Show Low building permits
VerifiedShow Low, Arizona — as published 2026-08-16.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family, multi-family, and recreational-vehicle dwelling-unit construction in the City of Show Low. Reviewed against the 2018 IRC/IBC and City of Show Low amendments (Show Low Municipal Code Title 18). Applications are submitted in person at City Hall, 180 N. 9th Street.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new residential construction within Show Low city limits
- Plans must comply with the 2018 IRC/IBC and City of Show Low Climatic and Geographic Design Criteria (90 mph wind, Exposure C; Seismic Zone B; 50 psf ground snow load; 18-inch frost line)
- Two (2) copies of plans and specifications required at submittal (Show Low Municipal Code § 18.15.070)
- Applicant selects either Standard Plan Review (30 working days) or Non-Standard Plan Review (two sequential 20-working-day phases, 40 working days total) per § 18.15.070
- A $200 non-refundable-if-forfeited deposit is required at application and plan submittal, applied to the plan review fee (20% of the Building Permit Fee)
- Contractor must hold a valid Arizona ROC license, or the applicant must be the bona fide property owner
- Assessor's Parcel Number and a scaled site plan (24"x36" max, showing actual — not minimum — setbacks on all four sides) required with the application
Required documents
- RequiredNew Residential Permit ApplicationCity of Show Low Building Safety Department application (updated 1/2/2026), submitted in person or by mail to 180 N. 9th Street, Show Low, AZ 85901
- RequiredPlan Submittal Checklist (New Residential)City of Show Low checklist covering Planning & Zoning items (address, parcel number, subdivision/lot, setbacks, lot coverage) and Building items (footing/foundation, floor plan, roof plan, insulation, gas schematic, electrical plan)
- RequiredSite PlanTwo (2) copies, not larger than 24"x36", drawn to scale, showing actual setback dimensions from all four sides and location of existing/proposed structures
- OptionalRight-of-Way (ROW) ApplicationRequired if work affects the public right-of-way or connects to public utilities; processed by City of Show Low Public Works (10 business days to process)
- OptionalErosion Control Permit ApplicationRequired under City Code Title 13 for site disturbance of 500+ sq ft, or under 500 sq ft within 50 feet of a pond/lake/river/stream/canal/wetland; fee is included in the Building Permit Fee
- RequiredBuilding Affidavit (CC&Rs Notice)Affidavit acknowledging the City does not verify compliance with subdivision covenants, conditions, and restrictions
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Formulated by the 1997 Uniform Building Code (UBC) valuation-based fee schedule | City of Show Low Commercial Permit Application (2025 rev.) states Building Permit Fees are formulated per the 1997 UBC fee schedule; Show full citationHideCity of Show Low Commercial Permit Application (2025 rev.) states Building Permit Fees are formulated per the 1997 UBC fee schedule; Building Safety Department staff calculate the exact figure per project valuation. Same fee-schedule basis applies to residential permits per the City's Fee Schedules page. |
| Plan Review Fee (Residential) | 20% of the Building Permit Fee | City of Show Low Fee Schedules page; a $200 deposit is due at application/plan submittal and applied to this fee. Master/Standard Plans re-reviewed with no changes are charged a flat $50 after the initial review. |
| Transportation (Street Facilities) Development Fee | $1,112 (single-family detached); $874 (all other housing types); $834 (recreational vehicle dwelling unit) | Show Low Municipal Code § 18.25.140; due at building permit issuance while pledged street debt remains outstanding |
| Total Fixed Residential Fees (transportation + sewer capacity + security deposit + turn-on), before variable water-meter fee | $5,676 (single-family detached); $4,523 (other residential); $2,189 (recreational vehicle) | City of Show Low Residential Fee Schedule, effective 1/1/2026 (printed on the New Residential Permit Application); additional building permit fees apply on top of these utility/development fees |
Residential Addition / Remodel Permit
VerifiedRequired for room additions, remodels, and alterations to existing residential structures in the City of Show Low, using the City's Building Addition Permit Application. Reviewed against the 2018 IRC/IBC and City of Show Low amendments.
