Version history — Aurora, Colorado
This is PermitBase’s own verified record for Aurora, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Aurora’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- Aurora, Colorado — fee schedule re-verified across 1 permit type
- 2026-08-13Superseded
- Aurora, Colorado — Sign Permit record added
- Aurora, Colorado — Fire Sprinkler and Fire Alarm System Permit record added
- Aurora, Colorado — Change of Occupancy / Change of Use Permit record added
- 2026-07-20Superseded
- Aurora, Colorado — EV Charger / EVSE Permit record added
- 2026-07-01Superseded
- Aurora, Colorado — Accessory Dwelling Unit (ADU) Permit fee record updated: Billed per square foot by occupancy group per the 2026 New Building Construction Fee Table, or via the Permit Fee Calculator → $1.30 per square foot (R-3 occupancy group rate)
- 2026-06-30Initial record — coverage of Aurora began