You are viewing the permanent link for the record currently in effect, published 2026-07-07.
Unincorporated Pinal County building permits
VerifiedUnincorporated Pinal County, Arizona — as published 2026-07-07.
Verified 2026-07-13 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction, Addition, Accessory Structure)
VerifiedRequired for new single-family dwellings, residential additions, detached accessory structures over exemption thresholds, and structural alterations in unincorporated Pinal County (and in Kearny, Superior, and Mammoth, which are administered directly by Pinal County Building Safety under IGA). Applications may be submitted online through the Pinal County Citizen Access Portal (one set of plans) or in person at the Florence office (two sets of plans).
Verified 2026-07-13 · Source
Requirements
- Required for new single-family dwellings, additions, detached accessory structures exceeding exemption thresholds (200 sq ft / 10 ft wall height), and structural alterations
- Complete permit application; if applicant is not the property owner, a Property Owner Authorization form is required
- Two sets of complete construction documents (one set for online submittals): site plan, foundation plan, floor plan, roof framing plan, exterior elevations, general framing/foundation details, electrical/plumbing/mechanical plans, and RESCheck report or Manual J & S (2018)
- Separate zoning-required site plan drawn to engineer's scale showing property lines, all structures (including eaves/overhangs), septic/sewer location, washes, easements, and rights-of-way
- Construction documents must be dimensioned, drawn to an architect's scale (1/4" = 1'-0"), and of sufficient clarity to show location, nature, and extent of proposed work
- Structural design criteria: 2018 IBC/IRC, Wind Speed 115 mph, Wind Exposure Category C, Seismic Design Category B, Roof Live Load 20 psf minimum
- Apply online through Pinal County Citizen Access Portal (https://citizenaccess.pinalcountyaz.gov/) or in person at 85 N. Florence Street, Florence, AZ
- Termite (soil) treatment required within the perimeter of the foundation for any building requiring a permit, applied by a licensed applicator per Arizona Structural Pest Control Commission rules (2018 IBC §2304.12.4 as amended)
Required documents
- RequiredBuilding Permit ApplicationStandard permit application form; available at https://www.pinal.gov/DocumentCenter/View/460
- OptionalProperty Owner Authorization FormRequired with each application submission when the applicant is not the property owner; available at https://www.pinal.gov/DocumentCenter/View/464
- RequiredInformation Bulletin 004 — Permit Submittal RequirementsComplete construction-document checklist and structural design criteria; available at https://www.pinal.gov/DocumentCenter/View/445
- RequiredInformation Bulletin 004R — Residential Submittal RequirementsResidential-specific submittal checklist; available at https://www.pinal.gov/DocumentCenter/View/23640
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee — valuation-based (Article 3, Fee Schedule No. 071013-BPFS) | $1–$500: $22.00; $501–$2,000: $22.00 for first $500 + $2.75 per additional $100 or fraction; $2,001–$25,000: $63.25 for first $2,000 + $12.50 per additional $1,000 or fraction; $25,001–$50,000: $350.75 for first $25,000 + $9.00 per additional $1,000 or fraction; $50,001–$100,000: $575.75 for first $50,000 + $6.25 per additional $1,000 or fraction; $100,001–$500,000: $888.25 for first $100,000 + $5.00 per additional $1,000 or fraction; $500,001–$1,000,000: $2,888.25 for first $500,000 + $4.25 per additional $1,000 or fraction; $1,000,001+: $5,013.25 for first $1,000,000 + $2.75 per additional $1,000 or fraction | Fee Schedule No. 071013-BPFS (approved by Board of Supervisors 10 July 2013, repealing 2007 Schedule No. 022107-BPFS), Article 3. Valuation from Table I (Building Valuation Data–Feb 2012, ICC) with 0.70 Regional Modifier applied to cost/sq ft. Source: https://www.pinal.gov/DocumentCenter/View/475 |
| Plan review fee | 65% of the calculated building permit fee | Fee Schedule No. 071013-BPFS, Section 102. Due at time of submittal; separate from the permit fee, which is due at issuance. |
| Room additions (valuation determination) | $20.00/sq ft without plumbing; $25.00/sq ft with plumbing | Fee Schedule No. 071013-BPFS, Article 8. This sets the valuation used to calculate the Article 3 permit fee, not a flat fee itself. |
| Investigation fee (work commenced without a permit) | Equal to the permit fee | Fee Schedule No. 071013-BPFS, Section 103. Charged in addition to the permit fee whether or not a permit is subsequently issued. |
| Re-inspection / inspections outside normal business hours / inspection with no fee specifically indicated | $42.00 per hour (minimum charge one-half hour, or two hours for after-hours inspections) | Fee Schedule No. 071013-BPFS, Article 8 (Other Inspections and Fees). |
Commercial Building Permit (New Construction, Tenant Improvement, Remodel)
VerifiedRequired for all new commercial, industrial, and multi-family buildings, tenant improvements, remodels, and change-of-use projects in unincorporated Pinal County. Review timelines scale with project size: 45 business days up to 2,500 sq ft, 50 business days for 2,501–50,000 sq ft, and 60 business days for 50,001+ sq ft (which requires third-party review). Commercial fire-sprinkler/alarm plans may be deferred submittals, but must be approved and inspected prior to occupancy.