Verified 2026-07-06 · Source
Requirements
- Building permit required for additions and remodels affecting structural, electrical, plumbing, or mechanical systems
- Applicant selects Standard Plan Review (30 working days) or Non-Standard Plan Review (40 working days) per § 18.15.070
- A minimum $50.00 deposit must be submitted with the Building Addition Permit Application
- Plans must comply with City of Show Low Climatic and Geographic Design Criteria (90 mph wind, Exposure C; Seismic Zone B; 50 psf ground snow load; 18-inch frost line)
- Repairs that only replace existing component parts with similar materials for maintenance (e.g., painting, floor coverings, cabinetry, storm doors/windows) are exempt from permit requirements per § 18.15.040, provided no addition, design change, or modification of exit facilities/fixtures/equipment is involved
Required documents
- RequiredBuilding Addition Permit ApplicationCity of Show Low Building Safety Department application, submitted at 180 N. 9th Street, Show Low, AZ 85901
- RequiredSite/Plot PlanShowing existing structure, addition footprint, and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Formulated by the 1997 Uniform Building Code (UBC) valuation-based fee schedule | City of Show Low Fee Schedules page and Commercial/Addition Permit Applications |
| Plan Review Fee (Residential) | 20% of the Building Permit Fee | City of Show Low Fee Schedules page; minimum $50.00 deposit submitted with the Building Addition Permit Application |
| Like-for-Like Replacement (hardwired electrical, plumbing, or mechanical systems/appliances, single-family or 2-family) | $30 flat fee | City of Show Low Fee Schedules page; excludes countertop, convenience, laundry, or similar appliances |
Electrical / Plumbing / Mechanical Like-for-Like Replacement Permit
VerifiedFlat-fee permit covering routine like-for-like replacement of hardwired electrical, plumbing, and mechanical systems and appliances (e.g., water heaters, panels, HVAC equipment) in single-family and two-family residential dwellings in Show Low, where no other system modification occurs.
Verified 2026-07-06 · Source
Requirements
- Covers routine like-for-like replacement of hardwired electrical, plumbing, and mechanical systems and appliances for single-family and 2-family residential dwellings
- Appliances are those defined in the International Mechanical Code and International Plumbing Code — does not include countertop, convenience, laundry, or similar appliances
- Governed by the 2018 IMC, 2018 IPC, and 2017 NEC as adopted by the City of Show Low
- Applicant must verify contractor licensing (Arizona ROC) or owner-exemption status prior to issuance
Required documents
- RequiredBuilding Addition Permit Application (used for like-for-like trade permits)City of Show Low Building Safety Department application, submitted at 180 N. 9th Street
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Like-for-Like Replacement Permit (electrical, plumbing, or mechanical) | $30 flat fee | City of Show Low Fee Schedules page — flat $30 fee for all routine like-for-like hardwired electrical, plumbing, and mechanical replacement in single-family/2-family dwellings |
Residential Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of residential solar photovoltaic systems in the City of Show Low, using the City's dedicated Solar Permit Application. Governed by the 2017 NEC as adopted and amended by the City of Show Low.
Verified 2026-07-06 · Source
Requirements
- Solar Permit Application required, submitted at 180 N. 9th Street, Show Low, AZ 85901
- Applicant must select either an Existing Panel or Panel Upgrade option; if the selection or panel model changes after permit issuance, a resubmittal with additional fees is required
- Applicant selects Standard Plan Review (30 working days) or Non-Standard Plan Review (40 working days) per § 18.15.070
- A minimum $50.00 deposit must be submitted with the application
- Governed by the 2017 NEC as adopted by the City of Show Low
- Contractor licensing verification (Arizona ROC) required prior to permit issuance
Required documents
- RequiredSolar Permit ApplicationCity of Show Low Building Safety Department application, includes Electrical Panel (Existing/Upgrade) selection and Plan Review Process selection
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Formulated by the 1997 Uniform Building Code (UBC) valuation-based fee schedule | City of Show Low Fee Schedules page; Building Safety Department staff calculate the exact figure based on project valuation |
| Plan Review Fee (Residential) | 20% of the Building Permit Fee | City of Show Low Fee Schedules page; minimum $50.00 deposit submitted with the Solar Permit Application |
EV Charger / EVSE Permit
VerifiedThe City of Show Low has no dedicated EV charger/EVSE permit application or fee line — confirmed by reviewing the City's Fee Schedules page and City Permits & Applications page, which list a dedicated Solar Permit Application but nothing for EV chargers. An EV charging station (Level 2 or DC fast charger) installation does NOT qualify for the City's $30 flat-fee Electrical/Plumbing/Mechanical Like-for-Like Replacement Permit, since that category is expressly limited to routine LIKE-for-like replacement of existing hardwired systems with no other modification — a new dedicated EV charger circuit is new electrical work, not a replacement. It is instead processed under the standard valuation-based Building Permit Fee (1997 UBC schedule) plus Plan Review Fee, the same fee mechanism the solar-pv-permit entry documents for the electrical scope of a PV installation.
