Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Nogales independently adopts and administers its own construction codes through its Community Development Department (Planning & Building) and does not defer building permitting to Santa Cruz County. Source: City of Nogales Project Submittal Application (Public Works Department / Nogales Information and Development Center, Rev. 07/31/2023).2018 International Building Code (IBC), as adopted and administered by the City of Nogales. Source: City of Nogales Project Submittal Application (Rev. 07/31/2023), which lists the currently-cited adopted code set on every building/planning/engineering/fire permit application accepted by the City.2018 International Residential Code (IRC), as adopted and administered by the City of Nogales. Source: City of Nogales Project Submittal Application (Rev. 07/31/2023).2018 International Fire Code (IFC), as adopted and administered by the City of Nogales, administered in coordination with the City Fire Department/Fire Marshal (the Project Submittal Application has a dedicated Fire tracking-number field distinct from Building). Source: City of Nogales Project Submittal Application (Rev. 07/31/2023).2017 National Electrical Code (NEC), as adopted by the City of Nogales (one edition behind the 2018 ICC set, consistent with typical NEC adoption lag). Source: City of Nogales Project Submittal Application (Rev. 07/31/2023).2010 ADA Standards for Accessible Design, as referenced by the City of Nogales for accessibility compliance on all building permit work. Source: City of Nogales Project Submittal Application (Rev. 07/31/2023).1997 UCADB (Uniform Code for the Abatement of Dangerous Buildings), as adopted by the City of Nogales for enforcement against unsafe/dangerous existing structures. Source: City of Nogales Project Submittal Application (Rev. 07/31/2023).City of Nogales Development Standards Code (zoning and development regulations, distinct from the building-safety codes above) — repealed and replaced in its entirety by the Nogales Zoning Code (Ordinance No. 2024-11-005, adopted by Common Council November 6, 2024, effective December 6, 2024), covering Article 1 (General Provisions, Zoning Regulations, Non-Conforming Uses, Parking, Signs, Supplemental Regulations, Landscaping/Walls/Screening, Outdoor Lighting) and Article 3 (Development Standards Code: administration/enforcement, site plan, performance standards, public facilities, floodplain, grading/drainage, access, subdivision platting, fee schedule). Source: City of Nogales Ordinance No. 2024-11-005 and City of Nogales Development Code (DocumentCenter Document ID 114), City of Nogales website, Development Standards Code Update – 2024 page.Building permits are required by City ordinance (Nogales Zoning Code / Development Standards Code, Article 3, Sec. 3.103.d.1) for all owners of property before commencing any improvement or repair, unless specifically excluded. A narrow no-permit exemption applies where total added square footage is 120 sq ft or less AND the work involves no electric, plumbing, or gas installation/movement/extension/curtailment and does not otherwise violate the Code (Sec. 3.103.d.2). Source: City of Nogales Development Code, Article 3, Sec. 3.103.d (Ordinance No. 2024-11-005, adopted 11/06/2024).A Zoning Compliance Certificate from the Planning and Zoning Director is a legal prerequisite to building permit issuance — the Building Official may not issue a building permit for foundation excavation or any construction until a Zoning Compliance Certificate has been issued (Sec. 3.103.c.1). Source: City of Nogales Development Code, Article 3, Sec. 3.103.c.Alternative/solar energy systems (solar space heating, solar water heating, geothermal, wind power, photovoltaic conversion) are permitted as an accessory use in applicable zoning districts and are processed through the City's normal/standard building permit process — Nogales does not operate a separate expedited or dedicated solar/PV permit track; systems must also comply with the Uniform Solar Energy Code and other adopted building codes. Source: City of Nogales Development Code, Article 3, Sec. 3.104.p (Alternative Energy Systems).Building permit fees are valuation-based: City Code Sec. 5-26 adopts the 2012 International Residential Code (IRC), including IRC Appendix L ('Permit Fees'), as the City's building-fee mechanism (current on Municode; also confirmed by Ordinance No. 2015-11-005, adopted 11/4/2015, which adopts the 2012 I-Codes + IRC Appendix L + City amendments — the full signed PDF survives in archived form). The Development Code's own Fee Schedule section (Article 3, Sec. 3.113) separately states fees are adopted 'by reference under separate City document,' consistent with the Sec. 5-26 mechanism rather than contradicting it. Plan review fee is 25% of the Building Permit Fee where project valuation is $100,000 or less, and 65% where valuation is $100,001 or more; valuation of garages, porches, canopies, and storage rooms is calculated at $14 per square foot — both figures per the City's own 'Building Permit Application Requirements' page (archived 2016-12-15; the live current page no longer republishes these figures, so they are flagged for reconfirmation, not treated as stale-and-wrong). The exact dollar-bracket IRC Appendix L valuation table is not reproduced here against ICC's own source (codes.iccsafe.org does not expose the table text for citation) — an access gap, not an unpublished-fee gap. Source: City of Nogales City Code Sec. 5-26 (Municode); Ordinance No. 2015-11-005; City of Nogales 'Building Permit Application Requirements' page (archived 2016-12-15).

