Codes adopted

2024 International Building Code (IBC) — City of Littleton Building Codes and Amendments page2024 International Residential Code (IRC)2024 International Energy Conservation Code (IECC)2024 International Existing Building Code (IEBC)2024 International Fuel Gas Code (IFGC)2024 International Mechanical Code (IMC)2024 International Plumbing Code (IPC) — Littleton uses the International Plumbing Code, not the Uniform Plumbing Code2024 International Property Maintenance Code (IPMC)2024 International Swimming Pool and Spa Code (ISPSC)2024 International Wildland-Urban Interface Code (IWUIC)2024 International Fire Code (IFC)ICC A117.1-2017 Standard with Supplement 1 — Accessible and Usable Buildings and FacilitiesNFPA 70 National Electrical Code, 2026 Edition ("2026 NEC")1997 Uniform Code for the Abatement of Dangerous Buildings (International Conference of Building Officials)Colorado Model Electric Ready and Solar Ready Code, adopted by the Colorado Department of Local Affairs and Colorado Energy Office effective June 1, 2023Littleton City Code Title 4, Chapter 1 — local IRC amendments including adopted Climatic and Geographic Design Criteria (Table R301.2): Ground Snow Load 40 psf (non-reducible), Ultimate Design Wind Speed 136 mphLittleton City Code Title 3, Chapter 16 — Contractor Licensing (license/registration required to obtain permits within city limits, effective July 1, 1985)

Permit types & fees

Residential Building Permit (New Single-Family, Townhouse, Two-Family Dwelling)

Verified

Required for new single-family homes, townhouses, and two-family dwellings within Littleton. Reviewed under the 2024 IRC/IBC as locally amended, plus Littleton's adopted structural design criteria (ground snow load, wind speed) under City Code Title 4, Chapter 1. Issued and inspected by the City of Littleton Building and Code Compliance Division.

Verified 2026-07-05 · Source

Requirements

  • Plans must comply with the 2024 IRC/IBC as adopted by the City of Littleton
  • Must meet Littleton's adopted Climatic and Geographic Design Criteria (City Code Title 4, Ch. 1 amending IRC Table R301.2): Ground Snow Load 40 psf (non-reducible), Ultimate Design Wind Speed 136 mph
  • Structural plans must be stamped and signed by a Licensed Colorado Structural Engineer; architectural plans must be stamped and signed by a Colorado Design Professional
  • Site plan required showing dimensions to property lines, all easements, and existing/proposed structures with a landscaping plan
  • Energy Conservation Code compliance required via one of: Prescriptive R-Value/U-Factor, Prescriptive Component Performance Alternative, Simulated Building Performance, or Energy Rating Index
  • All contractors working on the project must hold a current City of Littleton Contractor's License and be identified on the permit
  • All documents must be submitted electronically via the eTRAKiT portal; 'preliminary' or 'not for construction' plan sets are not accepted
  • Permit must be commenced within 180 days and expires 365 days after issuance unless extended by the Building Official

Required documents

  • RequiredBuilding Permit Application (eTRAKiT Online System)Submitted electronically through the City's eTRAKiT portal
  • RequiredStructural Plans (stamped)Stamped/signed by a Licensed Colorado Structural Engineer; footings, column pads, piers, caissons, grade beams, foundation walls, floor/roof framing plans, and complete structural design criteria
  • RequiredArchitectural Plans (stamped)Stamped/signed by a Colorado Design Professional; dimensioned floor layout, roof plan, reflected ceiling plan, exterior elevations, wall sections, stair geometry
  • RequiredSite PlanNorth arrow, dimensions to property lines, easements, existing/proposed structures, landscaping plan
  • RequiredElectrical, Mechanical, and Plumbing PlansNot required to be stamped; must show service equipment/panel locations, HVAC equipment, Manual J/D/S calculations, plumbing fixture layout and supply/discharge line sizing

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1 to $500.00$25.85Per Resolution 2025-105 (approved by City Council Dec. 21, 2025), the City's current published fee schedule
Building Permit Fee — valuation $500.01 to $2,000.00$25.85 for the first $500 plus $3.35 for each additional $100 or fraction thereof, to and including $2,000.00City of Littleton Permit Fee Schedules page, TOTAL VALUATION table, $500.01-$2,000.00 row; same row in Resolution 2025-105 Exhibit A (2026 Schedule of Fees), Building Permits table
Building Permit Fee — valuation $2,000.01 to $25,000.00$76.17 for the first $2,000 plus $15.40 for each additional $1,000 or fraction thereof, to and including $25,000.00City of Littleton Permit Fee Schedules page, TOTAL VALUATION table, $2,000.01-$25,000.00 row; same row in Resolution 2025-105 Exhibit A (2026 Schedule of Fees), Building Permits table
Building Permit Fee — valuation $25,000.01 to $50,000.00$430.37 for the first $25,000 plus $11.11 for each additional $1,000 or fraction thereof, to and including $50,000.00City of Littleton Permit Fee Schedules page, TOTAL VALUATION table, $25,000.01-$50,000.00 row; same row in Resolution 2025-105 Exhibit A (2026 Schedule of Fees), Building Permits table
Building Permit Fee — valuation $50,000.01 to $100,000.00$708.12 for the first $50,000 plus $7.70 for each additional $1,000 or fraction thereof, to and including $100,000.00City of Littleton Permit Fee Schedules page, TOTAL VALUATION table, $50,000.01-$100,000.00 row; same row in Resolution 2025-105 Exhibit A (2026 Schedule of Fees), Building Permits table
Building Permit Fee — valuation $100,000.01 to $500,000.00$1,093.12 for the first $100,000 plus $6.16 for each additional $1,000 or fraction thereof, to and including $500,000City of Littleton Permit Fee Schedules page, TOTAL VALUATION table, $100,000.01-$500,000.00 row; same row in Resolution 2025-105 Exhibit A (2026 Schedule of Fees), Building Permits table
Building Permit Fee — valuation $500,000.01 to $1,000,000.00$3,557.12 for the first $500,000 plus $5.23 for each additional $1,000 or fraction thereof, to and including $1,000,000City of Littleton Permit Fee Schedules page, TOTAL VALUATION table, $500,000.01-$1,000,000.00 row; same row in Resolution 2025-105 Exhibit A (2026 Schedule of Fees), Building Permits table
Building Permit Fee — valuation greater than $1,000,000.00$6,172.12 for the first $1,000,000 plus $4.02 for each additional $1,000 or fraction thereofCity of Littleton Permit Fee Schedules page, TOTAL VALUATION table, greater than $1,000,000.00 row; same row in Resolution 2025-105 Exhibit A (2026 Schedule of Fees), Building Permits table
Plan Review Fee65% of the Permit FeeOnly applicable when blueprints/construction documents are reviewed for municipal and adopted building codes
City of Littleton Use Tax Deposit0.01969 x Total Job Valuation, i.e. (Total Job Valuation x 52.5%) x 3.75%City Code Title 3-9-3-5 sets the sales/use tax rate at 3.75%
Arapahoe County Open Space Tax0.00125 x Total Valuation, i.e. (Total Job Valuation x 50%) x 0.25%City of Littleton Permit Fee Schedules page, "fees also charged on the Building Permit" list, Arapahoe County Open Space Tax line
Master Plan subsequent-permit fee (single-family detached residential projects)$350City of Littleton Permit Fee Schedules page, Other Building Permit Plan Review and Inspection Fees list, master-plan subsequent-permit line; Resolution 2025-105 Exhibit A scopes the same $350 to one- and two-family and townhouse projects

