Mesa building permits

Verified

Mesa, Arizona — as published 2026-06-29.

Verified 2026-07-16 · Source

Codes adopted

2024 International Building Code (IBC) — adopted by Mesa City Council; effective January 8, 2026 (applies to permit applications submitted on or after that date); local amendments published in Mesa City Code Title 4 — Building Regulations (Municode)2024 International Residential Code (IRC) — effective January 8, 2026; Mesa City Code Title 4 local amendments; existing 2018 IRC standard plans valid for 6 months after adoption2024 International Fire Code (IFC) — effective January 8, 2026; Mesa City Code Title 4 local amendments2024 International Plumbing Code (IPC) — effective January 8, 2026; Mesa City Code Title 4 local amendments2024 International Mechanical Code (IMC) — effective January 8, 2026; Mesa City Code Title 4 local amendments2024 International Fuel Gas Code (IFGC) — effective January 8, 2026; Mesa City Code Title 4 local amendments2024 International Energy Conservation Code (IECC) — effective January 8, 2026; Mesa City Code Title 4 local amendments2024 International Existing Building Code (IEBC) — effective January 8, 2026; Mesa City Code Title 4 local amendments2024 International Swimming Pool and Spa Code (ISPSC) — effective January 8, 2026; Mesa City Code Title 4 local amendments2023 National Electrical Code (NEC) — Mesa City Code Title 4 local amendments; 2023 NEC (Electrical) Checklist published by Development ServicesADA 2017 / ICC A117.1 — referenced for accessibility compliance2025 NFPA 13 (Sprinklers) and 2025 NFPA 72 (Fire Alarm) — referenced for fire protection systems

Permit types & fees

Residential Building Permit (New Home / Custom Residence)

Verified

Required for new single-family homes, duplexes, and townhouses in Mesa. All permit applications, plan review, documents, and approvals are submitted electronically through the DIMES system. Mesa reviews residential plans within 10 working days (Monday–Thursday, holidays excluded). Expedited review (5 working days) is available for double the regular permit fee. Projects already submitted or under construction before January 8, 2026 are reviewed under the 2018 codes; new submissions are reviewed under the 2024 I-Codes.

Verified 2026-07-16 · Source

Requirements

  • Apply through the DIMES online permit system (mesaaz.gov); all submissions are electronic
  • Required documents: Contractor Licensure Verification Form; fully dimensioned site plan; code data sheet with scope of work; architectural, structural, and engineer-sealed drawings; grading, drainage, and utilities plan (if applicable); electrical, plumbing, and mechanical plans
  • If property is in a flood zone, obtain Maricopa County Flood Control District approval before applying for a Mesa construction permit
  • Licensed contractor generally required; owner-occupied residential projects may qualify for an exemption under Arizona Registrar of Contractors guidelines (see ARS 32-1121)
  • Permit is valid for 180 days after issuance; contact Permit Services before expiration if an extension is needed
  • Permit applications received on or after January 8, 2026 must comply with the 2024 I-Codes

Required documents

  • RequiredContractor Licensure Verification FormRequired with permit application; verifies contractor licensure per Arizona Registrar of Contractors requirements
  • RequiredFully Dimensioned Site PlanPlot plan showing all property lines, new and existing buildings with distances to property lines, total lot and building square footage, and utility right-of-way
  • RequiredCode Data Sheet with Scope of WorkSummary sheet identifying applicable codes, occupancy classification, and scope of work
  • RequiredArchitectural, Structural, and Engineer-Sealed DrawingsComplete construction plans prepared by licensed design professionals
  • OptionalGrading, Drainage, and Utilities PlanRequired when applicable to the project; shows grading, drainage, and utility connections
  • RequiredElectrical, Plumbing, and Mechanical PlansTrade-specific plans included in the full plan set

