You are viewing the permanent link for the record currently in effect, published 2026-07-07.

Kayenta Township building permits

Verified

Kayenta Township, Arizona — as published 2026-07-07.

Verified 2026-07-08 · Source

Codes adopted

International Green Construction Code (IGCC), 2010 edition, Public Version 2.0, as amended — Kayenta Township is documented by the U.S. EPA as 'the first Tribal community in the U.S. to adopt the International Green Construction Code (IGCC),' formalized via the Township's Building Codes Resolution. The codified ordinance itself (Regulations for the Kayenta Township Building Codes, Chapter 11, Section 11-3, Subchapter 9, adopted under Resolution KTCD-28-13, Dec. 9, 2013) states: 'International Green Construction Code, 2010 edition, Public Version 2.0, as amended.' The Township's own Ordinances and Codes page separately lists 'International Green Construction Code' as a standalone Volume 2 standard document. Sources: U.S. EPA, 'Kayenta Township Green Building Code,' https://www.epa.gov/green-building-tools-tribes/kayenta-township-building-code (fetched live 2026-07-07); Kayenta Township, Regulations for the Kayenta Township Building Codes (Chapter 11), https://kayentatownship-nsn.gov/wp-content/uploads/2023/07/002_Building_Code_1.pdf (fetched live 2026-07-07).2018 International Building Code (IBC), 2018 International Residential Code (IRC), 2018 International Fire Code (IFC), 2018 International Plumbing Code (IPC), 2018 International Mechanical Code (IMC), 2018 International Energy Conservation Code (IECC), 2017 National Electrical Code (NFPA 70), and 2009 Arizona Registrar of Contractors Workmanship Standards for Licensed Contractors — per the Township's current published code list, 'Adopted Building Codes & Amendments,' approved via Kayenta Township Commission (KTC) Resolution No. KTCJN-29-2026, effective July 1, 2026. This document supersedes the 2006-edition code list that appears in the Township's still-published 2013 codified ordinance (Chapter 11, Section 11-3) and in the residential/commercial Plan Review Requirements documents (which cite 2006 IRC/IBC/IMC/IPC/IFGC and the 2005 NEC) — those older editions remain visible in some still-linked documents, indicating the code-edition update to the 2018 I-Code family (via KTCJN-29-2026) is very recent (effective July 1, 2026) and not yet fully propagated across all published forms as of this research pass. Source: Kayenta Township, 'Adopted Building Codes & Amendments,' https://www.kayentatownship-nsn.gov/wp-content/uploads/2026/06/2018-Adopted-Building-Codes-for-Kayenta-Township-.pdf (fetched live 2026-07-07).International Plumbing Code (IPC) and International Mechanical Code (IMC) — separately confirmed via the Township's own Ordinances and Codes page footnote: '**The Kayenta Township has adopted the International Code Council's following International Codes: IPC (International Plumbing Code) & IMC (International Mechanical Code).' Source: Kayenta Township, Ordinances and Codes page, https://www.kayentatownship-nsn.gov/ordinances-and-codes/ (fetched live 2026-07-07).2006 International Building Code, 2006 International Residential Code, 2006 International Mechanical Code, 2006 International Plumbing Code, 2005 National Electrical Code, 2006 International Existing Building Code, 2006 International Fuel Gas Code, and 2009 International Energy Conservation Code — the codified Chapter 11 ordinance (Section 11-3, adopted under Resolution KTCD-28-13, Dec. 9, 2013) lists these editions as the 'Kayenta Township Building Codes' in effect at that time, each 'amended' with a Township-specific name (e.g., '2006 Kayenta Township Building Code'). This 2013 codification is still the live linked 'Building Codes' PDF on the Township's Ordinances and Codes page even though the Township's newer 'Adopted Building Codes & Amendments' page (effective July 1, 2026) lists the 2018 I-Code family instead — both documents are currently published, and applicants should confirm with the Building & Safety Department which edition governs a specific project given the code-cycle transition. Source: Kayenta Township, Regulations for the Kayenta Township Building Codes, Chapter 11, Section 11-3, https://kayentatownship-nsn.gov/wp-content/uploads/2023/07/002_Building_Code_1.pdf.Manufactured housing is regulated under HUD Title 24: Part 3280 (Manufactured Home Construction and Safety Standards), Part 3282 (Manufactured Home Procedural and Enforcement Regulations), Part 3285 (Model Manufactured Home Installation Standards), and Part 3286 (Manufactured Home Installation Program), unless the manufacturer indicates the home should be regulated by a more restrictive code. Source: Regulations for the Kayenta Township Building Codes, Chapter 11, Section 11-4.Kayenta Township Zoning Code — a separate adopted ordinance (Volume 2 of the Township's Official Compilation) governing land use and zoning, referenced in permit plan-review requirements ('Provide a copy of the approved Planning and Zoning stipulations'). Source: Kayenta Township, Ordinances and Codes page; Kayenta Township Zoning Ordinance, https://kayentatownship-nsn.gov/wp-content/uploads/2023/07/019_Zoning_Code.pdf.

