Columbine Valley building permits

Verified

Columbine Valley, Colorado — as published 2026-07-07.

Verified 2026-07-06 · Source

Codes adopted

2024 International Building Code (IBC) — Town of Columbine Valley Building Codes page, current as of page last-modified date 2026-06-172024 International Residential Code (IRC) — same page, adopted alongside the IBC2023 National Electrical Code (NEC) — same pageNote on code scope: the Town's live Building Codes page (columbinevalley.org/building-codes/) names ONLY the 2024 IBC, 2024 IRC, and 2023 NEC by edition; it does NOT separately name adopted editions of the IECC (energy code), IPC (plumbing code), IMC (mechanical code), IFGC (fuel gas code), IFC (fire code), or IEBC (existing building code) anywhere on that page, the Building Department page, the Building Permits page, or the Fee Schedule page — checked all directly. This is a materially thinner published code-adoption list than larger peer Colorado jurisdictions in this corpus (e.g. Vail names 9 separate model codes). It is plausible the IRC/IBC editions carry their own internal plumbing/mechanical/fuel-gas provisions by reference (both the IBC and IRC contain their own integrated plumbing/mechanical/fuel-gas chapters or cross-reference companion I-Codes), but the Town does not state this explicitly, so no separate IPC/IMC/IFGC edition is asserted here.Third-party aggregator ColoradoEnergy.org's code database lists Columbine Valley under a stale 'IRC 2003 / NEC 2003' entry with no IECC data — this aggregator is out of date relative to the Town's own live, actively-maintained Building Codes page (dateModified 2026-06-17) and is NOT used as a source for this file's codesAdopted list, per this corpus's official-source-only policy.HB22-1362 (Colorado Building Greenhouse Gas Emissions Reduction Act) note: this statute requires any Colorado local government that adopts or updates ANY building code between July 1, 2023 and July 1, 2026 to concurrently adopt the 2021 IECC (or equivalent) plus an Electric Ready and Solar Ready code. The Town's Building Codes page shows a dateModified of 2026-06-17 (within this window) and reflects an update from a prior code cycle to the 2024 IBC/IRC — however, the Town's own page does not mention IECC, Electric Ready, or Solar Ready adoption anywhere, and no separate ordinance or resolution documenting HB22-1362 compliance was found after searching the Town's website, Board of Trustees packets, and general web search. This is flagged as an open compliance question rather than assumed either way — the Town may be out of step with HB22-1362, may have adopted an energy code not documented on this particular webpage, or the page update may not itself constitute a triggering 'adoption or update' event under the statute's technical definition. Confidence on this specific point is partial; verify directly with the Building Department (303-795-1434) before relying on it for compliance purposes.

Permit types & fees

Building Permit with Plan Review (New Construction)

Verified

Columbine Valley's primary building-permit track for new single-family home construction, reviewed under the 2024 IBC/IRC as locally adopted. The Town does not operate a separate 'new construction' permit type distinct from its general 'Building Permit with Plan Review' track, which also covers structural remodels and plumbing/electrical changes (see residential-addition-remodel for that broader scope).

Verified 2026-07-06 · Source

Requirements

  • Signed contract between contractor and homeowner submitted with the application
  • HOA approval required for any exterior alterations before Town permit issuance
  • Plans prepared to the level of complexity required by the project; may be hand-drawn for simple work, professionally prepared/stamped for larger new-construction projects
  • Reviewed under the 2024 IBC/IRC as adopted by the Town
  • Compliance with Town roofing amendments if roofing work is part of the new construction scope

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the Town's GovPilot online portal
  • RequiredSigned Contractor-Homeowner ContractCopy required at submittal
  • RequiredConstruction PlansComplexity and stamping requirements scale with project scope
  • RequiredHOA ApprovalRequired for any exterior alterations

