Westminster building permits
VerifiedWestminster, Colorado — as published 2026-08-14.
Verified 2026-06-30 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for all new single-family attached or detached dwellings in Westminster. Reviewed against the 2021 IRC and 2021 IECC with Westminster amendments, plus the City's Design Criteria for Structures (wind, snow, seismic). Applications are submitted entirely online via eTRAKiT.
Verified 2026-06-30 · Source
Requirements
- Complete permit application via eTRAKiT for 'RESIDENTIAL NEW – Single Family Attached OR Detached'
- Plot/site plan stamped by a Colorado licensed professional engineer or land surveyor, per the Residential Lot Survey Program
- Site-specific foundation plans stamped and signed by a registered Colorado Professional Engineer
- Site-specific soils report signed and sealed by a Colorado Licensed Professional Engineer
- Architectural plans: floor plans, framing plans, building sections, and construction details (hold-downs, shear walls, flashing)
- Structural plans (if deviating from 2021 IRC prescriptive provisions) meeting the City's Design Criteria for Structures (30 psf snow load, Seismic Design Category B, City Map Wind Zone speed, 36-inch frost depth) and the Colorado Model Electric and Solar Ready Code's future-solar provisions
- Energy plans showing the proposed 2021 IECC compliance path plus Colorado Model Electric and Solar Ready provisions
- Electrical plans showing all interior/exterior lighting, receptacles, and equipment, including Electric/Solar Ready code items
- Fire sprinkler plans (separate permit from the Westminster Fire Department for NFPA 13D/13R systems; deferred submittals not accepted)
- Truss designs uploaded to eTRAKiT for staff review (a paper copy must also be provided to field inspectors on site)
Required documents
- RequiredBuilding Permit Application (eTRAKiT)Online application submitted through the City's eTRAKiT permitting portal
- RequiredNew Residential Plan Submittal RequirementsCity of Westminster checklist for new single-family attached or detached construction
- RequiredPlot/Site Plan (Residential Lot Survey Program)Stamped by a Colorado licensed PE or land surveyor
- RequiredFoundation Plans and Soils ReportSite-specific, stamped/signed/sealed by a Colorado Licensed Professional Engineer
- RequiredEnergy Compliance Documents2021 IECC compliance path documentation including envelope, Manual J/S/D, and Colorado Model Electric and Solar Ready Provisions
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1 to $500 | $19.50 | City of Westminster Building Division Fee Schedule, effective January 1, 2026 |
| Building Permit Fee — valuation $501 to $2,000 | $19.50 for the first $500 plus $2.65 for each additional $100 or fraction thereof | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — Total Valuation fee table, $501 to $2,000 row |
| Building Permit Fee — valuation $2,001 to $25,000 | $59.25 for the first $2,000 plus $11.90 for each additional $1,000 or fraction thereof | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — Total Valuation fee table, $2,001 to $25,000 row |
| Building Permit Fee — valuation $25,001 to $50,000 | $332.95 for the first $25,000 plus $8.55 for each additional $1,000 or fraction thereof | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — Total Valuation fee table, $25,001 to $50,000 row |
| Building Permit Fee — valuation $50,001 to $100,000 | $546.70 for the first $50,000 plus $5.95 for each additional $1,000 or fraction thereof | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — Total Valuation fee table, $50,001 to $100,000 row |
| Building Permit Fee — valuation $100,001 to $500,000 | $844.20 for the first $100,000 plus $4.60 for each additional $1,000 or fraction thereof | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — Total Valuation fee table, $100,001 to $500,000 row |
| Building Permit Fee — valuation $500,001 to $1,000,000 | $2,684.20 for the first $500,000 plus $3.95 for each additional $1,000 or fraction thereof | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — Total Valuation fee table, $500,001 to 1,000,000 row |
| Building Permit Fee — valuation $1,000,001 and up | $4,659.20 for the first $1,000,000 plus $2.65 for each additional $1,000 or fraction thereof | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — Total Valuation fee table, final row, printed as "$1,000,0001 and up" (a published typo for $1,000,001; the preceding tier runs to and including $1,000,000) |
| Plan Review Fee | 65% of the Building Permit Fee | City of Westminster Building Division Fee Schedule (effective Jan 1, 2026) |
| Permit Trade Fees (mechanical, plumbing, electric) | An additional 15% of the Building Permit Fee for each trade involved, plus 15% of the Plan Review Fee for each trade | Westminster issues one project permit rather than separate trade permits; trade work is billed as a percentage add-on |
| Estimated Use Tax | 4.25% of 50% of Total Valuation | Effective January 1, 2026 |
Residential Addition / Remodel Permit
VerifiedRequired for room additions, basement finishes, remodels, and structural alterations to existing one- and two-family dwellings in Westminster. Uses the same valuation-based fee schedule as new residential construction.
