This is PermitBase’s published record for Alamosa as of 2026-08-02. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Alamosa building permits

Verified

Alamosa, Colorado — as published 2026-08-02.

Verified 2026-07-06 · Source

Codes adopted

2018 International Building Code (IBC) — City of Alamosa Building Department page (alamosa.gov/building-department)2018 International Residential Code (IRC)2018 International Mechanical Code (IMC)2018 International Energy Conservation Code (IECC)2018 International Fire Code (IFC)2018 International Property Maintenance Code (IPMC)2018 International Existing Building Code (IEBC)2009 ICC/ANSI A117.1 Accessible and Usable Buildings and Facilities (ICCA 2009)2023 National Electrical Code (NEC) — State of Colorado adopted edition, enforced by the state (not the City) per the City's own Building Department page2021 International Plumbing Code (IPC) — State of Colorado adopted edition, enforced by the state (not the City)2021 International Fuel Gas Code (IFGC) — State of Colorado adopted edition, enforced by the state (not the City)Local design criteria published alongside the adopted codes: Ground Snow Load 30 psf; Wind Design Speed 115/89 mph; Frost Line Depth 36 inches (ice) / 32 inches (damage); Seismic Design Category C; Winter Design Temperature -16°F; Air Freezing Index 3000; Mean Annual Temperature 45°F; Ice Barrier Underlayment required

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for construction of new single-family homes and other one- and two-family dwellings within City of Alamosa limits. Reviewed under the 2018 IRC/IBC as locally adopted, plus the City's own structural design criteria (snow, wind, frost depth, seismic). Issued by the City of Alamosa Building Department; electrical and plumbing work on the project is permitted and inspected separately by the State of Colorado, not the City.

Verified 2026-07-06 · Source

Requirements

  • Plans must comply with the 2018 IRC/IBC as adopted by the City of Alamosa
  • Must meet the City's published design criteria: Ground Snow Load 30 psf, Wind Design Speed 115/89 mph, Frost Line Depth 36 inches (ice) / 32 inches (damage), Seismic Design Category C, Winter Design Temperature -16°F, required ice barrier underlayment
  • Application (per the City's Building Permit & Certificate of Occupancy Application form) requires: site address/parcel number, owner information, contractor information (name, address, city license number), engineer/architect information where applicable, construction type (I-V), occupancy group, land use zone and land use, total floor area, height, stories, setbacks (front/side/street side/rear), and project cost
  • Applicant acknowledges responsibility for asbestos-regulation compliance (CDPHE Regulation No. 8, Part B) at time of application
  • Non-compliant public sidewalks must be upgraded if construction valuation exceeds $80,000, per Sec. 16-42 of City ordinances (per the Building Permit Application form's own stated threshold)
  • Applicant is responsible for scheduling all required inspections; Final Inspection must be scheduled within 10 working days of job completion
  • All electrical and plumbing work on the project is separately permitted and inspected by the State of Colorado (DORA Division of Professions and Occupations), not included in this City building permit

Required documents

  • RequiredBuilding Permit & Certificate of Occupancy ApplicationCity of Alamosa form covering site/owner/contractor/engineer/architect information, construction type, occupancy group, land use, and project cost
  • RequiredConstruction Drawings / PlansPlan set demonstrating compliance with the 2018 IRC/IBC as adopted and the City's structural design criteria
  • RequiredSite PlanShowing setbacks and property lines consistent with the applicable Land Use Zone

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1 to $500$24City of Alamosa Permit Fee Schedule 'A', Revision 8/9/2023
Building Permit Fee — valuation $501 to $2,000$24 for the first $500, plus $3 for each additional $100 or fraction thereof, up to and including $2,000
Building Permit Fee — valuation $2,001 to $40,000$69 for the first $2,000, plus $11 for each additional $1,000 or fraction thereof, up to and including $40,000
Building Permit Fee — valuation $40,001 to $100,000$487 for the first $40,000, plus $9 for each additional $1,000 or fraction thereof, up to and including $100,000
Building Permit Fee — valuation $100,001 to $500,000$1,027 for the first $100,000, plus $7 for each additional $1,000 or fraction thereof, up to and including $500,000
Building Permit Fee — valuation $500,001 to $1,000,000$3,827 for the first $500,000, plus $5 for each additional $1,000 or fraction thereof, up to and including $1,000,000
Building Permit Fee — valuation $1,000,001 to $5,000,000$6,327 for the first $1,000,000, plus $3 for each additional $1,000 or fraction thereof, up to and including $5,000,000
Building Permit Fee — valuation $5,000,001 and up$18,327 for the first $5,000,000, plus $1 for each additional $1,000 or fraction thereof
Plan Review Fee25% of the Building Permit FeeFee Schedule 'B'
Outside consulting for plan review/inspectionActual costIncludes administration and overhead cost

