use-permit fee is set by Town Council resolution | Town of Thatcher Zoning Ordinance § 13.8.D and 'Portable Carport Guidelines' flyer (9/2020); Zoning Ordinance § 1.7 (fees set by resolution). The exact site-plan-review fee figure is not published — call 928-428-2290. |
Residential/Commercial Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of a rooftop or ground-mounted solar photovoltaic system within Thatcher town limits. The Town's own iWorq Citizen Portal application flow explicitly names 'Solar' as one of its listed permit categories, alongside Electrical, Gas, and Plumbing (thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4632) — confirming solar is a genuine, distinct application category rather than folded silently into the general electrical permit. However, consistent with every other permit type in this record, Thatcher has NO fixed, published dollar-figure fee for solar — Code of Ordinances § 150.98 states all fees are set by separate Town Council resolution, and no such resolution document was located online as of the last verification. Arizona statute A.R.S. § 9-468 independently caps whatever fee is actually charged at the Town's actual cost of issuing the permit.
Verified 2026-07-20 · Source
Requirements
- Solar PV installation requires a permit submitted via the iWorq Citizen Portal's combined 'Solar, Electrical, Gas or Plumbing permit' application (thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4632), selecting Solar as the work type
- Governed by the 2015 IBC/IRC (structural mounting) and 2014 NEC (electrical interconnection) as adopted by the Town — see codesAdopted
- Per A.R.S. § 9-468(A), the Town may not require a professional engineer's stamp on a standard residential rooftop PV system absent a written, installation-specific finding of necessity
- Per A.R.S. § 9-468(D)-(F), any fee the Town actually assesses 'shall not exceed the actual cost of issuing the permit,' and the Town must hold a public hearing with at least 15 days' notice before adopting or changing a solar-specific fee
- Site Plan Review Checklist (2 D-size copies) required with the building plans and permit application, per the same general submittal framework documented in the Residential Building Permit entry
Required documents
- RequirediWorq Citizen Portal Permit Application (Solar, Electrical, Gas or Plumbing)Online application at thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4632, with 'Solar' selectable as its own work type
- RequiredSite Plan Review Checklist – Single ResidenceTwo D-size (24"x36") copies showing array location, setback compliance, and interconnection point, per the same checklist documented in the Residential Building Permit entry
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar PV Permit Fee | Set by Town Council resolution — no fixed dollar figure is published in the Code of Ordinances, Zoning Ordinance, or anywhere else on the Town's website as of the last verification | Town of Thatcher Code of Ordinances § 150.98 ('Permit fees will be set by a resolution of the Town Council from time to time'). Show full citationHideTown of Thatcher Code of Ordinances § 150.98 ('Permit fees will be set by a resolution of the Town Council from time to time'). No fee figure is published in the Code of Ordinances, the Document Center, the Forms Center, or any archived capture — the same gap that applies to every other permit type in this record. A.R.S. § 9-468(D) independently requires that whatever is charged for the solar permit not exceed the Town's actual cost of issuing it. Call the Building Inspector (928-428-2290) or use the iWorq portal's live application flow for the current fee. |
Electric Vehicle (EV) Charging Station Permit
The Town of Thatcher has no distinct EV charger / EVSE permit type, application, or published fee. An EV charging station installation (new circuit, subpanel, or dedicated 240V branch circuit for a Level 2 charger) is permitted as standard electrical work under the Town's 2014 NEC adoption (Code of Ordinances Sec. 150.03), applied for through the same combined iWorq Citizen Portal 'Solar, Electrical, Gas or Plumbing permit' application used for all trade permits. Per Code of Ordinances Sec. 150.98, permit fees are set by Town Council resolution rather than published as a fixed schedule in the code text — the same fee gap documented for Thatcher's general electrical-permit entry. No numeric electrical/building permit fee table appears in the Town's Document Center, on the Finance Department page, in the Agendas/Meeting archive, or in the amlegal.com code library, and no archived version of a Thatcher fee schedule exists either.
Reviewed 2026-07-20 · Source
Requirements
- Electrical work must comply with the 2014 National Electrical Code (NEC) as adopted by the Town of Thatcher (Code of Ordinances Sec. 150.03)
- No distinct EV-charger permit type exists — apply via the iWorq Citizen Portal's combined 'Solar, Electrical, Gas or Plumbing permit' application and select Electrical
- All residential, commercial, and infrastructure permit applications are submitted online through the iWorq Citizen Portal (thatcherpermitting.portal.iworq.net) with uploaded PDF plans and contractor licensing documentation
Required documents
- RequirediWorq Citizen Portal Permit Application (Solar, Electrical, Gas or Plumbing)Online application at thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4632; select Electrical for an EV charger installation
- RequiredElectrical PlansPanel/service details and circuit layout for the EV charging station, uploaded as PDF supporting the application
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee (no distinct EV-charger line item) | Set by Town Council resolution — no fixed dollar figure is published | Town of Thatcher Code of Ordinances Sec. 150.98. Show full citationHideTown of Thatcher Code of Ordinances Sec. 150.98. The same fee-schedule gap documented on the general electrical permit applies here, after checking the Code of Ordinances, Document Center, Finance Department page, agendas and meeting archive, and Forms Center — call the Building Inspector (928-428-2290) for current pricing. |
Commercial Building Permit (New Construction / Tenant Improvement)
VerifiedRequired for new commercial construction and for remodels/tenant improvements of existing commercial space within Thatcher town limits. Thatcher administers commercial building permitting itself through its own Community Development/Engineering Department (Building Inspector, vested as Building Official under Code of Ordinances § 150.15) — it does NOT route commercial building safety or plan review to Graham County or a third-party contractor. There is no separate commercial application: the Town's iWorq Citizen Portal offers exactly five application categories, and its single 'Building, Addition, Remodel, Outbuilding, and Pool Permit Application' is described by the Town as covering 'a residential or commercial building, addition, remodel, outbuilding, or pool permit.' New commercial work is reviewed under the 2015 IBC as amended by the Town; alterations/tenant improvements to existing buildings fall under the 2015 International Existing Building Code, adopted with no local amendments (§ 150.08).