Verified 2026-06-30 · Source
Requirements
- Room additions, attached/detached garages, and accessory buildings larger than 120 sq ft require a permit
- Basement finishes and remodels involving modifications to electrical, plumbing, mechanical, and/or structural systems require a permit
- Installation of additional windows or doors, or a change in window/door size, requires a permit
- Electric-to-gas conversions require a permit
- Plans must show scope, dimensions, structural details, and connection to the existing structure
- Structural work must meet the City's Design Criteria for Structures (30 psf snow, Seismic Design Category B, City Map Wind Zone speed)
Required documents
- RequiredBuilding Permit Application (eTRAKiT)Online application; select the applicable remodel/addition permit type
- RequiredSite PlanProperty lines, existing structures, proposed addition footprint, setbacks
- RequiredConstruction DrawingsPlans showing the addition/remodel scope, including structural details if structural work is involved
- RequiredResidential Additions Plan Submittal RequirementsCity of Westminster's current checklist for addition and remodel submittals
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (same tiers as new construction) | Varies by valuation — see Residential Building Permit fee tiers ($19.50 minimum, up to $4,659.20 + $2.65/$1,000 over $1M) | City of Westminster Building Division Fee Schedule, effective January 1, 2026 |
| Plan Review Fee | 65% of the Building Permit Fee | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — "Plan Review Fee: 65% of Building Permit Fee" |
| Permit Trade Fees (mechanical, plumbing, electric) | An additional 15% of the Building Permit Fee, plus 15% of the Plan Review Fee, for each trade involved | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — "Permit trade fees: An additional 15% of the permit fee for each of the following; Show full citationHideCity of Westminster Building Division Fee Schedule, effective January 1, 2026 — "Permit trade fees: An additional 15% of the permit fee for each of the following; mechanical, plumbing, electric" and "Plan review trade fees: An additional 15% of the plan review fee for each of the following; mechanical, plumbing, electric" |
| Estimated Use Tax | 4.25% of 50% of Total Valuation | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — "Estimated Use Tax: 4.25% of 50% of Total Valuation (effective 1/1/2026)" |
Electrical Permit
VerifiedRequired for installation of new or altered electrical service equipment, feeders, branch circuits, and interconnected power sources in Westminster. The City of Westminster's Building Division issues and administers electrical permits as part of its single project-permit model — Westminster does NOT route permit issuance through the Colorado DORA Electrical Board, though contractors must hold the underlying state Electrical Contractor/Master Electrician license as a prerequisite to the City's own Class C Electrical Contractor license.
Verified 2026-06-30 · Source
Requirements
- Installation of new or altered electrical service equipment, including service entrance, feeder, or branch circuit conductors (permit required city-wide)
- Interconnected electric power production sources (generators, solar/photovoltaic, wind, fuel cell systems) require a permit
- Underground electric over 50 volts for landscaping requires a permit
- Electrical contractors must hold a City of Westminster Class C Electrical Contractor license (no charge) — issuance requires providing copies of the electrician's Colorado state master's license AND state contractor's license
- Beginning May 1, 2026: Electrical subcontractors must be registered with the City and signed onto the permit prior to permit release
Required documents
- RequiredBuilding/Electrical Permit Application (eTRAKiT)Westminster issues a single project permit; electrical scope is entered on the same application with the applicable trade fee
- RequiredContractor License ApplicationCity of Westminster Class C Electrical Contractor license application; requires copies of the state master's and state contractor's licenses
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Trade Fee — Electric | An additional 15% of the Building Permit Fee, plus 15% of the Plan Review Fee | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — 'Permit trade fees: An additional 15% of the permit fee for each of the following: mechanical, plumbing, electric' |
| Contractor License — Class C Electrical Contractor | No charge | Requires copies of Colorado state master's license and state contractor's license; City of Westminster Contractor License Application (Revised October 9, 2025) |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Westminster, including underground repair/replacement of sewer and water lines. The City of Westminster's Building Division issues plumbing permits itself; contractors must hold the underlying Colorado state DORA Plumbing license as a prerequisite to the City's Class B Plumbing Contractor license.
