Fountain Hills building permits

Verified

Fountain Hills, Arizona — as published 2026-07-11.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-municipality authority under state enabling statutes (A.R.S. Title 9). The Town of Fountain Hills independently adopts and administers its own construction codes through its Building Safety Division, a work unit within the Planning and Zoning Department; it does not defer permitting to Maricopa County. Source: Town of Fountain Hills Building Safety page (fountainhillsaz.gov/204/Building-Safety).2024 International Building Code (IBC), as published by the International Code Council, adopted by reference with Town of Fountain Hills amendments (Ordinance No. 25-06, repealing and replacing Town Code Chapter 7, Buildings and Building Regulations). Effective for all building permit applications received on or after September 1, 2025. Source: Town of Fountain Hills Adopted Codes page (fountainhillsaz.gov/208/Adopted-Codes); Ordinance No. 25-06 (fountainhillsaz.gov/DocumentCenter/View/12020).2024 International Residential Code (IRC) for One- and Two-Family Dwellings, with Appendix G, adopted by reference with Town amendments, effective September 1, 2025. Source: Adopted Codes page; Ordinance No. 25-06.2024 International Mechanical Code (IMC), adopted by reference, effective September 1, 2025. Source: Adopted Codes page; Ordinance No. 25-06.2024 International Plumbing Code (IPC), adopted by reference, effective September 1, 2025. Source: Adopted Codes page; Ordinance No. 25-06.2024 International Fuel Gas Code (IFGC), adopted by reference, effective September 1, 2025. Source: Adopted Codes page.2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference (one edition behind the 2024 ICC set, consistent with the statewide pattern of NEC lagging one cycle). Effective September 1, 2025. Source: Adopted Codes page; Ordinance No. 25-06.2024 International Energy Conservation Code (IECC), adopted by reference with Town amendments (IRC Section N1103.10.3 / R403.10.3 'Covers' deleted). Effective September 1, 2025. Source: Adopted Codes page; Ordinance No. 25-06.2024 International Fire Code (IFC), adopted by reference as the Town of Fountain Hills Fire Code, with extensive Town amendments including Appendix P (Control and Suppression of Hazardous Fire Areas) and Appendix Q (Fountain Hills Fire-Related Incidents Citation Program) added; administered by the Fire Marshal / Fire Code Official. Note: the Town's residential fire-sprinkler requirement is preserved from the 2006 IFC as amended and adopted April 17, 2008, regardless of which edition of the Fire Code is otherwise in force. Effective September 1, 2025. Source: Adopted Codes page; Ordinance No. 25-06.2024 International Swimming Pool, Spa and Hot Tub Code (ISPSC), adopted by reference with Town amendments (barrier height/clearance provisions amended). Effective September 1, 2025. Source: Adopted Codes page; Ordinance No. 25-06.1997 Uniform Administrative Code, amended to adopt in part only — Section 304 and the referenced Tables 3-A through 3-H — solely for the purpose of determining fees. Source: Adopted Codes page.1997 Uniform Code for the Abatement of Dangerous Buildings, as published by the International Conference of Building Officials, adopted by reference with a Town amendment adding a definition for structures with construction cessation exceeding one year. Source: Adopted Codes page; Ordinance No. 25-06.Maricopa Association of Governments (MAG) Standard Specifications and Uniform Details for Public Works Construction, adopted by reference for engineering/public-works construction. Source: Adopted Codes page; Ordinance No. 25-06.Removing Solar Equipment procedure/amendment, published separately by Building Safety. Source: fountainhillsaz.gov/DocumentCenter/View/12635.NOTE: A prior 2018 I-Codes / 2017 NEC adoption cycle (as reflected in older third-party directories) has been superseded — the Town Council adopted the 2024 code suite effective September 1, 2025 per Ordinance No. 25-06. Plans submitted on or after that date must use the 2024-cycle codes. Source: Adopted Codes page (fountainhillsaz.gov/208/Adopted-Codes), which explicitly states this notice.

Permit types & fees

Residential Building Permit (New Construction / Additions)

Verified

Required for new single-family and two-family dwelling construction and building additions in the Town of Fountain Hills. Reviewed against the 2024 IRC and Town of Fountain Hills amendments (Ordinance No. 25-06), effective for submittals on/after September 1, 2025. Applications are submitted exclusively through T.O.P.P.S., the Town's Citizenserve-hosted online permitting portal.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family/two-family dwelling construction and additions within Town limits
  • Plans must comply with the 2024 IRC and Town of Fountain Hills amendments (Ordinance No. 25-06), including Climatic and Geographic Design Criteria (105 mph wind; Seismic Design Category B; 34°F winter design temperature; 0 psf ground snow load; moderate-to-heavy termite potential)
  • Automatic fire sprinklers are required throughout the entire new dwelling, including garages and carports, per the Town's amended IFC Section 903.2 (Ordinance No. 25-06) — plans must be submitted separately for the fire sprinkler system and noted on the house plans
  • Engineering (lateral analysis for shear, retaining and gravity where required) must be sealed, signed and dated by an architect or engineer registered in the State of Arizona
  • Submittal exclusively via T.O.P.P.S. (Town's Online Permitting and Planning System), a Citizenserve-hosted portal — no paper/walk-in applications accepted
  • Full square-footage summary required (livable, garage, covered patios/porches, storage, mechanical), plus site plan, floor plan, foundation/floor/wall/roof framing details, and an energy-code compliance path (prescriptive, performance, or full RES-Check)

Required documents

  • RequiredTown of Fountain Hills One and Two Family Residential 2024 IRC Plan Submittal ChecklistOfficial Town checklist covering site plan, square footage summary, engineering, foundations, floor/wall/roof framing, energy efficiency (IECC Table), mechanical (Manual J), fuel gas, plumbing, and electrical submittal requirements
  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal
  • RequiredSite/Plot PlanLot dimensions, easements, setbacks, structure locations, and correct/complete address and legal description
  • RequiredConstruction Drawings and Structural CalculationsSealed, signed and dated by an Arizona-registered architect or engineer where lateral, retaining, or gravity engineering is required
  • RequiredFire Sprinkler PlansSubmitted separately from the building plan set per Town Fire Code amendment; house plans must note that fire sprinklers are required

Fee schedule

Fee typeAmountNotes
Single Family Homes & Additions — Livable Area with A/C$0.73 per square footIncludes Permit and Plan Review. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees section.
Single Family Homes & Additions — Covered Area (Garage and/or Patio, non-A/C)$0.55 per square footTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Landscape Deposit$2,500.00 refundable depositRequired for Certificate of Occupancy if landscaping is not yet installed; refundable upon Town approval within 6 months. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Single-Family Residential Development Impact Fee$8,816.00 per dwellingSeparate from building permit/plan review fee; split among Parks & Recreation, Fire, and Streets funds. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Residential Automatic Sprinkler System Plan Review/Inspection$340.00 for up to 4,400 sq ft, then $0.08 per sq ft thereafterTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section — mandatory given the Town's sprinkler-in-all-new-construction amendment.
Plan Review Add-On (After 3rd Review)50% of Building Permit/Plan Review FeeTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Permit Extension — Residential new construction/additions$460.00 per extensionIf Town has all records and project is within current code cycle. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Penalty for failure to obtain a building permit100% of Building Permit/Plan Review FeeTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.

Residential Remodel Permit

Verified

Required for remodels and alterations to existing one- and two-family dwellings in Fountain Hills that are not full additions with new foundation. Reviewed against the 2024 IRC as adopted and amended by the Town (Ordinance No. 25-06).

Verified 2026-07-06 · Source

Requirements

  • Building permit required for remodels and alterations affecting structural or life-safety elements
  • Additions with new foundation are billed under the Residential Building Permit livable/covered-area rates rather than the remodel rate
  • Detached accessory structures one-story and 120 sq ft or less do not require a permit (Ordinance No. 25-06 amendment to IRC/IBC 105.2), but zoning/setback rules still apply
  • Plans must comply with Town of Fountain Hills Design Criteria (105 mph wind, Exposure per Table R301.2(1); Seismic Design Category B)
  • Submittal exclusively via T.O.P.P.S. online portal

Required documents

  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal
  • RequiredTown of Fountain Hills One and Two Family Residential 2024 IRC Plan Submittal ChecklistApplies to remodel scope affecting structural, mechanical, electrical, or plumbing systems
  • RequiredSite/Plot PlanShowing existing structure and remodel/alteration footprint

Fee schedule

Fee typeAmountNotes
Single Family Remodel$0.24 per square footIncludes Permit and Plan Review. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees section.
Single Family Remodel, non-A/C area$0.15 per square footTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Miscellaneous Plan Review or Inspection (1-hour minimum)$115.00 per hourTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Permit Extension — Residential remodel only$120.00 per extensionIf Town has all records and project is within current code cycle. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Refund for cancelled Building Permit35% of building permit fee paidRequest must be made in writing within 180 days of original payment. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.

Electrical Permit (Minor / One-Discipline)

Verified

Required for standalone electrical work such as panel repair, in the Town of Fountain Hills, governed by the 2023 National Electrical Code (NEC) as adopted and amended by the Town (Ordinance No. 25-06). Larger electrical scope tied to new construction or remodels is billed under those permit types instead.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for panel repair and other standalone hard-wired electrical work not part of a larger building permit
  • Governed by the 2023 NEC as adopted by the Town of Fountain Hills
  • One-Discipline Permit classification applies to standalone building, plumbing, electrical, or mechanical work; a Combination Permit applies where multiple disciplines are involved in one minor scope
  • Apply via T.O.P.P.S. online portal only

Required documents

  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal
  • OptionalElectrical Load Calculation / One-Line DiagramRequired for service upgrades and panel work per Town electrical submittal practice

Fee schedule

Fee typeAmountNotes
Electrical — Panel Repair (minor)$150.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Commercial Building Fees section (also applied to comparable residential minor electrical scope as the Town's published one-discipline minor rate).
One Discipline Permit (building, plumbing, electrical, or mechanical)$140.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees section.
Addendum$115.00 per addendumTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Reinspection Fee$170.00 per inspectionTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.

Plumbing Permit (Water Heater / Minor)

Verified

Required for plumbing installation, alteration, or repair such as water heater replacement/solar minor work in the Town of Fountain Hills, governed by the 2024 International Plumbing Code (IPC) as adopted and amended by the Town (Ordinance No. 25-06).

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for water heater replacement/solar (minor) and other standalone plumbing work
  • Governed by the 2024 IPC as adopted by the Town of Fountain Hills
  • Apply via T.O.P.P.S. online portal only

Required documents

  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal

Fee schedule

Fee typeAmountNotes
Plumbing — Water Heater Replacement/Solar (minor)$140.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Commercial Building Fees section (published minor-scope rate; applied uniformly to comparable residential minor plumbing scope).
One Discipline Permit (building, plumbing, electrical, or mechanical)$140.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees section.
Reinspection Fee$170.00 per inspectionTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.

Mechanical / HVAC Permit (Minor Replacement)

Verified

Required for HVAC replacement in the Town of Fountain Hills, governed by the 2024 International Mechanical Code (IMC) as adopted and amended by the Town (Ordinance No. 25-06).

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for HVAC replacement (minor) and other standalone mechanical work
  • Governed by the 2024 IMC as adopted by the Town of Fountain Hills
  • Apply via T.O.P.P.S. online portal only

Required documents

  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal

Fee schedule

Fee typeAmountNotes
Mechanical — HVAC Replacement (minor)$140.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Commercial Building Fees section (published minor-scope rate; applied uniformly to comparable residential minor HVAC scope).
One Discipline Permit (building, plumbing, electrical, or mechanical)$140.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees section.
Reinspection Fee$170.00 per inspectionTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.

Solar Photovoltaic & Energy Storage Permit

Verified

Required for installation of rooftop or ground-mounted residential solar photovoltaic systems and battery energy storage systems (ESS) in the Town of Fountain Hills. Governed by the Town's dedicated Solar Photovoltaic & Energy Storage Submittal Checklist (NEC 2023) and IRC R330 (energy storage).