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1,000,001 and up$7,600 for the first $1,000,000 plus $5.00 for each additional $1,000 or fraction thereof, plus inspection feesTown of Columbine Valley Fee Schedule, effective Jan. 1, 2026; new SFR construction is separately valued at $300/sq ft under the Miscellaneous Project Valuation Schedule if greater than the applicant's stated value
Plan Review Fee65% of Building Permit FeeAssessed only when plans are reviewed for code compliance
Town Sales Tax and Use TaxTotal Job Valuation x 50% x 3%Non-refundable, due at permit issuance
Arapahoe County Open Space TaxTotal Job Valuation x 50% x 0.25%Non-refundable, due at permit issuance
Inspection / Re-inspection Fee$45 per inspectionPer the Fee Schedule PDF and Inspections page

Building Permit with Plan Review (Addition / Structural Remodel)

Verified

Required for home additions and structural remodels involving changes to structure, plumbing, or electrical systems, per the Town's 'Building Permit with Plan Review' track. Kitchen and bath remodels may or may not require this track depending on scope; the Town advises contacting Town Hall for a scope determination.

Verified 2026-07-06 · Source

Requirements

  • Signed contract between contractor and homeowner submitted with the application
  • HOA approval required for any exterior alterations
  • Applies to home remodels with changes to structure, plumbing, or electrical; also applies to structures anchored by footings/caissons (e.g., pergolas) and complex landscaping projects involving electric, gas, or plumbing work
  • Kitchen/bath remodel scope is case-by-case; contact Town Hall (303-795-1434) for a determination of whether plan review is required
  • Reviewed under the 2024 IBC/IRC as adopted

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the Town's GovPilot online portal
  • RequiredSigned Contractor-Homeowner Contract
  • OptionalHOA ApprovalRequired for exterior alterations

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-tiered schedule)$33 minimum ($1-$500 valuation), scaling through $7,600 + $5/$1,000 above $1,000,000Town of Columbine Valley Fee Schedule effective Jan. 1, 2026
Miscellaneous Project Valuation — SFR Addition$300 per square foot
Miscellaneous Project Valuation — SFR Remodel$200 per square foot
Miscellaneous Project Valuation — New Basement Finish$35/sq ft base plus Category 1 ($50/sq ft), Category 2 ($80/sq ft), or Category 3 ($90/sq ft) finish add-on
Plan Review Fee65% of Building Permit FeeOnly when plans are reviewed for code compliance
Town Sales Tax and Use TaxTotal Job Valuation x 50% x 3%
Arapahoe County Open Space TaxTotal Job Valuation x 50% x 0.25%
Inspection / Re-inspection Fee$45 per inspection

Electrical Permit (Non-Structural Building Permit / Building Permit with Plan Review)

Columbine Valley does not publish a standalone Electrical Permit application; electrical service changes are processed under the Town's 'Non-Structural Building Permit' track, while electrical work bundled with structural remodels is processed under the 'Building Permit with Plan Review' track. The Town issues its own electrical permits and performs its own electrical inspections locally (does not defer permitting entirely to the Colorado State Electrical Board), though the Electrician contractor-license category itself carries no local license fee, consistent with electricians separately holding Colorado DORA state licensure.

Reviewed 2026-07-06 · Source

Requirements

  • Change to electrical service alone qualifies for the 'Non-Structural Building Permit' track
  • Electrical work that is part of a structural remodel or new construction project requires the 'Building Permit with Plan Review' track instead
  • Homeowners occupying their own property may perform electrical work without a contractor license, per the Town's FAQs, but must still obtain the applicable permit and meet code
  • Non-homeowner electrical contractors: the Town's Contractor License fee table lists an 'Electrician' category with no local license fee, implying reliance on separate Colorado State Electrical Board (DORA) licensure for the credential itself, while the Town still issues the local permit and schedules its own inspection
  • Governed by the 2023 NEC as adopted by the Town

Required documents

  • RequiredNon-Structural Building Permit Application (for standalone electrical service changes)Submitted via the Town's GovPilot online portal
  • OptionalBuilding Permit Application with Plan Review (if electrical work is part of a larger remodel)