Verified 2026-06-30 · Source
Requirements
- Underground repair/replacement of sewer/water lines requires a permit
- Relocating plumbing fixtures requires a permit (replacing fixtures in place does not)
- Whole house water softener system installation requires a permit
- Plumbing contractors must hold a City of Westminster Class B Plumbing Contractor license ($110) — issuance requires copies of the state master's and state contractor's license
- Beginning May 1, 2026: Plumbing subcontractors must be registered with the City and signed onto the permit prior to permit release
Required documents
- RequiredBuilding/Plumbing Permit Application (eTRAKiT)Westminster issues a single project permit; plumbing scope is entered on the same application with the applicable trade fee
- RequiredContractor License ApplicationCity of Westminster Class B Plumbing Contractor license application ($110); requires copies of the state master's and state contractor's licenses
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Trade Fee — Plumbing | An additional 15% of the Building Permit Fee, plus 15% of the Plan Review Fee | City of Westminster Building Division Fee Schedule, effective January 1, 2026 |
| Water Heater Replacement (Miscellaneous SFD Residential Permit) | $40.00 | City of Westminster Building Division Fee Schedule — Miscellaneous SFD Residential Permit Fees section |
| Contractor License — Class B Plumbing Contractor | $110.00 | Requires copies of Colorado state master's license and state contractor's license; City of Westminster Contractor License Application (Revised October 9, 2025) |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, ventilation, and gas-fired equipment installations in Westminster, including furnaces, boilers, water heaters, evaporative coolers, and air conditioners. Governed by the 2021 IMC and 2021 IFGC with Westminster amendments.
Verified 2026-06-30 · Source
Requirements
- Installation or replacement of HVAC equipment, including boilers, water heaters, furnaces, and tankless water heaters requires a permit
- Evaporative (swamp) cooler installation or replacement requires a permit
- Air conditioner installation or replacement requires a permit
- Gas logs and gas lines require a permit; fireplace/inserts (wood, pellet, or gas) require a permit
- Gas pipe plan required for any gas line work, or when a replacement appliance's input BTU/hr exceeds the appliance being replaced — must show meter delivery pressure (6" W.C., 12" W.C., or 2 psi per Xcel Energy) and a system drawing
- Gas pipe sizing follows Appendix AA of the 2021 IRC or Appendix A of the 2021 IFGC; conversion uses 831 BTU/hr per CFH for Westminster (per Xcel Energy); no altitude derate factor is used under the current 2021 I-Codes
Required documents
- RequiredBuilding/Mechanical Permit Application (eTRAKiT)Westminster issues a single project permit; mechanical scope is entered on the same application with the applicable trade fee
- OptionalGas Pipe Plan Submittal RequirementsRequired for any gas line work or appliance replacement with higher BTU/hr input than the unit being replaced
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Trade Fee — Mechanical | An additional 15% of the Building Permit Fee, plus 15% of the Plan Review Fee | City of Westminster Building Division Fee Schedule, effective January 1, 2026 |
| Furnace Replacement (Miscellaneous SFD Residential Permit) | $60.00 | May also require an electrical permit fee |
| Air Conditioner (Miscellaneous SFD Residential Permit) | $80.00 | May also require an electrical permit fee |
| Evaporative Cooler (Miscellaneous SFD Residential Permit) | $60.00 | May also require an electrical permit fee |
| Gas Log (Miscellaneous SFD Residential Permit) | $60.00 | See WMC Section 11-9-3(E)(2) for exceptions |
Roofing Permit (Reroof)
VerifiedRequired for roof replacement in Westminster whenever cumulative roof covering damage exceeds one square (100 sq ft), per the Residential Re-roofing Guide based on the 2021 IRC with Westminster amendments. Minor repairs of 100 sq ft or less do not require a permit.
Verified 2026-07-05 · Source
Requirements
- Full roof replacement required when cumulative damage exceeds one square (100 sq ft) — replacement must be of the entire roof covering
- Apply for a Residential Counter Type permit via eTRAKiT; provide total valuation including labor and material
- HOA written permission (if required) must be uploaded to the permit prior to final inspection
- Engineer's letter required when replacing existing metal or asphalt roofing with new concrete/clay tile roofing, or when replacing tile with heavier tile — verifying the structure meets current code and Design Criteria
- If solar is existing, an additional permit is required for removal and reinstallation of the solar system
- Westminster is in a Special Wind Region — high wind nailing per manufacturer instructions is required for all asphalt shingle installations
- Asphalt shingles must comply with 2021 IRC Section R905.2.4, tested to ASTM D 7158, with wind classification appropriate to the ultimate design wind speed for the parcel's City Map Wind Zone
- Minor roofing repair of 100 sq ft (one square) or less does NOT require a permit
Required documents
- RequiredRoofing Permit Application (eTRAKiT, Residential Counter Type)Online application through eTRAKiT
- RequiredResidential Re-roofing GuideCity of Westminster's submittal and inspection guide based on the 2021 IRC as amended
- OptionalEngineer's LetterRequired only when changing roofing material type/weight (e.g., asphalt/metal to concrete/clay tile)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roofing (Miscellaneous SFD Residential Permit) | $100.00 | City of Westminster Building Division Fee Schedule V3 2026, effective January 1, 2026 — the "Miscellaneous SFD Residential Permit Fees" table lists Re-Roofing at $100.00, with no footnote asterisk on that line item. Show full citationHideCity of Westminster Building Division Fee Schedule V3 2026, effective January 1, 2026 — the "Miscellaneous SFD Residential Permit Fees" table lists Re-Roofing at $100.00, with no footnote asterisk on that line item. This two-column table does not copy and paste cleanly: a copy-paste misaligns the columns and reports this row as a figure belonging to a neighbouring row. Read it from the page as published. |
Solar PV Permit
VerifiedRequired for interconnected electric power production sources including rooftop or ground-mounted solar/photovoltaic systems in Westminster. Processed as a Miscellaneous Permit with a flat fee, subject to the Colorado Model Electric Ready and Solar Ready Code amendments (WMC 11-9-12).
