This is PermitBase’s published record for Buckeye as of 2026-07-03. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Buckeye building permits
VerifiedBuckeye, Arizona — as published 2026-07-03.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family dwelling construction in the City of Buckeye. Reviewed against the 2024 IRC and City of Buckeye amendments (effective for submittals on/after January 1, 2025). Applications are submitted via email to permitcenter@buckeyeaz.gov or through the EnerGov Customer Self-Service (CSS) online portal.
Verified 2026-07-03 · Source
Requirements
- Building permit required for new single-family and two-family dwelling construction within Buckeye city limits
- Plans must comply with the 2024 IRC and City of Buckeye amendments, including Climatic and Geographic Design Criteria (115 mph wind, Exposure C; Seismic Design Category B; 34°F winter design temperature; moderate-to-heavy termite potential)
- Mandatory residential air conditioning capable of maintaining 90°F or below (IRC R325.9)
- Construction documents, statement of special inspections, and geotechnical report (where applicable) must be prepared by an Arizona-registered design professional per the State Board of Technical Registration
- Submittal via the EnerGov CSS online portal (egselfservice.buckeyeaz.gov) or by emailing a completed Building Permit Application and plans to permitcenter@buckeyeaz.gov
- Tract homes and custom homes are both billed at 65% of the calculated Building Permit Fee (per ICC valuation) for 1st and 2nd plan review, per the Development User Fee Schedule
Required documents
- RequiredBuilding Permit ApplicationCity of Buckeye Building Permit Application (Revised 3.11.2025, interactive form), submitted via EnerGov CSS portal or email to permitcenter@buckeyeaz.gov
- RequiredResidential Single Family Tract Home Checklist / Custom Home ChecklistCity of Buckeye submittal checklist (2021) for tract or custom single-family residential plan sets
- RequiredSite/Plot PlanLot dimensions, easements, setbacks, and structure locations
- RequiredConstruction Drawings and Structural CalculationsPrepared by an Arizona-registered design professional; truss calculations reviewed separately at $280 per standard set (residential)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (Table 1-A) | $50 (valuation $1-$500); $50 + $5 per additional $100 to $2,000; $125 + $18.35 per additional $1,000 to $25,000; $547 + $13.33 per additional $1,000 to $50,000; $880 + $12.17 per additional $1,000 to $100,000; $1,489 + $8.03 per additional $1,000 to $500,000; $4,699 + $7.26 per additional $1,000 to $1,000,000; $8,329 + $5 per additional $1,000 above $1,000,000 | City of Buckeye Development User Fee Schedule, Table 1-A (valuation chart), as archived April 2026 (doc revised 11-05-2024 per Resolution 72-24); superseded effective May 21, 2026 by Resolution 38-26 — exact current dollar figures should be reconfirmed against the live Resolution 38-26 exhibit if precision beyond this baseline is required |
| Plan Review Fee (Single Family Tract or Custom Home), 1st and 2nd Review | 65% of the calculated Building Permit Fee (per ICC valuation) | City of Buckeye Development User Fee Schedule, Section 4 (Building Safety, Vertical Construction); $1,000 initial submittal fee due at submission for standard residential plans, with remaining balance due at permit issuance |
| Truss Calculation Review, Residential (per standard), 1st and 2nd Review | $280 | City of Buckeye Development User Fee Schedule, Section 4 |
| Certificate of Occupancy, Residential, per residence | $100 | City of Buckeye Development User Fee Schedule, Section 4 |
| Subsequent Reviews (3rd and beyond) | $130 per hour | City of Buckeye Development User Fee Schedule, Section 4 |
Residential Addition / Remodel / Room Addition Permit
VerifiedRequired for room additions, remodels, garage conversions, patio covers, and other alterations to existing one- and two-family dwellings in Buckeye. Reviewed against the 2024 IRC as adopted and amended by the City of Buckeye.