Permit types & fees

Residential Building Permit (New Construction, Additions, Repairs)

Verified

Required under the City of Nogales Development Code for new single-family/two-family residential construction and for any improvement or repair to residential property, unless the narrow 120-sq-ft/no-utility-work exemption applies. Reviewed against the 2018 IRC/IBC and City of Nogales Development Code amendments. Applications are submitted at the Nogales Information and Development Center ("One Stop") using the City's Project Submittal Application, and a Zoning Compliance Certificate must be obtained before any foundation excavation or construction permit is issued.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new residential construction and for any improvement or repair to property within City limits, except where total added square footage is 120 sq ft or less and no electric/plumbing/gas work is involved (Development Code Sec. 3.103.d.1-d.2)
  • A Zoning Compliance Certificate from the Planning and Zoning Director is a legal prerequisite — the Building Official cannot issue a building permit for foundation excavation or construction until it is issued (Sec. 3.103.c.1)
  • Reviewed against the 2018 IRC/IBC and 2017 NEC as adopted by the City of Nogales, plus 2010 ADA accessibility standards
  • Applicant must submit the City of Nogales Project Submittal Application (Rev. 07/31/2023) with project valuation, applicant/property owner/contractor licensing information, and required attachments (site plan, structural calcs, etc. as applicable)
  • Contractor must hold a valid Arizona ROC license and City business/contractor license
  • All applicable fees (established by separate City Council resolution, not published in the Development Code itself) must be paid before permit issuance (Sec. 3.103.d.5)
  • Permit becomes invalid if work is not commenced within 180 days of issuance, or is suspended/abandoned for 180 days after commencement

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / Nogales Information and Development Center (NIDC) form (Rev. 07/31/2023); required for Building, Planning, Engineering, Fire, Signs, Admin, and Utilities application types
  • RequiredSite PlanFor single-family residential in an approved subdivision, the site plan is submitted to the Building Official and Planning and Zoning Director together with the Building Permit Application rather than as a standalone Development Site Plan (Development Code Sec. 3.105.b.1)
  • OptionalProperty Owner Authorization LetterRequired if the applicant is not the property owner, or in lieu of the property owner's signature on the Project Submittal Application
  • OptionalStructural CalculationsCheckbox attachment item on the Project Submittal Application; required where applicable to the scope of work

Fee schedule

Fee typeAmountNotes
Building Permit Fee and Plan Review FeeBased on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005). Plan review fee: 25% of the Building Permit Fee where valuation is $100,000 or less; 65% where valuation is $100,001 or more.
City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Show full citation

City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Ordinance No. 2015-11-005; City of Nogales 'Building Permit Application Requirements' page (archived 2016-12-15, Wayback) for the 25%/65% plan-review split. The exact IRC Appendix L dollar-bracket table could not be independently reproduced against ICC's own source (codes.iccsafe.org blocks automated access) — confirm the precise base fee for your project's valuation with Community Development / One Stop.