Verified 2026-07-06 · Source

Requirements

  • System must comply with NEC 2023 Article 690 (solar PV) and Article 706 (energy storage) as adopted by the Town of Fountain Hills
  • Roof access/pathway requirements per IFC 1205: not fewer than two 36-inch-wide pathways from lowest roof edge to ridge on separate roof planes (or one on the street/driveway side), plus a ridge setback of 18 inches (arrays ≤33% of roof area) or 36 inches (arrays >33% of roof area)
  • Rapid shutdown compliance required for rooftop systems per NEC 690.12
  • One-line (single-line) diagram required showing PV array to battery storage, inverters, and main service panel; three-line diagram required if wire sizes/conduit/overcurrent protection/disconnects/grounding are not shown on the one-line
  • Battery Energy Storage Systems (ESS) restricted to specific locations under IRC R330 — detached garages/accessory structures, attached garages separated from living space, outdoors 3+ ft from doors/windows, or fire-rated enclosed utility/storage spaces — and prohibited in sleeping rooms or closets/spaces opening into sleeping rooms
  • Individual ESS units capped at 20 kWh; aggregate ESS capped at 40 kWh (utility closets/basements/storage), 80 kWh (attached/detached garages), or 80 kWh (exterior walls or outdoors on the ground)
  • Structural load calculations (engineer-certified) required for roof-mounted systems; wind load compliance for attachment methods per local design criteria
  • Apply via T.O.P.P.S. online portal only

Required documents

  • RequiredSolar Photovoltaic & Energy Storage Submittal Checklist (NEC 2023)Official Town checklist covering site plan, system description, equipment cut sheets, one-line/three-line diagrams, array requirements (NEC Article 690), inverter/interconnection details, grounding/bonding, labeling, structural considerations, and battery/ESS requirements (NEC Article 706, IRC R330)
  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal
  • RequiredEquipment Cut Sheets & Manufacturer SpecificationsData sheets for solar panels, inverters, charge controllers, and batteries

Fee schedule

Fee typeAmountNotes
Solar Photovoltaic (Includes Permit and Plan Review)$150.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees — Specialized Permits section.
One Discipline Permit (if applicable to scope)$140.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.

EV Charger / EVSE Permit

Verified

Required for installation of a residential or commercial electric vehicle charging station (EVSE) in the Town of Fountain Hills, governed by the 2023 National Electrical Code (NEC) as adopted and amended by the Town (Ordinance No. 25-06). The Town's Comprehensive Fee Schedule has no distinct EV-charger/EVSE fee line item — a standalone EVSE circuit is billed under the same 'One Discipline Permit' minor-electrical category used for other standalone electrical work (see this jurisdiction's electrical-permit entry). Note the Town's fee schedule does list a separate, unrelated 'Electric Vehicle Charging — Charging Station Fee' of $4.00/hour (2-hour maximum) under Public Works, but that is a usage/parking fee for a Town-owned public charging station, not a building-permit fee for installing a charger.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for EVSE/charging equipment installation as standalone electrical work not part of a larger building permit
  • Governed by the 2023 NEC as adopted by the Town of Fountain Hills
  • One-Discipline Permit classification applies to standalone electrical work such as an EVSE circuit; larger scope bundled with new construction or a remodel is billed under that permit type instead
  • Apply via T.O.P.P.S. online portal only — the Town accepts no walk-in/paper submittal

Required documents

  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal; no EV-specific application form was found published separately from the standard electrical permit application.
  • OptionalElectrical Load Calculation / One-Line DiagramMay be required if the EVSE installation also involves a panel or service upgrade, per Town electrical submittal practice

Fee schedule

Fee typeAmountNotes
One Discipline Permit (building, plumbing, electrical, or mechanical)$140.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees section. No distinct EV-charger/EVSE line item is published; a standalone EVSE circuit is billed under this general minor-electrical/one-discipline category.
Reinspection Fee$170.00 per inspectionTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.