Verified 2026-07-03 · Source
Requirements
- Building permit required for room additions, remodels, garage conversions, and patio covers
- Residential Room Addition and Remodel Checklist (2021) and Residential Detached Garage or Storage Shed Checklist (2021), or Residential Patio Cover Checklist (2021) apply depending on scope
- Detached accessory structures one-story and 200 sq ft or less do not require a permit (City amendment to IBC 105.2), but must still meet zoning/setback rules
- Garage conversions and garage conversion restorations are separately fee-classified from new room additions
- Plans must comply with City of Buckeye Design Criteria (115 mph wind, Exposure C; Seismic Design Category B)
Required documents
- RequiredBuilding Permit ApplicationSubmitted via EnerGov CSS portal or email to permitcenter@buckeyeaz.gov
- RequiredResidential Room Addition and Remodel Checklist (2021)City of Buckeye submittal checklist for room additions and remodels
- RequiredSite/Plot PlanShowing existing structure, addition footprint, and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Remodel Fee (Based on Valuation) | BOV — 65% of calculated permit fee per ICC valuation (Table 1-A) for plan review, plus the Table 1-A permit fee itself | City of Buckeye Development User Fee Schedule, Section 4, Miscellaneous Permit Fees — Based on Valuation |
| Garage Conversion | $200 | City of Buckeye Development User Fee Schedule, Section 4 |
| Garage Conversion Restoration | $310 | City of Buckeye Development User Fee Schedule, Section 4 |
| Patios, Decks, Ramadas, etc. | BOV (Based on Valuation, Table 1-A) | City of Buckeye Development User Fee Schedule, Section 4 |
| Residential Misc. (Accessory Structure, Patio Cover, Room Addition, Plot Plan) — review timeframe basis | N/A (fee varies by valuation) | Classified under 'Residential Misc.' in the Plan Review Timeframes Guideline |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Buckeye, governed by the 2023 National Electrical Code (NEC) as adopted and amended by the City of Buckeye. Certain miscellaneous electrical permit types (meter clearances, temporary service, individual runs) qualify for the same-day 'Online Permits' track.
Verified 2026-07-03 · Source
Requirements
- Electrical permit required for meter clearances, panel work, service entrance changes, temporary service, generators, and other hard-wired electrical work
- Governed by the 2023 NEC as adopted by the City of Buckeye; all electrical equipment 1,000 amps or larger must pass a dielectric strength test by a qualified third party before requesting a meter clearance (City amendment to NEC Article 110.7)
- Electric Meters and Single Service Dry Utility permits are eligible for the same-day 'Online Permits' track if submitted complete by 2 p.m.
- Apply via the EnerGov CSS online portal (egselfservice.buckeyeaz.gov)
Required documents
- RequiredBuilding/Electrical Permit ApplicationSubmitted via EnerGov CSS portal or, for select same-day miscellaneous permits, through the online applications system
- RequiredResidential Electric Run Checklist / Residential New Electric Checklist / Residential Electrical Panel Upgrade Checklist (2021)City of Buckeye submittal checklists depending on scope of electrical work
- OptionalResidential Load Calculations (2021)Required for service upgrades and new electrical service
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Meter Clearance (up to 200 AMP) | $200 | City of Buckeye Development User Fee Schedule, Section 4, Utility Permit Fees |
| Electrical Meter Clearance (201 to 400 AMP) | $260 | City of Buckeye Development User Fee Schedule, Section 4 |
| Service Entrance Section (up to 400 AMP), per meter | $260 | City of Buckeye Development User Fee Schedule, Section 4 |
| Service Entrance Section (400 AMP and above) | BOV (Based on Valuation, Table 1-A) | City of Buckeye Development User Fee Schedule, Section 4 |
| Electrical Panel / Panel De-rate, Residential / Power Pedestal, per meter | $260 | City of Buckeye Development User Fee Schedule, Section 4 |
| Residential Electrical, Individual Run | $50 | City of Buckeye Development User Fee Schedule, Section 4 |
| Electrical, Residential Misc. / Commercial Misc. | BOV (Based on Valuation, Table 1-A) | City of Buckeye Development User Fee Schedule, Section 4 |
| Temporary Service / Temporary Overhead Service | $260 | City of Buckeye Development User Fee Schedule, Section 4 |
| Generators, Temporary (10,000 Watts and above), per generator | $190 | City of Buckeye Development User Fee Schedule, Section 4 |
| Generators, Permanent, per generator | BOV (Based on Valuation, Table 1-A) | City of Buckeye Development User Fee Schedule, Section 4 |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Buckeye, governed by the 2024 International Plumbing Code (IPC) as adopted and amended by the City of Buckeye, including Buckeye-amended maximum fixture flow rates.
