Wellton building permits
VerifiedWellton, Arizona — as published 2026-07-07.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Additions)
VerifiedRequired for new construction, enlargement, alteration, repair, moving, demolition, or occupancy change of a building or structure in the Town of Wellton, reviewed against the Town's adopted 2009 I-Codes. Applications are submitted to the Building Safety Division at Town Hall.
Verified 2026-07-06 · Source
Requirements
- Building permit required to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure within Wellton town limits
- Two complete sets of plans required for review, including: site/plot plan, floor plan, foundation plan, roof/floor framing plans, typical wall section, building elevations, truss plans and calculations, and plumbing/mechanical/electrical plans
- Reviewed against the Town's adopted 2009 International Codes (I-Codes) per the Town's own published code-adoption statement
- Applicant must indicate whether the address has overhead service and whether it has septic (if not, the Yuma County septic permit number must be attached)
- Owner/contractor must certify exemption from or compliance with the Arizona State Contractor's License Law (A.R.S. § 32-1121 / § 32-1169A) on the application
- Permit applications expire by limitation if no permit is issued within 180 days of the application date
Required documents
- RequiredBuilding Permit ApplicationTown of Wellton Building Permit Application (Building Safety Division), listing project address, owner/contractor/designer/engineer contacts, scope of work, type of construction, square footage, and valuation
- RequiredTwo Complete Sets of Construction PlansSite/plot plan, floor plan, foundation plan, roof/floor framing plans, typical wall section, building elevations, truss plans and calculations, plumbing/mechanical/electrical plans, per the Construction Plan Review Requirements Handout
- OptionalYuma County Septic Permit (if applicable)Required attachment if the project address does not have sewer/overhead utility service and relies on septic
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | Calculated by Building Safety Division staff at intake based on project valuation, per the fee provisions of the Town's adopted 2009 I-Codes | No separate, itemized municipal fee schedule or ICC valuation table is separately published on the Town's website, DocumentCenter, or in its adopted budgets; the Building Permit Application form itself leaves 'Valuation' and 'Permit Fees' blank for staff completion at intake. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312). |
| Construction Plan Review Fee | 65% of the building permit fee | Covers the first review and one resubmittal; hourly charges apply for subsequent reviews. Due at time of plan submittal. Source: Town of Wellton Construction Plan Review Requirements Handout (PDF, DocumentCenter Doc ID 310). |
Residential Addition / Remodel Permit
VerifiedRequired for room additions, remodels, and alterations to existing one- and two-family dwellings in Wellton, reviewed against the Town's adopted 2009 I-Codes using the same Building Permit Application and plan review process as new construction.
Verified 2026-07-06 · Source
Requirements
- Building permit required for enlargement, alteration, or repair of an existing structure, unless the specific scope falls under the Town's published permit-exempt list (e.g., accessory structures up to 120 sq ft, fences up to 6 feet, retaining walls up to 4 feet)
- Two complete sets of plans required, scaled to the scope of the addition/remodel (site plan, floor plan, framing details, and structural connection details to the existing structure)
- Same Building Permit Application form used as for new construction, checking the 'Building' permit type box
- Ordinary repairs not affecting structural elements, egress, or utility systems do not require a permit or notice to the building official
Required documents
- RequiredBuilding Permit ApplicationTown of Wellton Building Permit Application, 'Building' permit type checked
- RequiredSite/Plot Plan and Construction PlansShowing existing structure, addition/remodel footprint, and structural connection to existing framing
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | Calculated by Building Safety Division staff at intake based on project valuation | No separate itemized fee schedule is published; fee is valuation-based per the Town's adopted 2009 I-Codes fee provisions. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312). |
| Construction Plan Review Fee | 65% of the building permit fee | First review and one resubmittal; hourly for subsequent reviews. Source: Town of Wellton Construction Plan Review Requirements Handout (PDF, DocumentCenter Doc ID 310). |
Electrical Permit
VerifiedRequired to erect, install, enlarge, alter, repair, remove, convert, or replace an electrical system regulated by the Town of Wellton's adopted 2009 I-Codes. Minor repairs and maintenance (lamp replacement, connecting approved portable equipment to approved permanently-installed receptacles) are exempt.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for installation, alteration, or repair of electrical systems regulated by the Town's adopted codes
- Exempt: minor repair/maintenance, including lamp replacement or connecting approved portable electric equipment to approved permanently-installed receptacles
- Application submitted via the Town's Building Permit Application ('Electrical' permit type box), with the Electric Contractor's Arizona ROC license number listed under Sub-Contractors Information
Required documents
- RequiredBuilding Permit ApplicationTown of Wellton Building Permit Application, 'Electrical' permit type checked, with Electric Contractor AZ License # provided
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee — Based on Valuation | Calculated by Building Safety Division staff at intake based on project valuation | No separate itemized fee schedule is published on the Town's website; the Building Permit Application's Official Use Only section shows a separate 'Electrical: $___' line completed by staff. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312). |
Plumbing Permit
VerifiedRequired to erect, install, enlarge, alter, repair, remove, convert, or replace a plumbing or gas system regulated by the Town of Wellton's adopted 2009 I-Codes. Minor leak-stopping and stoppage-clearing that doesn't require replacing/rearranging pipes, valves, or fixtures is exempt.