Verified 2026-07-20 · Source
Requirements
- Building Addition Permit Application required, submitted at 180 N. 9th Street, Show Low, AZ 85901 — no dedicated EV-charger-specific application exists
- Does NOT qualify for the $30 flat-fee Like-for-Like Replacement Permit, since that category excludes any change in design, capacity, or routing (a new EV charger circuit is new work, not a like-for-like replacement of an existing hardwired system)
- Applicant selects Standard Plan Review (30 working days) or Non-Standard Plan Review (40 working days) per § 18.15.070, the same election documented for solar and other building permits in this record
- Governed by the 2017 NEC as adopted and amended by the City of Show Low
- Contractor licensing verification (Arizona ROC) required prior to permit issuance, or confirm owner-exemption status
Required documents
- RequiredBuilding Addition Permit ApplicationCity of Show Low Building Safety Department application, submitted at 180 N. 9th Street — used for EV charger installations since no dedicated EV-charger form exists
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Formulated by the 1997 Uniform Building Code (UBC) valuation-based fee schedule | City of Show Low Fee Schedules page; Building Safety Department staff calculate the exact figure based on project valuation. No dedicated EV-charger fee line exists, so the general valuation-based table applies, consistent with the solar-pv-permit entry. |
| Plan Review Fee (Residential) | 20% of the Building Permit Fee | City of Show Low Fee Schedules page |
Commercial Building Permit
VerifiedRequired for new commercial construction and commercial tenant improvements in the City of Show Low. A pre-application/pre-submittal meeting is mandatory for all new commercial construction and substantial commercial remodels or additions. Reviewed against the 2018 IBC and City of Show Low amendments.
Verified 2026-07-06 · Source
Requirements
- Pre-submittal meeting REQUIRED for all commercial projects before application submittal (928-532-4040)
- Six (6) identical copies of engineered, stamped/sealed plans required for new commercial construction; four (4) copies for tenant improvements
- A $400 deposit is required for new commercial projects, or $200 for tenant improvements, submitted when plans are filed; applied to the plan review fee at issuance
- Applicant selects Standard Plan Review (30 working days) or Non-Standard Plan Review under A.R.S. Title 9, Chapter 7, Article 4 (two 20-working-day phases, 40 working days total) per § 18.15.070
- All commercial jobs require a stated material cost valuation on the application
- Owner/applicant is solely responsible for the full commercial plan review fee regardless of whether the permit is ultimately issued, including fees paid by the City to outside plan reviewers
Required documents
- RequiredCommercial Permit ApplicationCity of Show Low Building Safety Department application (2025 revision), requires material cost valuation and plan review process selection
- RequiredPre-Submittal ChecklistCity of Show Low checklist covering Building, Planning & Zoning, and Engineering submittal items (site plan, occupancy group, structural plans/calculations, drainage report, traffic study where applicable, etc.), completed at the mandatory pre-submittal meeting
- RequiredEngineered Site Plan and Support DocumentsSix (6) copies (four (4) for tenant improvement), each on paper no smaller than 11x17 inches, drawn to scale not smaller than 40 feet to the inch; large-scale projects require 24x36-inch sheets
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Formulated by the 1997 Uniform Building Code (UBC) valuation-based fee schedule | City of Show Low Commercial Permit Application (2025 rev.): 'Building Permit Fee. Fees are formulated by the 1997 Uniform Building Code fee schedule. Please contact Building Safety Department personnel for assistance in calculating this fee.' |
| Plan Review Fee (Commercial) | 50% of the Building Permit Fee | City of Show Low Commercial Permit Application (2025 rev.) and Fee Schedules page; $400 deposit (new commercial) or $200 deposit (tenant improvement) applied at issuance |
| Commercial Water/Sewer System Capacity Fees (effective 1/1/2026), Total (meter plus fees) | $8,611.24 (3/4" meter); $14,299.72 (1" meter); $28,981.49 (1 1/2" meter); $45,814.27 (2" meter); $100,577.37 (3" meter); $173,985.15 (4" meter) | City of Show Low Commercial Fee Schedule, effective 1/1/2026 (printed on the New Commercial Permit Application); includes meter cost, turn-on fee, security deposit, water system capacity fee, and sewer system capacity fee — additional building permit fees apply on top |
Complimentary Fence Permit
VerifiedA free, no-fee permit required for construction or installation of fencing in the City of Show Low, per Show Low Municipal Code Title 19.25.090(A). Staff plan review confirms zoning/setback compliance even though no fee is charged.