Verified 2026-07-03 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping
- Governed by the 2024 IPC as adopted by the City of Buckeye, with Appendix E (Sizing of Water Piping System) adopted
- Buckeye-amended maximum fixture flow rates apply (Table 604.4 / IRC Table P2903.2): lavatory 1.5 gpm at 60 psi, shower head 2.0 gpm at 80 psi, water closet 1.28 gal/flush
- Water Heaters (residential, per unit) qualify for the 'Online Permits' miscellaneous same-day track
- Apply via the EnerGov CSS online portal or email permitcenter@buckeyeaz.gov
Required documents
- RequiredBuilding/Plumbing Permit ApplicationSubmitted via EnerGov CSS portal or email
- RequiredResidential Plumbing Checklist / Residential Gas Line Checklist / Residential Tankless Water Heater Checklist (2021)City of Buckeye submittal checklists depending on scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water Heater, per unit | $25 | City of Buckeye Development User Fee Schedule, Section 4, Utility Permit Fees |
| Plumbing, Residential Misc. / Commercial Misc. | BOV (Based on Valuation, Table 1-A) | City of Buckeye Development User Fee Schedule, Section 4 |
| Gas Line, Residential Meter Clearance | $100 | City of Buckeye Development User Fee Schedule, Section 4 |
| Gas Line, Commercial Meter Clearance | $100 | City of Buckeye Development User Fee Schedule, Section 4 |
| Gas Line, Residential Misc. / Commercial Misc. | BOV (Based on Valuation, Table 1-A) | City of Buckeye Development User Fee Schedule, Section 4 |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in Buckeye, governed by the 2024 International Mechanical Code (IMC) as adopted and amended by the City of Buckeye. Given the City's mandatory residential AC requirement (IRC R325.9), AC replacement/upgrade is a very common permit type with its own checklist.
Verified 2026-07-03 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems
- Governed by the 2024 IMC as adopted by the City of Buckeye
- Every dwelling unit is required to maintain air conditioning per IRC R325.9 (90°F max at 3 ft above floor / 2 ft from exterior walls)
- AC Unit replacement/upgrade uses the Residential AC Replacement Checklist (2021) and qualifies for the same-day 'Online Permits' track when applicable
- Apply via the EnerGov CSS online portal or email permitcenter@buckeyeaz.gov
Required documents
- RequiredBuilding/Mechanical Permit ApplicationSubmitted via EnerGov CSS portal or email
- RequiredResidential AC Replacement Checklist / Residential Mechanical Checklist (2021)City of Buckeye submittal checklists for HVAC scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| AC Unit, Replace or Upgrade, Commercial or Residential, per unit | $75 | City of Buckeye Development User Fee Schedule, Section 4, Utility Permit Fees |
| Mechanical/HVAC, Residential Misc. / Commercial Misc. | BOV (Based on Valuation, Table 1-A) | City of Buckeye Development User Fee Schedule, Section 4 (utility/miscellaneous permit categories; no separately itemized HVAC line beyond AC unit replacement was found — other HVAC scope is billed as Residential/Commercial Misc. based on valuation) |
Re-Roofing Permit
VerifiedRequired for residential and commercial re-roofing in Buckeye when not covered by the City's limited permit exemption for like-for-like single-layer asphalt-shingle overlays on R-3 dwellings. Governed by the 2024 IRC/IBC roofing provisions and the City's published Residential Re-Roofing Checklist.
Verified 2026-07-03 · Source
Requirements
- Building permit required for re-roofing except the narrow exemption: R-3 (single-family) re-roofing using the same material as the existing roof, provided no more than one layer of asphalt shingles is applied over an existing asphalt shingle roof (City amendment to IBC 105.2)
- Roof plan/material listing required showing existing framing, square footage, existing material/weight, sheathing detail (typically 1/2 inch+ plywood/OSB, 8d nails at 6 in O.C. edges / 12 in O.C. field), flashing, underlayment, proposed material/weight, fire rating, and roof slope classification (High/Low/Flat)
- Pre-inspection may be required depending on roofing system type
- Owner/Builder form required if applicable
Required documents
- RequiredBuilding Permit Application (Re-Roofing)Submitted via EnerGov CSS portal or email to permitcenter@buckeyeaz.gov
- RequiredResidential Re-Roofing Checklist (2021)City of Buckeye submittal checklist detailing plot plan, roof plan/material listing, and slope classification requirements
- RequiredPlot PlanExisting property lines, house footprint, north arrow, address and lot number
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roof Replacement (Single Family Residence), All Other | BOV (Based on Valuation, Table 1-A) | City of Buckeye Development User Fee Schedule, Section 4, Miscellaneous Permit Fees — Fee-Based/BOV category |
Residential Solar Photovoltaic (PV) Permit (15kW and Under)
VerifiedRequired for installation of rooftop residential solar photovoltaic systems 15kW and under in Buckeye. Governed by the City's dedicated Residential Photovoltaic Procedure (rev. 02/2023) and the 2023 NEC as adopted and amended by the City of Buckeye. Applications are submitted via the EnerGov CSS online portal under Permit Type 'Electrical Residential', Work Class 'Photovoltaic System'.
