You are viewing the permanent link for the record currently in effect, published 2026-09-20.
Redwood City building permits
VerifiedRedwood City, California — as published 2026-09-20.
Verified 2026-09-20 · Source
Codes adopted
Permit types & fees
Building Permit
VerifiedRedwood City takes submittals through a Box.com folder and will refuse files that are not named after the project address. Inspections are booked three to eight days ahead - far longer than the next-day norm.
Verified 2026-09-20 · Source
Requirements
- SUBMITTAL IS A FILE UPLOAD TO BOX.COM, NOT A PERMIT PORTAL. The published sequence: "Complete and submit the building permit application or revision application", then "Upload a completed permit application to this link" - a redwoodcitypermits.app.box.com folder.
- THE FILENAME IS A HARD REQUIREMENT AND THE CITY SAYS WHAT HAPPENS IF YOU GET IT WRONG: "The filename for the application must include the project address along with the words 'Permit application.' For example, '1017 Middlefield Permit Application.'" And for everything else: "The files must also be named with the address. Make sure to name the files with the address; otherwise, we will not accept the application or files."
- AN EMAIL CLOSES THE SUBMITTAL: "Once the permit application and additional documents are uploaded, please email permits@redwoodcity.org to confirm the complete submittal." The upload alone does not register the application.
- STATUS IS CHECKED SOMEWHERE ELSE AGAIN: "To check permit status, please visit the city eTRAKiT website". So a single project touches Box for submittal, email for confirmation and eTRAKiT for status.
- SOLARAPP+ RUNS AS A SEPARATE AUTOMATIC ROUTE, published as "SOLARAPP+ AUTOMATIC PERMITTING" alongside the manual process.
Required documents
- Optional
- Optional
- Optional
- Optional
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit fees | NOT TRANSCRIBED for this record. | No fee schedule was opened and no fee basis is stated on the pages read - the Building & Code Enforcement page and the Inspections page - so none is asserted. |
Sources & verification
Verified against official sources. Last reviewed 2026-09-20.
Applications & forms
Online permit portal
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Redwood City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.