Swimming Pool & Spa Permit

Verified

Required for construction of swimming pools and spas in the Town of Fountain Hills. Reviewed against the 2024 International Swimming Pool, Spa and Hot Tub Code (ISPSC) as adopted and amended by the Town (Ordinance No. 25-06), including barrier/VGBA anti-entrapment requirements.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for any structure intended for swimming, recreational bathing, or wading that contains water more than 18 inches deep and/or more than 8 feet across
  • Barrier top must be not less than 60 inches (Pool Checklist: 60 in. min / 72 in. max) above grade around the entire perimeter and 3 feet horizontally from the barrier
  • Vertical clearance between grade and bottom of barrier not to exceed 2 inches (non-solid surfaces, e.g. grass/gravel) or 4 inches (solid surfaces, e.g. concrete)
  • Barrier openings shall not allow passage of a 4-inch-diameter sphere; horizontal/vertical member spacing rules apply where barrier members are spaced less than 54 inches apart
  • Pedestrian access gates must swing away from the pool, be self-closing, and self-latching, with specific release-mechanism height/setback rules
  • All pumps, motors, drains, grates, return and suction fittings must comply with VGBA (Virginia Graeme Baker Act) anti-entrapment standards, with manufacturer cut sheets required
  • Pool electrical panel location/ampacity, one-line drawing, and load calculations required; lighting cut sheets required to verify Dark Sky ordinance compliance
  • Apply via T.O.P.P.S. online portal only

Required documents

  • RequiredFountain Hills Pool Requirements & Pool ChecklistOfficial Town checklist covering site plan, barrier details/layout, engineering, electrical one-line/calculations/panel schedules, heater/pump/drain cut sheets, and VGBA compliance method
  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal

Fee schedule

Fee typeAmountNotes
Pools & Spas Attached$320.00 up to 450 sq ft, plus $0.72 per sq ft above 450 sq ftIncludes Permit and Plan Review. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees — Specialized Permits section.
Stand Alone Spas$140.00Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
Landscape Deposit$2,500.00 refundable depositRequired if landscaping is not installed at Certificate of Occupancy; refundable upon Town approval within 6 months. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.

Fence and Retaining Wall Permit

Verified

Fences and retaining walls in Fountain Hills are regulated with a limited no-permit exception for very short fences and low retaining walls, and full permit/engineering requirements above those thresholds.

Verified 2026-07-06 · Source

Requirements

  • Fences not over 30 inches high do NOT require a building permit (Ordinance No. 25-06 amendment to IRC/IBC 105.2) — this is a materially lower no-permit threshold than many neighboring Maricopa County cities
  • Retaining walls not over 2 feet in height (measured from bottom of footing to top of wall) do NOT require a permit, UNLESS the wall supports a surcharge (or, under the IBC amendment, impounds Class I/II/IIIA liquids)
  • Retaining walls above the 2-foot threshold require structural calculations and a building permit
  • Apply via T.O.P.P.S. online portal only

Required documents

  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal
  • RequiredSite Plan and Structural CalculationsRequired for retaining walls exceeding the Town's 2-foot no-permit threshold or supporting a surcharge

Fee schedule

Fee typeAmountNotes
Fence Walls$200.00 for first 100 linear feet, plus $2.00 per linear foot thereafterIncludes Permit and Plan Review. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees — Specialized Permits section.
Retaining Walls$300.00 for first 100 linear feet, plus $3.20 per linear foot thereafterTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.

Sign Permit

Verified

Required to erect, install, or modify any permanent commercial/business sign in the Town of Fountain Hills, per Zoning Ordinance Chapter 6 (Sign Regulations), Section 6.03 (Permits). Issued by the Development Services/Building Safety Division via T.O.P.P.S., with substantive size/height/placement standards set by Section 6.08 (Specific Requirements and Allowances) and reviewed for zoning compliance by the Planning Division. A separate Comprehensive (Master) Sign Plan and fee applies to multi-tenant commercial developments, and a distinct Administrative Use Permit covers most temporary signage.