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-tiered; no separate electrical-only fee table published)$33 minimum, scaling per the Town's general Building Permit Fee ScheduleThe Town does not publish a distinct electrical-fee valuation table (unlike some larger CO jurisdictions that use the CRS 12-23-117(3) state-anchored schedule) — electrical work is billed under the same general valuation-based Building Permit Fee schedule
Inspection / Re-inspection Fee$45 per inspection

Plumbing Permit (Building Permit with Plan Review)

Columbine Valley does not publish a standalone Plumbing Permit application; plumbing work is processed under the Town's 'Building Permit with Plan Review' track whenever it involves changes to structure, plumbing, or electrical systems, or under the Non-Structural track for simpler fixture-level work. The Town's Contractor License fee schedule bills a distinct 'Plumber' license category ($100/year full, $50/half-year), indicating the Town runs its own local plumbing-permit and licensing program rather than deferring entirely to the Colorado State Plumbing Board.

Reviewed 2026-07-06 · Source

Requirements

  • Plumbing work bundled with structural changes requires the Building Permit with Plan Review track
  • Homeowners occupying their own property may perform plumbing work without a contractor license per the Town's FAQs, but must still obtain the applicable permit
  • Plumbing contractors must hold a current Town of Columbine Valley Plumber contractor license ($100/year, $50 half-year after June 30), in addition to any Colorado state-level plumbing licensure
  • Governed by the 2024 IBC/IRC as adopted (the Town's Building Codes page does not separately name an IPC edition)

Required documents

  • RequiredBuilding Permit Application with Plan Review (or Non-Structural Building Permit for simpler fixture work)Submitted via the Town's GovPilot online portal
  • RequiredTown of Columbine Valley Plumber Contractor License

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-tiered; no separate plumbing-only fee table published)$33 minimum, scaling per the Town's general Building Permit Fee Schedule
Plumber Contractor License$100/year (full year); $50 (half-year, applications after June 30)
Inspection / Re-inspection Fee$45 per inspection

Mechanical / HVAC Permit (Non-Structural Building Permit)

Verified

HVAC and water heater replacement are explicitly named examples of work processed under the Town's 'Non-Structural Building Permit' track. The Town's Contractor License fee schedule bills a distinct 'Mechanical' license category ($100/year, $50 half-year).

Verified 2026-07-06 · Source

Requirements

  • Air conditioner, furnace, and water heater replacement qualify for the Non-Structural Building Permit track
  • Mechanical contractors must hold a current Town of Columbine Valley Mechanical contractor license
  • Homeowners occupying their own property may perform mechanical/HVAC work without a contractor license per the Town's FAQs

Required documents

  • RequiredNon-Structural Building Permit ApplicationSubmitted via the Town's GovPilot online portal
  • RequiredTown of Columbine Valley Mechanical Contractor License

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-tiered; no separate mechanical-only fee table published)$33 minimum, scaling per the Town's general Building Permit Fee Schedule
Mechanical Contractor License$100/year (full year); $50 (half-year, applications after June 30)
Inspection / Re-inspection Fee$45 per inspection

Roofing Permit (Re-Roof)

Verified

Standard roof replacement (asphalt shingle, shake shingle, ceramic tile) is processed under the Town's dedicated Roofing Permit Application, distinct from the general Building Permit tracks. Subject to the Town's specific roofing amendments (ice barrier, drip edge, ventilation, flashing, fastening requirements).