Verified 2026-07-06 · Source
Requirements
- Complimentary Fence Permit required for construction/installation of fencing per Show Low Municipal Code Title 19.25.090(A)
- Site plan required showing surveyed property corners and the location, height, and type of all fencing materials
- Fences must be built entirely on the owner's property
- Front yard: no view-obscuring fence over 3 feet permitted in the required front setback; non-view-obscuring fences (e.g., chain link without slats) up to 4 feet permitted in the front yard setback
- Rear/side yards (excluding corner lots): a permitted fence (view-obscuring or not) may be up to 6 feet high in a required rear or side setback behind the front yard setback; a rear yard abutting a road must comply with front-yard setbacks
- Fences 6 feet in height must be located 20 feet back from all street-side property lines
- Barbed wire is only permitted in residentially zoned districts for livestock fencing; barbed/razor wire is permitted above the 6-foot limit in commercial/industrial zones for security purposes
- Applicant should confer with Planning & Zoning staff (928-532-4040) to confirm exact setback requirements for the specific zoning district
Required documents
- RequiredComplimentary Fence Permit Application and Site PlanCity of Show Low Planning & Zoning form (updated 2/18/21) combining the permit application with a fence site-plan diagram (address, APN, owner/applicant, fence height, materials, setbacks)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence Permit | $0 (no fee) | City of Show Low Complimentary Fence Permit form: 'This permit and staff review is a free service provided by the City of Show Low.' |
Shed / Accessory Structure Permit
VerifiedA free 'Complimentary Shed Permit' covers detached accessory structures (sheds, greenhouses, barns) up to 200 square feet under roof in the City of Show Low, per Show Low Municipal Code Title 19.25.060(F). Structures over 200 square feet, or any shed with electricity/plumbing or direct attachment to another building, require a full fee-bearing Building Permit instead.
Verified 2026-07-06 · Source
Requirements
- Sheds/accessory structures up to 200 square feet under roof: Complimentary Shed Permit required (no fee) per Title 19.25.060(F)
- Sheds greater than 200 square feet under roof require a full Building Permit; prefabricated sheds over 200 square feet are prohibited outright in the City of Show Low
- Shipping containers of any size are prohibited in residential areas
- Any shed incorporating electricity and/or plumbing, or directly attached to another structure, requires a full Building Permit regardless of size
- Detached sheds limited to one story; sheds located 5 feet from a side/rear property line are limited to 15 feet in height or the height of the main structure, whichever is less
- Minimum setback for any detached accessory structure is 5 feet from a side or rear property line, and at least 5 feet from other structures; not permitted within required front-yard setbacks; sheds may not be placed within any public or private easement
- Site plan required showing surveyed property corners, shed location/size/type, and distances to all existing structures
Required documents
- RequiredComplimentary Shed Permit Application and Site PlanCity of Show Low Planning & Zoning form (updated 1/6/22) for accessory structures up to 200 sq ft
- OptionalBuilding Addition Permit ApplicationRequired instead of the complimentary form for sheds over 200 sq ft, or any shed with electrical/plumbing/attachment to another structure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Shed Permit (accessory structure, 200 sq ft or less, no electrical/plumbing, not attached to another structure) | $0 (no fee) | City of Show Low Complimentary Shed Permit form: 'This permit and staff review is a free service provided by the City of Show Low.' |
| Building Permit Fee (sheds over 200 sq ft, or with electrical/plumbing/attachment) | Formulated by the 1997 Uniform Building Code (UBC) valuation-based fee schedule | City of Show Low Fee Schedules page and Commercial Permit Application fee-methodology citation; applies once a shed exceeds the complimentary-permit exemption criteria |
Sign Permit
VerifiedRequired for installation of signage in the City of Show Low, administered by the Planning & Zoning Department under Title 19.100 of the Show Low Zoning Ordinance, with its own dedicated flat fee table separate from the Building Safety Department's valuation-based fee model.
Verified 2026-07-06 · Source
Requirements
- Sign Permit Application required per Title 19.100 of the Show Low Zoning Ordinance, administered by Planning & Zoning (928-532-4040)
- Two (2) copies of a detailed site plan required, including sign size/height/shape sketch, adjacent streets and rights-of-way, setbacks, dimensioned drawings, allowable sign area calculation, building lineal frontage measurement, materials/mounting/lighting description, and footing/engineering details for freestanding or monument signs
- Fees are not required to be submitted with the application but must be paid prior to permit issuance
- Incomplete applications are not considered received and may delay consideration
Required documents
- RequiredSign Permit ApplicationCity of Show Low Planning & Zoning Department application (updated 2/22/2021)
- RequiredSign Site Plan / Submittal ChecklistDetailed site plan meeting the City's submittal checklist requirements for sign proposals
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign, 20 square feet and under | $20.00 | Per City of Show Low Resolution Nos. 824 and R2015-01, per sign in the application |
| Sign, 21 to 40 square feet | $40.00 | Per City of Show Low Resolution Nos. 824 and R2015-01 |
| Sign, 41 square feet and greater | $60.00 | Per City of Show Low Resolution Nos. 824 and R2015-01 |
| Portable Sign (A-frame/sandwich-board) | $200.00/year | Per City of Show Low Resolution Nos. 824 and R2015-01; must be renewed at the beginning of each calendar year |
Fire Sprinkler / Fire Alarm Permit (issued by Timber Mesa Fire and Medical District)
The City of Show Low adopts no fire code and issues no fire sprinkler or fire alarm permit of its own. Show Low Municipal Code § 18.05.040 ('The Building Codes of the City of Show Low') adopts the 2018 International Building Code, 2018 International Residential Code, 2018 International Fuel Gas Code, 2018 International Mechanical Code, 2018 International Plumbing Code and 2017 National Electrical Code — with no International Fire Code among them — and every current City permit application cover sheet directs applicants elsewhere for fire code: 'Fire Code Contact Timber Mesa Fire & Medical District at (928) 537-5100.' Fire code adoption and enforcement, fire protection system plan review, fire construction permits and fire inspections inside Show Low city limits are performed by the Timber Mesa Fire and Medical District (TMFMD), an independent special district at 3561 E. Deuce of Clubs, Show Low, AZ 85901, (928) 537-5100, which adopts and enforces its own International Fire Code with local amendments. Fire sprinkler, fire alarm, CO2 and kitchen hood suppression plans are filed with the City of Show Low Building Department, and the same application plus one electronic plan set is filed separately with the District's Fire Prevention and Life Safety Division. The District states plainly that any associated plan review or inspection/permit fees are invoiced by the District and paid directly to the District — they are NOT City of Show Low fees and do not appear on any City fee schedule.
Reviewed 2026-08-15 · Source
Requirements
- The City of Show Low adopts NO fire code: Show Low Municipal Code § 18.05.040 enumerates only the IBC, IRC, IFGC, IMC, IPC and NEC, and the International Fire Code is absent from that list. Fire code jurisdiction therefore sits with the fire district, not the City.
- City of Show Low Commercial Permit Application, 'City of Show Low Building Codes and Standards' block (.' The same line appears on the City's Residential, Solar and Addition permit applications.
- TMFMD adopts and enforces the International Fire Code with its own local amendments (District Fire Code page); the amendment document currently published by the District is '2018 IFC Amendments and Recommendations — Adopted 9-26-2022'.
- SUBMITTAL ROUTE (District Plan Review Procedures page, City of Show Low section): submit all construction plans to the City of Show Low Building Department as required; submit the appropriate District application and one set of electronic plans (PDF) or a file-download link for fire plan review to the Timber Mesa Fire and Medical District Fire Prevention and Life Safety Division, (928) 537-5100. Once reviewed, plans are delivered back to the City of Show Low Building Department for pickup.
- The District states: 'All fire sprinkler, fire alarm system, CO2 system, and kitchen hood suppression system plans are to be submitted to the City of Show Low Building Department,' with the appropriate District application and one electronic plan set submitted separately to the District.
- The District states: 'Any associated plan review or inspection/permit fees will be invoiced by the Timber Mesa Fire and Medical District and paid directly to the District' — a separate process from the jurisdictions the District serves (Show Low, Pinetop-Lakeside, Navajo County).
- SPRINKLER SUBMITTAL MINIMUMS (District Fire Sprinkler System Installation or Modification Permit Application): 2 hard-copy sets signed and stamped by a NICET III or IV or an Arizona Design Professional, or 1 PDF copy on digital media; hydraulic calculations (PDF); product specifications (PDF with specific products highlighted or indicated); and the City or County building permit number, which is REQUIRED. Review will not be completed until all required information is provided.
- SPRINKLER SMALL-PROJECT RULE: any addition/modification involving fewer than 21 sprinkler heads on an EXISTING NFPA 13/13R/13D/combination system does not require a complete plan submittal provided a completed permit application, a check for the appropriate fee, and a letter from the Arizona-licensed fire sprinkler contractor addressing hydraulic sufficiency, remote-area impact, exact head count and reason, work schedule, and code compliance are provided. Paint booths, pipe-schedule designed systems and other special-application sprinkler systems always require a complete plan submittal, no exceptions, and there is a limit of ONE 'less than 21 sprinkler head' construction permit per sprinkler system without a complete plan submittal.