Verified 2026-07-23 · Source

Requirements

  • Unlawful to erect, install, and/or modify any permanent sign within the Town without first applying for and obtaining a building permit from the Development Services Department (Zoning Ordinance § 6.03); 'modify' includes any change to a sign's size/shape, electrical components, design, or supporting structure
  • No building permit required for: address numbers required by the Fire Code; any sign 4 square feet or less in area (not otherwise prohibited); repainting; minor nonstructural repairs to a sign or its supports; temporary signs; window signs; and changes to sign panel/copy on an existing sign — all remain subject to the chapter's other provisions, including Zoning Administrator approval where required (§ 6.03)
  • A sign permit does NOT include electrical work — illuminated signs require a separate electrical permit application (§ 6.03)
  • Building Wall Sign: 1.5 sq ft of sign area per lineal foot of occupancy frontage along a street (minimum 24 sq ft per occupancy with an exterior wall; maximum 100 sq ft per individual sign); corner buildings between 45° and 90° may transfer up to 25% of sign area from one frontage to the other; one sign per 50 ft of occupancy street frontage; signs may project no more than 12 inches from the wall (§ 6.08(A)(5))
  • Monument Sign: maximum size/height by zoning district — Single Residential 32 sq ft/6 ft, Multiresidential 32 sq ft/8 ft, Commercial/Industrial 50 sq ft (individual sign)/12 ft; one monument sign per lot/parcel for each full 300 ft of street frontage, separated from any other monument sign on the same property by at least 150 ft (§ 6.08(A)(10))
  • Banner signs require their own permit from Development Services (separate from a permanent-sign building permit): maximum 32 sq ft, one per occupancy, maximum 30 days per permit up to 150 days per calendar year (new businesses may qualify for up to 1 year via business-license documentation) (§ 6.08(A)(4))
  • Multi-tenant commercial developments typically require a Comprehensive (Master) Sign Plan reviewed by the Planning Division, a separate fee product from the Building Safety sign-installation permit
  • Apply via T.O.P.P.S. online portal only — the Town accepts no walk-in/paper submittal

Required documents

  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal; no sign-specific standalone application form was found published separately from the general building permit application
  • RequiredSign Plan / Elevation DrawingPer Zoning Ordinance § 6.03: sufficient information on property/building/tenant occupancy size, sign dimensions and size, sign height and location, lighting information (for Chapter 8 Outdoor Lighting Control compliance), and materials used
  • OptionalComprehensive (Master) Sign PlanRequired for qualifying multi-tenant commercial/PAD developments; reviewed by the Planning Division separately from the individual sign building permit

Fee schedule

Fee typeAmountNotes
Sign Permit, less than 32 square feet (New/Modified)$85.00 per permitTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees — Commercial section. Verified by visual inspection of the fee-schedule PDF table (pdftotext column extraction of this row was misaligned/scrambled and is NOT reliable — confirmed correct figure via rendered-page review).
Sign Permit, 32 or greater square feet (New/Modified)$105.00 per permitTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027. Verified by visual inspection of the fee-schedule PDF table (pdftotext column extraction of this row was misaligned/scrambled and is NOT reliable — confirmed correct figure via rendered-page review).
Administrative Use Permit / Temporary Sign Permit$50.00 per requestTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Development Services — Planning Fees section; covers most temporary-sign/administrative-use scenarios, including the banner-sign permit.
Comprehensive Sign Plans and amendments$280.00 per requestTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Development Services — Planning Fees section.
Reinspection Fee$170.00 per inspectionTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees — Commercial section (general reinspection fee applied to commercial permit types including signs).

Fire Sprinkler and Fire Alarm System Permit

Verified

Required for installation, modification, or extension of automatic fire sprinkler systems, fire alarm systems, and commercial kitchen hood suppression systems in the Town of Fountain Hills. Unlike some neighboring Maricopa County jurisdictions, Fountain Hills is served by its OWN municipal Fire Department (Fire Chief Dave Ott) rather than a contracted provider or independent fire district — the Town operated under a Rural/Metro Corporation services contract through the end of 2023, then re-staffed and transitioned to running its own department starting in 2024. Fire prevention plan review and permitting is administered in-house by Assistant Fire Chief/Fire Marshal Mike Winters, applying the Town-amended 2024 International Fire Code (Ordinance No. 25-06) and the Town's own 'Interpretations and Applications of NFPA 13D' (2022 ed.), effective September 1, 2025, for one- and two-family dwelling sprinkler systems.