Residential Addition / Remodel Permit

Verified

Required for room additions, basement finishes, and structural modifications to existing residential dwellings in Littleton. Reviewed under the 2024 IRC as locally amended, using the City's Residential Remodel submittal track (distinct from the New SFD/Addition/ADU track for ground-up structural work).

Verified 2026-07-05 · Source

Requirements

  • Applicable codes must be notated on plans; 'preliminary' or 'not for construction' plans are not accepted
  • Existing and proposed floor plans required, including north arrow, room use/size, ceiling heights, door/window sizes and locations, stairway rise/run/handrail/headroom details
  • Any alteration of foundation or structural components requires a plan/detailed drawing stamped by a structural engineer at time of application; the engineer of record (or representative) must inspect and verify the alteration prior to final Building Division approval
  • Basement finishes must show beam/ductwork locations and finished-floor-to-beam/ductwork clearance heights
  • Electrical plans must show receptacles, switches, lighting, smoke alarms, ventilation fans, and service size/location
  • Manual J, S, and D calculations required if the heating system is replaced or ductwork is replaced/relocated/altered
  • IECC compliance documentation may be required depending on scope (thermal envelope, mechanical, or electrical system impact)
  • All documents submitted electronically via eTRAKiT

Required documents

  • RequiredBuilding Permit Application (eTRAKiT Online System)Submitted electronically
  • RequiredExisting and Proposed Floor PlansNorth arrow, room dimensions/use, ceiling heights, framing member sizes/spans/spacing
  • OptionalStructural Engineer Stamped Plan (if applicable)Required for any foundation or structural alteration

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based table as new construction)$25.85 minimum, scaling per the valuation tiers in the Permit Fee Schedule (Resolution 2025-105)City of Littleton Permit Fee Schedules page, TOTAL VALUATION table; $25.85 is the $1-$500.00 row, higher brackets scale from it
Plan Review Fee65% of the Permit FeeCity of Littleton Permit Fee Schedules page, PLAN REVIEW FEE line; Resolution 2025-105 Exhibit A, Building Permit Plan Review and Inspection Fees
City Use Tax Deposit0.01969 x Total Job ValuationCity of Littleton Permit Fee Schedules page, "fees also charged on the Building Permit" list, use tax deposit line ((total job valuation x 52.5%) x 3.75%); the 3.75% city use tax rate is stated on the city Business and Sales/Use Tax License page
Arapahoe County Open Space Tax0.00125 x Total ValuationCity of Littleton Permit Fee Schedules page, "fees also charged on the Building Permit" list, Arapahoe County Open Space Tax line

Electrical Permit

Verified

Required for installation, alteration, or repair of electrical systems in Littleton. Governed by NFPA 70 National Electrical Code, 2026 Edition, as locally adopted. Electrical contractors must hold an active Colorado DORA Master's/Journeyman's license AND State Contractor's License, in addition to a City of Littleton Contractor's License.

Verified 2026-07-05 · Source

Requirements

  • Permit required for any work to erect, install, enlarge, alter, repair, remove, convert, or replace an electrical system, per the City's Building Permit FAQ
  • Contractors must hold proof of an active State of Colorado Master's/Journeyman's License AND State of Colorado Contractor's License, matching current DORA record
  • Contractors must also hold a current City of Littleton Contractor's License (City Code Title 3, Chapter 16), required since July 1, 1985
  • Governed by the 2026 NEC as adopted
  • All documents submitted electronically via eTRAKiT

Required documents

  • RequiredElectrical Permit Application (eTRAKiT Online System)Apply via eTRAKiT under the electrical permit type
  • RequiredProof of Colorado DORA Master's/Journeyman's License and State Contractor's License

Fee schedule

Fee typeAmountNotes
Permit fee — valuation-based (Permit Fee Schedule, Resolution 2025-105)$25.85 minimum, scaling per valuation tiersCity of Littleton Permit Fee Schedules page, TOTAL VALUATION table; $25.85 is the $1-$500.00 row, higher brackets scale from it
Plan Review Fee65% of the permit fee, applicable only when plans are reviewed for code complianceCity of Littleton Permit Fee Schedules page, PLAN REVIEW FEE line, including the condition that it applies only when construction documents are reviewed for code compliance
Re-inspection Fee$80/hourCity of Littleton Permit Fee Schedules page, Other Building Permit Plan Review and Inspection Fees list, re-inspection line; Resolution 2025-105 Exhibit A instead states $80.00 per re-inspection from the third failure onward

Plumbing Permit

Verified

Required for installation, alteration, or repair of plumbing systems in Littleton. Governed by the 2024 International Plumbing Code (IPC), not the Uniform Plumbing Code. Plumbing contractors must hold an active Colorado DORA Master's/Journeyman's license AND State Contractor's License, in addition to a City of Littleton Contractor's License.

Verified 2026-07-05 · Source

Requirements

  • Permit required for plumbing system installation, alteration, or repair, per the City's Building Permit FAQ
  • Littleton uses the 2024 IPC, not the UPC
  • Contractors must hold proof of active Colorado DORA Master's/Journeyman's License and State Contractor's License matching current DORA record, plus a City of Littleton Contractor's License
  • Gas piping submittals require isometric drawings showing incoming pressure/pressure drop, BTU demand per appliance, pipe material/diameter/length, shutoff valve locations, and burial depth; pressure test at minimum 10 psig for a minimum 15 minutes

Required documents

  • RequiredPlumbing Permit Application (eTRAKiT Online System)Apply via eTRAKiT under the plumbing permit type
  • OptionalGas Pipe Isometric Drawing (if gas piping involved)Required per the Residential Gas Line Submittal Requirements

Fee schedule

Fee typeAmountNotes
Permit fee — valuation-based (Permit Fee Schedule, Resolution 2025-105)$25.85 minimum, scaling per valuation tiersCity of Littleton Permit Fee Schedules page, TOTAL VALUATION table; $25.85 is the $1-$500.00 row, higher brackets scale from it
Plan Review Fee65% of the permit fee, applicable only when plans are reviewed for code complianceCity of Littleton Permit Fee Schedules page, PLAN REVIEW FEE line, including the condition that it applies only when construction documents are reviewed for code compliance

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, air conditioning, and fuel-gas equipment installation or replacement in Littleton. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) as locally adopted.

Verified 2026-07-05 · Source

Requirements

  • Permit required for installation, alteration, or replacement of mechanical/gas systems, per the City's Building Permit FAQ
  • Governed by the 2024 IMC and 2024 IFGC as adopted
  • Manual J, Manual D, and S calculations required (legible) if the heating system or ductwork is being installed, replaced, relocated, or altered
  • Contractors must hold applicable state licensure (Class D-11 HVAC/Mechanical ICC exam where required) plus a City of Littleton Contractor's License

Required documents

  • RequiredMechanical Permit Application (eTRAKiT Online System)Apply via eTRAKiT under the mechanical permit type
  • OptionalManual J/D/S CalculationsRequired for heating system or ductwork replacement/relocation/alteration

Fee schedule

Fee typeAmountNotes
Permit fee — valuation-based (Permit Fee Schedule, Resolution 2025-105)$25.85 minimum, scaling per valuation tiers
City of Littleton Permit Fee Schedules page, TOTAL VALUATION table — $25.85 for the $1–$500 tier, scaling through seven valuation tiers. Show full citation

City of Littleton Permit Fee Schedules page, TOTAL VALUATION table — $25.85 for the $1–$500 tier, scaling through seven valuation tiers. Also in Resolution No. 105, Series 2025, Exhibit A, Building Permits table. The figures are unchanged from the preceding Resolution No. 08 edition.

Plan Review Fee65% of the permit fee, applicable only when plans are reviewed for code compliance
City of Littleton Permit Fee Schedules page — “PLAN REVIEW FEE = 65% x PERMIT FEE(S) IS ONLY APPLICABLE WHEN THE BLUEPRINTS/CONSTRUCTION DOCUMENTS ARE REVIEWED FOR MUNICIPAL AND ADOPTED BUILDING CODES”. Show full citation

City of Littleton Permit Fee Schedules page — “PLAN REVIEW FEE = 65% x PERMIT FEE(S) IS ONLY APPLICABLE WHEN THE BLUEPRINTS/CONSTRUCTION DOCUMENTS ARE REVIEWED FOR MUNICIPAL AND ADOPTED BUILDING CODES”. Resolution No. 105, Series 2025, Exhibit A states the same rate as “Building Permit Plan Review and Inspection Fees — 65% of permit fee”.

Roofing Permit (Reroof)

Verified

Required for roof covering replacement or overlay exceeding one square (100 sq ft) aggregate area in Littleton. Governed by detailed City Roof Covering Installation and Inspection Requirements Policy #24-001 (5th Revision, 5/21/2026), including mandatory full tear-off, wind/snow-rated material requirements, and a defined roof-repair-vs-replacement threshold.

Verified 2026-07-05 · Source

Requirements

  • A permit is required for replacement/removal of more than one square (100 sq ft aggregate) of existing roof covering; equal to or less than one square is deemed 'roof repair' and does not require replacement of the entire roof (Policy #24-001, Section 3)
  • Littleton REQUIRES FULL TEAR-OFF TO DECK for asphalt, metal, or clay/concrete tile roofs — no overlays are accepted on those materials (Policy #24-001, Section 1.1); membrane-type roof overlays ARE permitted under Section 2, but mineral-surfaced roll roofing is NOT permitted anywhere in the City
  • Roofing materials must be listed/rated for the City's adopted design criteria (Ground Snow Load 40 psf non-reducible, Ultimate Design Wind Speed 136 mph): Asphalt shingles ASTM D7158 Class H (up to 150 mph); Metal roofing UL 580/ASTM E1592 (150+ mph); Clay/concrete tile ASTM C1167 (150+ mph, high-wind install)
  • Manufacturer's specifications demonstrating wind-load compliance must be submitted at permit intake; permits will not be accepted without this documentation
  • Ice and water barrier underlayment (ASTM D1970) required at eaves of all conditioned structures, extending minimum 2 feet inside the exterior wall line; valley treatment per Policy #24-001 Section 1.4
  • Asphalt shingles must comply with 2024 IRC Section R905.2.4 / ASTM D3462, nailed with minimum 6 nails per shingle; may not be installed below 2/12 pitch; double underlayment or ice/water barrier required between 2/12 and 4/12 pitch
  • Roof decks with spaced/board sheathing having gaps exceeding 1/2 inch must be overlaid or replaced with minimum 3/8-inch panel sheathing; a Building Division sheathing-fastening inspection is required before underlayment/covering installation
  • If City records indicate an existing photovoltaic (solar) system, roof permit issuance is delayed until a City-licensed solar contractor has obtained a separate permit to remove/replace the solar assembly (Policy #24-001, Section 4)
  • Permit must be displayed in a location visible from the street prior to work commencement

