Version history — Yuma, Arizona
This is PermitBase’s own verified record for Yuma, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Yuma’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-20Superseded
- 2026-08-16Superseded
- Yuma, Arizona — adopted-codes record updated
- Yuma, Arizona — Sign Permit record added
- Yuma, Arizona — Fire Sprinkler / Fire Alarm Permit record added
- Yuma, Arizona — Change of Use / Change of Occupancy Permit record added
- 2026-08-01Superseded
- Yuma, Arizona — Commercial Building Permit (New Construction / Addition) record added
- Yuma, Arizona — Commercial Tenant Improvement / Alteration Permit record added
- 2026-07-20Superseded
- Yuma, Arizona — EV Charger / Electric Vehicle Charging Station Permit record added
- Yuma, Arizona — EV Charger / Electric Vehicle Charging Station Permit fee record added: Power Apparatus (kW/HP/kVA/kVAR-rated equipment — most specifically applicable Table 1-A bracket for the EVSE unit itself) (Up to and including 1 kW/HP/kVA: $5.00; over 1 to 10: $13.00; over 10 to 50: $25.00; over 50 to 100: $50.00; over 100: $67.00)
- 2026-07-03Initial record — coverage of Yuma began