Fee schedule

Fee typeAmountNotes
Building permit — Residential Rate Table (valuation-based)$0–$8,333: $220; $8,334–$16,667: $330; $16,668–$24,999: $440; $25,000–$200,000: $500 plus $6/each $1,000 or portion thereof over $25,000; $200,000.01–$500,000: $1,550 plus $9/each $1,000 or portion thereof over $200,000; $500,000.01–$2,000,000: $4,250 plus $6/each $1,000 or portion thereof over $500,000; over $2,000,000: $13,250 plus $3/each $1,000 or portion thereof over $2,000,000Mesa Development Services Schedule of Fees and Charges (updated December 2025), Residential Rate Table. Valuation = Livable Area (sq ft × current ICC Building Safety Journal $/sq ft) + Non-Livable Area (sq ft × 50% of ICC $/sq ft). Fees include plumbing, mechanical, electrical, and all other work in the valuation (Mesa City Code § 4-1-8(J)). A 4% Technology Improvement Fee (capped at $800) is added to every permit fee.
Permit Application DepositLess than $25,000: $170; $25,000–$200,000: $500; $200,000.01–$500,000: $1,500; $500,000.01–$2,000,000: $4,000; over $2,000,000: $13,000Non-refundable deposit collected at application and credited toward the permit fee at issuance. Mesa Development Services Schedule of Fees and Charges, Residential Permit Deposit Table.
Expedited Review Premium100% of the total permit fee (Expedited, 5 working days); 200% for Super-ExpeditedMesa Development Services Schedule of Fees and Charges, Special Services — Expedited Projects. Expedited entitles the project to special handling on the initial submittal and up to two re-submittals.
Fourth and Subsequent Re-submittals$120 per staff hour, minimum 2 hoursMesa Development Services Schedule of Fees and Charges. Non-refundable deposit of $120 per resubmittal collected with each submission after the third.

Commercial / Multifamily Building Permit

Verified

Required in Mesa for new commercial buildings, tenant improvements, alterations, changes of occupancy, multi-family residential developments, and new accessory structures over 200 sq ft. Submit electronically through the DIMES portal. Mesa reviews commercial plans within 18 working days (Monday–Thursday, holidays excluded). Expedited review (10 working days) and Super-Expedited review (5 working days) are available for an additional premium. A Self-Certification Program allows a registered professional to certify code compliance, expediting permit issuance to within 5 days.

Verified 2026-07-16 · Source

Requirements

  • Apply through the DIMES online permit system; all submissions are electronic
  • A permit is required for: new buildings; tenant improvements / alterations / modifications; changes of occupancy; building systems (electrical, plumbing, mechanical, gas); safety systems (fire sprinklers, alarms, hoods, ADA compliance); accessory structures; swimming pools; perimeter fences and entry gates; demolition; at-risk grading; after-hours work
  • Required documents: Contractor Licensure Verification Form; fully dimensioned site plan; code data sheet with scope of work; architectural, structural, and engineer-sealed drawings; grading, drainage, and utilities plan (if applicable); electrical, plumbing, and mechanical plans
  • If property is in a flood zone, obtain Maricopa County Flood Control District approval before applying for a Mesa permit
  • Maricopa County Dust Control approval required for soil disturbance over 1/10 acre prior to Mesa permit issuance
  • Permit applications received on or after January 8, 2026 must comply with the 2024 I-Codes

Required documents

  • RequiredContractor Licensure Verification FormRequired prior to permit issuance; verifies contractor licensure per Arizona Registrar of Contractors
  • RequiredFully Dimensioned Site PlanPlot plan showing all property lines, new and existing buildings with distances to property lines, and utility right-of-way
  • RequiredArchitectural, Structural, and Engineer-Sealed DrawingsComplete construction plans prepared by licensed design professionals; engineer-sealed where required
  • RequiredElectrical, Plumbing, and Mechanical PlansTrade-specific plans included in the plan set