Required documents

  • RequiredRoofing Permit Application (eTRAKiT Online System)Apply via eTRAKiT under the roofing permit type
  • RequiredManufacturer's Wind/Snow-Load Compliance SpecificationsRequired at permit intake per Policy #24-001; permits will not be accepted without this documentation

Fee schedule

Fee typeAmountNotes
Permit fee — valuation-based (Permit Fee Schedule, Resolution 2025-105)$25.85 minimum, scaling per valuation tiers
City of Littleton Permit Fee Schedules page, TOTAL VALUATION table — $25.85 for the $1–$500 tier, scaling through seven valuation tiers. Show full citation

City of Littleton Permit Fee Schedules page, TOTAL VALUATION table — $25.85 for the $1–$500 tier, scaling through seven valuation tiers. Also in Resolution No. 105, Series 2025, Exhibit A, Building Permits table. The figures are unchanged from the preceding Resolution No. 08 edition.

Re-inspection Fee$80/hourApplies if a required inspection (e.g., final roof) cannot be completed due to missing ladder access or other unmet requirements

Residential Rooftop Solar (PV) and Energy Storage System (ESS) Permit

Verified

Required for installation of residential photovoltaic (PV) systems and energy storage systems (ESS) in Littleton. Governed by detailed City-published design/submittal requirements referencing UL/NEC standards, distinct from and more detailed than many peer Colorado jurisdictions' solar guidance.

Verified 2026-07-05 · Source

Requirements

  • Applies only to residential PV and ESS installations administered by the Building and Code Compliance Division; other City departments or outside authorities may require additional permits/approvals
  • For townhouses/multi-family buildings, PV panels, pathways, and setbacks must be restricted to the roof area allocated to the individual dwelling unit — cannot use a neighboring unit's rooftop as required pathway space
  • PV panels/modules must be listed/labeled per UL 1703 or both UL 61730-1 and UL 61730-2; inverters listed/labeled per UL 1741; grid-tied systems must use inverters listed for utility interaction
  • Exposed grounding conductors on the roof must be 6 AWG copper or larger (NEC 250.120(C)); a single-rod/pipe/plate grounding electrode requires a supplemental electrode spaced at least 6 feet apart (IRC E3608.4)
  • ESS must be listed/labeled per UL 9540 and installed per IRC R328.4, the NEC, and Littleton amendments; restricted to specific locations (detached garages/accessory structures, separated attached garages, exterior walls 3+ feet from doors/windows, or enclosed utility spaces with fire-rated finishes) and prohibited in sleeping rooms/closets
  • ESS installed inside dwelling units, basements, or attached garages must have interconnected smoke alarms or heat detectors
  • A digitally stamped/signed structural engineer letter is required confirming the existing structure and proposed PV system have been evaluated against Littleton's design criteria
  • All electrical design sheets must be digitally stamped/signed by a State of Colorado-registered Electrical Engineer
  • Contractors and installers must be licensed to perform PV and electrical work within the City of Littleton
  • Only 25% of panels may be installed prior to rough frame and rough electrical inspection

Required documents

  • RequiredBuilding Permit Application (eTRAKiT Online System)Apply via eTRAKiT for the residential PV/ESS permit type
  • RequiredStamped Structural Engineer LetterConfirms structural evaluation of existing roof/structure for the proposed PV system per Littleton design criteria
  • RequiredStamped Electrical Design SheetsCover sheet, dimensioned site plan, one/three-line diagrams, roof attachment diagram, required warning labels, NEC compliance calculations — stamped by a Colorado-registered Electrical Engineer

Fee schedule

Fee typeAmountNotes
Permit fee — valuation-based (Permit Fee Schedule, Resolution 2025-105)$25.85 minimum, scaling per valuation tiersNo separate solar-specific flat fee is published; billed under the general Permit Fee Schedule

Demolition Permit

Verified

Required for demolition of structures in Littleton. Requires Colorado State Demolition Approval notice, a detailed site plan, a separate grading permit, and coordination with utility disconnection (including Denver Water approval for water service).

Verified 2026-07-05 · Source

Requirements

  • Colorado State Demolition Approval notice required for each structure being demolished; Asbestos Abatement Report should be provided if available (see the City's published asbestos information sheet)
  • Site plan required indicating: structure(s) to be demolished, square footage of each structure, floodplain status if applicable, utility disconnects, utility tie-ins, utility ownership, and area of disturbance
  • A SEPARATE Grading Permit is required in addition to the demolition permit
  • A debris hauling map or turn-by-turn written instructions indicating the shortest route to the nearest state highway from the demolition address must be provided
  • All utilities must be disconnected prior to demolition
  • Proof of Denver Water approval for water service disconnect required (obtained by emailing Denver Water directly)

Required documents

  • RequiredDemolition Permit Application (eTRAKiT Online System)Apply via eTRAKiT under the demolition permit type
  • RequiredColorado State Demolition Approval Notice
  • RequiredSite PlanStructures to be demolished, square footage, floodplain status, utility disconnects/tie-ins/ownership, area of disturbance
  • OptionalAsbestos Abatement ReportProvide if available; see City's published asbestos information sheet (BuildingCDPHEAsbestosSheet.pdf)
  • RequiredDebris Hauling Route MapShortest route to the nearest state highway from the demolition address
  • RequiredDenver Water ApprovalProof of approval for water service disconnect

Fee schedule

Fee typeAmountNotes
Permit fee — valuation-based (Permit Fee Schedule, Resolution 2025-105)$25.85 minimum, scaling per valuation tiersNo demolition-specific flat fee is published separately; a separate Grading Permit fee also applies

Fence Permit

Verified

Required for ALL fences in Littleton — a stricter baseline than jurisdictions that exempt low fences. Detailed height/construction rules differ by front yard, side yard, rear yard, and pool-enclosure context; flat $100 fee.