Mechanical / HVAC Permit

Verified

Required for mechanical system installation, alteration, or repair within Alamosa city limits, per the City's Building Department permit-type list, which explicitly includes a Mechanical Permit Application. Governed by the 2018 International Mechanical Code (IMC) as locally adopted.

Verified 2026-07-06 · Source

Requirements

  • A Mechanical Permit Application (listed directly among the City's published permit application forms) is required for mechanical work
  • Governed by the 2018 IMC as adopted by the City of Alamosa
  • General rule per the City's Building Department page: 'A permit is needed for everything' outside the specific enumerated exemption list (which does not include mechanical/HVAC equipment)

Required documents

  • RequiredMechanical Permit ApplicationListed on the City of Alamosa Building Department page as a distinct application form

Fee schedule

Fee typeAmountNotes
Permit fee — when not attached to a valid Building PermitCalculated per the Fee Schedule 'A' valuation tiers ($24 minimum)
The City's Fee Schedule 'A' & 'B' does not break out a separate flat mechanical-permit line item; Show full citation

The City's Fee Schedule 'A' & 'B' does not break out a separate flat mechanical-permit line item; standalone trade permits are billed under the same valuation-based Building Permit Fee Schedule, consistent with the pattern used at peer Colorado home-rule jurisdictions in this corpus (e.g. Durango) absent a published mechanical-specific fee

Plan Review Fee25% of the permit feeFee Schedule 'B'

Roofing Permit (Reroof)

Verified

Required for roofing/re-roofing work within Alamosa city limits, per the City's dedicated Roofing Permit Application. Governed by the 2018 IBC/IRC as locally adopted, with the City's own Building Guide | Roof reference document.

Verified 2026-07-06 · Source

Requirements

  • A Roofing Permit Application (listed directly among the City's published permit application forms) is required for roofing/reroofing work
  • A City-published 'Building Guide | Roof' document is referenced on the Building Department page as supplemental guidance
  • Roofing without a permit triggers a fine of 200% of the original permit fee, per Fee Schedule 'B'

Required documents

  • RequiredRoofing Permit ApplicationListed on the City of Alamosa Building Department page as a distinct application form

Fee schedule

Fee typeAmountNotes
Permit fee — valuation-based (Fee Schedule 'A')$24 minimum, scaling per valuation tiersNo separate flat roofing-specific fee is published in the recovered Fee Schedule 'A' & 'B'; billed under the general valuation-based table
FINE: Roofing without a permit200% of the original permit feeFee Schedule 'B'

Solar PV Permit

Verified

Required for installation of solar panel systems within Alamosa city limits, per the City's dedicated Solar Permit Application. Reviewed under the 2018 IBC/IRC as locally adopted; the fee schedule carries a distinct flat fee for residential photovoltaic installations. Electrical interconnection work is separately permitted by the State of Colorado, not the City.

Verified 2026-07-06 · Source

Requirements

  • Application (per the City's Application for Solar Permit form) requires: site address/parcel number, owner information, contractor information (name, address, city contractor license number), system size (kW), battery bank size, roof material, legal description (subdivision/block/lot), and cost of project
  • Required attachments per the Solar Permit Application form: Site Plan with setbacks, Attachment Details, Roof Plan, Manufacturer's Spec Sheets, Line Diagram, Footer Specs (if ground mount), Structural Certification Report, and Electrical Labels
  • A ladder MUST be provided on site for inspection, per the application form
  • Applicant acknowledges responsibility for asbestos-regulation compliance (CDPHE Regulation No. 8, Part B) at time of application
  • Non-compliant public sidewalks must be upgraded if construction valuation exceeds $20,000, per Sec. 16-42 of City ordinances (per the Solar Permit Application form's own stated threshold — differs from the $80,000 threshold stated on the general Building Permit Application; both figures are reported as found since neither form reconciles the discrepancy)
  • Final Inspection must be scheduled within 10 working days of job completion
  • Electrical interconnection work associated with the solar installation is separately permitted and inspected by the State of Colorado (DORA), not the City, consistent with the City's general electrical carve-out

Required documents

  • RequiredApplication for Solar PermitCity of Alamosa form requiring system specifications, site plan, attachment details, roof plan, manufacturer spec sheets, line diagram, structural certification, and electrical labels
  • RequiredSite Plan with Setbacks
  • RequiredManufacturer's Spec Sheets
  • RequiredStructural Certification Report
  • OptionalFooter SpecsRequired only for ground-mount installations

Fee schedule

Fee typeAmountNotes
Photovoltaic Permit Fee — Residential (Ground/Roof mount)$100.00City of Alamosa Permit Fee Schedule 'B', Revision 8/9/2023 — a flat fee distinct from the general valuation-based Building Permit Fee Schedule

EV Charger / EVSE Permit

Alamosa has no City-run electrical permitting program — the City's own Building Department page states plainly 'electrical and plumbing inspections are not completed by our office, they are done by the state,' directing applicants to the State of Colorado DPO Electrical and Plumbing Permits system. A residential EV charger / EVSE installation is electrical work and follows this same state track; no EV-charger-specific fee line item or expedited process was found on the City's site, the City's Permit Fee Schedule 'A' & 'B' (Rev. 8/9/2023), or the State DPO's electrical permitting pages.

Reviewed 2026-07-20 · Source

Requirements

  • A valid Colorado State Electrical permit (State Electrical Board, DORA/DPO) is required prior to installing an EV charger circuit in Alamosa — obtained through the State's Electrical and Plumbing Permits system, not from the City
  • Work must comply with the National Electrical Code (NEC) as adopted by the State of Colorado
  • Consistent with the City's treatment of solar installations (electrical interconnection permitted separately by the State), an EV charger circuit is not covered by any City building-permit fee schedule line item

Required documents

  • RequiredColorado State Electrical Permit ApplicationObtained through the Colorado DORA/DPO Electrical and Plumbing Permits system, not from the City of Alamosa

Fee schedule

Fee typeAmountNotes
State Electrical Board general permit fee (no EV-specific line item found)Set by the Colorado State Electrical Board's own current fee schedule, not by the City of Alamosa
No EV charger/EVSE-specific fee category appears in the City of Alamosa Permit Fee Schedule 'A' & 'B' (Rev. Show full citation

No EV charger/EVSE-specific fee category appears in the City of Alamosa Permit Fee Schedule 'A' & 'B' (Rev. 8/9/2023) or on the City's Building Department page — an EV charger circuit is ordinary electrical work handled entirely by the State. Re-chased 2026-07-20: dpo.colorado.gov and the Secretary of State's CCR rule text (3 CCR 710-1) both return HTTP 403 to WebFetch and browser-header curl, same statewide block documented in this dataset's Wellington, CO rooftop-solar-pv-permit entry. The most recent public reproduction of the statewide schedule located anywhere is Douglas County's Electrical Permit Application & Fee Schedule (douglasco.gov/documents/electrical-permit-app-2025.pdf), but that document is itself footer-dated 01/12/2023, so it is not adopted here as a verified current figure, consistent with this project's treatment of the same document elsewhere in this dataset. For reference only: that document's 'ALL OTHER FEES' category (which explicitly lists 'EV Charger' as a checkbox item) ties to Colorado Revised Statute § 12-115-121.3 and reads: not more than $2,000 valuation = $57 flat; $2,001+ = $5 per $1,000 (or fraction) plus $57 base.

Demolition Permit

Verified

Required for demolition of structures within Alamosa city limits, per the City's dedicated Demolition Permit Application. An approved State of Colorado Demolition Permit must be provided at the time of application; the City's own demolition permit fee is a flat, low-cost line item, valid for only 30 days.