Verified 2026-07-06 · Source

Requirements

  • Ice barrier required on the eave edge for all new roof tear-offs, extending 24 inches from the exterior wall
  • Drip edge metal required at eaves and gable ends (minimum 2 inches onto roof surface, 1.5 inches over exposed decking edge)
  • Minimum roof ventilation of 1 square foot of roof vents per 150 square feet of roof area
  • Nail-down mineral surfaced roll roofing is NOT allowed; adhered- or torch-down installation required instead
  • Open valley flashing must be minimum 24-inch wide, 26-gage galvanized steel
  • Flashing and counter-flashing required where roof meets a vertical surface
  • Asphalt shingles must be fastened to solidly sheathed decks
  • HOA approval required before Town permit issuance, since roofing is an exterior alteration

Required documents

  • RequiredRoofing Permit ApplicationSubmitted via the Town's GovPilot online portal
  • RequiredHOA Approval
  • RequiredSigned Contractor-Homeowner Contract

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-tiered; no separate flat re-roof fee published)$33 minimum, scaling per the Town's general Building Permit Fee Schedule
Roofer Contractor License$100/year (full year); $50 (half-year, applications after June 30)
Inspection / Re-inspection Fee$45 per inspection

Rooftop Solar / Photovoltaic Permit

Verified

The Town does not publish a standalone Solar/Photovoltaic permit page or application distinct from its general Building Permit tracks. Based on the Town's own permit-track structure, a rooftop PV installation would be processed as an electrical-service-change item under the Non-Structural Building Permit (for a straightforward panel/inverter/service-connection retrofit) or under the Building Permit with Plan Review track if structural roof-mounting work is involved.

Verified 2026-07-20 · Source

Requirements

  • No dedicated solar permit application exists on the Town's website — checked the Building Permits, Other Permits, and Fee Schedule pages directly; none name solar or photovoltaic systems specifically
  • Likely processed as an electrical service change (Non-Structural Building Permit) for the electrical/inverter portion, with structural roof-mount review folded into the same or a Building Permit with Plan Review application if roof structure is altered
  • HOA approval required before Town permit issuance for any roof-mounted or exterior-visible equipment
  • Governed by the 2023 NEC as adopted, for the electrical interconnection portion

Required documents

  • RequiredNon-Structural Building Permit Application or Building Permit with Plan Review (project-dependent)Submitted via the Town's GovPilot online portal; contact Town Hall to confirm which track applies before submitting
  • RequiredHOA Approval

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-tiered; no separate solar fee table published)$33 minimum, scaling per the Town's general Building Permit Fee ScheduleNo solar-specific fee line exists in the Town's published Fee Schedule PDF or webpage
Inspection / Re-inspection Fee$45 per inspection
Statewide aggregate fee cap on active solar energy system installs$500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284)Statutory cap on the aggregate of all local-government fees/charges related to installing an active solar energy system under 2 megawatts DC, applicable statewide regardless of Columbine Valley's own valuation-based fee table. Repealed effective December 31, 2029 unless renewed.

Electric Vehicle Charging Station Permit

Verified

The Town does not publish a standalone EV charger/EVSE permit page or application. Checked the Building Permits, Other Permits, and Fee Schedule pages directly (columbinevalley.org/building-permits/, /street-cut-permit/, /fee-schedule/) — none name electric vehicle charging stations, EV chargers, or EVSE specifically. Based on the Town's own permit-track structure, installing an EV charger (a new circuit/outlet or electrical service modification) would fall under the 'Non-Structural Building Permit' track, the same track the Town names for other electrical service changes; a charger installation bundled with a larger structural remodel would instead fall under 'Building Permit with Plan Review.' Re-chased 2026-07-20: located and directly fetched the Town's actual, currently-effective Building Permit Fee Schedule PDF (CV_Building_ProjectEvaluationFees_01.01.26.pdf, effective Jan. 1, 2026), confirming the valuation-tiered fee table below is real and governs this permit track (no separate EV/EVSE line exists in it).