Verified 2026-06-30 · Source
Requirements
- Interconnected electric power production sources (generators, solar/photovoltaic, wind, fuel cell systems) require a permit in all areas
- Plans must show compliance with the Colorado Model Electric and Solar Ready Provisions (WMC 11-9-12)
- Structural verification that the roof can support the panel/racking load per the City's Design Criteria for Structures (30 psf snow load, City Map Wind Zone wind speed, Seismic Design Category B)
- Electrical single-line diagram and load calculations required
- A licensed electrical contractor holding a City of Westminster Class C Electrical Contractor license must be signed onto the permit
Required documents
- RequiredSolar Permit Application (eTRAKiT)Apply as a Solar Systems permit via the eTRAKiT portal
- RequiredElectrical PlanSingle-line diagram, load calculations, equipment location including disconnect
- RequiredStructural/Racking DetailsRoof attachment and load verification per Design Criteria for Structures
- RequiredEquipment SpecificationsManufacturer spec sheets for panels, inverter, racking, and battery storage if applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Systems (Miscellaneous Permit Fee) | $300.00 | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — Miscellaneous Permit Fees section |
Electric Vehicle Charger Permit
VerifiedRequired for installation of Level 1, Level 2, or Level 3 (DC fast) electric vehicle charging equipment in Westminster. Applied for as a dedicated 'ELECTRIC VEHICLE CHARGER' permit type in eTRAKiT with submittal requirements that scale by charger level; billed through the City's standard valuation-based building permit fee schedule plus the electric trade fee add-on rather than a separate flat EV-specific fee (Westminster's fee schedule has no distinct EV-charger line item, unlike its flat $300 Solar Systems fee).
Verified 2026-07-20 · Source
Requirements
- Complete the permit application via eTRAKiT selecting permit type 'ELECTRIC VEHICLE CHARGER'
- Level 1 chargers: site plan or floor plan showing the location of the new electrical receptacle outlet(s)
- Level 2 chargers (residential): site plan or floor plan showing charging equipment location, plus load calculations for the entire residence and a one-line diagram
- Level 2 chargers (commercial): site plan showing charging equipment location, plus load calculations for the entire service and a one-line diagram
- Level 3 (DC fast) chargers: applicant must contact the Planning Department to initiate an Official Development Plan (ODP) amendment, in addition to a site plan and load calculations/one-line diagram for the entire service of connection
- Level 3 chargers taller than 6 feet require structural engineering for the foundation, with plans and calculations prepared and stamped by a Colorado licensed professional engineer
- A licensed electrical contractor holding a City of Westminster Class C Electrical Contractor license must be signed onto the permit
Required documents
- RequiredElectric Vehicle Charger Permit Application (eTRAKiT)Online application through eTRAKiT, permit type 'ELECTRIC VEHICLE CHARGER'
- RequiredElectric Vehicle Charger Permit Submittal RequirementsCity of Westminster checklist specifying required documentation by charger level (1, 2, or 3)
- RequiredOne-Line Diagram and Load CalculationsRequired for all Level 2 and Level 3 installations, covering the entire residence/service as applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (no distinct EV-charger fee line published) | Per the standard Total Valuation fee table (same tiers as other building permits); minimum $19.50 | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — the Miscellaneous Permit Fees and Miscellaneous SFD Residential Permit Fees tables do not list an EV charger line item… Show full citationHideCity of Westminster Building Division Fee Schedule, effective January 1, 2026 — the Miscellaneous Permit Fees and Miscellaneous SFD Residential Permit Fees tables do not list an EV charger line item (unlike Solar Systems, which has its own flat $300 fee), so EV charger installations are billed under the general valuation-based fee schedule |
| Permit Trade Fee — Electric | An additional 15% of the Building Permit Fee, plus 15% of the Plan Review Fee | Same mechanism used for all electrical scope in Westminster's single project-permit model |
Accessory Dwelling Unit (ADU) Permit
VerifiedRequired for construction of a new attached or detached ADU on a single-family detached lot in Westminster. City Council newly authorized ADUs citywide on November 18, 2024, effective January 1, 2025 — the same codes that apply to residential construction (2021 IRC, Fire, utility connections) apply to ADUs.