Verified 2026-07-05 · Source

Requirements

  • ALL fences require a building permit in Littleton — there is no height-based exemption
  • In all residential districts, swimming/wading pools 24+ inches deep must be fully enclosed by a fence at least 48 inches high, constructed to prohibit entry
  • Fences must be separated from sidewalks and public right-of-way by a minimum of 2 feet
  • Fences over 7 feet tall require stamped engineered drawings
  • Front Yards: maximum height 48 inches; construction must be at least 50% open (interior lot) or 75% open (corner lot)
  • Side Yards: maximum height 6 feet (may be 100% solid); any fence over 6 feet requires a variance from the Board of Adjustment
  • Rear Yards: maximum height 6 feet (may be 100% solid); any fence over 6 feet requires a variance from the Board of Adjustment
  • All fences must meet sight-triangle/sight-distance requirements
  • Governed by Littleton Land Use Code Section 10-1-1.6C.D.2
  • Applicant must call the Utility Notification Center of Colorado (1-800-922-1987) at least two business days before digging post holes

Required documents

  • RequiredFence Permit Application (eTRAKiT Online System)Submitted via eTRAKiT
  • RequiredDetailed Site PlanFence placement relative to property lines and house, fence height, linear feet, elevations, north arrow, post depth, and material type; may be hand-drawn if legible and to scale
  • OptionalStamped Engineered DrawingsRequired only for fences over 7 feet tall

Fee schedule

Fee typeAmountNotes
Residential Fence Permit$100Flat fee per the Permit Fee Schedule (Resolution 2025-105)

EV Charger / Electric Vehicle Charging Station Permit

Verified

The City of Littleton has no dedicated EV-charger or EVSE permit type or fee line. Installing a Level 2 (240V) home EV charger -- whether a hardwired unit or a new NEMA 14-50 outlet -- requires a standard City of Littleton Electrical Permit, billed under the City's general valuation-based Permit Fee Schedule (Resolution 2025-105), reviewed against the locally-adopted 2026 edition of NFPA 70 (National Electrical Code).

Verified 2026-07-20 · Source

Requirements

  • Electrical work must be performed by a contractor holding an active Colorado DORA Master's/Journeyman's Electrical License and a Colorado State Electrical Contractor's License, in addition to City of Littleton contractor licensing
  • Reviewed against the locally-adopted 2026 edition of NFPA 70 (NEC)
  • No EV-specific application, checkbox, or fee category exists; the permit is billed under the same general valuation-based electrical permit fee schedule used for any electrical installation, alteration, or repair
  • If the installation requires a panel upgrade or new/upsized electrical service, that work is valued and permitted the same way, at a higher valuation tier

Required documents

  • RequiredCity of Littleton Electrical Permit applicationSubmitted to City of Littleton Building Development for the EV charger circuit installation

Fee schedule

Fee typeAmountNotes
Permit fee -- valuation-based (EV charger circuit installation)$25.85 for the first $500, plus $3.35 for each additional $100 or fraction thereof up to $2,000 (higher tiers scale further for larger-valuation projects)
City of Littleton Permit Fee Schedule, per the current fee-schedule resolution PDF (the live site serves it behind a WAF challenge; Show full citation

City of Littleton Permit Fee Schedule, per the current fee-schedule resolution PDF (the live site serves it behind a WAF challenge; the City's own document as archived by the Wayback Machine, timestamp 20251014, carries the schedule). No distinct 'EV charger'/'EVSE' line item exists; this is the general valuation-based electrical permit fee an EV charger circuit installation is billed under.

Plan Review Fee65% of the permit fee, applicable only when plans are reviewed for code complianceCity of Littleton Permit Fee Schedule (Resolution 2025-105)
Re-inspection Fee$80/hourCity of Littleton Permit Fee Schedule (Resolution 2025-105)

Commercial Building Permit (New Construction & Additions)

Verified

Required for new commercial buildings and commercial additions in Littleton. Reviewed under the 2024 IBC, IECC, IMC, IPC, IFC and related I-codes as locally amended, plus the 2026 NEC. Issued and inspected by the City of Littleton Building and Code Compliance Division (Permit Center) — the City runs one unified in-house building department for all parcels within city limits, including the small portions of Littleton that extend into Douglas and Jefferson Counties beyond its Arapahoe County core. Fire/life-safety construction documents must be submitted separately and in parallel to South Metro Fire Rescue.