Fee schedule

Fee typeAmountNotes
Building permit — Commercial Rate Table (valuation-based)$0–$8,333: $220; $8,334–$16,667: $330; $16,668–$24,999: $440; $25,000–$500,000: $500 plus $10/each $1,000 or portion thereof over $25,000; $500,000.01–$1,000,000: $5,250 plus $5/each $1,000 or portion thereof over $500,000; $1,000,000.01–$5,000,000: $7,750 plus $4/each $1,000 or portion thereof over $1,000,000; $5,000,000.01–$10,000,000: $23,750 plus $2/each $1,000 or portion thereof over $5,000,000; over $10,000,000: $33,750 plus $1/each $1,000 or portion thereof over $10,000,000Mesa Development Services Schedule of Fees and Charges (Dec 2025), Commercial Rate Table. Valuation = Building Area × current ICC Building Safety Journal $/sq ft. Fees include plumbing, mechanical, electrical, and all other work in the valuation (Mesa City Code § 4-1-8(J)). A 4% Technology Improvement Fee (capped at $800) is added to every permit fee.
Change of Occupancy PermitMinimum $500; fee calculated same as Renovation PermitMesa Development Services Schedule of Fees and Charges — Change of Occupancy Permits section. A Change of Occupancy requires a new Building Permit regardless of the extent of construction.
Expedited Review PremiumExpedited (10 working days): 100% of total permit fee; Super-Expedited (5 working days): 200% of total permit feeMesa Development Services Schedule of Fees and Charges, Special Services — Expedited Projects. Super-Expedited requires prior approval from PermitServices@MesaAZ.gov.
Temporary Certificate of Occupancy (extensions)Initial issuance (up to 30 days): No charge; next three months or portion (up to 30 days each): $500 per extension, or $20/day whichever is less; each month after the fourth: $1,000 per extension, or $40/day whichever is lessMesa Development Services Schedule of Fees and Charges — Temporary Certificates of Occupancy section.

Electrical Permit (Stand-Alone)

Verified

Stand-alone electrical permits are required in Mesa for separate electrical work not part of a building permit — including new electric panels or subpanels, new system connections, and relocated electrical systems. Work must comply with the 2023 National Electrical Code (NEC) as adopted with Mesa local amendments (Mesa City Code Title 4). Mesa publishes a 2023 NEC (Electrical) Checklist for plan review guidance. Note: replacing an air conditioning unit with one using the same or less electrical load and same connections does NOT require a permit; replacing or modifying electrical connections DOES require a permit.

Verified 2026-07-16 · Source

Requirements

  • Electrical work must comply with the 2023 NEC with Mesa local amendments (Mesa City Code Title 4)
  • Stand-alone electrical permits (not part of a building permit) use the Residential Rate Table or Commercial Rate Table based on valuation
  • Permit required for: new electric panels or subpanels; new system connections; relocated electrical systems; structural modifications requiring electrical changes
  • No permit required for: replacing an air conditioning unit with one using the same or less electrical load and the same connections
  • Apply through the DIMES online permit system; submit with required plans and Contractor Licensure Verification Form

Required documents

  • Optional2023 NEC (Electrical) ChecklistMesa Development Services review checklist for electrical plan submissions; available on the Construction Forms, Guides & Checklists page
  • RequiredContractor Licensure Verification FormRequired prior to permit issuance for licensed contractor work

Fee schedule

Fee typeAmountNotes
Stand-alone electrical permit — Residential Rate Table$0–$8,333: $220; $8,334–$16,667: $330; $16,668–$24,999: $440; $25,000–$200,000: $500 plus $6/each $1,000 over $25,000Mesa Development Services Schedule of Fees and Charges (Dec 2025). Stand-alone permits (separate trade work not part of a building permit) use the Residential Rate Table for residential work and the Commercial Rate Table for commercial work. Valuation determined by applicant and verified by Plans Examiner.

Plumbing Permit (Stand-Alone)

Verified

Stand-alone plumbing permits are required in Mesa for separate plumbing work not included in a building permit. Work must comply with the 2024 International Plumbing Code (IPC) with Mesa local amendments (Mesa City Code Title 4). Mesa publishes a 2024 IPC (Plumbing) Checklist for plan review guidance. Water heater replacements: replacing a gas or electric water heater with a like-for-like model of equal or lesser rating does NOT require a permit; replacing a traditional storage gas water heater with a tankless or on-demand gas water heater DOES require a permit. Gas utility notification is required before placing gas appliances into service.

Verified 2026-07-16 · Source

Requirements

  • Plumbing work must comply with the 2024 IPC with Mesa local amendments (Mesa City Code Title 4)
  • Stand-alone plumbing permits (not part of a building permit) use the Residential Rate Table or Commercial Rate Table based on valuation
  • No permit required: 'like for like' gas or electric water heater replacement of equal or lesser rating
  • Permit required: replacing a traditional (storage) gas water heater with a tankless or on-demand gas water heater
  • Notification required to the serving Gas Utility before placing gas appliances into service
  • Apply through the DIMES online permit system

Required documents

  • Optional2024 IPC (Plumbing) ChecklistMesa Development Services review checklist for plumbing plan submissions; available on the Construction Forms, Guides & Checklists page
  • OptionalResidential Gas Piping ChecklistMesa-specific gas piping checklist for residential work; available on the Construction Forms, Guides & Checklists page

Fee schedule

Fee typeAmountNotes
Stand-alone plumbing permit — Residential Rate Table$0–$8,333: $220; $8,334–$16,667: $330; $16,668–$24,999: $440; $25,000–$200,000: $500 plus $6/each $1,000 over $25,000Mesa Development Services Schedule of Fees and Charges (Dec 2025). Stand-alone permits use the Residential Rate Table for residential work. Valuation determined by applicant and verified by Plans Examiner.

Mechanical / HVAC Permit (Stand-Alone)

Verified

Stand-alone mechanical/HVAC permits are required in Mesa for separate mechanical or fuel-gas work not included in a building permit. Work must comply with the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) with Mesa local amendments (Mesa City Code Title 4). Mesa publishes 2024 IMC (Mechanical) and 2024 IFGC (Fuel/Gas) checklists. Note: replacing an A/C unit with one using the same or less electrical load and same connections does NOT require a permit.

Verified 2026-07-16 · Source

Requirements

  • Mechanical/HVAC work must comply with the 2024 IMC and 2024 IFGC with Mesa local amendments (Mesa City Code Title 4)
  • Stand-alone mechanical permits (not part of a building permit) use the Residential Rate Table or Commercial Rate Table based on valuation
  • No permit required: A/C unit replacement where the new unit uses the same or less electrical load and same connections as the existing unit
  • Permit required: changing the electrical connections during A/C replacement; new mechanical systems; modifications to existing mechanical systems
  • Apply through the DIMES online permit system

Required documents

  • Optional2024 IMC (Mechanical) ChecklistMesa Development Services review checklist for mechanical plan submissions; available on the Construction Forms, Guides & Checklists page
  • Optional2024 IFGC (Fuel / Gas) ChecklistMesa Development Services review checklist for fuel gas plan submissions; available on the Construction Forms, Guides & Checklists page

Fee schedule

Fee typeAmountNotes
Stand-alone mechanical permit — Residential Rate Table$0–$8,333: $220; $8,334–$16,667: $330; $16,668–$24,999: $440; $25,000–$200,000: $500 plus $6/each $1,000 over $25,000Mesa Development Services Schedule of Fees and Charges (Dec 2025). Stand-alone permits use the Residential Rate Table for residential work. Valuation determined by applicant and verified by Plans Examiner.

Solar Photovoltaic (PV) System — Permit Exemption / Electrical Permit

Verified

In Mesa, residential solar photovoltaic (PV) systems that are under 10,000 square feet, certified by a nationally recognized testing agency, and installed by an Arizona licensed contractor do NOT require a construction permit. However, new electric meters or circuits required by the solar installation WILL require a stand-alone electrical permit. If the home is historic, Planning Division approval (Certificate of Appropriateness) is required. For height, location, and historic home requirements, contact the Planning Division. For construction permit and building code requirements, contact Permit Services.

Verified 2026-07-16 · Source

Requirements

  • No construction permit required for: residential solar PV systems under 10,000 sq ft, listed and labeled by a nationally recognized testing agency, and installed by an Arizona licensed contractor
  • Permit required for: new electric meters or circuits added as part of the solar installation
  • If home is historic, Planning Division approval (Certificate of Appropriateness) is required before installation
  • Contact Planning Division (480-644-4726 / Planning.Info@MesaAz.gov) for height, location, and historic home requirements
  • Contact Permit Services (480-644-4273 / PermitServices@MesaAz.gov) for construction permit and code requirements

Required documents

  • OptionalElectrical permit application (if new meter or circuit required)Stand-alone electrical permit required if the solar installation requires new electric meters or circuits; apply through DIMES

Fee schedule

Fee typeAmountNotes
Construction permit: not required for qualifying systemsNo permit fee for systems meeting the exemption criteria (under 10,000 sq ft, listed/labeled, installed by AZ licensed contractor). If a stand-alone electrical permit is required for new meters or circuits, fees apply per the Residential Rate Table.Mesa Residential Construction FAQ and Residential Construction Homeowner's Guide (March 2025). If an electrical stand-alone permit is required: $0–$8,333: $220; $8,334–$16,667: $330; $16,668–$24,999: $440; $25,000–$200,000: $500 plus $6/each $1,000 over $25,000 (Mesa Development Services Schedule of Fees and Charges, Dec 2025, Residential Rate Table).