Verified 2026-06-30 · Source
Requirements
- 1 ADU allowed per primary dwelling unit on the same lot
- Permitted in any zone that allows single-family detached dwelling units as a use
- ADU may be located within the principal dwelling (e.g., basement/attic with private entrance), attached as an addition, or as a separate detached building on the same lot
- Must be on a permanent foundation; all codes applicable to residential construction apply, including the IRC and Fire Code (including fire sprinklers where required)
- Full kitchen facilities and a full bathroom are required
- Principal dwelling must have a Certificate of Occupancy; the ADU requires its own separate Certificate of Occupancy
- ADU must have its own address (assigned during the review process); apply for the permit under the principal dwelling's address
- Minimum size: 190 sq ft. Maximum size: 1,200 sq ft or 50% of the principal dwelling's gross floor area, whichever is less (up to 750 sq ft allowed where the principal dwelling is under 1,500 sq ft; ADU may never be larger than the principal dwelling)
- Setbacks: front and side match the principal dwelling's required setbacks; rear setback is the greater of the accessory-structure setback or 5 feet; ADUs may not be built over an easement
- Engineered plans prepared by a licensed professional, drawn to scale and specific to the property, are required
- No City-imposed restriction on ADU rental rates
Required documents
- RequiredBuilding Permit Application (eTRAKiT)Apply under the principal dwelling unit's address; ADU permits follow the standard residential permit process
- RequiredAccessory Dwelling Unit Info Sheet (Rev. 5, March 10, 2026)City of Westminster's current ADU provisions guide: allowance, size, setbacks, design, address, fees
- RequiredEngineered Construction PlansPrepared by a licensed professional, drawn to scale, specific to the property, meeting the 2021 IRC and Design Criteria for Structures
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (same tiers as new construction) | Varies by valuation — see Residential Building Permit fee tiers | ADU Info Sheet (Rev. 5): 'Building Permit fees, as determined by Building' |
| Plan Review Fee | 65% of the Building Permit Fee | ADU Info Sheet: 'Building Review fees, as determined by Building' |
| Use Tax | 4.25% of 50% of Total Valuation | ADU Info Sheet: 'Use Tax fees, as determined by Building' |
| Utility Tap Fees | Varies — determined by Westminster Public Works and Utilities (PWU) | ADU Info Sheet: 'Utility tap fees apply, as determined by PWU' — the Info Sheet explicitly states this is not an exhaustive fee list and other development/impact fees may apply; confirm exact tap fee at application via the Water Tap and Sewer Fees page |
Demolition Permit
VerifiedRequired for demolition of structures in Westminster. Processed as a flat-fee Miscellaneous Permit.
Verified 2026-07-01 · Source
Requirements
- Demolition permit required for structure removal
- Utility disconnects (gas, electric, water, sewer) must be verified or arranged prior to demolition
- Apply via eTRAKiT
Required documents
- RequiredDemolition Permit Application (eTRAKiT)Online application through eTRAKiT
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit (Miscellaneous Permit Fee) | $25.00 | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — Miscellaneous Permit Fees section |
Commercial Tenant Improvement Permit
VerifiedRequired for interior remodels, additions, and tenant improvements in commercial buildings in Westminster. Reviewed against the 2021 IBC, IFC, IPC, IMC, IFGC, and IECC plus the 2023 NEC and ICC/ANSI A117.1-2017 accessibility standard, all with Westminster amendments. Submitted digitally via eTRAKiT with a published SLA.
