Skip to main content
PermitBase

Version history — El Mirage, Arizona

This is PermitBase’s own verified record for El Mirage, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what El Mirage’s actual law was at that time.

Permanent link to today’s record

/arizona/maricopa-county/el-mirage/as-of/2026-08-21/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-21Current record
    • El Mirage, Arizona — Water Heater / Water Supply Line / Sewer Line Permit fee record updated: Flat fee — see FY25-26 Adopted Fee Schedule → Flat fee — see FY26-27 Comprehensive Fee Schedule
    • El Mirage, Arizona — Fence and Retaining Wall Permit fee record updated: Valuation-based, see FY25-26 Adopted Fee Schedule BOV table → Valuation-based, see FY26-27 Comprehensive Fee Schedule BOV table
    • El Mirage, Arizona — Swimming Pool / Spa Permit fee record updated: Flat fee — see FY25-26 Adopted Fee Schedule → Flat fee — see FY26-27 Comprehensive Fee Schedule
  • 2026-07-29Superseded
    • El Mirage, Arizona — Commercial Building Permit (New Construction, Shell/Grey Buildings, Additions & Alterations) record added
  • 2026-07-23Superseded
    • El Mirage, Arizona — Commercial Sign Permit (Wall, Monument/Pylon, Awning, Temporary Banner) record added
    • El Mirage, Arizona — Fire Sprinkler System & Fire Alarm System Permit record added
    • El Mirage, Arizona — Certificate of Occupancy / Change of Occupancy Permit (Commercial & Tenant Improvement) record added
  • 2026-07-20Superseded
    • El Mirage, Arizona — EV Charger / EVSE Permit (Billed as General Electrical Permit) record added
  • 2026-07-06Initial record — coverage of El Mirage began