Skip to main content
PermitBase

This is PermitBase’s published record for Springfield as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Springfield building permits

Verified

Springfield, Colorado — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

NONE CURRENTLY ADOPTED — verified by ordinance history, not assumed. The Town of Springfield originally adopted the International Building Code, 2006 edition, on July 10, 2008. Ordinance No. 355 (introduced Feb. 9, 2023; passed second reading March 9, 2023) repealed and re-adopted Sec. 18-1 of the Municipal Code, re-confirming the 2006 IBC with Town-specific geographic limits (Sec. 18-3). HOWEVER, Ordinance No. 356 (introduced June 8, 2023; passed and published July 13, 2023) subsequently REPEALED Chapter 18, Article I, Sec. 18-1 through 18-3 IN THEIR ENTIRETY, including the 2006 IBC adoption itself and all the geographic-limits provisions (frost depth, wind load, snow load, seismic category, etc.). No later ordinance (reviewed the Town's full ordinance archive through Ordinance No. 365, current as of this review) re-adopts any building code edition. As of 2026-07-06, Springfield therefore has NO adopted building code (no IBC/IRC/IMC/IPC/IECC edition) on its books.Despite the repealed building code, the Town continues to operate an active Building Permit process governed by Springfield Municipal Code Chapter 16 (Zoning) rather than Chapter 18 (Building Code) — the current Building Permit Application form (dated 03.25.2025) explicitly states the applicant 'agrees to comply with Springfield Municipal Code, Chapter 16 by which this permit is granted' and cites 'MUNICODE CHAPTER 16-ZONING' as the governing authority for the permit's underlying agreement. This is a zoning/land-use permit and property/setback review, not a code-compliance plan review against a specific model code edition.Electrical and plumbing work is NOT reviewed or inspected by the Town at all — Ordinance No. 355 (Sec. 13-158, as re-adopted, still in force) defines the 'electrical inspector' as 'the Colorado State Electrical Inspector assigned by the State of Colorado to perform electrical inspections for the Town of Springfield,' and the same ordinance's Sec. 18-3(10) (since repealed along with the rest of Sec. 18-3, but consistent with current practice) stated that electrical and plumbing issues are governed by 'the electrical and plumbing codes required by the State of Colorado.' The current Building Permit Application form itself lists only 'State electrical' and 'State plumbing' under its Inspections checklist — confirming Springfield defers both trades entirely to Colorado DORA/state inspection programs rather than running its own trade-permit or trade-inspection process.

Permit types & fees

Building Permit

Verified

Required for construction of houses, additions, remodels, accessory structures (porches, carports, decks, sheds, storage, garages, fences), and placement of tiny homes, modular homes, or manufactured/mobile homes within Springfield town limits. Issued directly by Town Hall (Town Clerk/Town Manager) under Springfield Municipal Code Chapter 16 (Zoning) — the Town's building code (originally the 2006 IBC) was repealed in its entirety by Ordinance No. 356 (July 2023) and has not been re-adopted, so this permit functions as a zoning/setback/land-use review rather than a model-code plan review.

Verified 2026-07-06 · Source

Requirements

  • Complete Building Permit Application (3-page Town of Springfield form) including legal description (subdivision/block/lot or metes-and-bounds), classification of construction, and type of work
  • Setback distances from all four lot lines (front, rear, and N/E/S/W side yards) must be provided; a drawing or survey may be attached
  • Required submittal documents: photos, side view, front view, building plans, floor plan, and foundation plan
  • Asbestos disturbance certification required on the application (three checkbox options: no inspection conducted, inspection not conducted, or inspection conducted with date)
  • Applicant must certify compliance with Springfield Municipal Code Chapter 16 (Zoning); any violation results in immediate permit revocation
  • Zoning review is conducted as part of permit issuance — the Town's internal review section checks the property's zoning district and notes whether a Variance from the Board or a Special Use Permit is required
  • Water, sewer, electric, and gas service type/size must be documented on the permit with officer initials, but the Town does NOT independently inspect electrical or plumbing work — those inspections are performed by Colorado State Electrical and Plumbing Inspectors, per the permit form's own Inspections checklist ('State electrical', 'State plumbing') and Ordinance No. 355 Sec. 13-158

Required documents

  • RequiredBuilding Permit Application (Town of Springfield, 03.25.2025 form)3-page application covering project cost, applicant/owner information, legal description, classification of construction, building specifications, setbacks, and required attachments
  • RequiredPhotos, site/elevation views, building plans, floor plan, foundation planListed on the application as required accompanying documents
  • OptionalSurvey or setback drawingReferenced on the application's Location on the Property / Set Backs section

