You are viewing the permanent link for the record currently in effect, published 2026-07-07.
Unincorporated Yuma County building permits
Unincorporated Yuma County, Arizona — as published 2026-07-07.
Reviewed 2026-07-07 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction, Addition, Remodel)
VerifiedRequired for new single-family homes, duplexes, and townhome construction, plus remodels and additions to existing homes (garage/carport construction or conversion, porch enclosures, demolition, patio covers, fences/walls, and other construction projects) in unincorporated Yuma County. Reviewed under the county's amended 2018 IRC/IBC by the Department of Development Services (DDS) Building Safety Division via a two-step Administrative Review + Technical Review process. Applications are submitted through the county's Online Permit Application Center or in person at the DDS office.
Verified 2026-07-07 · Source
Requirements
- Any new construction or addition exceeding $1,000 in value requires a building permit per A.R.S. § 11-321 as adopted by the Yuma County Board of Supervisors; accessory structures valued under $1,000 by the Building Official may be built without a permit
- Two-step review: Administrative Review (confirms all applicable forms/plans submitted) then Technical Review (confirms compliance with all applicable ordinances, codes, and regulations)
- Apply online through the county's Permit Application Center (https://yumacountyaz.portal.opengov.com/) or in person at 2351 West 26th Street, Yuma
- Submit two (2) scaled site plans (8.5x11) and two (2) sets of construction documents (any legible/reproducible format) for the Administrative Review Building Safety checklist
- Must comply with all Engineering (Public Works Standards Vol. I & II), Flood Control (PWS III, Floodplain Regulations), and Environmental Health approvals applicable to the site, in addition to Building Safety
- Permits expire if no inspection has occurred within 180 days of issuance
Required documents
- RequiredResidential Project Information Guide & Application InstructionsYuma County DDS guide covering the residential permitting process, checklists, timelines, and fee schedule; available at https://www.yumacountyaz.gov/home/showpublisheddocument/46813/637614427674300000
- RequiredScaled Site Plan (8.5 x 11)Two (2) copies required per the Administrative Review Building Safety checklist
- RequiredConstruction DocumentsTwo (2) sets, any legible/reproducible format, per the Administrative Review Building Safety checklist
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, Table 1-A of the locally amended Uniform Building Code) | $310.00 (as published in the current Residential Permit Guide's Fee Schedules table; underlying valuation-based Table 1-A brackets are published as Attachment #3 to the county's Fee Schedule document but were not separately rendered as line-item dollar brackets during this review) | Yuma County DDS Fee Schedule (Category 2, Permitting: Building Permit Fees, Attachments #1-6) and the Residential Project Information Guide & Application Instructions Fee Schedules table. |
| Building Plan Review Fee | 65% of the building permit fee, per set of plan review | Yuma County DDS Fee Schedule, Category 1 (Plan Reviews). |
| Grading Fee | $135.00 | Residential Project Information Guide & Application Instructions, Fee Schedules table (Individual Residential Lot or Parcel Grading Permit; see also DDS Fee Schedule general Flood Control grading fees). |
| Floodplain Use Permit Fee — Single Family Dwelling Unit | $135.00 | Yuma County DDS Fee Schedule, Floodplain Use Permit Fees; confirmed identically in the Residential Project Information Guide & Application Instructions. |
| Conventional Sewage/Septic Plan Review Fee (Residential, single unit) | $180.00 (owner-builder under 3,000 GPD: $250.00) | Yuma County DDS Fee Schedule, Sewage Disposal Plan Review Fees; matches the Residential Project Information Guide's 'Conventional Plan Review Fee $180.00' and 'Septic Owner Builder Plan Review Fee $250.00' entries. |
| Alternative Sewage System Plan Review Fee (Residential — Wisconsin Mound, Evapotranspiration Bed) | $450.00 | Yuma County DDS Fee Schedule, Sewage Disposal Plan Review Fees (Alternative Sewage System Plan Review Fees, Residential). |
| Water Well Permit Review Fee | $150.00 (plus $100.00 paid separately to the Arizona Department of Water Resources, ADWR) | Yuma County DDS Fee Schedule, Other Service Plan Review Fees; confirmed in the Residential Project Information Guide & Application Instructions Fee Schedules table. |
| Exempt Permit (Building Code Exempt / Agriculture Exempt) | $15.00 (Building Code Exempt) / $55.00 (Agriculture Exempt) | Yuma County DDS Fee Schedule, Building Related Permits, Exempt Permits. |
Commercial Building Permit (New Construction, Tenant Improvement, Remodel, Multi-Family)
VerifiedRequired for non-residential new construction, remodels, additions, tenant improvements, and change-of-use in unincorporated Yuma County, and also required for residential construction involving multi-family projects of three or more units, apartment buildings, condominiums, and Mobile Home/RV parks. Reviewed under the county's amended 2018 IBC by the DDS Building Safety Division via the same two-step Administrative + Technical Review process as residential permits, with its own published timelines and fee schedule.