Verified 2026-07-23 · Source

Requirements

  • Fire sprinkler and fire alarm system plans are reviewed and permitted in-house by the Fountain Hills Fire Department's Fire Prevention Bureau (Assistant Fire Chief/Fire Marshal Mike Winters, 480-816-5114) — not a contracted fire district; the Town ended its Rural/Metro Corporation services contract at the close of 2023 and has run its own municipal department since 2024
  • Governed by the Town-amended 2024 International Fire Code (Ordinance No. 25-06) and, for one- and two-family dwelling sprinkler systems specifically, the Town's own 'Interpretations and Applications of NFPA 13D' (2022 ed.), effective September 1, 2025
  • Fountain Hills requires automatic fire sprinklers throughout essentially all new occupancies without a general size threshold (IFC §§ 903.2.2–903.2.10 as Town-amended), including garages, carports, and all Group R, M, S-1, and S-2 occupancies
  • Town-amended IFC § 903.2.13 'Change of occupancy' independently requires an automatic sprinkler system for an EXISTING building or portion thereof undergoing a change of occupancy, whenever the change moves the building to a higher hazard level, or occurs within Hazard Level 1, per the ordinance's 5-tier hazard table (Level 1/highest: H, I, R-1, R-2, R-4; Level 2: A-2, A-5; Level 3: A-1, A-3, A-4; Level 4: E, F-1, M, S-1; Level 5/lowest: B, F-2, R-3, S-2, U)
  • Residential (NFPA 13D) fire sprinkler submittals must be digital PDF only, include hydraulic calculations per NFPA 13-28.4 and product data sheets, and be signed/sealed by a minimum Level III NICET Certified Engineering Technician (automatic sprinkler systems) or an Arizona-registered Professional Engineer — with a narrow exception for adding/altering five or fewer sprinklers to an existing approved system
  • A dedicated fire service line for a residential sprinkler system is not permitted — water supply must come from the domestic service line via a combination pump system where required, per the Town's NFPA 13D interpretations
  • Rough inspection (all system components in place, connected to permanent water supply, cold-water tested at a minimum 200 psi for 2 hours with no visible leakage) and a final inspection (system flowed to verify flow-switch/alarm-bell activation, hydraulic design placard in place) are both witnessed by the Fountain Hills Fire Department before a system is placed in service
  • Apply via T.O.P.P.S. online portal only — no dedicated fire-sprinkler/alarm application form separate from the Town's general permit system was found published

Required documents

  • RequiredT.O.P.P.S. ApplicationFiled through the Citizenserve-hosted Town's Online Permitting and Planning System portal; no dedicated fire sprinkler/alarm application form distinct from the general permit application was found published on the Town's site
  • RequiredFire Sprinkler / Fire Alarm Plans and Hydraulic CalculationsFor residential (NFPA 13D) systems: digital PDF only, signed/sealed by a NICET III CET or Arizona PE, including a scaled working plan (address, water meter size, static pressure, sprinkler model/manufacturer/temperature/orifice size, riser detail, hydraulic calculations, and more per the Town's Interpretations and Applications of NFPA 13D)
  • OptionalInterpretations and Applications of NFPA 13D (2022 ed., eff. 9/1/2025)Fountain Hills Fire Department's local additions/amendments to NFPA 13D governing residential fire sprinkler submittal requirements, water supply, installation, sprinkler position, and system acceptance

Fee schedule

Fee typeAmountNotes
Residential Automatic Sprinkler System Plan Review/Inspection$340.00 for up to 4,400 sq ft, then $0.08 per sq ft thereafterTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section. Applies to standalone residential sprinkler permits as well as sprinkler scope bundled into a new-construction building permit.
Commercial Automatic Sprinkler System Plan Review/Inspection$340.00 for the first 3,000 sq ft, then $0.11 per sq ft thereafterTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section. Verified by visual inspection of the fee-schedule PDF (this section's pdftotext -layout column extraction was misaligned/scrambled and is not independently reliable).
Commercial Auto Sprinkler System Modification Plan Review/Inspection$195.00 per requestTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section.
Commercial Hood System Plan Review/Inspection$290.00 per requestTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section.
Commercial Fire Alarm System Plan Review/Inspection$385.00 per requestTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section.
Commercial Fire Alarm System Modification Plan Review/Inspection$385.00 per requestTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section.
Residential LPG Installation Review/Inspection$170.00 per requestTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section.
Reinspection Fee (beyond one re-check)$150.00 per requestTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section. Assessed for, among other triggers, approved plans without an FHFD approval stamp on-site, incomplete installation, uncorrected prior deficiencies, or late/repeated inspection cancellations (per the Town's NFPA 13D interpretations, § 11.1.5).
Fire Dept Personnel (4-hour minimum)$55.00 per hourTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section.