Verified 2026-07-20 · Source

Requirements

  • No dedicated EV charger/EVSE permit application exists on the Town's website
  • Electrical service change for a new circuit/outlet (the typical Level 1/Level 2 EV charger installation) would qualify for the Non-Structural Building Permit track, consistent with the Town's treatment of other electrical service modifications
  • A charger installation involving structural work (e.g., new panel/service upgrade tied to a larger remodel) would instead require the Building Permit with Plan Review track
  • Homeowners occupying their own property may perform electrical work without a contractor license, per the Town's FAQs, but must still obtain the applicable permit
  • Governed by the 2023 NEC as adopted by the Town for the electrical work itself

Required documents

  • RequiredNon-Structural Building Permit Application (or Building Permit with Plan Review if bundled with structural work)Submitted via the Town's GovPilot online portal; contact Town Hall to confirm which track applies before submitting

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-tiered; no separate EV-charger fee line published)$33 minimum ($1-$500 valuation), then $33 + $4.50/each additional $100 up to $2,000, then $105.50 + $19/each additional $1,000 up to $25,000, then $542.50 + $13.50/each additional $1,000 up to $50,000, then $875 + $9.50/each additional $1,000 up to $100,000, then $1,350 + $7.50/each additional $1,000 up to $500,000, then $4,350 + $6.50/each additional $1,000 up to $1,000,000, then $7,600 + $5/each additional $1,000 above thatDirectly re-fetched and confirmed against the Town's currently-effective Building Permit Fee Schedule PDF (CV_Building_ProjectEvaluationFees_01.01.26.pdf, rev. 12.31.25, effective Jan. 1, 2026). No EV-charger-specific fee line exists in it; billed under this same general valuation-based schedule used for other electrical work, per the Town's own permit-track structure.
Inspection / Re-inspection Fee$45 per inspectionConfirmed on the same currently-effective Building Permit Fee Schedule PDF

Demolition Permit

Verified

Required for structure demolition in Columbine Valley, issued via a dedicated Demolition Permit Application distinct from the general Building Permit tracks. Mandatory asbestos testing applies to all demolition projects.

Verified 2026-07-06 · Source

Requirements

  • An asbestos test is required for ALL demolition projects, with documentation submitted to the Town
  • A positive asbestos test result mandates abatement before demolition may proceed
  • HOA approval likely required depending on HOA covenant scope (not explicitly stated for demolition specifically, but generally required for exterior work per the Town's Building Permits page)

Required documents

  • RequiredDemolition Permit ApplicationSubmitted via the Town's GovPilot online portal
  • RequiredAsbestos Test ReportRequired for all demolition projects; positive results require documented abatement before demolition

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-tiered; no separate flat demolition fee published)$33 minimum, scaling per the Town's general Building Permit Fee ScheduleNo demolition-specific fee line found in the Fee Schedule PDF or webpage; billed under the general schedule
Inspection / Re-inspection Fee$45 per inspection

Deck / Covered Patio Permit

Verified

Decks and patio covers are named examples of small-scope projects under the Town's general Building Permit process, with dedicated per-square-foot valuation rates. The Building Permits FAQ explicitly notes decks above ground generally require a permit.

Verified 2026-07-06 · Source

Requirements

  • Generally, if the deck is above ground, a permit is required, per the Town's FAQs
  • Structures anchored by footings or caissons (e.g., pergolas) require the Building Permit with Plan Review track
  • HOA approval required for exterior structures

Required documents

  • RequiredBuilding Permit Application (track depends on whether footings/caissons are involved)Submitted via the Town's GovPilot online portal
  • RequiredHOA Approval

Fee schedule

Fee typeAmountNotes
Miscellaneous Project Valuation — Deck$65 per square foot
Miscellaneous Project Valuation — Patio Cover$65 per square foot
Miscellaneous Project Valuation — Patio Enclosure$135 per square foot
Building Permit Fee (valuation-tiered, applied to the above per-sq-ft valuation)$33 minimum, scaling per the Town's general Building Permit Fee Schedule
Inspection / Re-inspection Fee$45 per inspection

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Columbine Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /colorado/arapahoe-county/columbine-valley/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356

Reproducible from PermitBase’s version-controlled dataset, commit 371a356.