Verified 2026-07-07 · Source
Requirements
- Required for all non-residential new construction, remodels, additions, tenant improvements, and change-of-use, and for residential multi-family projects of 3+ units, apartment buildings, condominiums, and MH/RV parks
- Two-step review: Administrative Review then Technical Review, verifying compliance with Building Safety (ICC codes), Engineering (PWS I & II), Flood Control (PWS III, Floodplain Regulations), Environmental Health, and MH & RV Park Plan Review (Zoning) as applicable
- Apply online through the county's Permit Application Center (https://yumacountyaz.portal.opengov.com/) or in person at 2351 West 26th Street, Yuma
- Administrative Review Building Safety checklist: two (2) site plans scaled on 8.5x11 (one if submitted electronically) and one (1) set of construction documents in any legible format
- Expedited Review is available, not to exceed 10 business days, for qualifying projects
Required documents
- RequiredCommercial Permit GuideYuma County DDS guide covering the commercial permitting process, checklists, timelines, and fee schedule; available at https://www.yumacountyaz.gov/government/development-services/permit-process/commercial-permit/commercial-permit-guide
- RequiredScaled Site Plan (8.5 x 11)Two (2) copies required (one if submitted electronically) per the Administrative Review Building Safety checklist
- RequiredConstruction DocumentsOne (1) set, any legible format, per the Administrative Review Building Safety checklist
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, Table 1-A) | $310.00 (as published in the current Commercial Permit Guide's fee schedules table) | Yuma County Commercial Permit Guide, fee schedules table; underlying valuation-based Table 1-A brackets are Attachment #3 to the county's DDS Fee Schedule document. |
| Building Plan Review Fee | 65% of the building permit fee, per set of plan review | Yuma County DDS Fee Schedule, Category 1 (Plan Reviews). |
| Grading Fee | $260.00 | Yuma County Commercial Permit Guide, fee schedules table. |
| Floodplain Use Permit Fee (Commercial or Industrial Facility) | $260.00 | Yuma County DDS Fee Schedule, Floodplain Use Permit Fees; confirmed in the Commercial Permit Guide's fee schedules table. |
| Conventional Sewage/Septic Plan Review Fee (Commercial, single unit) | $515.00 (2-5 units: $335.00 under the general DDS fee schedule; the Commercial Permit Guide's own summary table lists $515.00 for 'Conventional Plan Review Fee') | Yuma County DDS Fee Schedule, Sewage Disposal Commercial Plan Review Fees, cross-checked against the Commercial Permit Guide fee schedules table. |
| Alternative Sewage System Plan Review Fee (Commercial) | $150.00 (Commercial Permit Guide summary) / $515.00 for full Wisconsin Mound or Evapotranspiration Bed review under the general DDS fee schedule | Discrepancy noted between the Commercial Permit Guide's abbreviated fee table ($150.00) and the DDS Fee Schedule's detailed Alternative Sewage System Plan Review Fees table ($515.00 commercial); both are county-published documents, so this file reports both governing figures rather than picking one arbitrarily. |
| Water Well Permit Fee | $100.00 (paid to the Arizona Department of Water Resources, ADWR) | Yuma County Commercial Permit Guide, fee schedules table. |
Electrical, Plumbing & Mechanical Permit
Required for electrical, plumbing, and mechanical installation, alteration, or repair work in unincorporated Yuma County — including new residential solar photovoltaic installation, A/C relocation/replacement, water heater replacement, and sewer line repair outside the public right-of-way — administered by the DDS Building Safety Division and often issued via the county's Over-the-Counter Permits track for qualifying minor projects.