Verified 2026-07-13 · Source
Requirements
- Required for all new commercial, industrial, and multi-family construction, tenant improvements, remodels, and change-of-occupancy projects
- Two sets of complete construction documents (one set online) per Information Bulletin 004; see Information Bulletin 004C for commercial-specific submittal requirements
- Fire sprinklers/alarms when required by code may be listed as a deferred submittal on the building plans, but must be submitted, reviewed, approved, and inspected before occupancy; if the project is in a Fire District, fire plans go to that district's Fire Marshal, whose report must be provided to the Chief Building Official prior to final inspection
- Verify whether drawings must be designed and sealed by an Arizona-registered architect and/or engineer
- Tenant improvements: flat submittal fee of $50.00 at intake, with fees adjusted at plan review; plans examiner determines Major vs. Minor T.I. classification
- Projects over 50,000 sq ft require third-party plan review (adds to the standard review timeline)
Required documents
- RequiredInformation Bulletin 004C — Commercial Submittal RequirementsCommercial-specific submittal checklist; available at https://www.pinal.gov/DocumentCenter/View/23641
- OptionalInformation Bulletin 017B — Commercial InspectionsCommercial and tenant-improvement inspection phase checklist; available at https://www.pinal.gov/DocumentCenter/View/434
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee — valuation-based (same Table I / Article 3 schedule as residential) | Same valuation-based schedule as the Residential Building Permit fee table (Fee Schedule No. 071013-BPFS, Articles 2–3); commercial valuation driven by Table I cost/sq ft for the applicable occupancy group and construction type (e.g. B Business, M Mercantile, A Assembly), with 0.70 Regional Modifier and shell-building 20% deduction where applicable | Fee Schedule No. 071013-BPFS, Articles 2–3. Source: https://www.pinal.gov/DocumentCenter/View/475 |
| Plan review fee | 65% of the calculated building permit fee | Fee Schedule No. 071013-BPFS, Section 102. |
| Tenant improvement — Major T.I. | 40% of valuation based on the type of construction and occupancy, plus $50 flat submittal fee | Fee Schedule No. 071013-BPFS, Article 8. Plans examiner determines Major vs Minor classification. |
| Tenant improvement — Minor T.I. | 20% of valuation based on the type of construction and occupancy, plus $50 flat submittal fee | Fee Schedule No. 071013-BPFS, Article 8. |
| Use of outside consultants for plan checking/inspection | Actual costs (including administrative and overhead costs) | Fee Schedule No. 071013-BPFS, Article 8. Applies to the 50,000+ sq ft third-party-review tier. |
Electrical Permit
VerifiedRequired for new electrical service, panel/subpanel work, rewiring, and related electrical installations in unincorporated Pinal County, under the 2017 NEC with county amendments. Uses the Article 4 unit-fee schedule (issuance fee plus per-item/per-service fees). Utility companies will not energize service without a county clearance, but may impose additional requirements of their own.