Verified 2026-07-03 · Source
Requirements
- Residential Photovoltaic Systems shall be installed per the 2023 National Electric Code as adopted by the City of Buckeye (IRC R101.2.1)
- Construction plans required: site plan, roof layout, racking layout, attachment details, and a 3-line diagram (may be a single multi-page PDF)
- Cut sheets required for PV panels, inverters, and racking (racking cut sheets may be omitted if a racking layout is included in the construction plans)
- If a main-breaker de-rate is included, existing and new de-rated breaker sizes must be specified on the submittal checklist
- If a main panel upgrade/change-out is included (400A and under only), existing and new panel amperage must be specified
- Standard review timeframe is 2 business days, routed to Permit Technicians for prescreen
Required documents
- RequiredResidential Photovoltaic Procedure Submittal Checklist (15KW and Under Only, rev. 02/2023)Cover checklist plus required construction plan set and cut sheets, submitted in the specified document order via the EnerGov CSS portal
- RequiredResidential Photovoltaic System Checklist (2021)General residential PV submittal checklist
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Photovoltaic System, Residential | $150 | City of Buckeye Development User Fee Schedule, Section 4, Utility Permit Fees |
| Photovoltaic System — Residential Standard Plan Review | $155 | City of Buckeye Development User Fee Schedule, Section 4, Plan Review Fees |
Demolition Permit
VerifiedRequired for demolition of any residential or commercial structure in Buckeye. Requires coordination with Maricopa County Air Quality (asbestos/NESHAP) and Maricopa Dust Control prior to City permit issuance.
Verified 2026-07-03 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Buckeye city limits
- Site plan required showing lot dimensions, easements, and location of the building to be demolished plus other existing structures
- Owner Authorization Letter required
- All utilities must be terminated at the property line before demolition
- Applicant must contact Maricopa County Air Quality Department NESHAP program (602-506-6708, 1001 N Central Ave, Suite 400) for asbestos abatement approval PRIOR to applying for the demolition permit
- Applicant must contact Maricopa County Dust Control (602-506-6010) to verify whether a dust control permit is required
- Project is not legally complete until an approved final inspection has occurred
Required documents
- RequiredResidential Demo Checklist (2021) / Commercial Demo Checklist (2021)City of Buckeye submittal checklist for demolition permits
- RequiredBuilding Permit ApplicationSubmitted via EnerGov CSS portal or email to permitcenter@buckeyeaz.gov
- RequiredOwner Authorization LetterRequired for demolition permit submittal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Demolition — Single Family Residence, per structure | $230 | City of Buckeye Development User Fee Schedule, Section 4, Miscellaneous Permit Fees — Fee-Based |
| Building Demolition — Residential Accessory, per structure | $160 | City of Buckeye Development User Fee Schedule, Section 4 |
| Building Demolition — Structures other than Single Family Residence, per structure | $260 | City of Buckeye Development User Fee Schedule, Section 4 |
| Building Moving, per structure | $3,000 | City of Buckeye Development User Fee Schedule, Section 4 |
Fence and Retaining Wall Permit
VerifiedFences and retaining/themed walls in Buckeye are regulated with a limited no-permit exception for shorter residential fences, and full engineering/permit requirements for retaining walls and taller fences.
Verified 2026-07-03 · Source
Requirements
- Residential fences other than swimming pool barriers, not over 7 feet high, do NOT require a building permit (City amendment to IBC 105.2) — EXCLUDES perimeter and common-area subdivision fences, which do require review
- Pool barrier fences always require compliance with pool barrier standards regardless of the general fence exemption
- Retaining walls require: a site plan showing wall location with a legend listing wall sizes (color code if needed), a copy of approved grading plans for reference, structural calculations sealed by an Arizona-registered design professional, and a copy of the contract or a letter stating the contract amount
- Themed walls, retaining walls, and perimeter walls are billed as Based-on-Valuation (BOV) permits per the Development User Fee Schedule
Required documents
- RequiredResidential Fence and Block Wall Checklist (2021)City of Buckeye submittal checklist for fences and block walls
- RequiredResidential Retaining Walls Checklist (2021)City of Buckeye submittal checklist requiring site plan, approved grading plans, Arizona-sealed structural calculations, and contract documentation
- RequiredBuilding Permit ApplicationSubmitted via EnerGov CSS portal or email to permitcenter@buckeyeaz.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fences — Block, Privacy, Wrought Iron, Chain-link, Vinyl, Wood, etc. | $190 | City of Buckeye Development User Fee Schedule, Section 4, Miscellaneous Permit Fees — Fee-Based |
| Pool Barrier | $50 | City of Buckeye Development User Fee Schedule, Section 4 |
| Walls — Themed, Retaining, and Perimeter | BOV (Based on Valuation, Table 1-A) | City of Buckeye Development User Fee Schedule, Section 4, Miscellaneous Permit Fees — Based on Valuation |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Buckeye building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.