Reviewed 2026-07-07 · Source
Requirements
- Building Permit Fees, per the DDS Fee Schedule, expressly include plumbing, electrical, and mechanical work: 'the fee for each permit shall be as set forth and detailed in Attachments #1 through #6' (Attachment #4 Table No. 1-1 Plumbing Permit Fees; Attachment #5 Table No. 3A Electrical Permit Fees; Attachment #6 Section 106.5.2 Mechanical Permit Fees)
- Over-the-Counter (minor project) permits are available for: Service Clearance; Water Heater Replacement; A/C Relocation/Replacement; Window Replacement; Sewer Line Repair not in public right-of-way; Utilities not in public right-of-way; Residential Solar/PV Installation — using the county's dedicated Submittal Guide & Application
- Water heater replacement and permanently-wired light fixture additions require a permit in unincorporated Yuma County (this is a difference from some neighboring jurisdictions that exempt water heater replacement)
- A licensed contractor must be used for any work requiring a license under the Arizona Registrar of Contractors (ROC); owners may self-perform many minor projects but must follow applicable regulations
- Electric or gas clearance (turning utilities back on) requires a permit for the underlying work; for commercial projects a licensed contractor must be retained, and a building inspector must verify the work meets minimum standards before clearance
- Apply online through the county's Permit Application Center (https://yumacountyaz.portal.opengov.com/) or in person using the Over-the-Counter Submittal Guide & Application
Required documents
- RequiredOver the Counter Permits — Submittal Guide & ApplicationCovers Service Clearance, Water Heater Replacement, A/C Relocation/Replacement, Window Replacement, Sewer Line Repair (not in public R.O.W.), Utilities (not in public R.O.W.), and Residential Solar/PV Installation; available at https://www.yumacountyaz.gov/home/showdocument?id=26429
- OptionalArizona ROC Contractor License CopyA copy of the contractor's current AZ Registrar of Contractors license is required on file for any licensed-contractor-performed work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical/Plumbing/Mechanical Permit Fees (Attachments #4, #5, #6 to the DDS Fee Schedule) | Per Table No. 1-1 (Plumbing, per the locally amended Uniform Plumbing Code edition then in force), Table No. 3A (Electrical, per the locally amended National Electric Code edition then in force), and Section 106.5.2 (Mechanical, per the locally amended Uniform Mechanical Code edition then in force) | Yuma County DDS Fee Schedule, Category 2 (Permitting), Attachments #4-#6. The Fee Schedule document references these attachments by table/section number but the underlying per-item dollar tables were not rendered as extractable text on the live site during this review; the base Building Permit Fee ($310.00, per the current Residential/Commercial Permit Guides) is the confirmed governing base figure that these trade permits are billed alongside. |
| Plan Review Fee (when plan review required) | 65% of the building permit fee, per set of plan review | Yuma County DDS Fee Schedule, Category 1 (Plan Reviews) — applies uniformly across Building, Plumbing, Electrical, and Mechanical permits requiring plan review. |
| Permit Revision Fee | $15.00 | Yuma County DDS Fee Schedule, Building Related Permits. |
Manufactured Home Installation / Set-Up Permit
VerifiedRequired whenever a manufactured home is installed or reinstalled on a manufactured home park lot, an approved subdivision, or a private parcel in unincorporated Yuma County. The permit represents the county's approval of the installation and ensures the home meets minimum standards set by the Arizona Department of Housing, Office of Manufactured Housing. A licensed contractor must obtain the set-up permit; fees are set by the state's published schedule, not a county flat fee.
