Version history — Walsh, Colorado
This is PermitBase’s own verified record for Walsh, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Walsh’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-20Superseded
- 2026-08-14Superseded
- 2026-07-20Superseded
- Walsh, Colorado — Solar PV Installation (Building Permit) record added
- Walsh, Colorado — Electric Vehicle (EV) Charging Station / EVSE Permit record added
- Walsh, Colorado — Electric Vehicle (EV) Charging Station / EVSE Permit fee record added: Colorado State Electrical Board Permit Fee (EV charger/EVSE circuit) -- Section B, non-living-area installation ($90 base fee for valuation up to $2,000, plus $8.00 per additional $1,000 of valuation (rounded up) -- per the State Electrical Board's May 2019 published schedule; a 2024 Colorado legislative fiscal note (HB 24-1263) documents the base state electrical inspection fee increasing from $88 to $92 effective FY2024-25, so the current exact base figure may be modestly higher than $90)
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Walsh began