Verified 2026-07-06 · Source

Requirements

  • A copy of an approved State of Colorado Demolition Permit is required at the time of application, per the Application for Demolition Permit form's own stated requirement
  • Application (per the form) requires: project address, property owner and contractor information, description of demolition, description of materials being removed, occupancy group, hazardous materials testing information, list of materials being removed, and disclosure of which service utility connections (gas, plumbing, electrical) are present
  • If partial demolition, the application requires a description of the portion being demolished
  • Applicant must notify the City of Alamosa Building Department within 10 working days of job completion, per the form
  • The City's Demolition Permit fee is valid for 30 days, per Fee Schedule 'B'

Required documents

  • RequiredApproved State of Colorado Demolition PermitMust be provided at the time of City application, per the Application for Demolition Permit form
  • RequiredApplication for Demolition PermitCity of Alamosa form covering project details, materials being removed, hazardous materials testing, and utility disconnections
  • RequiredHazardous Materials Testing documentation

Fee schedule

Fee typeAmountNotes
Demolition Permit Fee$15.00City of Alamosa Permit Fee Schedule 'B', Revision 8/9/2023; must provide approved State Demolition Permit; valid for 30 days

Fence / Retaining Wall Permit

Verified

Fences 7 feet or under generally do not require a permit in Alamosa; taller fences and retaining walls over 4 feet high (or supporting a surcharge / impounding certain liquids regardless of height) do require one, per the City's published permit-exemption list.

Verified 2026-07-06 · Source

Requirements

  • Fences NOT over 7 feet high are explicitly exempt from permitting, per the City's Building Department page permit-exemption list
  • Retaining walls NOT over 4 feet in height (measured from the bottom of the footing to the top of the wall) are exempt from permitting UNLESS supporting a surcharge or impounding Class I, II, or III-A liquids, per the same exemption list
  • Fences over 7 feet, and retaining walls over 4 feet (or any height if supporting a surcharge/impounding those liquid classes), therefore require a permit by implication of the exemption list, though the City does not publish a standalone 'Fence/Retaining Wall Permit Application' distinct from the general Building Permit Application

Required documents

  • RequiredBuilding Permit & Certificate of Occupancy ApplicationThe City does not publish a separate fence/retaining-wall-specific application form; fences/walls requiring a permit appear to route through the general Building Permit Application

Fee schedule

Fee typeAmountNotes
Permit fee — valuation-based (Fee Schedule 'A')$24 minimum, scaling per valuation tiersNo fence/retaining-wall-specific flat fee is published in the recovered Fee Schedule 'A' & 'B'

Commercial Building Permit

Verified

Required for new commercial construction, additions, and alterations within City of Alamosa limits, issued by the City of Alamosa Building Department (Development Services) under the 2018 IBC, 2018 IEBC, and companion codes as locally adopted. Commercial projects use the same Building Permit & Certificate of Occupancy Application and the same valuation-based Fee Schedule 'A' as residential work, but are reviewed against the City's separate 'Commercial Plan Review General Requirements' (2024) submittal standard, which demands signed-and-sealed architectural and structural plans, a complete code analysis, a geotechnical report, and discipline-by-discipline (civil, mechanical, plumbing, electrical, fire, energy, accessibility) plan documentation. Electrical and plumbing WORK is permitted and inspected by the State of Colorado (DORA), not the City — though the City's commercial plan review still covers plumbing and electrical documents at the plan stage.