Residential Addition / Remodel Permit

Verified

Required under the City of Nogales Development Code for room additions, remodels, and alterations to existing one- and two-family dwellings, unless the narrow 120-sq-ft/no-utility-work exemption applies. Reviewed against the 2018 IRC and City of Nogales Development Code amendments.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for room additions, remodels, and alterations exceeding 120 sq ft of added area, or involving any electric, plumbing, or gas work regardless of size (Development Code Sec. 3.103.d.1-d.2)
  • No improvements may be placed on, and no repairs made to, property held to be in non-conformance with the Development Code without a building permit (Sec. 3.103.d.3)
  • Site plan for additions to single-family residences in an approved subdivision is submitted together with the Building Permit Application rather than as a standalone Development Site Plan (Sec. 3.105.b.1)
  • Applicant must submit the City of Nogales Project Submittal Application with project valuation and required attachments

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / NIDC form (Rev. 07/31/2023)
  • RequiredSite PlanShowing existing structure, addition footprint, and setbacks

Fee schedule

Fee typeAmountNotes
Building Permit Fee and Plan Review FeeBased on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005). Plan review fee: 25% of the Building Permit Fee where valuation is $100,000 or less; 65% where valuation is $100,001 or more.
City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Show full citation

City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Ordinance No. 2015-11-005; City of Nogales 'Building Permit Application Requirements' page (archived 2016-12-15, Wayback) for the 25%/65% plan-review split. The exact IRC Appendix L dollar-bracket table could not be independently reproduced against ICC's own source (codes.iccsafe.org blocks automated access) — confirm the precise base fee for your project's valuation with Community Development / One Stop.

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in the City of Nogales, governed by the 2017 National Electrical Code (NEC) as adopted by the City. Any addition involving electrical work loses the 120-sq-ft no-permit exemption automatically, per the Development Code.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for installation, alteration, or repair of electrical systems and equipment within City limits
  • Governed by the 2017 NEC as adopted by the City of Nogales (per the City's Project Submittal Application, Rev. 07/31/2023)
  • Any improvement or repair involving electrical work does NOT qualify for the Development Code's 120-sq-ft no-permit exemption, regardless of the project's total square footage (Sec. 3.103.d.2)
  • Contractor must hold a valid Arizona ROC Electrical license, indicated on the Project Submittal Application
  • Applicant must submit the City of Nogales Project Submittal Application

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / NIDC form (Rev. 07/31/2023); includes a Contractor's License Type checkbox for Electrical

Fee schedule

Fee typeAmountNotes
Electrical Permit FeeBased on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005) — no separately itemized flat electrical fee line was found; billed under the same valuation mechanism as other building permit work.
City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Show full citation

City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Ordinance No. 2015-11-005. The exact IRC Appendix L dollar-bracket table could not be independently reproduced against ICC's own source (codes.iccsafe.org blocks automated access) — confirm the precise fee with Community Development / One Stop.

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in the City of Nogales. Any addition involving plumbing work loses the 120-sq-ft no-permit exemption automatically, per the Development Code.

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, and water heaters within City limits
  • Any improvement or repair involving plumbing work does NOT qualify for the Development Code's 120-sq-ft no-permit exemption, regardless of the project's total square footage (Sec. 3.103.d.2)
  • Contractor must hold a valid Arizona ROC Plumbing license, indicated on the Project Submittal Application
  • Applicant must submit the City of Nogales Project Submittal Application

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / NIDC form (Rev. 07/31/2023); includes a Contractor's License Type checkbox for Plumbing

Fee schedule

Fee typeAmountNotes
Plumbing Permit FeeBased on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005) — no separately itemized flat plumbing fee line was found; billed under the same valuation mechanism as other building permit work.
City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Show full citation

City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Ordinance No. 2015-11-005. The exact IRC Appendix L dollar-bracket table could not be independently reproduced against ICC's own source (codes.iccsafe.org blocks automated access) — confirm the precise fee with Community Development / One Stop.

Mechanical / HVAC Permit

Verified

Required for installation, replacement, or alteration of heating, ventilation, air conditioning, and gas-fired mechanical equipment in the City of Nogales. As with electrical and plumbing work, any mechanical/gas work in a project disqualifies it from the Development Code's 120-sq-ft no-permit exemption.