Verified 2026-06-30 · Source
Requirements
- Properly completed online building permit application via eTRAKiT; incomplete applications are not accepted
- Scalable architectural site plan showing accessible routes, parking, curb ramps, and other ICC/ANSI A117.1-2017 compliance details
- Exterior elevations depicting all exposed mechanical/electrical equipment, meters, and gas lines, with screening methods per Planning Division review
- Digitally submitted plans must be signed and sealed by the design professional of record
- Site-specific soils report including foundation recommendations
- A licensed contractor must be signed onto the permit prior to issuance (design professionals may apply, but a licensed contractor must be added before issuance)
- Commercial building permit review timeline: 30 business days for initial review, 15 business days for subsequent reviews (published City SLA)
Required documents
- RequiredCommercial Building Permit Application (eTRAKiT)Online application through the City's eTRAKiT system
- RequiredCommercial Plan Review Submittal GuidelinesCity of Westminster's current commercial submittal checklist, listing all applicable design codes and editions
- RequiredFull Construction Drawing SetArchitectural, structural, mechanical, plumbing, electrical plans as applicable, digitally signed/sealed
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (same Table 1 as residential) | Per the City of Westminster Building Division Fee Schedule valuation tiers | Fee Schedule, effective January 1, 2026; commercial valuation includes labor, materials, and all trade work |
| Plan Review Fee | 65% of the Building Permit Fee | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — "Plan Review Fee: 65% of Building Permit Fee" |
| Permit Trade Fees (mechanical, plumbing, electric) | An additional 15% of the Building Permit Fee, plus 15% of the Plan Review Fee, for each trade involved | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — "Permit trade fees: An additional 15% of the permit fee for each of the following; Show full citationHideCity of Westminster Building Division Fee Schedule, effective January 1, 2026 — "Permit trade fees: An additional 15% of the permit fee for each of the following; mechanical, plumbing, electric" and "Plan review trade fees: An additional 15% of the plan review fee for each of the following; mechanical, plumbing, electric" |
| Estimated Use Tax | 4.25% of 50% of Total Valuation | City of Westminster Building Division Fee Schedule, effective January 1, 2026 — "Estimated Use Tax: 4.25% of 50% of Total Valuation (effective 1/1/2026)" |
Deck / Covered Patio Permit
VerifiedRequired for decks over 30 inches above grade, any deck with an attached roof, patio covers, awnings, and carports in Westminster. Decks 30 inches or less above grade with no roof do not require a permit.
Verified 2026-06-30 · Source
Requirements
- Decks over 30 inches above ground level require a permit
- Any deck with an attached roof requires a permit regardless of height
- Patio covers, non-retractable awnings, and carports require a permit
- Decks not more than 30 inches above ground (uncovered) do NOT require a permit — but Planning approval may still be required; contact the Planning Division at 303-658-2092 before proceeding
- Retaining walls greater than 3 feet, or with surcharge, require a permit (walls 36 inches or less with no surcharge do not)
Required documents
- RequiredBuilding Permit Application (eTRAKiT)Online application; select the applicable deck/patio cover permit type
- OptionalDeck GuideCity of Westminster's current deck submittal and construction guide
- OptionalPatio Cover and Carports GuideCity of Westminster's current patio cover/carport submittal guide
- RequiredSite PlanProperty lines, existing structures, proposed deck/patio footprint and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (same tiers as new construction) | Varies by valuation — see Residential Building Permit fee tiers | Westminster does not publish a separate flat deck/patio fee; decks over 30in and all covered structures use the standard valuation-based fee table |
| Plan Review Fee | 65% of the Building Permit Fee | City of Westminster Building Division Fee Schedule, effective 1 January 2026, Other Fees table — plan review fee at 65% of the building permit fee. The deck and patio-cover guides this permit type cites are model handouts and carry no fee figures. |
Sign Permit
VerifiedRequired for most permanent signs erected in Westminster — including wall/building signs, monument signs, and post signs — under the Westminster Sign Regulations (WMC Title XI, Chapter 11, enacted by Ord. No. 4053, effective 12-21-2020). Applications are filed with the Community Services Department; sign permits are separate from, and may be required in addition to, a building permit.
Verified 2026-08-14 · Source
Requirements
- It is unlawful to erect, maintain, or permit the erection or maintenance of any sign without first obtaining a sign permit, except for sign types specifically exempted (WMC 11-11-13(A)(1))
- Exempt from permit/the Chapter entirely: signs entirely inside a building and not visible from outside; required public notices/warning signs and street addresses ≤4 sq ft; a sign carried/worn by a person; most vehicle signs; public signs; up to five temporary signs/banners of 6 sq ft or less per 100 ft of frontage (plus one additional 6-sq-ft sign per additional 20 ft of frontage); bumper stickers (WMC 11-11-4(B))
- Monument signs: permit required in all seven Sign Code categories (RLI, RMI, OTC, COM, MSP, ERD, IFA); max sign area ranges from 32 sq ft (RLI) up to 60-150 sq ft in other categories depending on lot/development acreage; max height 6-25 ft depending on sign area; front setback 10-25 ft depending on height/area (WMC Table 11-11-9-1)
- Wall/building (attached) and post signs are likewise subject to permit and dimensional standards under WMC 11-11-9 through 11-11-10, which vary by Sign Code category
- Signs and sign structures must comply with the Building Code (WMC Title 11, Chapter 9); a separate building permit may also be required even where a sign permit is not (WMC 11-11-6(A))
- An engineer's stamp is required for any freestanding sign exceeding 6 feet in height (WMC 11-11-13(A)(2)(a)(v))
- A new sign permit is required before moving an existing sign to a new location or altering it (height, size, shape, construction material, or lighting) other than for normal maintenance (WMC 11-11-13(B))
- Digital signs are permitted only in the OTC, COM, MSP, and ERD categories and must meet brightness, hold-time, and technical standards in WMC 11-11-7(B)
- Billboards, pole signs, and snipe signs are prohibited citywide (WMC 11-11-5)
- The Commercial Plan Review Submittal Guidelines confirm that exterior signage requires a separate permit from the building permit, and its valuation should not be included in the building permit's project valuation
Required documents
- RequiredSign Permit Application (eTRAKiT)Filed with the Community Services Department via the City's eTRAKiT portal
- RequiredScaled Sign ElevationDrawing to scale of the proposed sign, showing proposed copy if desired
- RequiredMaterials/Finish DescriptionColor, finish, and construction materials of the sign and sign structure
- RequiredPlot PlanShows the location of the sign on the property; for attached signs, must show the building facade outline, doors, windows, and architectural features
- RequiredSign Inventory / MeasurementsAll measurements including area, total number of signs requested, and a table of existing signs to remain with heights and locations
- OptionalEngineer's StampRequired only for freestanding signs exceeding 6 feet in height
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Monument Sign | Per Fee Schedule | Billed under the City's general valuation-based Building Division Fee Schedule (effective January 1, 2026) rather than a separate flat sign fee |
| Sign (Wall/Building) | Per Fee Schedule - No Use Tax | Billed under the same general valuation-based fee schedule as monument signs, but explicitly excluded from the construction materials use tax, per the City's Building Division Fee Schedule (V3-2026) |
Fire Sprinkler & Fire Alarm Permit
VerifiedSeparate permits issued by the Westminster Fire Department Fire Prevention Bureau for new fire sprinkler systems (NFPA 13, 13R, 13D — 2019 edition) and fire alarm systems (NFPA 72 — 2019 edition) and their modifications, under the City's adopted 2021 International Fire Code with local amendments. Required before the City's Building Department will issue the associated building permit; deferred submittals are not accepted.
Verified 2026-08-14 · Source
Requirements
- The City of Westminster does not allow deferred fire permits — all required fire system permits must be approved before the Building Department will issue a building permit; the Building Division has also confirmed fire suppression and fire alarm permits are no longer accepted as deferred submittals
- Fire sprinkler plans must be reviewed and sealed by at least a NICET III (Water Based Systems) Technician or a Colorado-registered Professional Engineer; fire alarm plans require at least a NICET III (Fire Alarm) Technician or Colorado PE
- Fire sprinkler drawings must include all relevant items from NFPA 13-2019 §27.1.3 and/or NFPA 13R-2019 §8.1.7; fire alarm plans must contain all relevant items from NFPA 72-2019, Chapter 7
- A 10% safety factor (from static/residual pressure) is required for NFPA 13 and 13R systems; a 5% safety factor is required for NFPA 13D systems, per IFC (2021) 903.3.1.3 as amended by the City
- A separate fire permit is required for the underground fire line for NFPA 13 and 13R systems, in addition to the sprinkler system permit itself
- A scope-of-work letter may be submitted in lieu of full shop drawings for qualifying modifications to existing systems (sprinkler: ≤20 heads impacted; alarm: ≤10 devices impacted), each subject to detailed eligibility criteria and required to be stamped by a NICET III technician or Colorado PE
- Permanent, weatherproof FDC/FACP/Fire Sprinkler Riser Room identification signage is required: white letters on a red background, minimum 4-inch-tall letters with a 1/2-inch stroke, per City amendment to IFC 509.1
- City of Westminster IFC amendments apply, including 901.4.7.5 (sprinkler riser/pump rooms at grade, accessible from outside), 903.1.2 (anti-freeze systems must be listed), 903.3.2.1 (residential sprinkler heads prohibited in light-hazard occupancies), and 905.3.1/905.3.9 standpipe exceptions
- Expedited (48-hour, Monday-Friday) review is available based on current workload, at a fee of two times the standard plan review fee
- A hydro test is required for all fire sprinkler modifications exceeding 20 heads or any brand-new system installation, at the discretion of the AHJ
Required documents
- RequiredFire Sprinkler / Fire Alarm Permit Application (eTRAKiT)Submitted electronically through the City's eTRAKiT portal to the Westminster Fire Department Fire Prevention Bureau
- RequiredStamped Shop DrawingsFull system shop drawings sealed by a NICET III technician (Water Based Systems for sprinkler; Fire Alarm Engineering for alarm) or a Colorado-registered PE
- RequiredProduct Data SheetsData sheets for all system components (FACP, batteries, detectors, sprinkler heads, valves, etc.), with model numbers highlighted
- RequiredRecord of Completion / Contractor's Material and Test CertificateFire alarm record of completion (NFPA 72) or sprinkler contractor's material and test certificate for above-ground piping, uploaded prior to final inspection
- OptionalScope of Work LetterAlternative to full shop drawings for qualifying modifications to existing systems; must be stamped by a NICET III technician or Colorado PE and meet detailed eligibility criteria
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Department Construction Permits (sprinkler/alarm systems) | Per Fee Schedule | Assessed under the same valuation-based Building Division Fee Schedule used for building permits generally, per the City's Fees page ('Construction permits: Based on valuation and assessed in accordance with the building permit fee schedule') and Fee Schedule PDF (V3-2026) |
| Fire Department Operational Permits, per event | $100.00 | Applies to operational (not construction) fire permits; City of Westminster Fee Schedule / Fees page |
| Expedited Plan Review | 2x the standard plan review fee | Optional 48-hour (Mon-Fri) expedited review, subject to current Fire Prevention Bureau workload |
Change of Use / Change of Occupancy Permit
VerifiedRequired whenever a building's use or occupancy classification changes in Westminster, governed by the City's adopted 2021 International Existing Building Code (WMC 11-9-1(9)). The Building Division must confirm a proposed occupancy type is allowed in the existing building, and the Fire Department separately reviews the change for fire code compliance. If no structural changes or improvements are made to the site, an Official Development Plan (ODP) is not required (WMC 11-5-5(B)(3)), but Building Division and Fire Department review still applies.
Verified 2026-08-14 · Source
Requirements
- The City's adopted 2021 International Existing Building Code (WMC 11-9-1(9)) governs 'the repair, alteration, change of occupancy, addition to and relocation of existing buildings' — adopted by Ord. No. 3908 (11-27-2017), amended by Ord. No. 4241 (3-25-2024)
- WMC 11-5-5(B)(3) exempts 'a change of use or occupancy, if there are no changes or improvements to any structure on the site and all other provisions of this Code are met' from the Official Development Plan (ODP) requirement otherwise imposed on development
- Before signing a lease or purchasing a site, the Building Division should be contacted to confirm the proposed occupancy type is allowed in the existing building without major renovation; the Planning Division should separately be contacted for zoning approval
- The Fire Department reviews changes of occupancy — applying to new and existing buildings, tenant improvements, and residential uses — for fire code compliance and the use, modification, or addition of required fire protection systems; a licensing inspection may be scheduled if concerns arise
- If the change of occupancy involves any structural changes or improvements, the standard building permit / tenant finish process applies, including a full occupancy code analysis (occupancy type, construction type, allowable/actual floor area, occupant load per IBC Table 1004.5) as required by the Commercial Plan Review Submittal Guidelines
- A new or updated Certificate of Occupancy is issued once Building Division and Fire Department review is complete
Required documents
- OptionalBuilding Permit Application (eTRAKiT)Required if the change of occupancy involves any construction, alteration, or improvement to the structure
- OptionalOccupancy Code AnalysisDesigner's code analysis specifying occupancy type, construction type, allowable/actual floor area, and occupant load per IBC Table 1004.5, required for projects involving construction
- RequiredZoning VerificationConfirmation from the Planning Division that the proposed use is allowed at the site under current zoning, prior to lease signing or permit submittal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Certificate of Occupancy (copy of previously issued) | $5.00 each | City of Westminster Building Division Fee Schedule, effective January 1, 2026 |
| Temporary Certificate of Occupancy | 5% of Building Permit Fee, not less than $100.00 | City of Westminster Building Division Fee Schedule, effective January 1, 2026 |
| Building Permit Fee (if structural work/improvements are involved) | Valuation-based, per the general Building Division Fee Schedule | Applies only where the change of occupancy includes construction, alteration, or improvement to the structure; no separate flat 'change of use' fee is published for occupancy-only changes with no structural work |
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Westminster building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.