Verified 2026-08-01 · Source
Requirements
- Building permit required for new commercial construction, commercial additions, and remodels/tenant improvements, administered by the Town's own Building Inspector (Code of Ordinances § 150.15 vests the Building Official/Administrative Authority in the Office of the Building Inspector) — not Graham County
- Apply via the iWorq Citizen Portal's combined 'Building, Addition, Remodel, Outbuilding, and Pool Permit Application' (thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4522) — the same application used for residential; required uploads are plans in PDF format plus contractor documentation and licenses
- New commercial construction reviewed under the 2015 IBC as adopted and amended (§ 150.01): automatic fire sprinklers required for occupancy areas of all new structures with total floor area exceeding 7,500 sq ft, AND for occupancy areas within existing structures when additions or alterations result in a gross floor area of 7,500 sq ft or more of the total floor area (this does not exempt occupancies for which the adopted IBC itself requires sprinklers below 7,500 sq ft)
- Town-wide height caps (§ 150.01(B)(2)): no building may exceed 45 feet from grade to the highest point, or 30 feet from grade to the top of the highest outside wall
- Tenant improvements / alterations of existing buildings are governed by the 2015 International Existing Building Code, adopted by reference with no local amendments (§ 150.08)
- Trade work under the 2014 NEC (§ 150.03), 2015 IPC (§ 150.02), 2015 IMC (§ 150.04), and 2015 IFGC (§ 150.07) as adopted/amended; fire-safety review under the 2015 IFC as amended (§ 150.05) — no new building permits for shake/wood shingle roofing except repairs or additions under 20% of existing floor area
- Accessibility (§ 150.13): standards applicable to public accommodations and commercial facilities under Arizona's disability-access statute (A.R.S. § 41-1492.03) are incorporated into the Town's building codes, applying to new construction and alterations
- The building must conform to the Zoning Ordinance in addition to Chapter 150 building codes (§ 150.14); commercial zones carry specific rules such as the cargo-container appearance/site-plan-review requirements in Zoning Ordinance § 13.8.C
- No energy-code compliance path is locally enforced: the 2009 IECC was explicitly rescinded (§ 150.09) and IBC § 110.3.7 (Energy Efficiency Inspections) was deleted
Required documents
- RequirediWorq Citizen Portal Building Permit ApplicationOnline application at thatcherpermitting.portal.iworq.net/THATCHER/new-permit/600/4522 — the single combined application covering residential or commercial building, addition, remodel, outbuilding, or pool scope
- RequiredConstruction Drawings (PDF)Plans uploaded in PDF format through the iWorq portal, reviewed by the Building Inspector against the 2015 IBC (new construction) or 2015 IEBC (existing-building alterations/TI) and Town amendments
- RequiredContractor Documentation and LicensesUploaded through the iWorq portal alongside plans, per the portal's listed upload requirements
- RequiredSite PlanThe Town's general submittal framework requires a site plan with building plans; note the only site-plan checklist the portal publishes is the 'Single Residence Site Plan Checklist' — no commercial-specific site-plan checklist is published (confirm commercial site-plan expectations with the Building Inspector, 928-428-2290)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial Building Permit / Plan Review Fee | Set by Town Council resolution — no fixed dollar figure or valuation-based fee table is published anywhere | Code of Ordinances § 150.98 states 'Permit fees will be set by a resolution of the Town Council from time to time.' No commercial-specific fee, plan-review fee, or valuation-based fee table exists… Show full citationHideCode of Ordinances § 150.98 states 'Permit fees will be set by a resolution of the Town Council from time to time.' No commercial-specific fee, plan-review fee, or valuation-based fee table exists anywhere in the published code, and no Thatcher fee-schedule resolution is published anywhere online — not in the Document Center, Forms Center, Finance page, agendas archive, or the Wayback Machine. The same gap applies to every Thatcher permit type. Call the Building Inspector (928-428-2290) or use the iWorq portal's live application flow for current figures. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Checklists & handouts
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Thatcher building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.