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and gas-fired appliances within City limits
  • Any improvement or repair involving gas work does NOT qualify for the Development Code's 120-sq-ft no-permit exemption, regardless of the project's total square footage (Sec. 3.103.d.2)
  • Contractor must hold a valid Arizona ROC Mechanical license, indicated on the Project Submittal Application
  • Applicant must submit the City of Nogales Project Submittal Application

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / NIDC form (Rev. 07/31/2023); includes a Contractor's License Type checkbox for Mechanical

Fee schedule

Fee typeAmountNotes
Mechanical/HVAC Permit FeeBased on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005) — no separately itemized flat mechanical fee line was found; billed under the same valuation mechanism as other building permit work.
City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Show full citation

City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Ordinance No. 2015-11-005. The exact IRC Appendix L dollar-bracket table could not be independently reproduced against ICC's own source (codes.iccsafe.org blocks automated access) — confirm the precise fee with Community Development / One Stop.

Mobile Home / Manufactured Home Installation Permit

Verified

Required for placement of mobile home residences and accessory buildings on lots in established mobile home parks or approved subdivisions within Mobile Home Residence (MHR) or Recreational Vehicle Park (RV) zoning districts in the City of Nogales. Manufactured home construction/installation standards themselves are regulated directly by the State of Arizona; the City issues a separate on-site permit for placement, site plan, and zoning compliance.

Verified 2026-07-06 · Source

Requirements

  • Mobile home residences and accessory buildings placed on lots in established mobile home parks or approved subdivisions in Mobile Home Residence (MHR) and Recreational Vehicle Park (RV) districts are exempt from the standalone Development Site Plan requirement — site plan review is instead handled together with the Building Permit Application submitted to the Building Official and Planning and Zoning Director (Development Code Sec. 3.105.b.2)
  • A building permit is required prior to placement (pouring of slabs/footings or any site work), per the Development Code's general building permit requirement (Sec. 3.103.d.1)
  • A Zoning Compliance Certificate from the Planning and Zoning Director is required before any building permit for site work/foundation can be issued (Sec. 3.103.c.1)
  • Manufactured home construction/installation standards are separately regulated by the State of Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / NIDC form (Rev. 07/31/2023)
  • RequiredSite PlanSubmitted together with the Building Permit Application per Development Code Sec. 3.105.b.2, showing lot location within the approved mobile home park/subdivision

Fee schedule

Fee typeAmountNotes
Mobile Home Installation Permit FeeBased on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005) — no separately itemized flat mobile-home fee line was found; billed under the same valuation mechanism as other building permit work.
City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Show full citation

City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Ordinance No. 2015-11-005. The exact IRC Appendix L dollar-bracket table could not be independently reproduced against ICC's own source (codes.iccsafe.org blocks automated access) — confirm the precise fee with Community Development / One Stop.

Alternative Energy System Permit (Solar / Photovoltaic, Geothermal, Wind)

Verified

Required for installation of solar space heating, solar water heating, geothermal, wind power generating, or photovoltaic conversion systems in the City of Nogales. Unlike some Arizona cities, Nogales does not operate a separate expedited or dedicated solar/PV review track — these systems are processed through the City's normal, standard building permit process and must also comply with the Uniform Solar Energy Code.

Verified 2026-07-06 · Source

Requirements

  • Alternative energy systems (solar space/water heating, geothermal, wind power, photovoltaic) are evaluated as a permitted accessory use on a case-by-case basis in applicable zoning districts (Development Code Sec. 3.104.p.2)
  • Application for construction, installation, and use of alternative energy systems follows the City's normal/standard building permit process — there is no separate expedited track (Sec. 3.104.p.3)
  • Must comply with the Uniform Solar Energy Code and other building codes adopted by the City, in addition to the standard building permit process
  • The City's stated intent is to preserve direct access to sunlight and air, protecting installations from occlusion or obstruction; restrictive covenants for light/air easements are encouraged in subdivisions and PUDs

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / NIDC form (Rev. 07/31/2023), used for all building permit types including alternative energy systems
  • RequiredConstruction Plans and Equipment SpecificationsSite plan, roof/mounting layout, and equipment cut sheets as applicable to the system type, submitted as part of the standard building permit application package

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Alternative Energy System)Based on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005) — billed under the same standard building permit fee mechanism as other building permit work; no separate solar-specific fee line was found.
City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Show full citation

City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Ordinance No. 2015-11-005. The exact IRC Appendix L dollar-bracket table could not be independently reproduced against ICC's own source (codes.iccsafe.org blocks automated access) — confirm the precise fee with Community Development / One Stop.

Electric Vehicle (EV) Charger Permit

Nogales publishes no distinct EV-charger permit type or fee line — confirmed against the City's Project Submittal Application and Building Permit Application Requirements page, neither of which contains an EV-charger/EVSE entry. A new 120V or 240V circuit installed to serve an EV charger requires the City's standard Electrical Permit under the 2017 NEC (which governs EV charging equipment under NEC Article 625); per the Development Code, any electrical work automatically disqualifies a project from the 120-sq-ft no-permit exemption, so even a small EV charger circuit addition requires a full permit. If the charger is UL-listed for a standard 120V plug and installed into an existing, already-permitted receptacle, no new permit is required (consistent with general NEC-based practice, though not independently confirmed as City of Nogales-specific guidance).

Reviewed 2026-07-20 · Source

Requirements

  • A permit IS required for installation of a new 120V or 240V circuit to serve an EV charger
  • A permit is NOT required if the charger is UL-listed to plug into an existing 120V receptacle and that receptacle is already in place — general NEC-based practice, not independently confirmed as Nogales-specific published guidance
  • Governed by the 2017 NEC (NEC Article 625, Electric Vehicle Power Transfer System) as adopted by the City of Nogales
  • Any improvement or repair involving electrical work does NOT qualify for the Development Code's 120-sq-ft no-permit exemption, regardless of total project square footage (Sec. 3.103.d.2)
  • Contractor must hold a valid Arizona ROC Electrical license, indicated on the Project Submittal Application
  • Applicant must submit the City of Nogales Project Submittal Application

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / NIDC form (Rev. 07/31/2023); describe scope as new circuit for EV charging

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (applies to a new EV charger circuit)Based on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005)No distinct EV-charger fee line exists; billed under the same valuation-based electrical permit mechanism documented on the general electrical-permit entry. Confirm exact fee with Community Development / One Stop.

Demolition Permit

Verified

Required under the City of Nogales Development Code before demolishing a structure. Where demolition or removal of an existing building is substantially begun preparatory to rebuilding on the same site, it is treated as actual construction activity has begun for purposes of non-conforming-use/permit-validity rules under the Development Code.

Verified 2026-07-06 · Source

Requirements

  • Building permit required before demolishing any structure within City limits, per the general building permit requirement (Development Code Sec. 3.103.d.1)
  • A Zoning Compliance Certificate is required before the Building Official may issue a permit for excavation/construction activity connected to a demolition-and-rebuild project (Sec. 3.103.c.1)
  • Where demolition/removal of an existing building has been substantially begun preparatory to rebuilding, such demolition/removal is deemed to constitute actual construction commencement for Development Code purposes
  • Applicant must submit the City of Nogales Project Submittal Application

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / NIDC form (Rev. 07/31/2023)

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeBased on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005) — no separately itemized flat demolition fee line was found; billed under the same valuation mechanism as other building permit work.
City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Show full citation

City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Ordinance No. 2015-11-005. The exact IRC Appendix L dollar-bracket table could not be independently reproduced against ICC's own source (codes.iccsafe.org blocks automated access) — confirm the precise fee with Community Development / One Stop.

Commercial Building Permit (New Construction, Alterations, Change of Use)

Verified

Required under the City of Nogales Development Code for new commercial building construction and for alterations, repairs, or changes of use to existing commercial buildings, including industrial/warehouse buildings (relevant to Nogales' Mariposa Port of Entry-area warehouse and cross-border distribution sector). Commercial projects use the same Project Submittal Application, Zoning Compliance Certificate, and Building Permit process as every other permit type in this record — Nogales' application form has no 'New Build' vs 'Tenant Improvement' checkbox at all (unlike, for example, the Town of Florence's commercial application). The one genuinely commercial-specific process step is that commercial development is NOT exempt from the Development Code's standalone Development Site Plan requirement (Sec. 3.105.a-b) — the site plan must be reviewed and approved by unanimous vote of the City's Development Review Committee (Sec. 3.103.f) before/alongside the building permit. Tenant improvement work is not tracked as a separate permit type or fee schedule anywhere in the Development Code or on the Project Submittal Application; it is folded into this same commercial building/site-plan process.

