Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-09-20.

Vacaville building permits

Verified

Vacaville, California — as published 2026-09-20.

Verified 2026-09-20 · Source

Codes adopted

THE DIVISION STATES ITS REMIT AGAINST TITLE 24: "The Building Division implements and enforces the State of California's Title 24 California Code of Regulations, including local amendments."THE 2025 NOTICE IS CORRECT AND WELL DATED: "On July 1, 2025, the California Standards Commission published the 2025 Triennial Edition of the California Building Standards Code (CBSC), Title 24 of the California Code of Regulations. State law mandates that local jurisdictions, such as the City of Vacaville, implement the recently adopted codes by January 1, 2026." The city adds the purpose: the updates "are intended to improve fire, life, and safety requirements for new and altered structures and to further conserve energy and reduce emissions."BUT THE ENUMERATED PART LIST BENEATH IT IS THE 2022 CYCLE, part by part, with 2023 errata attached - Administrative, Building Volumes One and Two, Residential, Electrical, Mechanical, Plumbing, Energy, Historical, Fire, Existing Building, Green Building Standards and Referenced Standards. Read on 2026-09-20 the 2025 codes have been in force for nearly nine months while the itemised list still describes the superseded cycle. Both are recorded as published; see tipsAndGotchas.PART 7 IS EXPLAINED RATHER THAN LEFT BLANK, and the explanation is useful: "PART 7 - Vacant - formerly California Elevator Safety Construction Code (see Cal. Code Regs., Title 8)". Other records in this corpus disagree about Part 7 - San Mateo lists it as vacant, Roseville and Victorville list a Wildland-Urban Interface Code as an adopted part. This record reports what Vacaville publishes and does not adjudicate between them; anyone relying on a part number should check it against the Building Standards Commission rather than against a city page.A NON-TITLE-24 CODE IS ALSO ADOPTED: the "2021 International Property Maintenance Code", listed alongside the California codes. The IPMC is a separate model code and is not part of Title 24, so its presence is a local choice rather than a state mandate.Health & Safety Code 18938(b) provides that building standards in the California Building Standards Code "shall apply to all occupancies throughout the state and shall become effective 180 days after publication."

Permit types & fees

Building Permit

Verified

Vacaville works a nine-day fortnight with four overlapping schedules, and runs eTRAKiT across two different hosts after launching newer permitting software.

Verified 2026-09-20 · Source

Requirements

  • THE DIVISION'S SCOPE: "The City of Vacaville's Building Division reviews and inspects all new construction and improvements to existing structures within City limits."
  • THE SOFTWARE CHANGED RECENTLY AND THE CITY DESCRIBES WHAT IT BOUGHT: "Recently, the Building Division launched an improved permitting software allowing the City to respond more efficiently to the public's needs by offering an expanded list of online permit applications, online payment options, electronic plan reviews, and transparent permit information."
  • APPOINTMENTS ARE ENCOURAGED BUT NOT REQUIRED: "We encourage you to call and schedule an appointment to speak with staff. Walk-ins are welcome and will be assisted between appointments." That is a softer rule than Carlsbad's or Richmond's, where a new submittal needs an appointment outright.
  • PAYMENTS RUN LATER THAN THE COUNTER'S MIDDAY BREAK SUGGESTS: "Permit applications and payments accepted until 5:00 PM every day".

Required documents

  • Optional
  • Optional
  • Optional

Fee schedule

Fee typeAmountNotes
Permit feesNOT TRANSCRIBED for this record.Published under Building Forms & Fees and a Permit Fees section; neither was opened, and no fee basis is stated on the pages read, so none is asserted. Online payment is one of the capabilities the city names for its newer permitting software.
Development impact feesPublished as a 2022 schedule.The city lists "2022 Development Impact Fees" alongside a "1992 Development Impact Fee Study". Read on 2026-09-20 the operative schedule is four years old by its own label and the study behind it is thirty-four; neither was opened for this record.

Sources & verification

Verified against official sources. Last reviewed 2026-09-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Vacaville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /california/solano-county/vacaville/as-of/2026-09-20/

Snapshot date: 2026-09-20

Commit: 14ac60e

Reproducible from PermitBase’s version-controlled dataset, commit 14ac60e.