Verified 2026-08-02 · Source

Requirements

  • Plans reviewed under the 2018 IBC, 2018 IEBC, 2018 IMC, 2018 IECC, 2018 IFC, and ICC/ANSI A117.1-2009 as adopted by the City; 2023 NEC and 2021 IPC/IFGC apply via the State of Colorado's programs
  • Two or more sets of submittal documents required per IBC 107.1 as restated in the City's Commercial Plan Review General Requirements: complete SIGNED AND SEALED architectural plans, structural plans, and material specifications — one hard copy plus one digital copy; if an electronically signed, stamped, and dated set is emailed to treynolds@ci.alamosa.co.us, only one hard copy is required
  • Complete code analysis required on the plans: applicable codes, design criteria, occupancy classification(s), occupant load, square footage and height, construction type, egress calculations, risk category, sprinkler/suppression (yes/no), alarm system (yes/no), restroom requirement, and special inspections
  • Civil site plan required showing new and existing structures, lot-line distances, street/finish grades, parking configuration with stall counts and drive-aisle dimensions, grading and drainage, landscaping/open space, water/sewer/storm lines, and outdoor lighting
  • Structural submittal must include complete design criteria, a geotechnical report, signed/dated/sealed structural calculations, foundation and superstructure details, and provisions for required special inspections
  • Energy conservation (2018 IECC commercial) and accessibility (ICC/ANSI A117.1) plan documentation required per the City's discipline-specific checklists
  • Fire alarm and suppression plans (signed and sealed) are sent by the City to a third party for review
  • Electrical and plumbing WORK is permitted and inspected by the State of Colorado (DORA/DPO), not the City — but the City's commercial plan review still reviews plumbing and electrical plan documents (floor plans, fixture counts, load calculations, panel schedules, etc.)
  • Must meet the City's published design criteria: Ground Snow Load 30 psf, Wind Design Speed 115/89 mph, Frost Line Depth 36 inches (ice) / 32 inches (damage), Seismic Design Category C, Winter Design Temperature -16°F
  • Contractor must hold a City of Alamosa contractor's license (the City publishes its own Contractor's License Application alongside the permit forms)
  • Non-compliant public sidewalks must be upgraded if construction valuation exceeds the Sec. 16-42 threshold ($80,000 per the Building Permit Application form; the City's Solar form states $20,000 for the same section — confirm with the department)
  • Applicant is responsible for scheduling all required inspections; Final Inspection must be scheduled within 10 working days of job completion
  • Occupying a building without a Certificate of Occupancy triggers a fine of 200% of the original permit fee; a Temporary Certificate of Occupancy is available for $200 (max 90 days, 50% refunded after the CO is issued)

Required documents

  • RequiredBuilding Permit & Certificate of Occupancy ApplicationThe City uses one application form for both residential and commercial projects — there is no separate commercial application form; the form captures construction type (I-V), occupancy group, land use zone, floor area, height, stories, setbacks, and project cost
  • RequiredSigned and Sealed Architectural Plans with Complete Code AnalysisPer the City's Commercial Plan Review General Requirements (2024): fully dimensioned drawings, egress details, accessibility provisions, fire-resistive construction details, wall types, door/hardware/window schedules, elevations
  • RequiredSigned, Dated, and Sealed Structural Plans and CalculationsComplete design criteria, foundation and superstructure details, applicable construction standards and material specifications
  • RequiredGeotechnical ReportListed as a required structural submittal item in the City's Commercial Plan Review General Requirements
  • RequiredCivil Site PlanStructures, setbacks, grades, parking layout with stall counts, grading/drainage, landscaping, utility lines, outdoor lighting
  • RequiredEnergy Conservation DocumentationInsulation R-values, fenestration U-factors/SHGCs, mechanical system design criteria, equipment efficiencies, lighting fixture schedule with wattage and control narrative, air sealing details
  • OptionalFire Alarm and Suppression Plans (signed and sealed)Required where such systems are in scope; the City sends these to a third party for review
  • OptionalStatement of Special InspectionsRequired with the permit application per IBC 107.1 as restated in the City's submittal standard, where special inspections apply