Permit types & fees

Residential Building Permit

Verified

Issued by the Kayenta Township Building & Safety Department for a residential home, addition, alteration, patio, carport, garage, or other accessory structure intended for permanent family occupancy. The application must accompany construction drawings referenced by a Plan Check Number. Confirmed directly on the Township's official Permits & Applications page and via a dedicated Residential Building Permit Application form.

Verified 2026-07-08 · Source

Requirements

  • Obtain and complete the Application for Residential Building Permits form from the Building & Safety Department (P.O. Box 1490, Kayenta, AZ 86033)
  • Submit two complete sets of construction plans (24"x36"), drawn to scale, prepared by an Arizona-registered design professional (unless the work is minor, e.g., painting, floor coverings, moveable partitions/casework)
  • Plans must include: cover sheet with project address and building information block (use/occupancy, occupant load, construction type, square footage, fire sprinklers/alarms Y/N, exits), code summary; site plan (accessible routes, property lines, setbacks, parking); floor plan(s); roof plan; elevations; building sections/details; structural plans with calculations and a soils report or engineering assessment; plumbing and mechanical plans (with additional isometric drawings for homes in the Green Building Program under ICC-700); electrical plans; and, if applicable, fire sprinkler and fire alarm plans sealed by an Arizona-registered design professional
  • Submit a Res-Check for all Group-R occupancies (downloadable from the U.S. Department of Energy at energycodes.gov)
  • Provide proof of ownership (Business Site Lease or suitable evidence of ownership if ownership changed within the last 6 months)
  • If using a contractor, check the appropriate box and attach the Contractor/Worker Information Supplement Form listing Registrar of Contractor numbers and Sales Tax ID; contractors must obtain a Township Business License
  • Pay the Construction Permit Fee of 1% of estimated project valuation (Chapter 11, Section 11-5) before construction may begin, via the Construction Permit Form remitted to the Kayenta Township Finance Department
  • Sign and date the application, granting the Building Inspector permission to enter the premises during reasonable times for inspections

Required documents

  • RequiredApplication for Residential Building PermitsOfficial Kayenta Township Building & Safety Department form; captures residential/townhouse/two-family/rental status, type of work, job location, applicant/owner info, building information (floors, height, bedrooms, valuation, construction type, utilities).
  • OptionalContractor/Worker Information Supplement FormLists all contractors associated with the project, their Registrar of Contractors numbers, and Sales Tax identification numbers.
  • RequiredResidential Inspection ChecklistPublished alongside the residential permit package on the Township's Permits & Applications page; not independently extracted as a standalone document in this research pass.
  • OptionalRight of Way PermitReferenced as part of the residential building permit package; required for work affecting the public right-of-way (driveways, utility connections, etc.). Standalone form URL not independently confirmed in this research pass.
  • RequiredTwo complete sets of construction plans (24"x36", to scale)Must meet the detailed Residential Plan Review Requirements (cover sheet, site plan, floor plan, roof plan, elevations, sections, structural, plumbing, mechanical, electrical, and fire plans as applicable).