- FIRE PROTECTION UNDERGROUND: fire lines shall be visible during hydrostatic testing; center loading of the pipe is acceptable but all joints, valves, thrust blocks and fittings must be visible. The District's fire line inspection covers supply piping from inside/outside the building(s) to the point of connection to the supply water main at the street or the water main loop, plus piping to a remote FDC where installed.
- FIRE ALARM SUBMITTAL: all plans and specifications for fire alarm systems must be sealed by an Arizona design professional qualified in fire alarm system design or by a NICET/CSA level III or higher; shop drawings, floor plans, riser diagrams and battery/voltage-drop calculations per NFPA 72 are required. Plans must be reviewed and approved with a permit issued and on site prior to work beginning, and contractors must be licensed by the State of Arizona to perform the work.
- INSPECTION SCHEDULING (District Inspections page): any construction-phase inspection by the fire district must be requested a minimum of 48 business hours in advance, and approved plans bearing the Timber Mesa Fire and Medical District stamp must be on the job site — no inspections or tests will be conducted without them, and their absence results in a reinspection fee. If a contractor is not ready, the inspection must be cancelled at least two (2) hours before the scheduled time or a reinspection fee may apply.
- The City's own Commercial Permit Application pre-submittal checklist separately lists 'Fire sprinklers and types', 'Fire alarm' and 'Location to the nearest fire hydrant(s)' among the items required in a commercial plan submittal — the City collects the information, but the fire review, permit and fees are the District's.
Required documents
- RequiredTimber Mesa Fire and Medical District — Fire Sprinkler System Installation or Modification Permit ApplicationDistrict online application; requires the City of Show Low building permit number, project/owner/contractor information, ROC number, plans, hydraulic calculations and product specifications
- RequiredTimber Mesa Fire and Medical District — Fire Alarm System Installation or Modification Permit ApplicationDistrict online application; requires NFPA 72 shop drawings, floor plans, riser diagrams and system calculations sealed by an Arizona design professional or NICET/CSA level III or higher
- OptionalTimber Mesa Fire and Medical District — Commercial Hood System / Suppression System or Modification Permit ApplicationRequired instead of, or in addition to, the sprinkler/alarm applications where a commercial cooking hood or alternative extinguishing system is involved
- RequiredCity of Show Low Commercial Permit ApplicationThe underlying City building permit; sprinkler/alarm plans are filed with the City Building Department and the City building permit number is a required field on the District's sprinkler application
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| DISTRICT FEE (not a City of Show Low fee) — Fire Alarm & Detection System Plan Review & Inspections, new installation under 5,000 sq. ft. | $350 | Timber Mesa Fire and Medical District 'Fire Code Plan Reviews and Permits' fee schedule, page 1, first table block, Revised 04-2017. Show full citationHideTimber Mesa Fire and Medical District 'Fire Code Plan Reviews and Permits' fee schedule, page 1, first table block, Revised 04-2017. This table pairs labels with the wrong values when copied — read the figures from the page as published rather than from a copy-paste. Invoiced by and paid directly to the District. |
| DISTRICT FEE — Fire Alarm & Detection System, new installation 5,001 sq. ft. and over | $400 + $.005 per sq. ft. | TMFMD fee schedule page 1 (read from render), Revised 04-2017 |
| DISTRICT FEE — Fire alarm modification (including tenant improvement) | $100 for 1–6 devices; $150 for 7 or more devices | TMFMD fee schedule page 1, 'Modifications' rows under FIRE ALARM & DETECTION SYSTEM (read from render), Revised 04-2017 |
| DISTRICT FEE — Automatic Fire Sprinkler System Plan Review & Inspections, new commercial installation | $350 under 5,000 sq. ft.; $400 + $.005 per sq. ft. for 5,001 sq. ft. or more | TMFMD fee schedule page 1, AUTOMATIC FIRE SPRINKLER SYSTEM block (read from render), Revised 04-2017 |
| DISTRICT FEE — Automatic fire sprinkler system modification | $100 for 1–50 sprinklers; $150 for 51 or more sprinklers | TMFMD fee schedule page 1, 'Modifications' rows under AUTOMATIC FIRE SPRINKLER SYSTEM (read from render), Revised 04-2017 |