Verified 2026-08-01 · Source

Requirements

  • Building permit required for new commercial construction and for any improvement, repair, or change of use to commercial property within City limits, per the Development Code's general building permit requirement (Sec. 3.103.d.1); the narrow 120-sq-ft/no-utility-work exemption (Sec. 3.103.d.2) is not a practical no-permit path for commercial construction, which virtually always exceeds that threshold or involves electrical/plumbing/mechanical work
  • A Development Site Plan is required for commercial (and industrial) construction under Sec. 3.105.a — commercial projects are NOT among the categories the Development Code exempts from standalone Development Site Plan review (Sec. 3.105.b exempts only: single-family residences/accessory buildings in approved subdivisions; mobile home/RV park placements; and multi-family developments of fewer than 5 units per lot)
  • The Development Site Plan must be submitted to and reviewed/approved by the City's Development Review Committee — Community Development/Planning & Zoning Director, Building Official, Director of Public Works, City Engineer, Fire Marshal, Santa Cruz County Floodplain Administrator, and Assistant Administrator — by unanimous vote of members present (Sec. 3.103.f.2-f.4, Sec. 3.105.c)
  • Commercial (and industrial, Planned Area Development, and Shopping Center) site plans must show contour lines at 2-foot intervals, versus 1-foot intervals required for other site plans/subdivisions — the Development Code's one explicit, distinct technical requirement that names commercial projects separately from general residential/subdivision site plans (Sec. 3.105.c.1.b)
  • A Zoning Compliance Certificate from the Planning and Zoning Director is a prerequisite before the Building Official may issue a building permit for foundation excavation or construction (Sec. 3.103.c.1), with a verified 10-working-day issue-or-refuse turnaround from a complete filing (Sec. 3.103.c.3)
  • Development Review Committee decisions on a site plan are appealable to the Planning and Zoning Commission within 7 calendar days, with the Commission required to reach its decision within 30 calendar days (Sec. 3.103.f.7); a Commission decision is further appealable to City Council within 7 calendar days, with Council reaching its decision within 'a reasonable time' — no fixed day-count is published for the Council-level appeal
  • Reviewed against the 2018 IBC and 2018 IFC as adopted by the City (the Project Submittal Application carries a distinct 'Fire' tracking-number field, reflecting Fire Marshal review as part of the Development Review Committee), plus 2017 NEC and 2010 ADA Standards
  • No distinct industrial/warehouse permitting track exists: industrial-zoned projects (including warehouse/distribution buildings) go through the identical Building Permit + Development Site Plan + Zoning Compliance Certificate process as other commercial projects. Industrial use is instead addressed through separate, higher-threshold performance standards rather than a different permitting procedure — e.g., permitted exterior noise of up to 80 dBA (day) / 65 dBA (night) between two industrial-district properties versus 70/60 for commercial and 50/45 for residential (Sec. 3.106.d); distinct ground-vibration limits at industrial-district property boundaries (Sec. 3.106.e); and height-limit exceptions for chimneys, smokestacks, derricks, conveyors, and grain elevators where industrial processes customarily require greater height (Sec. 3.104.e.3)
  • Applicant must submit the City of Nogales Project Submittal Application (Rev. 07/31/2023) — the same single, generic form used citywide for Building, Planning, Engineering, Fire, Signs, Admin, and Utilities applications; it has no 'New Build' vs 'Tenant Improvement' checkbox and no commercial-specific fields beyond a free-text 'Proposed Use of Building/Suite' and 'Description of Work/Request'
  • Contractor must hold a valid Arizona ROC license (General, or the applicable trade license) and City business/contractor license, indicated on the Project Submittal Application
  • A Certificate/Occupancy Permit is required before the building may be occupied; the Building Official makes a final inspection within 10 working days after receiving notice that the building is complete and ready for use (Sec. 3.103.e.1)
  • Permit becomes invalid if work is not commenced within 180 days of issuance, or is suspended/abandoned for 180 days after commencement