Fee schedule

Fee typeAmountNotes
Construction Permit Fee1% of estimated project valuationPer Kayenta Township Code of Ordinances, Chapter 11, Section 11-5 (Resolution KTCAU-67-11); due and payable in advance of the construction commencement date; legal incidence on the contractor, but owner responsible for collection and remittance if the contractor does not pay. Payments over $10,001 must be wire-transferred. Source: Construction Permit Form (Rev. 04/09/18).

Commercial Building Permit

Verified

Issued by the Kayenta Township Building & Safety Department exclusively for non-residential construction projects — businesses, restaurants, churches, institutions, schools, and manufacturing facilities. Requires a Plan Check Number matching the construction plans. Also used for commercial demolition (per the Township's own instructions: 'Demolition: Use the Commercial Building Permit Application').

Verified 2026-07-08 · Source

Requirements

  • Obtain and complete the Application for Commercial Building Permit; the application must be assigned a Plan Check Number that is prominently displayed on the construction plans
  • Submit two complete sets of construction plans (24"x36"), drawn to scale, prepared by an Arizona-registered design professional
  • Plans must include: cover sheet (address, Planning & Zoning stipulations, NTUA-approved utility standards, building information block, code summary); site plan; floor plan(s) with a complete interior ADA accessibility plan; roof plan; elevations; building sections/details identifying elements requiring special inspection per IBC Chapter 17; structural plans with calculations, soils report, and engineering assessment; plumbing plans (isometric drawings, gas isometric); mechanical plans (showing compliance with IMC ventilation/efficiency sections); electrical plans (with load calculations, AFC/fault current calculations, panel AIC rating); and fire sprinkler/fire alarm plans sealed by an Arizona-registered design professional, Fire Protection Engineer, or NICET III/IV, if applicable
  • Submit a COMcheck for all conditioned buildings (downloadable from the U.S. Department of Energy at energycodes.gov)
  • Provide proof of ownership (Business Site Lease, deed, or lease agreement for tenant improvements) if ownership changed within the last 6 months
  • Submit the Contractor Information Supplement Form with Registrar of Contractors number and Sales Tax ID for each contractor; obtain a Transaction Privilege License / Business License for the contractor of record
  • Pay the 1% Construction Permit Fee via the Construction Permit Form, remitted to the Kayenta Township Finance Department, before construction begins
  • Sign and date the application, certifying compliance with adopted codes and granting inspection access

Required documents

  • RequiredApplication for Commercial Building PermitOfficial Kayenta Township Building & Safety Department form; captures description of work (construct/addition/alteration/demolition/change of use), square footage, valuation, applicant/property/utility information, use of building, fire protection features, and architect/engineer/contractor contact information.
  • RequiredContractor Information Supplement FormLists all contractors, Registrar of Contractors numbers, and Sales Tax identification numbers.
  • RequiredCommercial Plan Review ChecklistPublished alongside the commercial permit package on the Township's Permits & Applications page.
  • OptionalFire Protection Requirements documentPublished alongside the commercial permit package; governs fire sprinkler/alarm plan requirements.
  • RequiredCommercial Building Plan Review RequirementsDetailed submittal checklist for cover sheet, site plan, floor plan, roof plan, elevations, structural, plumbing, mechanical, electrical, and fire plans.
  • RequiredConstruction Permit FormUsed to calculate and remit the 1% Construction Permit Fee to the Finance Department.

Fee schedule

Fee typeAmountNotes
Construction Permit Fee1% of estimated project valuationPer Chapter 11, Section 11-5 (Resolution KTCAU-67-11); same fee structure applies to commercial as to residential projects. Payments over $10,001 must be wire-transferred to the Township's Wells Fargo account.

Trade Permit (Over-the-Counter Permit)

Verified

An expedited 'over-the-counter' permit for minor electrical, mechanical, plumbing, or fire/specialty work where full plan review is not required — e.g., electrical service upgrades, replacement/change-out of existing electrical panels, mechanical equipment replacement, plumbing fixture replacement, or piping repair where systems already exist. The Building Official may require plans if systems/equipment are being relocated or reconfigured. Intended to be reviewed and issued while the applicant waits, where possible.

Verified 2026-07-08 · Source

Requirements

  • Complete the Application for Trade Permit, checking the applicable type (General/Electrical/Mechanical/Plumbing) and Commercial or Residential occupancy
  • Provide a description of work, property address, project valuation
  • For electrical work: existing and new/upgraded service size (amps), whether service is located on a utility easement or another's property, and renewable energy details (photovoltaic/thermal, ground-set or rooftop) if applicable
  • For mechanical work: type of unit (electrical/gas-fuel piping/oil/other), number and location of units, number of fuel gas appliances
  • For plumbing work: system type (cistern/septic/water well/other) and number of fixtures added/replaced/repaired
  • For specialty/fire work: commercial kitchen hood systems, fuel tanks, fire alarms, or fire sprinklers, as applicable
  • Provide Contractor Information: name, company, address, Registrar of Contractors license number, classification, and expiration date
  • Sign and date the application, certifying compliance with adopted codes and granting inspection access

Required documents

  • RequiredApplication for Trade PermitOfficial Kayenta Township Building & Safety Department over-the-counter permit form covering electrical, mechanical, plumbing, and specialty-fire trade work.
  • OptionalEquipment/appliance specificationsAdditional manufacturer specification sheets may be attached to the trade permit application rather than kept as separate plan sets.

Fee schedule

Fee typeAmountNotes

Solar Photovoltaic (PV) / Renewable Energy Permit

Verified

Required for rooftop or ground-set solar photovoltaic (or solar thermal) installations within Kayenta Township. Kayenta Township has no dedicated standalone solar permit type or fee category — renewable energy work is captured directly on the same Application for Trade Permit used for electrical, mechanical, and plumbing work, with a specific field for renewable energy details (photovoltaic/thermal, ground-set or rooftop) and a requirement for roof load calculations if rooftop-mounted. It is billed under the Township's flat 1% Construction Permit Fee that applies to all construction projects Township-wide (Chapter 11, Section 11-5).

Verified 2026-07-20 · Source

Requirements

  • Complete the Application for Trade Permit, checking 'Electrical' (for the interconnection) and specifying renewable energy details: photovoltaic or thermal, and ground-set or rooftop mounting
  • Roof load calculations are required if the system is rooftop-mounted, per the Trade Permit application's own instructions
  • Construction Permit Fee of 1% of estimated project valuation is collected for the solar installation like any other Township construction project (Chapter 11, Section 11-5); legally the contractor's obligation, but the owner is responsible for collecting and remitting it if the contractor does not
  • Construction must be performed by a contractor licensed and in good standing in Utah, Arizona, Colorado, or New Mexico (proof required with the application), unless the work qualifies for the owner/lessee self-use exemption under Chapter 11, Section 11-10
  • Structural/racking design for a rooftop system, and any accompanying construction drawings, require the seal and signature of a licensed professional engineer or architect from Utah, Arizona, Colorado, or New Mexico

Required documents

  • RequiredApplication for Trade PermitOfficial Kayenta Township Building & Safety Department over-the-counter permit form; check 'Electrical' and complete the renewable energy (photovoltaic/thermal, ground-set/rooftop) fields
  • OptionalRoof load calculationsRequired specifically for rooftop-mounted photovoltaic or thermal systems, per the Trade Permit application's own instructions
  • RequiredContractor licensure proofUtah, Arizona, Colorado, or New Mexico contractor license in good standing, unless the owner/lessee self-use exemption applies

Fee schedule

Fee typeAmountNotes
Construction Permit Fee (all construction projects, Chapter 11 Section 11-5)1% of estimated project valuationKayenta Township Construction Permit Form (Rev. 04/09/18), citing Resolution KTCAU-67-11, Chapter 11, Section 11-5. Applies Township-wide to all construction, including solar/renewable energy installations; no separate flat solar-specific fee line is published. Payments over $10,001 must be wire-transferred (Wells Fargo Bank, Kayenta N.A., Tax Depository Account #1508724547).