Verified 2026-07-13 · Source
Requirements
- Permit required for new panels, subpanels, panel upgrades, rewiring, and other new/altered electrical service work
- Site plan noting placement of the new panel (location on structure) required with application
- If electrical service has been disconnected for MORE than 6 months, a permit is required before re-energizing; if disconnected for LESS than 6 months, a one-time courtesy inspection is available if no work has been performed
- Repair work requires a site plan (exterior work) or floor plan (interior work) clearly showing the location and scope of repair
- Utility companies require their own inspection/clearance of service equipment (trenches, masts, meters) in addition to county clearance — county approval does not guarantee utility acceptance
- Address must be posted and clearly visible from the street before an inspection will be performed
Required documents
- RequiredMechanical/Plumbing/Electrical (MPE) ApplicationFillable MPE application; available at https://www.pinal.gov/DocumentCenter/View/458
- OptionalInformation Bulletin 005 — Electrical ServiceOverhead electrical installation specifications; available at https://www.pinal.gov/DocumentCenter/View/446
- RequiredInformation Bulletin 011 — MEP PermitsMechanical/plumbing/electrical permit rules and inspection scheduling procedure; available at https://www.pinal.gov/DocumentCenter/View/440
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical permit issuance | $42.00 (plus $6.50 per supplemental permit on an unexpired original permit) | Fee Schedule No. 071013-BPFS, Article 4. |
| Services 600V or less, ≤200 amps | $27.25 each | Fee Schedule No. 071013-BPFS, Article 4, Section 7 (does not include permit-issuance fee). |
| Services 600V or less, over 200 to 1,000 amps | $55.50 each | Fee Schedule No. 071013-BPFS, Article 4, Section 7. |
| Services over 600V or over 1,000 amps | $111.00 each | Fee Schedule No. 071013-BPFS, Article 4, Section 7. |
| Receptacle/switch/lighting outlets and fixtures | $1.00 each for first 20; $0.65 each additional | Fee Schedule No. 071013-BPFS, Article 4, Sections 1–2. |
| Residential/nonresidential appliances (fixed, ≤1 HP/kW/kVA) | $4.25 each | Fee Schedule No. 071013-BPFS, Article 4, Sections 3–4. |
Plumbing Permit
VerifiedRequired for plumbing installations, gas piping, and sewer/septic connections in unincorporated Pinal County under the 2018 IPC with county amendments. Uses the Article 6 unit-fee schedule (issuance fee plus per-fixture/per-system fees). Like-for-like water heater replacement (same type, size, location) is permit-exempt.
Verified 2026-07-07 · Source
Requirements
- Permit required for new/altered plumbing fixtures, water piping, sewers, disposal systems, and gas piping systems
- Gas line permits require a site plan noting the placement of the gas line, number of BTUs, length of run, and pipe size/type — see Information Bulletin 009 for residential gas pipe installation guidelines
- Like-for-like replacement of a gas or electric water heater (same type, size, and location) is permit-exempt per Information Bulletin 003
- Repair work requires a site plan (exterior) or floor plan (interior) showing location and scope of work
- If gas service has been off for MORE than 6 months, a permit is required before re-energizing; LESS than 6 months with no work performed qualifies for a one-time courtesy inspection
Required documents
- RequiredMechanical/Plumbing/Electrical (MPE) ApplicationFillable MPE application; available at https://www.pinal.gov/DocumentCenter/View/458
- OptionalInformation Bulletin 009 — Gas PipingResidential gas system installation standards; available at https://www.pinal.gov/DocumentCenter/View/442
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing permit issuance | $42.00 (plus $6.50 per supplemental permit on an unexpired original permit) | Fee Schedule No. 071013-BPFS, Article 6. |
| Each plumbing fixture or trap/fixture set | $8.75 | Fee Schedule No. 071013-BPFS, Article 6, Section 1. |
| Each building sewer / trailer park sewer | $22.00 | Fee Schedule No. 071013-BPFS, Article 6, Section 2. |
| Each private sewage disposal system | $66.50 | Fee Schedule No. 071013-BPFS, Article 6, Section 2. |
| Water heater (including vent) | $11.00 each | Fee Schedule No. 071013-BPFS, Article 6, Section 3. |
| Gas piping system, 1–5 outlets | $5.50 (plus $1.00 per additional outlet over 5) | Fee Schedule No. 071013-BPFS, Article 6, Section 4. |
Mechanical / HVAC Permit
VerifiedRequired for HVAC and mechanical system installations in unincorporated Pinal County under the 2018 IMC with county amendments. Uses the Article 5 unit-fee schedule. Like-for-like replacement of furnaces, condenser units, and evaporative coolers (same type, rating, location) for one- and two-family dwellings is permit-exempt.