Required documents

  • RequiredProject Submittal ApplicationCity of Nogales Public Works Department / NIDC form (Rev. 07/31/2023); the same generic form used for all permit types — no distinct commercial or tenant-improvement section exists
  • RequiredDevelopment Site PlanRequired for commercial construction under Development Code Sec. 3.105 (not exempted, unlike single-family/mobile-home/small multifamily). Must include: location sketch with adjacent zoning/land uses; contour lines at 2-foot intervals for commercial/industrial/PAD/Shopping Center sites; drainage and finished-flow floodplain data; legal description and total site area; location/setbacks of all structures; percent lot coverage and percent impervious surface; adjacent right-of-way dimensions; parking and circulation areas; existing/proposed easements; future land use designation; exterior lighting; service areas (mail, trash); utility locations; nearest fire hydrant; and any street/alley dedication or improvement required under Sec. 3.111 (Sec. 3.105.c.1)
  • RequiredProof of Ownership and/or Proof of AgencyTitle report issued within 30 calendar days of submittal (by an Arizona-authorized title company) if establishing proof of ownership; or a certified Corporate Resolution / partnership document / individual authorization designating an agent, per A.R.S. 33-506.1-.3, if the land is owned by a corporation, partnership, or individual acting through an agent (Sec. 3.105.c.7)
  • RequiredDevelopment ScheduleAnticipated construction start date, progressive stages of development (if any), rate of development, and completion date; a master plan for the entire project is required for any development proposed to be built in phases, and must be approved before any sub-element can be approved or constructed (Sec. 3.105.c.8)
  • OptionalLandscape PlanFor larger projects, the Director of Planning may require a separate landscape plan drawn to scale showing walks, drives, parking, building entrances, lighting, service/loading areas, signage, open space, slopes, and a plant legend (Sec. 3.105.c.2)
  • OptionalSoil Engineering ReportIf required, prepared by a registered soil engineer, addressing soil nature/distribution/strength, grading procedures, and erosion control (Sec. 3.105.c.4)
  • OptionalSite Hydrology ReportIf required under the Santa Cruz County Flood Control Ordinance, addressing drainage area, peak discharge before/after development, and drainage management facilities (Sec. 3.105.c.5)

Fee schedule

Fee typeAmountNotes
Building Permit Fee and Plan Review FeeBased on Valuation (2012 IRC Appendix L 'Permit Fees', adopted by City Code Sec. 5-26 and Ordinance No. 2015-11-005) — the same valuation-based mechanism used for every other permit type in this record; no separate commercial-only valuation bracket or fee line was found. Plan review fee: 25% of the Building Permit Fee where valuation is $100,000 or less; 65% where valuation is $100,001 or more.
City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Show full citation

City Code Sec. 5-26 (2012 IRC + Appendix L adoption); Ordinance No. 2015-11-005; City of Nogales 'Building Permit Application Requirements' page (archived 2016-12-15, Wayback) for the 25%/65% plan-review split. The exact IRC Appendix L dollar-bracket table is not reproduced here: ICC's own source (codes.iccsafe.org) restricts access, and library.municode.com/az/nogales (Chapter 5, which would contain the City's locally-adopted dollar table) serves content only through its client-side application — an access gap, not an unpublished-fee gap. Confirm the precise base fee for your project's valuation with Community Development / One Stop.

Development Site Plan Review FeeNot published as a specific dollar amount
Development Code Sec. 3.105.g states only that 'Site plan review fees shall be paid in accordance with the adopted City of Nogales fee schedule' — no itemized site-plan-review dollar figure appears… Show full citation

Development Code Sec. 3.105.g states only that 'Site plan review fees shall be paid in accordance with the adopted City of Nogales fee schedule' — no itemized site-plan-review dollar figure appears in any publicly accessible City of Nogales document (the fee schedule itself is subject to the same Municode/ICC access barriers noted above). Confirm the exact amount with Community Development / One Stop before budgeting.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nogales building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-21)View current record →All versions →

Permalink: /arizona/santa-cruz-county/nogales/as-of/2026-08-26/

Snapshot date: 2026-08-26

Commit: 6cb4cca

Reproducible from PermitBase’s version-controlled dataset, commit 6cb4cca.