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1 to $500$24City of Alamosa Permit Fee Schedule 'A', Revision 8/9/2023 — re-verified live on alamosa.gov 2026-08-02; commercial projects use the same valuation-based table as residential, with no commercial-specific surcharge or separate commercial table
Building Permit Fee — valuation $501 to $2,000$24 for the first $500, plus $3 for each additional $100 or fraction thereof, up to and including $2,000
Building Permit Fee — valuation $2,001 to $40,000$69 for the first $2,000, plus $11 for each additional $1,000 or fraction thereof, up to and including $40,000
Building Permit Fee — valuation $40,001 to $100,000$487 for the first $40,000, plus $9 for each additional $1,000 or fraction thereof, up to and including $100,000
Building Permit Fee — valuation $100,001 to $500,000$1,027 for the first $100,000, plus $7 for each additional $1,000 or fraction thereof, up to and including $500,000
Building Permit Fee — valuation $500,001 to $1,000,000$3,827 for the first $500,000, plus $5 for each additional $1,000 or fraction thereof, up to and including $1,000,000
Building Permit Fee — valuation $1,000,001 to $5,000,000$6,327 for the first $1,000,000, plus $3 for each additional $1,000 or fraction thereof, up to and including $5,000,000
Building Permit Fee — valuation $5,000,001 and up$18,327 for the first $5,000,000, plus $1 for each additional $1,000 or fraction thereof
Plan Review Fee25% of the Building Permit FeeFee Schedule 'B'
Additional plan review required by changes, additions or revisions$50.00 per hourFee Schedule 'B'; minimum charge of one hour, or total cost to the jurisdiction, whichever is greatest, including administration and overhead
Outside consulting for plan review and inspectionActual costFee Schedule 'B'; includes administration and overhead — relevant to commercial projects since fire alarm/suppression plans are sent to a third party for review
Temporary Certificate of Occupancy (max 90 days)$200.00Fee Schedule 'B'; 50% refunded after the Certificate of Occupancy is issued
FINE: Building without a permit200% of original permit feeFee Schedule 'B'
FINE: Occupancy without a Certificate of Occupancy200% of original permit feeFee Schedule 'B'

Commercial Tenant Improvement (Tenant Finish)

Verified

Alamosa does NOT publish a distinct tenant-improvement or tenant-finish permit type: no TI-specific application form, fee line item, or process appears on the City's Building Department page, in the Permit Fee Schedule 'A' & 'B' (Rev. 8/9/2023, re-verified live 2026-08-02), or in the Commercial Plan Review General Requirements (2024) document. Interior alterations, remodels, and tenant finishes of commercial spaces are simply commercial building-permit work — the City has adopted the 2018 International Existing Building Code (IEBC), and its commercial submittal document restates IBC 104.2's scope covering 'erection, and alteration, demolition and moving of buildings and structures.' This entry exists to document that finding; apply under the commercial-building-permit process.

Verified 2026-08-02 · Source

Requirements

  • File the standard Building Permit & Certificate of Occupancy Application — there is no separate TI application form
  • Alterations to existing commercial buildings are reviewed under the 2018 IEBC (adopted by the City) alongside the 2018 IBC
  • Scaled-to-scope submittals per the City's Commercial Plan Review General Requirements: code analysis (occupancy classification, occupant load, egress, construction type), dimensioned drawings, accessibility provisions, and fire-resistive details remain the reviewable items for interior work; the 'permit is needed for everything' rule exempts only pure finish work (painting, papering, tiling, carpeting, cabinets, countertops and similar) and movable cases/counters/partitions not over 5 ft 9 in high
  • A change in use or occupancy indicated on the application form triggers review of the new occupancy classification
  • Electrical and plumbing portions of a tenant finish are permitted and inspected by the State of Colorado (DORA), not the City
  • If the space will be occupied before all work is complete, a Temporary Certificate of Occupancy ($200, max 90 days) is available; occupancy without a CO carries a 200% fine

Required documents

  • RequiredBuilding Permit & Certificate of Occupancy ApplicationSame form as all other building work; no TI-specific form exists
  • RequiredConstruction Drawings scaled to scopeFloor plan, code analysis, egress and accessibility details per the Commercial Plan Review General Requirements as applicable to the alteration

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (Fee Schedule 'A')$24 minimum, scaling per the same valuation tiers as all building permits (e.g., a $150,000 tenant finish = $1,377)No TI-specific fee line item exists in Fee Schedule 'A' & 'B' (Rev. 8/9/2023); tenant improvements are billed as ordinary building-permit valuation
Plan Review Fee25% of the Building Permit FeeFee Schedule 'B'

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Alamosa building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-20)Later version (2026-08-05) →View current record →All versions →

Permalink: /colorado/alamosa-county/alamosa/as-of/2026-08-02/

Snapshot date: 2026-08-02

Commit: 302fc3f

Reproducible from PermitBase’s version-controlled dataset, commit 302fc3f.