Residential Pool / Spa Permit

Verified

A construction permit is required in Mesa for constructing or filling in an inground swimming pool or spa, and for above-ground spa installations (a flat fee applies for above-ground spas). Plans must comply with the 2024 International Swimming Pool and Spa Code (ISPSC) with Mesa local amendments, the 2024 IRC, and the 2023 NEC including Mesa amendments. Mesa requires a 60-inch minimum pool barrier from time of excavation until permanent barrier completion. Pool equipment shall not be located within a public utility easement (PUE). The water's edge shall be at least 4 feet from property lines per Mesa Zoning Ordinance § 11-30-11.

Verified 2026-07-16 · Source

Requirements

  • Submit through DIMES online permit system; plans must comply with the 2024 ISPSC, 2024 IRC, and 2023 NEC with Mesa local amendments
  • Required documents: Contractor Licensure Verification Form; fully dimensioned site plan showing setbacks, pool location, equipment pad, and barrier; engineered schematics for all water, pool, and accessory features; structural design (per M-ISPSC 307.2.2); electrical and plumbing plans
  • Pool barrier minimum height: 60 inches maintained for 4 feet (M-ISPSC 305.2.1 Exception 1)
  • Minimum 60-inch construction fencing required from time of excavation until permanent barrier is completed (M-ISPSC 305.1.1)
  • Water's edge shall be 4 feet minimum from property lines (Mesa Zoning Ordinance § 11-30-11); pool equipment shall be 5 feet minimum from water's edge
  • Pool and pool equipment shall NOT be located within a public utility easement (PUE)
  • Windows and glass doors shall be 10 feet minimum from water's edge; windows shall be tempered glass if within 5 feet of water's edge
  • Pool barrier chain-link fence: 11-gauge wire minimum, mesh not exceeding 1¾ inches (M-ISPSC 305.2.8)

Required documents

  • RequiredContractor Licensure Verification FormRequired prior to permit issuance
  • RequiredFully Dimensioned Site PlanShowing all setbacks, pool location, equipment pad location, barrier location, and utility easements
  • RequiredArchitectural, Structural, and Engineer-Sealed DrawingsIncluding reinforcing details and shell construction type (gunite, shotcrete); engineer sealed schematics required per Mesa City Code § 4-1-4(I)
  • RequiredElectrical and Plumbing PlansRequired for pool electrical bonding, suction entrapment, and plumbing systems
  • OptionalResidential Pool and Spa ChecklistMesa submittal checklist; available on the Construction Forms, Guides & Checklists page; covers all plan requirements per 2024 ISPSC, 2024 IRC, and 2023 NEC
  • OptionalPool and Spa BrochureMesa guide covering pool barrier requirements; available on the Construction Forms, Guides & Checklists page

Fee schedule

Fee typeAmountNotes
Residential swimming pool / in-ground spa permit (all inclusive)$330 eachMesa Development Services Schedule of Fees and Charges (Dec 2025), Miscellaneous Fees — Residential Swimming Pools and in-ground Spas (all inclusive). This flat fee covers the permit.
Above-ground spa permit (all inclusive)$300 eachMesa Development Services Schedule of Fees and Charges (Dec 2025), Miscellaneous Fees — Above Ground Spas (all inclusive).

Accessory Dwelling Unit (ADU) / Casita Permit

Verified

Mesa requires a construction permit for attached additions and detached dwellings (casitas/ADUs). Mesa has adopted a Preapproved Housing Design Plan Program per ARS § 9-461.19 — Class 4 covers ADUs in sizes of 200, 600, or 1,000 sq ft. There is no fee for submitting preapproved housing design plans for review; standard construction permit fees apply at permit issuance. Preapproved plans from Mesa's Standard Plan Library may be used with permission from the plan owner (Preapproved Housing Design Plan Agreement required). Additional plans (plot plan, site plan, grading plan, off-site improvement plans) may be required regardless of whether a preapproved plan is used.