Verified 2026-08-02 · Source

Requirements

  • Plans must comply with the 2024 I-codes as adopted by the City of Littleton, and the applicable code versions must be notated on the plans
  • Seal of a Colorado Registered Architect required on architectural plans; a Colorado Professional Engineer seal required on structural, mechanical, electrical, and plumbing components — size/span/spacing of structural and framing members must be sealed by a Colorado PE only (an architect seal is not accepted for structural framing)
  • Full code analysis required on the plans: sheet index on the title sheet, statement of code versions used, Use and Occupancy Classification, Construction Type, occupant load with calculations, number of stories and building height, allowable area calculations (with justification for any area increases), plumbing fixture counts with spacing diagrams, identification of new and existing fire suppression systems, plan of exiting conditions, and a Life Safety Plan showing exit routes, lengths, exits, exit discharges, stairs, ramps, and elevators
  • Intended energy compliance path per IECC Chapter 4 must be identified: Prescriptive R-Value/U-Factor, Prescriptive Component Performance Alternative, Simulated Building Performance, or Energy Rating Index; IECC C406 additional efficiency requirements must be identified
  • Electrical plans (PE-sealed) must include a one-line diagram with load and fault current calculations, service panel location and load calcs, emergency/exit lighting layout, photometric study and cut sheets for exterior fixtures, and service entrance details for new construction
  • Mechanical and plumbing plans (PE-sealed) must include isometric drawings for plumbing and gas piping, equipment schedules with performance data, Manuals J, S, and D, and — for rooftop units — structural details confirming load and screening compliance with Municipal Code Title 10
  • Plans must be submitted separately to South Metro Fire Rescue for fire review
  • Projects including restaurants/grocery/food service, childcare facilities or schools, swimming pools, or body art facilities must also be submitted to the appropriate county health department (Arapahoe, Jefferson, or Douglas County depending on parcel location)
  • Site Plan (with north arrow) required for changes in use, exterior changes, street access modifications, or curb cuts
  • Community Development Engineering Division (303-795-3868) handles grading, right-of-way, sewer, traffic, and floodplain; for a new sewer tap, the Sanitation District is paid first, then the City of Littleton; Denver Water fees/application: 303-893-2444
  • All documents must be submitted electronically via the eTRAKiT portal; 'preliminary' or 'Not for Construction' plan sets are not accepted
  • General contractor must hold a current City of Littleton Contractor's License with $1,000,000/$2,000,000 Commercial General Liability insurance naming the City as Certificate Holder; electrical and plumbing subcontractors additionally need active Colorado DORA licenses
  • Permit must be commenced within 180 days of issuance and expires 365 days after issuance unless extended by the Building Official

Required documents

  • RequiredCommercial Building Permit Application (eTRAKiT Online System)Submitted electronically through the City's eTRAKiT portal; all documents electronic-only
  • RequiredArchitectural Plans (sealed by Colorado Registered Architect)Dimensioned, drawn to scale, showing all proposed work: floor plan, room uses and sizes, doors/windows with SHGC and U-factor, stairways with rise/run/handrail/headroom, insulation types and ratings, fire-rated wall locations and approved assemblies
  • RequiredStructural Plans (sealed by Colorado PE)Size, span, and spacing of all structural and framing members — Colorado PE seal only; architect seal not accepted
  • RequiredCode Analysis & Life Safety PlanSheet index, code versions, occupancy classification, construction type, occupant load calcs, allowable area calcs, stories/height, fixture counts, exiting conditions, and Life Safety Plan
  • RequiredElectrical Plans (sealed by Colorado PE)Receptacle/switch/lighting layout, panel location and load calculations, emergency and exit lighting, photometric study for exterior fixtures, one-line diagram with load and fault current calculations, service entrance details
  • RequiredMechanical & Plumbing Plans (sealed by Colorado PE)Fixture/appliance/piping/vent/trap/backflow details, plumbing and gas isometrics, equipment schedules with performance data, Manuals J/S/D, rooftop unit structural and screening details
  • RequiredIECC Energy Compliance DocumentationCompliance method (Prescriptive or Performance), thermal envelope and air barrier locations, C406 additional efficiency selections, and supporting calculations or compliance reports
  • RequiredSouth Metro Fire Rescue Plan SubmittalConstruction documents submitted separately to South Metro Fire Rescue via its own portal
  • OptionalSite PlanRequired for changes in use, exterior changes, street access modifications, or curb cuts; include north arrow
  • OptionalCounty Health Department SubmittalRequired for food service, childcare/schools, swimming pools, and body art facilities — Arapahoe, Jefferson, or Douglas County health department depending on parcel location

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)$25.85 minimum; sliding scale by total valuation
Per Resolution 2025-105 (approved December 21, 2025): $25.85 up to $500; Show full citation

Per Resolution 2025-105 (approved December 21, 2025): $25.85 up to $500; $25.85 + $3.35/$100 from $500.01-$2,000; $76.17 + $15.40/$1,000 to $25,000; $430.37 + $11.11/$1,000 to $50,000; $708.12 + $7.70/$1,000 to $100,000; $1,093.12 + $6.16/$1,000 to $500,000; $3,557.12 + $5.23/$1,000 to $1,000,000; $6,172.12 + $4.02/$1,000 above $1,000,000

Plan Review Fee65% of the Building Permit FeeApplicable when blueprints/construction documents are reviewed for municipal and adopted building codes — effectively always for commercial new construction
City Use Tax Deposit1.969% of total job valuation0.01969 x Total Job Valuation ((Total Job Valuation x 52.5%) x 3.75% City use tax rate); assessed and collected at permit issuance
Arapahoe County Open Space Tax0.125% of total valuation0.00125 x Total Valuation ((Total Job Valuation x 50%) x 0.25%); charged on the building permit
Land Development Impact Fee (new development, per square foot)$3.44-$6.51 per sq ft by use category
Per Ordinance No. 04-2026, effective February 17, 2026, paid at building permit issuance: Retail/Commercial $6.51, Auto Dealership $6.51, Lodging $4.52, Office $4.31, Industrial $3.79, Warehouse/Storage $3.44 per sq ft; Show full citation

Per Ordinance No. 04-2026, effective February 17, 2026, paid at building permit issuance: Retail/Commercial $6.51, Auto Dealership $6.51, Lodging $4.52, Office $4.31, Industrial $3.79, Warehouse/Storage $3.44 per sq ft; rates adjusted annually for inflation (Littleton City Code Title 1, Chapter 14)

Temporary Certificate of Occupancy$400 first issuance; $200 each renewalPer the Permit Fee Schedules page
Plan Revision / Resubmittal Review$160 minimum (first two hours), then $80/hourOr the total hourly cost to the jurisdiction, whichever is greater

Commercial Tenant Improvement (Tenant Finish) Permit

Verified

Interior remodels, tenant finishes, and changes of occupancy in existing commercial buildings in Littleton. The City does NOT maintain a separate tenant-improvement permit category — TI work is applied for, reviewed, and fee'd as a standard Commercial Building Permit under the same Commercial Submittal Requirements and the same valuation-based fee schedule (confirmed 2026-08-02: no 'tenant finish' or 'tenant improvement' page exists on littletonco.gov, and eTRAKiT lists only 'Commercial Building Permits'). The Commercial Submittal Requirements do, however, contain several provisions specific to work in existing buildings, captured here.