Fee schedule

Fee typeAmountNotes
Building Permit Application Fee$50.00 flatMaster Fee Schedule, Resolution No. 25-07 (adopted 8-14-2025), incorporating the rate originally set by Resolution No. 23-05 (4-13-2023)
Building Cost Fee$1.00 per $1,000 of estimated building/construction cost, capped at a $2,000.00 maximumMaster Fee Schedule, Resolution No. 25-07

Electrical Permit (State-Administered)

Verified

Electrical work within Springfield town limits is not permitted or inspected by the Town itself. Per Ordinance No. 355 (Sec. 13-158, currently in force), the 'electrical inspector' for the Town of Springfield is defined as the Colorado State Electrical Inspector assigned by the State of Colorado. The Town's own Building Permit Application lists 'State electrical' as an inspection to be conducted, confirming the Town defers electrical inspection entirely to the Colorado Division of DORA/State Electrical Board rather than running its own trade-permit program. No separate Town electrical permit fee exists in the Master Fee Schedule.

Verified 2026-07-06 · Source

Requirements

  • Electrical work is inspected by the Colorado State Electrical Inspector, not a Town of Springfield employee or contractor, per Ordinance No. 355 Sec. 13-158
  • Electrical service type and size must still be documented on the Town's Building Permit Application (officer-initialed field), tying electrical work to the overall building permit rather than a standalone Town electrical permit
  • No standalone Town of Springfield electrical permit fee is published in the Master Fee Schedule — electrical work appears to be covered under the general Building Permit Application Fee and Building Cost Fee rather than billed separately

Required documents

  • RequiredBuilding Permit Application (Town of Springfield) — Electric Service sectionElectric service type/size documented as part of the general Building Permit Application, not a standalone electrical permit form

Fee schedule

Fee typeAmountNotes
No standalone Town electrical permit fee publishedNot applicable — see Building Permit Application Fee ($50.00) and Building Cost Fee ($1.00/$1,000, max $2,000.00)Checked the Town's full Master Fee Schedule (Resolution 25-07) directly; no separate electrical line-item fee exists. Colorado DORA electrical contractor licensing fees are a separate state-level cost not set by the Town.

Plumbing Permit (State-Administered)

Verified

Plumbing work within Springfield town limits is inspected by Colorado state plumbing inspectors rather than the Town itself. The Town's Building Permit Application lists 'State plumbing' as an inspection to be conducted, and the Town's now-repealed Sec. 18-3(10) (Ordinance No. 355) explicitly stated that plumbing issues are governed by 'the electrical and plumbing codes required by the State of Colorado' with 'Colorado State Electrical and Plumbing inspectors' used for those inspections — a policy the Town's current permit form confirms is still followed in practice even though that specific code section was later repealed along with the rest of Chapter 18.

Verified 2026-07-06 · Source

Requirements

  • Plumbing work is inspected by Colorado state plumbing inspectors, not Town of Springfield staff
  • Water and sewer service type/size must be documented on the Town's Building Permit Application (officer-initialed field)
  • No standalone Town of Springfield plumbing permit fee is published in the Master Fee Schedule

Required documents

  • RequiredBuilding Permit Application (Town of Springfield) — Water/Sewer Service sectionWater and sewer service type/size documented as part of the general Building Permit Application, not a standalone plumbing permit form

Fee schedule

Fee typeAmountNotes
No standalone Town plumbing permit fee publishedNot applicable — see Building Permit Application Fee ($50.00) and Building Cost Fee ($1.00/$1,000, max $2,000.00)Checked the Town's full Master Fee Schedule (Resolution 25-07) directly; no separate plumbing line-item fee exists.

Demolition (via Building Permit)

The Town of Springfield does not publish a standalone demolition permit application or fee separate from its general Building Permit process. No distinct 'demolition permit' document, fee line, or ordinance provision was found in the Town's Master Fee Schedule, ordinance archive, or Building Permit Application after a full chase of the Town's document, ordinance, and resolution folders.

Reviewed 2026-07-06 · Source

Requirements

  • No standalone demolition permit process or fee is published by the Town of Springfield as of this review — demolition work, if regulated at all, would presumably be handled through the general Building Permit Application process, but no explicit demolition-specific requirement, checklist, or fee was located

Required documents

    Fee schedule

    Fee typeAmountNotes

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-06.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Springfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Later version (2026-07-07) →View current record →All versions →

    Permalink: /colorado/baca-county/springfield-co/as-of/2026-07-06/

    Snapshot date: 2026-07-06

    Commit: 753b0f6

    Reproducible from PermitBase’s version-controlled dataset, commit 753b0f6.