Verified 2026-07-07 · Source
Requirements
- Permit required for new or altered furnaces, air handlers, boilers/compressors, evaporative coolers, ventilation systems, and other mechanical equipment
- Like-for-like replacement of HVAC equipment (furnace, condenser, evaporative cooler) with same type/rating/location for one- and two-family dwellings is permit-exempt per Information Bulletin 003
- Site plan or floor plan showing equipment location required with application
Required documents
- RequiredMechanical/Plumbing/Electrical (MPE) ApplicationFillable MPE application; available at https://www.pinal.gov/DocumentCenter/View/458
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical permit issuance | $42.00 (plus $6.50 per supplemental permit on an unexpired original permit) | Fee Schedule No. 071013-BPFS, Article 5. |
| Forced-air/gravity furnace or burner, up to 100,000 Btu/h | $13.25 | Fee Schedule No. 071013-BPFS, Article 5, Section 1. |
| Forced-air/gravity furnace or burner, over 100,000 Btu/h | $16.25 | Fee Schedule No. 071013-BPFS, Article 5, Section 1. |
| Evaporative cooler (other than portable) | $9.50 | Fee Schedule No. 071013-BPFS, Article 5, Section 6. |
| Air-handling unit up to 10,000 cfm | $9.50 | Fee Schedule No. 071013-BPFS, Article 5, Section 5. |
Solar PV Permit (Roof-Mounted and Ground-Mounted Photovoltaic)
VerifiedRequired for residential photovoltaic (solar PV) system installations in unincorporated Pinal County under the 2017 NEC (Article 690), 2018 IFC §1204 (Solar Photovoltaic Power Systems), and county-specific submittal standards in Information Bulletin 021. Fees are kW-rating-based rather than flat-fee (unlike Maricopa County's flat-fee model). Manufactured/mobile-home installations require an Arizona-registered-engineer structural certification.
Verified 2026-07-07 · Source
Requirements
- Site plan showing solar arrays (roof- or ground-mounted) and major components
- One-line and three-line electrical diagrams with wire type/size, conductor count, conduit type/size, PV module and inverter information, and utility disconnect location
- Major component information: model numbers and manufacturer cut sheets for inverter, module, array, and batteries (if used), with UL listings and array electrical specs (series count, operating voltage/current, max system voltage, short-circuit current)
- Roof mounting: array weight (psf), roof covering type, roof framing spec, mounting/anchoring details, and penetration-sealing method
- Ground mounting: anchoring system called out and detailed
- Roof access, pathways, and setbacks per 2018 IFC/NEC 2017: minimum two access pathways on separate roof planes (one from street/driveway side), minimum 36-inch-wide pathways; 18-inch clear setback (arrays ≤33% of roof area) or 36-inch clear setback (arrays >33% of roof area) on both sides of the horizontal ridge
- Plan notes must reference NEC 2017 Article 690 compliance and required signage/plaques per NEC 705-10, 690-13, 690-31, 690-54
- Compliance with 2018 IFC §1204 for DC conductor marking/location, roof access, pathways, and spacing
- For manufactured/mobile-home installations: sealed structural certification letter from an Arizona-registered engineer confirming the structure can support the PV system loading under Pinal County's adopted design criteria
Required documents
- RequiredInformation Bulletin 021 — Residential Photovoltaic SystemsComplete solar PV submittal requirements; available at https://www.pinal.gov/DocumentCenter/View/428
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar PV permit issuance | $42.00 | Fee Schedule No. 071013-BPFS, Article 4 (Solar Fees section). |
| Solar PV — 1 to 5 kW rating | $13.60 per kW | Fee Schedule No. 071013-BPFS, Article 4 (Solar Fees). Add $42.00 permit issuance fee. |
| Solar PV — 6 to 10 kW rating | $12.50 per kW | Fee Schedule No. 071013-BPFS, Article 4 (Solar Fees). |
| Solar PV — 11 to 20 kW rating | $11.70 per kW | Fee Schedule No. 071013-BPFS, Article 4 (Solar Fees). |
| Solar PV — 21 kW and up | $11.00 per kW plus 65% plan review fee | Fee Schedule No. 071013-BPFS, Article 4 (Solar Fees). This tier adds a plan review fee not required at lower tiers. |
| Solar water heater | $60.00 flat fee | Fee Schedule No. 071013-BPFS, Article 4 (Solar Fees). |
Pool / Spa Permit (In-Ground and Above-Ground) and Barrier Requirements
VerifiedRequired for swimming pools and spas 18 inches or more in depth and wider than 8 feet, in unincorporated Pinal County under the 2018 International Swimming Pool and Spa Code (ISPSC) as adopted, plus A.R.S. §36-1681 pool-safety standards detailed in Information Bulletin 010. Final pool inspection must pass before the pool may be filled. Includes detailed perimeter-barrier, intermediate-barrier, and above-ground-pool/spa-cover standards.