Verified 2026-08-02 · Source

Requirements

  • Same submittal pathway as new commercial construction: electronic submittal via eTRAKiT under the City's Commercial Submittal Requirements, reviewed under the 2024 I-codes as adopted
  • Code analysis must include a plan of EXISTING exiting conditions and identification of new AND existing fire suppression systems — the two submittal items aimed squarely at work inside existing buildings
  • Colorado Registered Architect seal required; Colorado PE seal required on any structural, mechanical, electrical, or plumbing components of the TI scope
  • Life Safety Plan showing exit routes, lengths, exits, exit discharges, stairs, ramps, and elevators for the affected space
  • Site Plan required ONLY for changes in use, exterior changes, street access modifications, or curb cuts — a purely interior tenant finish with no change of use does not trigger the site plan item
  • Separate plan submittal to South Metro Fire Rescue
  • Health department submittal (Arapahoe, Jefferson, or Douglas County per parcel) required if the tenant space is a restaurant/grocery/food service, childcare/school, swimming pool, or body art facility
  • South Platte Water Renewal Partners review (303-783-3844) applies to food establishments and remodels affecting sanitary drainage, repair garages, and car washes
  • Asbestos: for buildings built before 1988, contact CDPHE (303-692-2000 / 303-692-3100) regarding abatement requirements before disturbing materials
  • IECC energy compliance path must be identified for altered building systems (Prescriptive or Performance)
  • Contractor must hold a current City of Littleton Contractor's License; electrical and plumbing subs also need active Colorado DORA licenses
  • All documents electronic via eTRAKiT; 'preliminary'/'Not for Construction' sets not accepted; permit must be commenced within 180 days and expires 365 days after issuance

Required documents

  • RequiredCommercial Building Permit Application (eTRAKiT Online System)Littleton has no separate TI application — tenant improvements are submitted as commercial building permits through eTRAKiT
  • RequiredArchitectural Plans (sealed by Colorado Registered Architect)Scaled floor plan of the tenant space showing all proposed work, room uses/sizes, doors/windows, fire-rated wall locations and approved assemblies
  • RequiredCode Analysis with Existing-Conditions Exiting Plan & Life Safety PlanOccupancy classification, construction type, occupant load, plan of existing exiting conditions, identification of new and existing fire suppression systems, plumbing fixture counts
  • OptionalStructural Plans (sealed by Colorado PE)Required if the TI scope alters structural or framing members; PE seal only for framing member sizing
  • OptionalElectrical Plans (sealed by Colorado PE)Required for electrical scope: layout, panel location and load calcs, emergency/exit lighting, one-line diagram with load and fault current calculations
  • OptionalMechanical & Plumbing Plans (sealed by Colorado PE)Required for mechanical/plumbing scope: fixture and equipment schedules, isometrics, and rooftop-unit structural/screening details where units are added or replaced
  • RequiredSouth Metro Fire Rescue Plan SubmittalConstruction documents submitted separately to South Metro Fire Rescue
  • OptionalCounty Health Department SubmittalRequired for food service, childcare/school, pool, or body art tenants
  • OptionalSite PlanOnly if the project involves a change in use, exterior changes, street access modification, or curb cut

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)$25.85 minimum; sliding scale by total valuationSame Resolution 2025-105 table as all building permits — no separate TI fee line. Example mid-range brackets: $430.37 at $25,000 + $11.11/$1,000 to $50,000; $708.12 at $50,000 + $7.70/$1,000 to $100,000; $1,093.12 at $100,000 + $6.16/$1,000 to $500,000
Plan Review Fee65% of the Building Permit FeeCharged when construction documents are reviewed for code compliance
City Use Tax Deposit1.969% of total job valuation0.01969 x Total Job Valuation; assessed and collected at permit issuance
Arapahoe County Open Space Tax0.125% of total valuation0.00125 x Total Valuation; charged on the building permit
Plan Revision / Resubmittal Review$160 minimum (first two hours), then $80/hourApplies to revised TI plan sets; provide a written narrative identifying each revision by page/section
Temporary Certificate of Occupancy$400 first issuance; $200 each renewalUseful for phased tenant openings

Sign Permit

Verified

The City of Littleton repealed its standalone Chapter 17 Sign Code, per the City's own online City Code and Charter table of contents (which lists it as '[Repealed] Chapter 17 SIGN CODE'). Sign standards are now set district-by-district within the Unified Land Use Code (ULUC) — for example, Business & Industry (BI) district sign types and standards are codified at ULUC Article 10-5-5, Section 10-5-5.1 — with similar district-specific sign articles for Downtown, Corridors/Mixed-Use, and Neighborhood districts. The City also publishes a standalone Special Temporary Sign Permit Application distinct from the general Building Permit Application.

Verified 2026-08-14 · Source

Requirements

  • Littleton's standalone Chapter 17 Sign Code has been repealed; sign standards are now set per zoning district within the Unified Land Use Code (ULUC) — e.g., Business & Industry (BI) district signs are governed by ULUC Article 10-5-5
  • A Special Temporary Sign Permit Application (separate from the general Building Permit Application) is published for temporary signage
  • Permanent signs are processed through the general Building & Development permitting process; site development/use permit submittal requirements are set by the Director of Community Development under ULUC Section 10-9-1.5(B)2
  • Fees follow the City's Permit Fee Schedule (adopted by City Council resolution, e.g. Resolution No. 08, Series 2025)

Required documents

  • RequiredSpecial Temporary Sign Permit ApplicationCity of Littleton Building & Development form for temporary signage

Fee schedule

Fee typeAmountNotes
Sign Permit FeePer the City's adopted Permit Fee ScheduleThe City's 2025 Schedule of Fees (Resolution No. 08, Series 2025) governs permit fees; specific sign-permit line-item dollar amounts from that resolution are not reproduced here. Contact the Permit Center (303-795-3751, permits@littletonco.gov) for a current fee quote.

