Redwood City building permits

Verified

Redwood City, California — as published 2026-09-20.

Verified 2026-09-20 · Source

Codes adopted

THE EDITION, THE AMENDMENTS AND THE DATE ARE ALL STATED IN ONE SENTENCE: "The city adopted the 2025 California Building Standards Code with local amendments, which becomes effective on January 1, 2026, and replaces the current 2022 code." It names what it adopts, that it amended it, when it starts and what it displaces.That date matches the statewide position - the 2025 edition was published 2025-07-01 and takes effect 180 days later under Health & Safety Code 18938(b), which is 2026-01-01.THE CITY GIVES A ROUTE FOR QUESTIONS ABOUT IT: "For more information, contact the city's Building Division by phone at 650-780-7350 or by email permits@redwoodcity.org".THE AMENDMENTS THEMSELVES WERE NOT READ FOR THIS RECORD - the sentence confirms they exist but does not enumerate them, and no municipal code chapter was opened.

Permit types & fees

Building Permit

Verified

Redwood City takes submittals through a Box.com folder and will refuse files that are not named after the project address. Inspections are booked three to eight days ahead - far longer than the next-day norm.

Verified 2026-09-20 · Source

Requirements

  • SUBMITTAL IS A FILE UPLOAD TO BOX.COM, NOT A PERMIT PORTAL. The published sequence: "Complete and submit the building permit application or revision application", then "Upload a completed permit application to this link" - a redwoodcitypermits.app.box.com folder.
  • THE FILENAME IS A HARD REQUIREMENT AND THE CITY SAYS WHAT HAPPENS IF YOU GET IT WRONG: "The filename for the application must include the project address along with the words 'Permit application.' For example, '1017 Middlefield Permit Application.'" And for everything else: "The files must also be named with the address. Make sure to name the files with the address; otherwise, we will not accept the application or files."
  • AN EMAIL CLOSES THE SUBMITTAL: "Once the permit application and additional documents are uploaded, please email permits@redwoodcity.org to confirm the complete submittal." The upload alone does not register the application.
  • STATUS IS CHECKED SOMEWHERE ELSE AGAIN: "To check permit status, please visit the city eTRAKiT website". So a single project touches Box for submittal, email for confirmation and eTRAKiT for status.
  • SOLARAPP+ RUNS AS A SEPARATE AUTOMATIC ROUTE, published as "SOLARAPP+ AUTOMATIC PERMITTING" alongside the manual process.

Required documents

  • Optional
  • Optional
  • Optional
  • Optional

Fee schedule

Fee typeAmountNotes
Permit feesNOT TRANSCRIBED for this record.No fee schedule was opened and no fee basis is stated on the pages read - the Building & Code Enforcement page and the Inspections page - so none is asserted.

Sources & verification

Verified against official sources. Last reviewed 2026-09-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Redwood City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /california/san-mateo-county/redwood-city/as-of/2026-09-20/

Snapshot date: 2026-09-20

Commit: c4f8b95

Reproducible from PermitBase’s version-controlled dataset, commit c4f8b95.