| DISTRICT FEE — Automatic Fire Sprinkler System (NFPA 13D/R/M residential) Plan Review & Inspections | $200 new residential installation; $100 modifications/additions | TMFMD fee schedule page 1, residential sprinkler block, Revised 04-2017. Show full citationHideTMFMD fee schedule page 1, residential sprinkler block, Revised 04-2017. Note: the PDF's text layer mis-pairs the values in this block — copy-pasted, it shows $100 against 'New Residential Installation' and $300 against 'Modifications/Additions'. Read the block from the page as published rather than from a copy-paste. |
| DISTRICT FEE — Alternative fire-extinguishing system plan review & inspections | $300 new installation (foam, CO2, clean agent, chemical, etc.); $250 new installation commercial cooking (hood) single system | TMFMD fee schedule page 1 (read from render), Revised 04-2017 |
| DISTRICT FEE — Fire pump, new installation and modified | $450 | TMFMD fee schedule page 1 (read from render), Revised 04-2017 |
| DISTRICT FEE — Commercial Development Plan (new and remodel projects) | $350 for buildings up to 99,999 sq. ft.; $600 over 100,000 up to 249,999 sq. ft.; $1,200 over 250,000 sq. ft. | TMFMD fee schedule page 1 (read from render), Revised 04-2017 — the District's general commercial fire plan review fee, which runs alongside the system-specific sprinkler/alarm fees |
| DISTRICT FEE — Re-inspection fee (after two inspections) | $100 | TMFMD fee schedule page 2, OTHER FIRE CODE FEES (), Revised 04-2017. Show full citationHideTMFMD fee schedule page 2, OTHER FIRE CODE FEES (), Revised 04-2017. CONFLICT RECORDED, NOT RESOLVED: the District's own Fire Sprinkler and Fire Alarm permit-application web pages each state that if additional inspections become necessary they are billed at $150.00 per inspection. Both figures are as published; no District document located reconciles them, so confirm the applicable charge with the Fire Prevention and Life Safety Division. |
| DISTRICT FEE — Expedited plan review (based on staff availability) | $200 in addition to base fee | TMFMD fee schedule page 2 (read from render); the same row states normal review time is 10 business days |
| DISTRICT FEE — Violation fees | $150 no approved plans on site or failure to attend a scheduled inspection (15 minute wait time); $150 failure to install per approved plans; $250 failure to pre-test fire protection systems for acceptance | TMFMD fee schedule page 2, VIOLATION FEES (read from render), Revised 04-2017 |
Change of Use / Certificate of Compliance
VerifiedCovers a change in the use or occupancy of an existing building or space in the City of Show Low (for example converting a retail suite to a restaurant). The City publishes no application named 'Change of Use' — its complete permit inventory on the City Permits & Applications page is Accessory, Commercial, Fence, Short Term Rental Registration, Plumbing, Sign, Shed, Solar, Additions, Manufactured Home, Water/Sewer Connection and Residential, plus Conditional Use Permits, Temporary Permits, Business Permits and Other Applications (207 Waiver, Right of Way Permit, Special Inspection Certificate). A use change is instead handled through three existing City instruments, each independently grounded in the Show Low Municipal Code: (1) the Commercial Permit Application on its tenant-improvement track for the physical work; (2) a Certificate of Compliance under Municipal Code § 18.20.020, which the Code expressly ties to 'use change' in an existing structure, or a new Certificate of Occupancy under § 18.20.010; and (3) a Conditional Use Permit from Planning & Zoning where the new use is a conditional rather than permitted use in the zoning district.
Verified 2026-08-15 · Source
Requirements
- Show Low Municipal Code § 18.20.020 (Certificate of compliance): 'The certificate of compliance is for existing structures. It may be associated with removing, relocating, renovation, use change, addition and existing structure or housing code. A letter of certification (duplicate certification) may be for other than the original issue.' This is the only place in the Show Low code that names a use change as its own certificate trigger.
- Show Low Municipal Code § 18.20.010 (Certificate of occupancy): when final inspection indicates a building is in full compliance with applicable codes, a certificate of occupancy shall be issued; no building may be occupied for any reason or purpose until after a final inspection has been performed and the certificate of occupancy issued. A temporary certificate of occupancy may be issued for a specified period where uncompleted items are not a threat to occupant health and safety. Certificates of occupancy are not issued for accessory buildings.
- Physical work associated with a change of use is permitted on the City's Commercial Permit Application, which requires an Occupancy Classification, Type of Construction and number of stories to be stated on the form, plus a material cost valuation for all commercial jobs.