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing/gas systems regulated by the Town's adopted codes
- Exempt: stopping leaks in drains/water/soil/waste/vent pipe (provided no concealed pipe is removed and replaced with new material — that is new work requiring a permit); clearing stoppages or repairing leaks in pipes/valves/fixtures and removing/reinstalling water closets, provided no replacement/rearrangement of valves, pipes, or fixtures is involved
- Emergency plumbing/gas repairs must have a permit application submitted to the building official within the next business day
- Application submitted via the Town's Building Permit Application ('Plumbing' permit type box), with the Plumbing Contractor's Arizona ROC license number listed under Sub-Contractors Information
- Septic-served properties must attach their Yuma County septic permit number to the Building Permit Application
Required documents
- RequiredBuilding Permit ApplicationTown of Wellton Building Permit Application, 'Plumbing' permit type checked, with Plumbing Contractor AZ License # provided
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee — Based on Valuation | Calculated by Building Safety Division staff at intake based on project valuation | No separate itemized fee schedule is published; the Building Permit Application's Official Use Only section shows a separate 'Plumbing: $___' line completed by staff. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312). |
Mechanical / HVAC Permit
VerifiedRequired to erect, install, enlarge, alter, repair, remove, convert, or replace a mechanical (heating, ventilation, cooling) system regulated by the Town of Wellton's adopted 2009 I-Codes. Portable heating/ventilation/cooling appliances and small self-contained refrigeration systems are exempt.
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for installation, alteration, or repair of HVAC/mechanical systems regulated by the Town's adopted codes
- Exempt: portable heating, ventilation, and cooling appliances (including portable evaporative coolers); steam/hot/chilled water piping within already-regulated equipment; minor part replacement not affecting equipment approval/safety; self-contained refrigeration systems with 10 lbs or less of refrigerant or actuated by motors of 1 horsepower or less; portable fuel cell appliances not connected to a fixed piping system/power grid
- Application submitted via the Town's Building Permit Application ('Mechanical' permit type box), with the Mechanical Contractor's Arizona ROC license number listed under Sub-Contractors Information
Required documents
- RequiredBuilding Permit ApplicationTown of Wellton Building Permit Application, 'Mechanical' permit type checked, with Mechanical Contractor AZ License # provided
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee — Based on Valuation | Calculated by Building Safety Division staff at intake based on project valuation | No separate itemized fee schedule is published; the Building Permit Application's Official Use Only section shows a separate 'Mechanical: $___' line completed by staff. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312). |
Demolition Permit
VerifiedRequired to demolish any building or structure in the Town of Wellton, listed as a distinct permit type on the Town's Building Permit Application alongside Building, Plumbing, Mechanical, Electrical, and Fire Sprinkler.
Verified 2026-07-06 · Source
Requirements
- Permit required to demolish a building or structure within Wellton town limits, per the Town's general permit requirement ('A permit is required to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure')
- 'Demolition' is listed as one of six checkbox permit types on the Town's standard Building Permit Application
- Applicant must indicate whether the address has overhead service and septic status on the application
Required documents
- RequiredBuilding Permit ApplicationTown of Wellton Building Permit Application, 'Demolition' permit type checked
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit Fee — Based on Valuation | Calculated by Building Safety Division staff at intake | No separate itemized fee schedule is published; the standard Building Permit Application's Official Use Only fee section (Permit / Plan Check Fee / Total Permit) applies. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312). |
Solar PV Installation (Building + Electrical Permit)
VerifiedThe Town of Wellton has no dedicated solar-PV application, checklist, or fee line — this file's own prior research explicitly confirmed no re-roofing- or solar-specific procedure exists on the Town's site. A rooftop or ground-mount solar photovoltaic installation is filed on the same standard six-checkbox Building Permit Application used for all other permit types (selecting 'Building' for the racking/structural component and 'Electrical' for the interconnection), reviewed against the Town's adopted 2009 I-Codes, with fees calculated by Building Safety Division staff at intake from project valuation — the same genuine 'no published fee schedule' finding documented throughout this file for every permit type. Arizona's statewide municipal solar-permitting statute, A.R.S. § 9-468, independently constrains what the Town may require on plans and what it may charge.