Verified 2026-07-16 · Source

Requirements

  • A construction permit is required for all attached additions and detached dwellings (casitas/ADUs)
  • Apply through the DIMES online permit system; all submissions are electronic
  • Required documents: Contractor Licensure Verification Form; fully dimensioned site plan; code data sheet with scope of work; architectural, structural, and engineer-sealed drawings; electrical, plumbing, and mechanical plans
  • Contact Planning Division (480-644-4726 / Planning.Info@mesaaz.gov) to determine zoning, setbacks, lot coverage, and architectural design requirements before applying
  • For preapproved housing design plans: complete the Preapproved Housing Design Plan Agreement (signed by both applicant and plan owner) and submit to Permit Services
  • Preapproved ADU plans available for 200 sq ft, 600 sq ft, or 1,000 sq ft units (Class 4 under the Preapproved Housing Design Plan Program)

Required documents

  • RequiredContractor Licensure Verification FormRequired prior to permit issuance
  • RequiredFully Dimensioned Site PlanShowing all property lines, new and existing structures with setbacks, total lot and building square footage
  • RequiredArchitectural, Structural, and Engineer-Sealed DrawingsComplete construction plans; if using a preapproved plan, use as-is (modifications require new submittal) with the Preapproved Housing Design Plan Agreement
  • OptionalPreapproved Housing Design Plan AgreementRequired if using a plan from Mesa's Standard Plan Library; must be completed by both parties and submitted to Permit Services

Fee schedule

Fee typeAmountNotes
ADU / casita building permit — Residential Rate Table (valuation-based)$0–$8,333: $220; $8,334–$16,667: $330; $16,668–$24,999: $440; $25,000–$200,000: $500 plus $6/each $1,000 over $25,000; $200,000.01–$500,000: $1,550 plus $9/each $1,000 over $200,000Mesa Development Services Schedule of Fees and Charges (Dec 2025), Residential Rate Table. ADU/casitas are permitted as residential construction. Preapproved plan review: no fee for initial and up to two re-submittals; $120/hour (minimum 1 hour) for additional reviews beyond the third submittal.

Fence / Wall Permit

Verified

In Mesa, fences and walls require a construction permit if they exceed 6 feet in height (rear and side yards) or exceed 3 feet in the front and side yards. Retaining walls over 4 feet tall (measured from bottom of footing to top) or any retaining wall supporting surcharge or liquids require a permit. Fences and walls requiring a permit also require zoning clearance from the Planning Division. Fences on top of retaining walls always require a permit. Fences under 6 feet in the rear do not require a permit. No fence may be within 3 feet of a fire hydrant or utility.

Verified 2026-07-16 · Source

Requirements

  • Permit required: fences over 6 feet high; retaining walls over 4 feet measured from bottom of footing to top; fences on top of retaining walls; any retaining wall supporting surcharge or liquids
  • No permit required: fences up to 6 feet in the rear; fences up to 3 feet in the front and side yards
  • Fences/walls requiring a permit also require a zoning clearance from the Planning Division (call 480-644-4726 for Planner of the Day)
  • All fences must be at least 3 feet from fire hydrants or utilities
  • Corner lot fences must be located so as not to block driver's sightlines per Mesa Standard Details (2023 Mesa Standard Details and Specifications)
  • Contact Arizona 811 before digging (at least 2 days in advance)

Required documents

  • RequiredSite Plan showing fence/wall locationRequired for permit application showing property lines, setbacks, and fence/wall location

Fee schedule

Fee typeAmountNotes
Fence/wall permit — Residential Rate Table (valuation-based)$0–$8,333: $220; $8,334–$16,667: $330; $16,668–$24,999: $440. For most residential fences the valuation is under $25,000.Mesa Development Services Schedule of Fees and Charges (Dec 2025), Residential Rate Table. Valuation determined by applicant and verified by Plans Examiner.

Demolition Permit

Verified

A construction permit is required in Mesa for demolition of any structure. Condemnation demolitions are not charged a fee. Demolition permits use the Residential Rate Table or Commercial Rate Table based on valuation. Submit through the DIMES portal.

Verified 2026-07-16 · Source

Requirements

  • A construction permit is required to demolish any structure
  • Apply through the DIMES online permit system
  • Contractor Licensure Verification Form required prior to permit issuance
  • Notify utilities before demolition; verify utility disconnections

Required documents

  • RequiredContractor Licensure Verification FormRequired prior to permit issuance
  • RequiredSite PlanShowing structure to be demolished and existing structures to remain

Fee schedule

Fee typeAmountNotes
Demolition permit$120 each (no fee required for condemnation demolitions)Mesa Development Services Schedule of Fees and Charges (Dec 2025), Other Miscellaneous Fees — Demolition (no fee required for condemnation).

