Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-09-18.

Riverside building permits

Verified

Riverside, California — as published 2026-09-18.

Verified 2026-09-18 · Source

Codes adopted

2025 California Building Standards Code (Cal. Code Regs., Title 24) - published July 1, 2025 by the California Building Standards Commission, effective January 1, 2026. This is the statewide edition in force; it is not a city-specific adoption. Health & Safety Code s 18938(b): building standards adopted into the California Building Standards Code "shall apply to all occupancies throughout the state and shall become effective 180 days after publication."THE CITY'S OWN ADOPTING ORDINANCE WAS NOT READ FOR THIS RECORD, so no city ordinance number or local effective date is asserted here.

Permit types & fees

Building Permit

Verified

The City of Riverside issues building permits through the Building & Safety Division of the Community & Economic Development Department. The division publishes a fee schedule covering administrative fees, valuation-based state charges, and per-square-foot plan check and permit fees for new construction.

Verified 2026-09-18 · Source

Requirements

  • NOT PUBLISHED as a checklist on the artefacts read for this record.

Required documents

    Fee schedule

    Fee typeAmountNotes
    Permit Issuance Fee$39.00Administrative fee, Building & Safety Fee Schedule.
    Building Plan Check Fee (hourly)$82.00Hourly rate, Building & Safety Fee Schedule.
    Building Inspection (hourly)$82.00Hourly rate, Building & Safety Fee Schedule.
    Building reinspection fee$93.00Charged per reinspection, Building & Safety Fee Schedule.
    TCO Request$166.00Temporary Certificate of Occupancy request.
    Transfer of issued permit$66.00Building & Safety Fee Schedule.
    Appeal of building official$1,064.00Building & Safety Fee Schedule.
    California Building Standards charge$1.00 per every $25,000 or portion thereof, in construction valuationState charge collected locally; printed on the city's fee schedule.
    General Plan Maintenance FeeAll plan check and permit fees x 10%Applied on top of plan check and permit fees.
    Technology FeeAll plan check and permit fees X 4%Applied on top of plan check and permit fees.
    New SFD - R-3 Occupancy (residential new construction)Per SF $.53 plan check and .53 permit fee, with a 700 SF minimum and 7,000 SF maximumPer-square-foot rate with floor and ceiling, Building & Safety Fee Schedule.

    Sources & verification

    Verified against official sources. Last reviewed 2026-09-18.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverside building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    View current record →All versions →

    Permalink: /california/riverside-county/riverside/as-of/2026-09-18/

    Snapshot date: 2026-09-18

    Commit: f705640

    Reproducible from PermitBase’s version-controlled dataset, commit f705640.