Electric Vehicle (EV) Charger / EVSE Permit

Verified

Kayenta Township has no dedicated standalone EV charger/EVSE permit type or fee category. Like solar/renewable-energy interconnection work, EV charger circuit installation is electrical work captured on the same Application for Trade Permit used for electrical, mechanical, and plumbing work — the Trade Permit's electrical section requires existing and new/upgraded service size (amps), which applies directly to an EV charger circuit whether or not the renewable-energy field is also used. It is billed under the Township's flat 1% Construction Permit Fee that applies to ALL construction projects Township-wide (Chapter 11, Section 11-5), the same fee explicitly confirmed to apply to solar/renewable-energy installations; no distinct EV-specific fee line exists.

Verified 2026-07-20 · Source

Requirements

  • Complete the Application for Trade Permit, checking 'Electrical' and providing existing and new/upgraded service size (amps) for the EV charger circuit
  • If the charger is served by a new or upgraded electrical service, provide details of whether the service is located on a utility easement or another's property, per the Trade Permit's electrical-work fields
  • Construction Permit Fee of 1% of estimated project valuation is collected for the EV charger installation like any other Township construction project (Chapter 11, Section 11-5); legally the contractor's obligation, but the owner is responsible for collecting and remitting it if the contractor does not
  • Construction must be performed by a contractor licensed and in good standing in Utah, Arizona, Colorado, or New Mexico (proof required with the application), unless the work qualifies for the owner/lessee self-use exemption under Chapter 11, Section 11-10
  • Service utilities for any commercial EV charging installation (e.g., a fleet or workplace charging depot) are approved under Navajo Tribal Utility Authority (NTUA) standards, per the Commercial Plan Review Requirements document

Required documents

  • RequiredApplication for Trade PermitOfficial Kayenta Township Building & Safety Department over-the-counter permit form; check 'Electrical' and complete the service-size fields for the EV charger circuit; no EV-specific application form is published separately
  • RequiredContractor licensure proofUtah, Arizona, Colorado, or New Mexico contractor license in good standing, unless the owner/lessee self-use exemption applies

Fee schedule

Fee typeAmountNotes
Construction Permit Fee (all construction projects, Chapter 11 Section 11-5)1% of estimated project valuationKayenta Township Construction Permit Form (Rev. 04/09/18), citing Resolution KTCAU-67-11, Chapter 11, Section 11-5. Applies Township-wide to all construction, including EV charger/EVSE electrical installations; no separate flat EV-specific fee line is published. Payments over $10,001 must be wire-transferred (Wells Fargo Bank, Kayenta N.A., Tax Depository Account #1508724547).

Annual Permit (Registration)

Verified

A voluntary annual registration, authorized under Section 105.1.1 of the International Building Code, allowing a firm/organization regularly employing one or more qualified tradespersons to make alterations to approved electrical, gas, mechanical, and plumbing installations within a building's existing exterior walls throughout the year, without submitting plans for each individual alteration or being subject to individual building permits and field inspections. All work under the annual permit must be directed by a professional licensed engineer or architect, who submits monthly progress reports; the applicant must keep and maintain detailed alteration records accessible to the Building Official at all times.

Verified 2026-07-08 · Source

Requirements

  • Submit the Application for Annual Permit Registration, including firm/organization name (and DBA), complete mailing address, physical location(s) of the site(s)/building(s), and legal description of the site(s)
  • Submit a floor plan identifying uses or occupancies of each major area
  • Certification signed by both the applicant/agent and the engineer/architect of record, confirming they have read the requirements of Section 105 of the (2006, per the form's own text) International Building Code governing Annual Permits
  • Pay the registration fee upon approval, before the program takes effect (fee amount determined by Kayenta Township and prorated to a minimum amount as calculated; no published flat figure)
  • Renew registration annually, coinciding with the business license renewal date or a date set by the Building Official

Required documents

  • RequiredApplication for Annual Permit RegistrationOfficial Kayenta Township Building & Safety Department form; requires firm information, site location(s), legal description, authorized representative details, and dual certification (applicant/agent and engineer/architect, with Arizona Registrant Seal number).
  • RequiredFloor plan identifying uses/occupancies of each major areaRequired attachment identifying how each major area of the registered building is used.