- Show Low Municipal Code § 18.15.060: a pre-application meeting is required for all new commercial construction and substantial commercial remodels or additions; a commercial tenant improvement submittal requires four (4) copies of plans and specifications (versus six (6) for new commercial).
- Show Low Municipal Code § 18.25.080 defines 'new development' to include 'any change in use of an existing building, structure or lot requiring any form of city building permit or approval and which increases the demand for one (1) or more public facilities' — so a change of use can trigger development (impact) fees.
- Show Low Municipal Code § 18.25.100(B)(2): 'Upon receipt of an application for a building permit, the city shall determine whether it is for a change in use. In such cases, the development fee due shall be based only on the incremental increase in the fee for the additional public facilities needed for the change in use.' Development fees are calculated by the City and paid before the building permit is issued.
- Where the proposed new use is a conditional use in the zoning district rather than a use permitted by right, a Conditional Use Permit is required from Planning & Zoning; the Planning and Zoning Commission is empowered to grant or deny applications for Conditional Use Permits and to impose conditions upon them, and the process runs application → public notice → public hearing → appeals.
- A change of use in a commercial building also triggers fire review by the Timber Mesa Fire and Medical District (the City adopts no fire code) — see the fire-sprinkler-alarm-permit entry; the District's Commercial Development Plan review fee is expressly for 'new and remodel projects'.
- Contractor licensing: § 18.15.030 bars issuance of a permit to anyone contracting regulated work who does not hold a valid, unexpired, unrevoked Arizona contractor's license, unless the applicant is the bona fide owner of the premises.
Required documents
- RequiredCommercial Permit Application (tenant improvement track)City of Show Low Building Safety Department application (2025 revision); four (4) copies of plans and specifications for a tenant improvement, Occupancy Classification and Type of Construction stated on the form, material cost valuation required
- RequiredPre-Submittal ChecklistCompleted at the pre-application meeting required by § 18.15.060 for substantial commercial remodels; includes occupancy group(s), building construction type(s), occupancy separations, fire rating(s), area separation, fire sprinklers and types, and fire alarm
- OptionalConditional Use Permit ApplicationCity of Show Low Planning & Zoning application, filing fee $150.00; required only where the proposed new use is a conditional use in the zoning district. Requires one 24"x36" map plus one 11"x17" copy drawn to scale showing lot dimensions, building sizes/heights/uses/materials, parking and circulation, signs, lighting, grades and drainage, utilities and easements, landscaping and a vicinity sketch, plus a statement of the nature of the request
- RequiredCertificate of Compliance / Certificate of OccupancyIssued by Building Safety following final inspection, per Show Low Municipal Code §§ 18.20.010 and 18.20.020; § 18.20.020 expressly covers 'use change' in an existing structure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Formulated by the 1997 Uniform Building Code (UBC) valuation-based fee schedule | Same fee mechanism documented on the commercial-building-permit entry; Show Low Municipal Code § 18.25.010 provides only that the common council may establish building permit fee amounts by resolution, so no numeric table is codified |
| Plan Review Fee (Commercial), including tenant improvements | 50% of the Building Permit Fee | City of Show Low Fee Schedules page: 'For commercial project reviews, a fee of 50% of the building permit fee will be applied to the plan review fee. Show full citationHideCity of Show Low Fee Schedules page: 'For commercial project reviews, a fee of 50% of the building permit fee will be applied to the plan review fee. A $400 deposit for new commercial or a $200 deposit for tenant improvements will be received when the plans are submitted.' The deposit is applied to the plan review fee at issuance. |
| Conditional Use Permit filing fee (only where the new use is a conditional use) | $150.00 | Stated consistently in two independent City sources read directly: the Conditional Use Permits section of the City Permits & Applications page ('Permits cost $150 to file') and the face of the Conditional Use Permit Application PDF itself ('Filing Fee: $150.00') |
| Development (impact) fees on a change of use | Incremental increase only — the difference in fee for the additional public facilities needed for the change in use | Show Low Municipal Code § 18.25.100(B)(2). Show full citationHideShow Low Municipal Code § 18.25.100(B)(2). The Street Facilities (Transportation) Development Fee rates codified at § 18.25.140 are $1,112 per single-family detached housing unit, $874 per all other housing type and $834 per recreational vehicle dwelling unit; § 18.25.090(C)(2)-(3) provides that no development fee is imposed on nonresidential development that adds no square footage, or on any activity that does not increase demand for public facilities, unless demand increases. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Show Low building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.