Change of Use / Certificate of Occupancy

Verified

Fountain Hills has NO distinctly branded 'Change of Use Permit' process, dedicated Change-of-Occupancy fee, or published Change-of-Use checklist — unlike some neighboring Arizona municipalities (e.g., Apache Junction's Town Code §§ 7-1-6(A)/7-1-8 with its own dedicated fee schedule). The Town instead applies the 2024 International Building Code as adopted by Ordinance No. 25-06 without a local amendment to the IBC's standard Certificate of Occupancy provisions (Chapter 1, Section 111), and relies on its own Town-amended Fire Code § 903.2.13 ('Change of occupancy') to trigger fire-sprinkler compliance when an existing building's occupancy classification changes to a higher hazard level. A change of use involving construction work is processed as a standard Commercial Remodel/Tenant Improvement building permit through T.O.P.P.S.; a Zoning Verification Letter is available separately to confirm zoning/use compliance where no construction permit is otherwise required.

Verified 2026-07-23 · Source

Requirements

  • No standalone 'Change of Use Permit' or dedicated Certificate of Occupancy fee line item was found published in the Town's Comprehensive Fee Schedule FY2026-2027 or on the Building Permit Forms & Checklists page — confirmed after checking both documents directly; the only Certificate of Occupancy (C of O) reference in the fee schedule is the condition attached to the $2,500 refundable Landscape Deposit (required at C of O if landscaping is not yet installed)
  • Ordinance No. 25-06 adopts the 2024 IBC by reference with numerous Town amendments, but does not include a local amendment to IBC Chapter 1, Section 111 (Certificate of Occupancy) — meaning the standard, unmodified 2024 IBC Certificate of Occupancy provisions govern in Fountain Hills
  • The Town's amended Fire Code § 903.2.13 ('Change of occupancy,' Ordinance No. 25-06) independently requires an automatic fire sprinkler system for an existing building or portion thereof undergoing a change of occupancy, when the change moves the building to a higher hazard level as defined in the ordinance's 5-tier hazard table, or occurs within Hazard Level 1 (H, I, R-1, R-2, R-4)
  • A change of use accompanied by any physical/construction work is processed as a Commercial Remodel (Existing) or Tenant Improvement building permit via T.O.P.P.S, billed at the Town's per-square-foot commercial remodel rate rather than a change-of-use-specific fee
  • A Zoning Verification Letter is available as a separate Development Services product to confirm a property's zoning district and permitted-use status, typically used where no construction permit is otherwise required
  • Apply via T.O.P.P.S. online portal only for any permit-triggering scope of work

Required documents

  • OptionalT.O.P.P.S. Application (Commercial Remodel / Tenant Improvement)Filed through the Citizenserve-hosted Town's Online Permitting and Planning System portal when a change of use involves construction work; no distinct 'Change of Use' application or checklist separate from the standard commercial building permit was found published
  • OptionalZoning Verification Letter RequestSeparate Development Services product confirming a property's zoning district and use status; the applicable fee and process were not found published in detail beyond the Comprehensive Fee Schedule's line-item price

Fee schedule

Fee typeAmountNotes
Zoning Verification Letter$350.00 per requestTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Development Services — Planning Fees section. Not a Change-of-Use-specific fee, but the closest published Town product for confirming zoning/use status without a construction permit.
Commercial Remodel (Existing) — Area with A/C$585.00 for 3,000 square feet plus $0.20 per square foot thereafterTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees — Commercial section. Applies when a change of use requires construction/remodel work; no distinct change-of-use fee exists separately from this general commercial remodel rate.
Commercial Remodel (Existing) — Covered Area (non-A/C)$275.00 for 3,000 square feet plus $0.09 per square foot thereafterTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees — Commercial section.
Landscape Deposit (refundable)$2,500.00 refundable depositRequired for Certificate of Occupancy if landscaping is not yet installed at C of O; refundable upon Town approval within 6 months. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027 — the only Certificate of Occupancy-linked fee published by the Town.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fountain Hills building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /arizona/maricopa-county/fountain-hills/as-of/2026-07-11/

Snapshot date: 2026-07-11

Commit: c7e9a43

Reproducible from PermitBase’s version-controlled dataset, commit c7e9a43.