Verified 2026-07-07 · Source
Requirements
- Required for any placement, installation, or reinstallation of a manufactured home in a manufactured home park, an approved subdivision, or a private parcel
- A licensed contractor is required to obtain the manufactured home set-up permit
- Placement on the lot before permit issuance is prohibited — the permit must be obtained first
- Applicant must confirm the parcel is properly zoned for a manufactured home (call the Planning and Zoning Division, (928) 817-5161, and speak with the Planner on Duty)
- If the property is within an airport noise zone, the applicant must provide a copy of the manufacturer's invoice listing special noise-attenuation equipment or a sound test by a licensed acoustical engineer ('Noise Abatement Requirement')
- An Ad Valorem Tax Number must be obtained from the Yuma County Assessor's Office (410 South Maiden Lane, Yuma) by presenting the home's title, confirming all applicable taxes have been paid
- Owner may dig their own utility pit for the home, subject to prior DDS Building Safety approval of the pit design
- Apply through DDS Customer Service at 2351 West 26th Street, Yuma, or through the county's Permit Application Center
Required documents
- RequiredManufactured Home Set-Up Permit ApplicationSubmitted through DDS Customer Service, 2351 West 26th Street, Yuma, or the online Permit Application Center
- RequiredAd Valorem Tax NumberIssued by the Yuma County Assessor's Office upon presentation of the home's title
- OptionalManufacturer's Invoice or Acoustical Sound Test (if in an airport noise zone)Documents special noise-attenuation equipment or an acoustical engineer's sound test; required only for parcels within a designated noise zone
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Manufactured Home Placement Permit | Per State of Arizona schedule (set by the Arizona Department of Housing, Office of Manufactured Housing) — not a fixed Yuma County dollar amount | Yuma County DDS Fee Schedule, Building Related Permits, 'Manufactured Home Placement Permit — Per state schedule.' The fee covers the permit and up to two on-site inspections; additional fees apply if the home does not pass inspection after two attempts. Source: Yuma County Building Safety FAQ, 'Manufactured Home Permit Fees, how are they calculated and paid?' |
| Manufactured Home Pit Permit | $55.00 | Yuma County DDS Fee Schedule, Building Related Permits. |
Encroachment / Driveway Permit
VerifiedRequired to access a paved county road right-of-way from a new driveway (protects the pavement edge with a driveway apron), and more broadly for any work performed within Yuma County road right-of-way (utility crossings, culverts, curb/gutter, special events, etc.). Administered by the DDS Engineering Division. New homes, mobile homes, or buildings must construct a driveway prior to occupancy unless a driveway apron already exists at the site.
Verified 2026-07-23 · Source
Requirements
- Required to access a paved county road via a new driveway; not required if a driveway apron already exists at the site
- Required more broadly for any construction activity within the county road right-of-way (utility lines, culverts, curb & gutter, sidewalks, special events, survey monuments, etc.), per the detailed Encroachment Permit Fees Detail Charges schedule
- New homes, mobile homes, or other buildings must construct a driveway before occupancy is granted
- Driveway requirements depend on whether the parcel's access is off a paved or maintained county right-of-way; specific standards are published in Public Works Standards Volume I
- Mandatory minimum insurance coverage while working under an Encroachment Permit: bodily injury $500,000 per person / $1,000,000 more than one person; property damage $500,000 per occurrence (or $1,000,000 excess liability)
- 'After the Fact' permits (work performed without an approved permit) are charged double the normal fee
- Apply/inquire through the DDS Engineering Department, 2351 West 26th Street, Yuma; (928) 817-5123
Required documents
- RequiredEncroachment Permit Information Guide & Application PacketAvailable at https://www.yumacountyaz.gov/home/showpublisheddocument/49341/637825105621570000
- OptionalResidential Driveway @ Corner Lot Template / Mid-Block TemplateSample drawings for driveway placement at corner lots and mid-block locations; available via the county's Building Permits resources page
- RequiredCertificate of InsuranceEvidencing the mandatory minimum bodily-injury and property-damage coverage while working under the encroachment permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Encroachment Permit Processing Charge | $25.00 each | Yuma County DDS Fee Schedule, Encroachment Permit Fees Detail Charges. |
| Driveway | $135.00 each | Yuma County DDS Fee Schedule, Encroachment Permit Fees Detail Charges. |
| Concrete curb & gutter / Combination Curb, Gutter & Sidewalk | $0.20/L.F. (curb & gutter) / $0.31/L.F. (combination) | Yuma County DDS Fee Schedule, Encroachment Permit Fees Detail Charges. |