Sign Permit

Verified

Sign permits are required in Mesa for permanent and certain temporary signage. Sign permits are reviewed within 10 business days. Expedited review (5 business days) is available for 100% of the sign permit fee. Sign permits are charged in addition to applicable building and civil engineering permits. Mesa publishes a Sign Checklist for permanent signs, a '10 Steps to Get Your Sign Permit Approved in One Review' guide, and separate guides for temporary signage (banners/balloons, A-frame/T-frame signs).

Verified 2026-07-16 · Source

Requirements

  • Sign permit required for permanent signage; see Sign Checklist (PDF) and Article 5 — Sign Ordinance (Mesa Zoning Ordinance) for regulations
  • Temporary signage rules: portable fabric signs (banners/balloons) and portable signs (A-frame/T-frame) have separate requirements per Mesa Development Services guides
  • Sign permits are in addition to any applicable building permits
  • Apply through the DIMES online permit system

Required documents

  • RequiredSign Checklist (Attached and Freestanding Signs)Mesa checklist for permanent sign permit applications; available on the Construction Forms, Guides & Checklists page

Fee schedule

Fee typeAmountNotes
Base Sign Permit$102.40 base + 3% of sign valuation + $0.30 per sq ft of sign areaMesa Development Services Schedule of Fees and Charges (Dec 2025), Miscellaneous Permits, Services and Fees — Sign Permits. Sign permits are charged in addition to applicable Building and Civil Engineering Permits.
Electrical for Signs$18.25 per electrical signMesa Development Services Schedule of Fees and Charges (Dec 2025), Sign Permits — Electrical for Signs.
Expedited Sign Review100% of sign permit fee (5 business-day turnaround)City of Mesa Sign Regulations page.

EV Charger / EVSE Permit

Verified

The City of Mesa has no separate permit type or fee line item for EV charging station (EVSE) installation. Installing a dedicated 240V circuit or upgrading a panel for a Level 2 home or commercial EV charger is stand-alone electrical work, governed by the 2023 NEC as adopted with Mesa local amendments (Mesa City Code Title 4), and billed under the same Residential (or Commercial) Rate Table used for any other stand-alone electrical permit.

Verified 2026-07-20 · Source

Requirements

  • Permit required when installing a dedicated 240V circuit or upgrading an electrical panel/subpanel to support EV charging — this is permanent electrical work distinct from simply plugging into an existing outlet
  • Electrical work must comply with the 2023 NEC with Mesa local amendments (Mesa City Code Title 4)
  • Stand-alone electrical permits (not part of a larger building permit) use the Residential Rate Table or Commercial Rate Table based on the applicant-stated, Plans-Examiner-verified valuation of the work
  • Apply through the DIMES online permit system (Mesa E-Permit Online Portal, aca-prod.accela.com/mesa); submit with required plans and Contractor Licensure Verification Form for contractor-performed work

Required documents

  • Optional2023 NEC (Electrical) ChecklistMesa Development Services review checklist for electrical plan submissions, applicable to EVCS circuit/panel work; no separate EV-charger-specific checklist was found
  • RequiredContractor Licensure Verification FormRequired prior to permit issuance for licensed contractor work

Fee schedule

Fee typeAmountNotes
Stand-alone electrical permit — Residential Rate Table (applies to a typical EVCS circuit/panel install)$0–$8,333: $220; $8,334–$16,667: $330; $16,668–$24,999: $440; $25,000–$200,000: $500 plus $6/each $1,000 over $25,000Mesa Development Services Schedule of Fees and Charges (Dec 2025) — no distinct EV-charger/EVSE fee line item was found; a charger circuit/panel install is billed under the same stand-alone electrical Residential Rate Table used for any other electrical work, consistent with this file's electrical-permit entry.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mesa building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /arizona/maricopa-county/mesa/as-of/2026-06-29/

Snapshot date: 2026-06-29

Commit: 0214041

Reproducible from PermitBase’s version-controlled dataset, commit 0214041.