Fire Sprinkler / Fire Alarm System Permit

Verified

Fire protection for Littleton is provided by South Metro Fire Rescue (SMFR), which took over the Littleton Fire Department's duties in 2019. SMFR's Development & Construction Section publishes a detailed 'Systems and Other Fees' schedule (effective January 1, 2026) with itemized Plan Check, Inspection, and Total costs for fire protection system work, e.g.: NFPA 13 sprinkler system modification of ≤50 heads ($344.57 total), 51-300 heads ($414.31), >300 heads ($843.98); Fire Alarm System Modification Base Fee ($461.12, plus $6.12 per additional device); Fire Alarm Control Panel Replacement ($651.92). New fire sprinkler/alarm systems installed as part of new construction or tenant improvements are billed on a separate IBC-occupancy-classification table (base cost plus a per-100-sq-ft increment) rather than the flat modification fees.

Verified 2026-08-14 · Source

Requirements

  • Plans submitted via SMFR's Accela Permit Portal; over-the-counter review is available for alterations to existing wet-pipe fire sprinkler systems (light/ordinary hazard, up to 50 sprinkler heads, no hydraulic design impact) and for fire alarm system alterations involving substitution/relocation of up to 25 devices or addition of up to 10 new devices, when submitted by 11:00 a.m.
  • New fire sprinkler and fire alarm systems installed as part of new construction or tenant improvements are billed on SMFR's IBC-occupancy-classification-based fee table (base cost + cost per additional 100 sq ft), not the flat modification fees
  • All SMFR-issued permits and approved plans must remain on-site for the duration of the project; inspections will not be performed without them, and re-inspection fees may apply

Required documents

  • RequiredSMFR Fire Protection System Permit Application (via Accela Permit Portal)Submitted through South Metro Fire Rescue's Accela-based online permitting system

Fee schedule

Fee typeAmountNotes
NFPA 13 Sprinkler System Modification — ≤50 Sprinkler Heads$344.57 total ($104.61 plan check + $239.96 inspection)SMFR Systems and Other Fees, effective 1/1/2026
NFPA 13 Sprinkler System Modification — 51-300 Sprinkler Heads$414.31 total ($174.35 plan check + $239.96 inspection)SMFR Systems and Other Fees, effective 1/1/2026
NFPA 13 Sprinkler System Modification — >300 Sprinkler Heads$843.98 total ($244.07 plan check + $599.91 inspection)SMFR Systems and Other Fees, effective 1/1/2026
Fire Alarm System Modification Base Fee$461.12 total, plus $6.12 per additional deviceSMFR Systems and Other Fees, effective 1/1/2026
Fire Alarm Control Panel Replacement$651.92 total, plus $6.12 per additional deviceSMFR Systems and Other Fees, effective 1/1/2026
Fire Alarm System (Sprinkler Monitoring Only)$434.29 total ($153.84 plan check + $280.45 inspection)SMFR Systems and Other Fees, effective 1/1/2026
Change of Use (fire review)$587.99 total ($174.24 plan check + $413.75 inspection)SMFR Systems and Other Fees, effective 1/1/2026 — a fire-code compliance review fee, separate from any City of Littleton building/zoning change-of-use process
Re-Inspection Fee / Release of Stop Work Order$284.63SMFR Systems and Other Fees, effective 1/1/2026

Change of Use / Change of Occupancy

Verified

No standalone City of Littleton 'Change of Use' or 'Change of Occupancy' permit application distinct from the general Building & Development permitting process is confirmed in directly-quoted primary-source text. Separately, South Metro Fire Rescue (which provides fire protection for Littleton) charges its own itemized 'Change of Use' fire-code compliance review fee of $587.99 ($174.24 plan check + $413.75 inspection), per its Systems and Other Fees schedule effective 1/1/2026 — confirming that a change of use in Littleton triggers, at minimum, a real fire-district review process even though the City's own change-of-use process is not separately documented.

Verified 2026-08-14 · Source

Requirements

  • The City publishes no standalone change-of-use application distinct from the general Building & Development permitting process
  • South Metro Fire Rescue charges a $587.99 'Change of Use' fire-code compliance review fee ($174.24 plan check + $413.75 inspection), per its Systems and Other Fees schedule effective 1/1/2026
  • Contact the Permit Center (303-795-3751, permits@littletonco.gov) to confirm the City-side requirements and applicable fee schedule for a specific change-of-use project

Required documents

  • RequiredBuilding Permit Application (Change of Use)Contact the Permit Center to confirm current requirements; a separate South Metro Fire Rescue fire-code compliance review also applies

Fee schedule

Fee typeAmountNotes
South Metro Fire Rescue — Change of Use (fire review)$587.99 total ($174.24 plan check + $413.75 inspection)SMFR Systems and Other Fees, effective 1/1/2026
City of Littleton Building Permit Fee (if applicable)Per the City's adopted Permit Fee Schedule (Resolution No. 08, Series 2025); specific change-of-use line-item amounts are not reproduced here. Contact the Permit Center (303-795-3751) for a current quote.

Sources & verification

Verified against official sources. Last reviewed 2026-07-05.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Littleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-02)View current record →All versions →

Permalink: /colorado/arapahoe-county/littleton/as-of/2026-08-14/

Snapshot date: 2026-08-14

Commit: 3f7a229

Reproducible from PermitBase’s version-controlled dataset, commit 3f7a229.