Verified 2026-07-13 · Source
Requirements
- Permit required for any pool/spa 18 inches or more in depth at any point and wider than 8 feet, intended for swimming
- Perimeter barrier required: minimum 60 inches above finished grade (outside); max 2-inch gap at bottom for wrought iron/chain link (4 inches over solid surfaces like concrete decks); anti-climb spacing of horizontal members no closer than 45 inches for ladder-effect designs
- Chain link barriers: openings must not allow passage of a 1-3/4-inch sphere; minimum 11-gauge wire
- Mesh barriers: must not be readily removable; bottom no more than 1 inch above deck/grade; cannot pull up more than 4 inches or down below 60 inches
- Gates: must meet 60-inch height requirement, be self-closing/self-latching, swing away from the pool, with latch mechanism located per code (no less than 3 inches below gate top if latch is under 54 inches, no opening larger than 2 inches within 18 inches of the release mechanism)
- If a house wall forms part of the perimeter barrier and has doors with direct pool access, ONE of: self-closing/self-latching device (release 54 inches above floor); UL 2017-listed door alarm (30-second minimum, 85 dBA at 10 feet, auto-reset, manual 15-second deactivation switch at 54 inches); or a 48-inch intermediate barrier that doesn't obstruct the pool view
- Above-ground pools: if used as the barrier or barrier is mounted atop the structure, access ladder/steps must be lockable/removable or surrounded by a perimeter barrier
- Spas/hot tubs ≤8 feet wide may use an approved safety cover (latchable, 100 lb static load capacity, blocks passage of a 4-inch sphere when closed) instead of a full perimeter barrier — pool covers alone are NOT an approved barrier for full-size pools
- Minimum setback requirements per county diagram: 3 feet from structure, 4 feet from sides/rear property lines; pool equipment minimum 5 feet from the pool
- Windows within 5 feet of the water's edge (and less than 5 feet above adjacent walking surface) must be tempered glass or have R308.4.5-approved safety film
- Draining: pool/spa water may only be discharged off-property if free of chlorine (≤1 ppm) and other chemicals, pH 7–8, not cloudy/discolored, and directed to a drainage channel, wash, or curb-line gutter without causing erosion; acid-washed water may not be discharged off-property (ADEQ requirements)
Required documents
- RequiredPool Permit ApplicationStandard pool permit application; available at https://www.pinal.gov/DocumentCenter/View/461
- RequiredInformation Bulletin 010 — Residential Pool/Spa Barriers & DrainageComplete barrier specifications and ADEQ drainage rules; available at https://www.pinal.gov/DocumentCenter/View/443
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Swimming pool (non-standard) — plan check fee | $150.00 | Fee Schedule No. 071013-BPFS, Article 8. |
| Swimming pool (non-standard) — permit fee | $300.00 (half of which is non-refundable) | Fee Schedule No. 071013-BPFS, Article 8. |
| Standard Plan Approval — Pool/Spa (pre-approved standard plans) | See Building Permit Fee Schedule for standard-plan-specific fees | Standard Plan Approval Pool/Spa applications follow a faster review track (30 business days total) per the Community Development Permit Process Review Times. |
| In-ground spa (not attached to a pool) | $150.00 permit fee | Fee Schedule No. 071013-BPFS, Article 8. |
| Above-ground spa/pool | $42.00 permit fee | Fee Schedule No. 071013-BPFS, Article 8. |
Fence / Wall / Retaining Wall Permit
VerifiedRequired for fences, walls, and retaining walls exceeding exemption thresholds in unincorporated Pinal County. Fences/walls up to 7 feet (measured from the lowest adjacent grade) and retaining walls up to 4 feet (measured from bottom of footing to top of wall) are permit-exempt; anything taller requires a permit with plans prepared by an Arizona-registered engineer.
Verified 2026-07-07 · Source
Requirements
- Walls/fences up to 7 feet high (from the side with the lowest adjacent grade) are exempt; a single row of masonry cap may exceed the 7-foot limit without triggering a permit
- Retaining walls up to 4 feet high (bottom of footing to top of wall) are exempt, UNLESS supporting a surcharge over 2 feet in height
- Walls, fences, and retaining walls exceeding these limits require a building permit AND plans prepared by an Arizona-registered engineer
- Drainage openings at grade level recommended in solid fences to preserve natural sheet flow; contact Flood Control District (520-866-6411) for regulated washes
- Contact Planning Division (520-866-6442) separately for zoning requirements on wall/fence location and height (setback rules are a Planning function, not Building Safety)
- Wall/Fence Permit Application requires parcel/section/township/range, lineal footage (subdivision walls only), and height x length calculation (retaining walls only)
Required documents
- RequiredWall/Fence Permit ApplicationStandard wall/fence application; available at https://www.pinal.gov/DocumentCenter/View/457
- RequiredInformation Bulletin 014 — Walls, Fences & Retaining WallsHeight/setback rules plus example construction detail drawings for a 7-foot wall/fence and a 4-foot retaining wall; available at https://www.pinal.gov/DocumentCenter/View/435
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential fence walls | $126.00 for the first 500 lineal feet, plus $126.00 for every additional 500 lineal feet or fraction thereof | Fee Schedule No. 071013-BPFS, Article 8 (Others section). |
| Commercial & subdivision fence walls | $200.00 for the first 500 lineal feet, plus $200.00 for every additional 500 lineal feet or fraction thereof | Fee Schedule No. 071013-BPFS, Article 8 (Others section). |
| Retaining walls | $0.25 x height x length | Fee Schedule No. 071013-BPFS, Article 8 (Others section). |
Demolition Permit
Required for demolition of structures in unincorporated Pinal County. Flat fee of $42.00 per Fee Schedule No. 071013-BPFS. The county's published review-timeline table does not list a distinct "Demolition" row, so no jurisdiction-specific published review-time figure exists for this permit type specifically (unlike the named permit types in the review-times table).
Reviewed 2026-07-13 · Source
Requirements
- Required for demolition of any structure in unincorporated Pinal County
- Apply through the Pinal County Citizen Access Portal (https://citizenaccess.pinalcountyaz.gov/) or in person at 85 N. Florence Street, Florence, AZ
- Contact Arizona 811 (call 811 or az811.com) before demolition to have underground utilities located
- Ensure all connected utilities (gas, electric, water, sewer) are properly disconnected before demolition begins
Required documents
- RequiredCertificate of Occupancy / Demolition-related formsGeneral permit application forms available through the Applications & Information Bulletins page; available at https://www.pinal.gov/191/Applications-Information-Bulletins
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition permit — flat fee | $42.00 | Fee Schedule No. 071013-BPFS, Article 8 (Others section). |
EV Charger / EVSE Permit
VerifiedPinal County does not publish a distinct EV charger/EVSE fee line. Installing electric vehicle charging equipment in unincorporated Pinal County requires a Mechanical/Plumbing/Electrical (MPE) Electrical Permit under the 2017 NEC with county amendments, billed under the Article 4 unit-fee schedule (Fee Schedule No. 071013-BPFS): a flat issuance fee plus itemized per-service and per-fixture fees. A typical Level 2 EV charger circuit is billed as a new circuit/service item under this same schedule.
Verified 2026-07-20 · Source
Requirements
- Mechanical/Plumbing/Electrical (MPE) Application required for EV charger/EVSE circuit installation in unincorporated Pinal County
- Site plan noting placement of any new panel/subpanel (location on structure) required with application
- Utility companies require their own separate inspection/clearance of service equipment in addition to county clearance
- Documentation should show location of electric meter, electric panel, and new charging station, plus a one-line diagram with conductor/conduit sizes and overcurrent protection calculations, consistent with the county's general electrical permit submittal requirements
- No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by the county as of this review
Required documents
- RequiredMechanical/Plumbing/Electrical (MPE) ApplicationFillable MPE application covering EV charger/EVSE circuit installation
- OptionalInformation Bulletin 011 — MEP PermitsMechanical/plumbing/electrical permit rules and inspection scheduling procedure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical permit issuance | $42.00 (plus $6.50 per supplemental permit on an unexpired original permit) | Fee Schedule No. 071013-BPFS, Article 4 — same base issuance fee documented on this jurisdiction's Electrical Permit entry; no distinct EV charger/EVSE fee line is published. |
| Services 600V or less, ≤200 amps (typical EV charger circuit/service) | $27.25 each | Fee Schedule No. 071013-BPFS, Article 4, Section 7. |
| Receptacle/switch/lighting outlets and fixtures | $1.00 each for first 20; $0.65 each additional | Fee Schedule No. 071013-BPFS, Article 4, Sections 1-2 — applicable if the EVSE is billed as a fixture/outlet rather than under the service fee. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Pinal County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.