Santa Monica building permits

Verified

Santa Monica, California — as published 2026-09-21.

Verified 2026-09-21 · Source

Codes adopted

THE PLAN REVIEW PAGE NAMES ONE EDITION AND ITS EFFECTIVE DATE AND NOTHING ELSE: applications are evaluated under the "2025 California Standards Code (Title 24), effective January 1, 2026". Title 24 is the container for the whole California suite - Building, Residential, Electrical, Mechanical, Plumbing, Energy, Green Building and the rest - so this is an edition statement rather than a code-by-code list.NO CODE-BY-CODE ENUMERATION AND NO LOCAL AMENDMENT LIST WAS FOUND ON THE PAGES READ. Santa Monica publishes the edition year rather than a chapter-by-chapter adoption list, so what it adds locally on top of Title 24 is not established from the pages read for this record.Health and Safety Code 18938(b) provides that building standards in the California Building Standards Code apply to all occupancies throughout the state, so the 2025 Title 24 suite is the floor in Santa Monica regardless of what the city adds on top.

Permit types & fees

Building Permit

Verified

Santa Monica says plainly that its plan review is running late, publishes no number to be late against, and runs its permit counter four days a week. A separate seismic programme reaches over two thousand buildings.

Verified 2026-09-21 · Source

Requirements

  • THE CITY TELLS YOU IT IS BEHIND, WHICH IS RARE AND USEFUL: "Plan review timelines are currently delayed beyond the estimated timeframes." Two reads of the page under different framings returned that sentence identically.
  • BUT THE SENTENCE CARRIES NO DATE, AND THAT IS THE PROBLEM WITH IT. There is no posting date, no review date and no expiry on the notice, so a reader cannot tell whether "currently" means this week or eighteen months ago. It is a true statement with no shelf life attached.
  • AND THERE IS NO PUBLISHED FIGURE FOR IT TO BE LATE AGAINST. The page refers to "the estimated timeframes" as though they are stated somewhere, but no first-review or recheck figure appears on the pages read. The delay is announced relative to a number the reader has not been given.
  • A COMPLETE SUBMITTAL IS A CONDITION, NOT AN ASPIRATION: "submittals must be complete with all required supporting documentation and fee payments at the time of submission." Fee payment is part of completeness here - an application with documents but without payment is not a submittal.
  • THERE IS A COUNTER ROUTE FOR SMALL WORK: "Same-Day Review - for certain minor projects such as reroofs, mechanical installations, facade remodels/repairs that can be reviewed and approved at the public counter." Note the words "such as" - the three named are examples and the eligible set is not enumerated on the page, so ask rather than assume your scope qualifies.
  • OVER TWO THOUSAND BUILDINGS ARE IN THE SEISMIC PROGRAMME. If the property is commercial or multi-family, check whether it carries an "Order to Structurally Analyze Potentially Seismically Vulnerable Building" before planning other work, because a retrofit obligation changes the scope of anything else.

Required documents

  • Optional
  • Optional

Fee schedule

Fee typeAmountNotes
Permit feesNOT PUBLISHED on the pages read for this record.No fee schedule or valuation table appeared on the plan review or Permit Services Center pages. Fees are nonetheless load-bearing for timing here, because payment is part of what makes a submittal complete - an unpaid application is not lodged.

Sources & verification

Verified against official sources. Last reviewed 2026-09-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santa Monica building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →