Boulder building permits

Verified

Boulder, Colorado — as published 2026-06-30.

Verified 2026-06-30 · Source

Codes adopted

2024 International Building Code (IBC) family — City Council adopted the 2024 International Code Council (ICC) suite of codes with local amendments on March 20, 2025 (Ordinance 8684); effective August 1, 2025; local amendments codified in Title 10 of the Boulder Revised Code2024 International Residential Code (IRC) — part of the 2024 ICC suite adopted March 20, 2025, effective August 1, 2025, with Boulder amendments in BRC Title 102024 International Mechanical Code (IMC) — part of the 2024 ICC suite, effective August 1, 20252024 International Plumbing Code (IPC) — part of the 2024 ICC suite, effective August 1, 20252024 International Fuel Gas Code (IFGC) — part of the 2024 ICC suite, effective August 1, 20252024 International Fire Code (IFC) — part of the 2024 ICC suite, effective August 1, 20252024 City of Boulder Energy Conservation Code (CoBECC) — Boulder's own locally-amended energy code (not a straight IECC adoption), effective December 1, 2024; published on ICC Digital Codes as COBECC2024P1; mandatory-measures checklist now required to be integrated into commercial/multifamily plan sets2023 NFPA 70 National Electrical Code (NEC), as amended by the City of Boulder — effective August 1, 2023; amendments in BRC Title 102021 International Wildland-Urban Interface Code (IWUIC) — applies to properties in Boulder's designated wildland urban interface zone per the city's Structure Protection Plan / Wildland Fire program (edition as referenced in Boulder's Zoning and Permitting FAQ, Oct. 2020; confirm current edition at time of application)

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family detached dwellings, duplexes, townhomes, and other one- and two-family residential new construction in the City of Boulder. Reviewed against the 2024 IRC (effective Aug. 1, 2025) and the 2024 City of Boulder Energy Conservation Code (CoBECC, effective Dec. 1, 2024), plus Boulder Revised Code Title 9 zoning and Title 10 building amendments.

Verified 2026-06-30 · Source

Requirements

  • Application and plan set submitted via the Customer Self-Service (CSS) Portal (EnerGov-based)
  • Plans must comply with the 2024 IRC with Boulder amendments (BRC Title 10) and the 2024 CoBECC
  • Structural drawings for all new structures and additions must be designed by a Colorado-licensed engineer to resist wind, seismic, and gravity loads; footings/foundations over 150 sq ft require a Colorado-licensed engineer's seal
  • Design wind speed must be shown on plans: 150 mph (3-second gust) east of Broadway, 165 mph west of Broadway
  • Colorado-licensed Land Surveyor-stamped survey required in the plan set
  • Soils report required for new structures on properties with steep slope, mass-movement, or shrink/swell soil potential (per city Geologic Development Constraints map)
  • Grading and drainage plan (Colorado PE-designed) required for significant slope/soils concerns or grade modification
  • Homeowner contractor permit is available ONLY for work on a single-family detached dwelling (or its accessory structures) owned and occupied as the owner's primary residence — limited to one property per calendar year; does not apply to detached ADUs
  • Sustainable/zero-waste Construction Waste Recycling Application required

Required documents

  • RequiredResidential - New Construction and Additions Requirements ChecklistCity of Boulder checklist covering permit application requirements for new construction/additions to one- and two-family dwellings, detached garages, or accessory buildings
  • RequiredScope of Work FormStructure-type-specific form identifying project scope
  • RequiredLot Area Declaration Form / Zoning Data WorksheetConfirms lot area, zoning district, and applicable form/bulk standards
  • RequiredSurvey (Colorado Licensed Land Surveyor stamp)Site survey showing property lines, existing/proposed structures
  • RequiredStructural DrawingsFull structural design (footings, foundation, framing) sealed by a Colorado-licensed engineer where required
  • RequiredEnergy Conservation Code DocumentationCompliance documentation under the 2024 CoBECC; scope varies by project size
  • RequiredStormwater & Flood Management Plant Investment Fee Calculation FormDetermines stormwater PIF obligation based on added impervious area
  • RequiredPlumbing Fixture Count FormUsed to determine plumbing permit fee tier and potential water meter upsizing
  • RequiredResidential Housing, Development Excise Tax and Impact Fee WorksheetCalculates Development Excise Tax and Capital Facility Impact Fees due
  • OptionalSoils ReportRequired for new structures on sites with steep slope, mass-movement, or shrink/swell soil potential