Fee schedule

Fee typeAmountNotes
Annual Permit registration feeDetermined by Kayenta Township and prorated to a minimum amount as calculated; no published flat dollar figure found in this research pass.Disclosed as a gap — the form states the fee 'shall be determined by Kayenta Township and prorated to a minimum amount as calculated' without stating the actual base amount. Confirm current fee directly with the Building & Safety Department (928-697-8451).

Final Inspection and Certificate of Occupancy (Commercial)

Verified

A guideline-driven, multi-department final inspection and Certificate of Occupancy (CO) process specifically published for commercial projects, coordinated by the Building & Safety Department alongside fire prevention, on-site engineering, off-site construction engineering, utilities, sanitation, planning, and landscape architecture review. The owner is responsible for satisfying all listed requirements before a final inspection can be requested and a CO walk-through scheduled. The Building Official may issue a Temporary Certificate of Occupancy before all work is complete, at the Building Official's discretion, with an established time period.

Verified 2026-07-08 · Source

Requirements

  • Hold a recommended pre-construction meeting with the Building Official to discuss required inspections, tests, and questions before commencing work
  • Provide at least 24 hours' notice for all inspection requests (unless the Building Official determines an emergency situation warrants immediate inspection); inspections may be requested via phone (928-697-8451) or email (ptso@kayentatownship.net)
  • Ensure the inspection card copy of the building permit and approved plans are posted on the job-site for all scheduled inspections
  • Fire Prevention: install and ensure operating order for all fire protection systems (sprinklers, alarms) per approved plans; install all required fire lane, premise identification, and graphic directory signage
  • On-Site Engineering: complete all on-site improvements (grading, paving, water, sewer) per approved plans; remove drywell covers for site-retention prior to final inspection; provide as-built drawings from the consulting engineer to the Building Official prior to requesting final inspection; install on-site ADA ramps and parking signage
  • Off-Site Construction Engineering: hold a pre-construction meeting with the off-site inspector; schedule inspections with a minimum 24 hours' notice (after-hours inspections may incur additional charges); comply with the Right-of-Way permit for traffic control; provide certified mylar as-built drawings for completed off-site improvements before acceptance; install off-site ADA ramps and signage
  • Utilities: complete testing and approval of all water and sewer connections/installations by the appropriate utility company, including required cross-connection devices (double-check valves, RPP valves)
  • Sanitation: install all refuse enclosures per approved plans (location, size, materials, gates, landscaping)
  • Planning: complete all building construction with approved materials/color schemes (documented on-site); complete parking lot improvements (pavement, lighting, curbing, striping); install all screen walls, trash enclosures, and approved signage; remove all temporary signage; complete interior walkways, pedestrian furniture, and on-site lighting
  • Landscape Architecture: install all landscape materials per approved plans in healthy condition (no deviation without prior Planning Department approval); complete irrigation system plumbing/electrical per approved plans; complete site grading (berms, retention areas) per approved Grading and Drainage plans; install screen walls to approved height/specifications

Required documents

  • RequiredFinal Inspection and Certificate of Occupancy — Requirement Guideline for Commercial ProjectsOfficial Kayenta Township Building & Safety Department guideline document listing all department-by-department requirements (Building & Safety, Fire Prevention, On-Site/Off-Site Engineering, Utilities, Sanitation, Planning, Landscape Architecture) that must be satisfied before a CO or Temporary CO can be issued.
  • RequiredAs-built drawings (on-site and off-site improvements)Certified mylar as-builts from the consulting engineer required before acceptance of off-site improvements; as-built drawings for on-site grading/improvements required before requesting final inspection.

Fee schedule

Fee typeAmountNotes

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kayenta Township building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /arizona/navajo-nation/kayenta-township-az/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356

Reproducible from PermitBase’s version-controlled dataset, commit 371a356.