Verified 2026-07-20 · Source
Requirements
- File the standard Building Permit Application, checking 'Building' (racking/structural mounting) and 'Electrical' (interconnection) as applicable — no separate solar checkbox exists among the Town's six permit-type categories (Building, Plumbing, Mechanical, Electrical, Fire Sprinkler, Demolition)
- Two complete sets of plans required per the Construction Plan Review Requirements Handout, including site/plot plan and structural/electrical details for the installation
- Per A.R.S. § 9-468 (statewide, binds every Arizona municipality including Wellton): plans must show the system's location and mounting details plus an electrical diagram (one-line or three-line); the Town may satisfy documentation requirements via a qualified online automated permitting platform; the Town may not require a professional engineer's stamp on a single-family system unless it provides the applicant a written explanation of why one is necessary
- Per A.R.S. § 9-468: any fee the Town charges for a solar permit must be attributable to and defray/cover only its actual cost of the service, may not exceed actual cost, and the Town must provide an itemized cost breakdown to the applicant on request; the method the Town uses to arrive at its assessed fee must be published and publicly available
- Electric Contractor's Arizona ROC license number must be listed under Sub-Contractors Information for the electrical portion, per the standard application
- Owner-occupants installing their own system (not for sale/rent) may self-certify exemption from the Arizona State Contractor's License Law (A.R.S. § 32-1121)
Required documents
- RequiredBuilding Permit ApplicationSame standard six-checkbox Town of Wellton application used for all permit types; check 'Building' and/or 'Electrical' as applicable — no dedicated solar-only form is published
- RequiredElectrical Diagram (one-line or three-line)Required per A.R.S. § 9-468; may be satisfied through a qualified online design/automated permitting platform
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building/Electrical Permit Fee — Based on Valuation | Calculated by Building Safety Division staff at intake based on project valuation, per the fee provisions of the Town's adopted 2009 I-Codes | No separate itemized municipal fee schedule is published for any permit type at the Town of Wellton, solar included; the Building Permit Application leaves 'Valuation' and 'Permit Fees' blank for staff completion at intake. Statutorily constrained by A.R.S. § 9-468: the fee must be attributable to, and may not exceed, the Town's actual cost of providing the permitting service. |
| Construction Plan Review Fee | 65% of the building permit fee | Same flat rate that applies to all permit types, per the Town's Construction Plan Review Requirements Handout |
EV Charger Installation (Building + Electrical Permit)
The Town of Wellton has no dedicated EV-charger/EVSE application, checklist, or fee line — an EV charging station (Level 2 or DC fast charger) is filed on the same standard six-checkbox Building Permit Application used for all other permit types (checking 'Electrical' for the circuit/charger wiring, and 'Building' if a new canopy, carport, or structural mounting is involved), reviewed against the Town's adopted 2009 I-Codes, with fees calculated by Building Safety Division staff at intake from project valuation — the same genuine 'no published fee schedule' finding documented throughout this file for every permit type, including solar-pv-permit. Arizona's statewide municipal solar-permitting statute, A.R.S. § 9-468, does not extend to EV chargers, and no separate Arizona statute mandating expedited or capped-fee EV-charger permitting for towns the size of Wellton was found.
Reviewed 2026-07-20 · Source
Requirements
- File the standard Building Permit Application, checking 'Electrical' (charger circuit/wiring) and 'Building' (if a new canopy, carport, or structural mounting is added) — no separate EV-charger checkbox exists among the Town's six permit-type categories (Building, Plumbing, Mechanical, Electrical, Fire Sprinkler, Demolition)
- Electric Contractor's Arizona ROC license number must be listed under Sub-Contractors Information for the electrical portion, per the standard application
- Owner-occupants installing their own charger (not for sale/rent) may self-certify exemption from the Arizona State Contractor's License Law (A.R.S. § 32-1121)
- Two complete sets of plans required per the Construction Plan Review Requirements Handout if the scope includes new structural work (e.g., a carport-mounted charger); a standalone wall-mounted charger retrofit is expected to need only the Electrical permit application, consistent with the Town's general permit-exempt/permit-required framework for minor electrical work
Required documents
- RequiredBuilding Permit ApplicationSame standard six-checkbox Town of Wellton application used for all permit types; check 'Electrical' and/or 'Building' as applicable — no dedicated EV-charger-only form is published
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee — Based on Valuation | Calculated by Building Safety Division staff at intake based on project valuation | No separate itemized fee schedule is published on the Town's website for any permit type, EV charging included; the Building Permit Application's Official Use Only section shows a separate 'Electrical: $___' line completed by staff. Source: Town of Wellton Building Permit Application (PDF, DocumentCenter Doc ID 312). Re-chased 2026-07-20: searched for a Town of Wellton fee schedule document (none found via site search or web search -- only golf course, business license, court, and sanitation fee schedules are published), and searched for an intergovernmental agreement (IGA) with Yuma County for building/electrical permitting services (none confirmed; an October 2025 Town Council meeting notice referencing an agreement could not be read in detail, and the Building Safety landing page does not identify Yuma County as the permitting authority). No statewide Arizona electrical-permit fallback authority exists comparable to Idaho DOPL or Colorado DORA, since Arizona electrical permitting is administered locally. Confirmed no numeric fee or explicit delegation mechanism is publicly available beyond Building Safety Division staff discretion at intake. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wellton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.