| All After the Fact Permits (work performed without an approved permit) | Double the normal fee | Yuma County DDS Fee Schedule, Encroachment Permit Fees Detail Charges. |
| Request for Appeal (Engineering-related) | $265.00 | Yuma County DDS Fee Schedule, Encroachment Permit Fees Detail Charges. |
Residential Solar / Photovoltaic (PV) Installation Permit
Unincorporated Yuma County treats residential solar/PV installation as one of the Department of Development Services' Over-the-Counter (OTC) minor-project permit categories, alongside service clearance, water heater replacement, and A/C relocation/replacement — processed at the counter via the county's OTC Submittal Guide & Application rather than the full multi-week Residential Permit Guide review track. No distinct flat or per-watt solar fee line was found published separately from the general Building Permit Fee (Table No. 1-A, valuation-based) and Electrical Permit Fee (Table No. 3A) that this OTC permit is billed under (same fee attachments cited in the electrical-plumbing-mechanical-permit entry). Arizona's statewide solar-permitting statute, A.R.S. § 11-323, independently caps what the county may charge and constrains what the county may require on plans.
Reviewed 2026-07-20 · Source
Requirements
- Residential Solar/PV Installation is one of the explicitly listed Over-the-Counter (OTC) minor-project permit categories in Yuma County DDS's OTC Submittal Guide & Application, alongside Service Clearance, Water Heater Replacement, A/C Relocation/Replacement, Window Replacement, and Sewer Line Repair (not in public R.O.W.)
- Per A.R.S. § 11-323 (statewide, applies to every Arizona county including Yuma): construction plans must show the location of the photovoltaic system and mounting details; electrical diagrams (one-line or three-line) are required and may be satisfied through a qualified online/third-party platform; the county may not require a professional engineer's stamp on a single-family system's plans unless the county determines it is necessary and provides a written explanation
- Per A.R.S. § 11-323, any building/permit fee the county assesses for a solar construction permit must be attributable to and defray/cover the actual expense of the service for which it is charged, may not exceed actual cost, and the county must provide a written itemized cost breakdown to the applicant upon request
- A licensed contractor (Arizona Registrar of Contractors) is required for work requiring a license; a copy of the contractor's current ROC license must be on file
- Apply online through the county's Permit Application Center (https://yumacountyaz.portal.opengov.com/) or in person using the OTC Submittal Guide & Application
Required documents
- RequiredOver the Counter Permits — Submittal Guide & ApplicationLists Residential Solar/PV Installation as one of the OTC minor-project categories; available at https://www.yumacountyaz.gov/home/showdocument?id=26429
- RequiredElectrical Diagram (one-line or three-line)Required per A.R.S. § 11-323; may be satisfied through a qualified online design platform rather than a custom-drafted diagram
- OptionalArizona ROC Contractor License CopyRequired on file for licensed-contractor-performed work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building/Electrical Permit Fee (OTC, solar/PV installation) | Per the general valuation-based Building Permit Fee (Table No. 1-A) and Electrical Permit Fee (Table No. 3A) — no distinct flat solar-specific fee line found published | Yuma County DDS Fee Schedule, Attachments #3 and #5; same fee mechanism documented in this file's electrical-plumbing-mechanical-permit entry. Statutorily constrained by A.R.S. § 11-323: the fee must be attributable to and defray/cover only the county's actual cost of the permitting service, may not exceed actual cost, and an itemized cost breakdown must be provided to the applicant on request. |
| Permit Revision Fee | $15.00 | Yuma County DDS Fee Schedule, Building Related Permits |
Electric Vehicle (EV) Charging Station / EVSE Permit
Unincorporated Yuma County has no distinct EV charger/EVSE permit application or fee line. EV charging station circuit installation is billed and reviewed as ordinary electrical work under the county's existing Electrical, Plumbing & Mechanical Permit (P/E/M Permit), the same permit type used for other electrical, plumbing, and mechanical work in the county, per Attachment #5 (Table No. 3A Electrical Permit Fees) of the DDS Fee Schedule. The county's own Over the Counter Permits Submittal Guide & Application (which lists its minor-project categories -- Service Clearance, Water Heater Replacement, A/C Relocation/Replacement, Window Replacement, Sewer Line Repair, Utilities, and Residential Solar/PV Installation) was checked directly and contains no electric-vehicle, EV charger, or EVSE category, confirming there is no dedicated minor-project pathway for EV chargers either.
