Skip to main content
PermitBase

Version history — Cave Creek, Arizona

This is PermitBase’s own verified record for Cave Creek, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Cave Creek’s actual law was at that time.

Permanent link to today’s record

/arizona/maricopa-county/cave-creek/as-of/2026-07-29/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-07-29Current record
  • 2026-07-23Superseded
  • 2026-07-20Superseded
    • Cave Creek, Arizona — EV Charger / EVSE Permit fee record added: Building Permit Fee -- Valuation $1 to $500 (minimum tier, EV charger circuit) ($47.74)
    • Cave Creek, Arizona — EV Charger / EVSE Permit fee record added: Building Permit Fee -- Valuation $501 to $2,000 ($47.74 for the first $500 plus $7.23 per each additional $100 of valuation or fraction thereof)
    • Cave Creek, Arizona — EV Charger / EVSE Permit fee record removed: Electrical work not otherwise separately classified (EV charger circuit)
    • Cave Creek, Arizona — EV Charger / EVSE Permit record added
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Cave Creek began