Reviewed 2026-07-20 · Source
Requirements
- No standalone EV charger/EVSE permit application exists; EV charging station circuit work is permitted through the county's standard Electrical, Plumbing & Mechanical Permit (P/E/M Permit)
- Building Permit Fees, per the DDS Fee Schedule, expressly cover electrical work: 'the fee for each permit shall be as set forth and detailed in Attachments #1 through #6' (Attachment #5, Table No. 3A Electrical Permit Fees)
- The county's Over the Counter Permits Submittal Guide & Application -- which covers Service Clearance, Water Heater Replacement, A/C Relocation/Replacement, Window Replacement, Sewer Line Repair (not in public R.O.W.), Utilities (not in public R.O.W.), and Residential Solar/PV Installation -- does NOT list EV chargers/EVSE among its minor-project categories, so a standard (not over-the-counter) electrical permit process applies unless county staff direct otherwise at intake
- A licensed contractor under the Arizona Registrar of Contractors (ROC) must be used for licensed work; owners may self-perform many minor electrical projects but must follow applicable regulations
- Apply online through the county's Permit Application Center (yumacountyaz.portal.opengov.com) or in person at the DDS Building Safety Division
Required documents
- RequiredElectrical, Plumbing & Mechanical Permit ApplicationSame P/E/M application used for other electrical work; no EV-specific application exists, and the EV charger category is absent from the county's Over-the-Counter minor-project list
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fees (EV charger/EVSE circuit) | Per Table No. 3A (Electrical), per the locally amended National Electric Code edition then in force | Yuma County DDS Fee Schedule, Category 2 (Permitting): "Building Permit Fees (including plumbing, electrical and mechanical): the fee for each permit shall be as set forth and detailed in Attachments #1 through #6" -- "Attachment #5 - Table No. 3A - Electrical Permit Fees 1996 National Electric Code." Re-chased 2026-07-20: the live DDS Fee Schedule PDF (yumacountyaz.gov/home/showpublisheddocument/28926/636228368161800000) now returns HTTP 403 to automated fetch; retrieved instead via a Wayback Machine snapshot (2023-05-06) of the same 12-page document, which independently re-confirms the Attachment #5/Table 3A reference but -- as in the live version -- does NOT embed Table 3A's actual per-item dollar figures; the table exists only as a separate, unlinked attachment file not discoverable via county site search, Wayback, or the amlegal.com Yuma code library (codelibrary.amlegal.com/codes/yuma's Electrical Code and Building Safety Code Amendments pages both return HTTP 403/require JavaScript rendering not available to automated fetch tools). No EV-specific line exists within it regardless. Confirm the exact fee with DDS Building Safety Division, (928) 817-5000. Re-chased 2026-07-23: the live Fee Schedule PDF is now confirmed directly reachable (both via a real Browser-pane session, which downloaded it successfully rather than hitting a WAF block, and via an r.jina.ai proxy fetch) -- the prior 403 was transient/WAF-related, not rot. Content is unchanged from the 2017-dated document (Published Time header: Thu, 16 Feb 2017): it still references Attachment #5/Table 3A by name only and does not embed the per-item dollar figures on the page itself. Also confirmed Yuma County itself (as opposed to the City of Yuma) is not hosted on either Municode or American Legal Publishing at all, so the amlegal.com Electrical Code link cited below points to the wrong jurisdiction's code and should not be relied on for the county's fee table. |
| Plan Review Fee (when plan review required) | 65% of the building permit fee, per set of plan review | Yuma County DDS Fee Schedule, Category 1 (Plan Reviews) — applies uniformly across Building, Plumbing, Electrical, and Mechanical permits requiring plan review |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Yuma County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.