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $500 or less$25.002026 Planning and Development Services Schedule of Fees, Building Permit Fees (Section 4-20-4(c)(d)(e))
Building Permit Fee — valuation $500.01 to $2,000$25.00 for the first $500 plus $3.25 for each additional $100 or fraction thereof
Building Permit Fee — valuation $2,000.01 to $25,000$74.00 for the first $2,000 plus $14.95 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $25,000.01 to $50,000$418.00 for the first $25,000 plus $10.75 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $50,000.01 to $100,000$686.00 for the first $50,000 plus $7.45 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $100,000.01 to $500,000$1,059.00 for the first $100,000 plus $5.95 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $500,000.01 to $1,000,000$3,447.00 for the first $500,000 plus $5.05 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $1,000,000.01 or more$5,979.00 for the first $1,000,000 plus $3.85 for each additional $1,000 or fraction thereof
Valuation BasisHigher of the City of Boulder Valuation Table (ICC August 2025 square-foot construction cost data, e.g. R-3 Single/Two-Family Type V-B = $170.80–$182.23/sf) or applicant's estimated project value2026 Schedule of Fees — City of Boulder Valuation Table
Plan Check Fee — single-family residential, initial application25% of the Building Permit Fee2026 Schedule of Fees, Plan Check Fee (Section 4-20-4(f)7); due at application, nonrefundable
Energy Code Fee — Residential$83.902026 Schedule of Fees, Energy Code Fee (Section 4-20-4(f)8); reviews compliance with the CoBECC

Residential Addition / Remodel Permit

Verified

Required for additions, interior remodels, basement finishes, and structural alterations to existing one- and two-family dwellings and townhomes in the City of Boulder. Uses the same valuation-based Building Permit Fee schedule as new construction.

Verified 2026-06-30 · Source

Requirements

  • Room additions, structural modifications, basement finishes involving framing/electrical/plumbing/mechanical work
  • Interior remodels use the 'Residential - Interior Remodel Requirements Checklist'; additions use the 'Residential - New Construction and Additions Requirements Checklist'
  • Structural modifications require plans prepared by a Colorado-licensed structural engineer
  • Energy documentation required where the addition affects conditioned floor area, per the 2024 CoBECC
  • Applications submitted via the Customer Self-Service (CSS) Portal
  • Additions scope = 100% of Building Permit Fee valuation table (per City of Boulder Valuation Table – Scope); Alterations/Repairs = 50%; Basement Finish (residential) = 50%; Unfinished Basement = $31.50 per sq ft

Required documents

  • RequiredResidential - New Construction and Additions Requirements ChecklistFor additions and structural alterations
  • RequiredResidential - Interior Remodel Requirements ChecklistFor interior remodels of one- and two-family dwellings or townhomes
  • RequiredSite PlanProperty lines, existing structures, proposed addition footprint, setbacks
  • OptionalStructural DrawingsRequired for any structural modification; must bear a Colorado-licensed structural engineer's seal

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (same table as new construction)Varies by valuation — see Residential Building Permit fee tiers ($25 minimum up to $5,979 + $3.85/$1,000 over $1M)2026 Schedule of Fees, Building Permit Fees; City of Boulder Valuation Table – Scope: Addition = 100%, Alteration = 50%, Basement Finish (residential) = 50%, Unfinished Basement = $31.50/sf
Plan Check Fee — single-family residential, initial application25% of the Building Permit Fee2026 Schedule of Fees, Plan Check Fee
Energy Code Fee — Residential$83.902026 Schedule of Fees, Energy Code Fee — applies where CoBECC compliance review is required

Electrical Permit

Verified

Required for electrical installations, alterations, and service changes in the City of Boulder. The CITY issues and reviews electrical permits directly (submitted via the CSS Portal) — Boulder is not routed through a separate statewide DORA/DPO permit-issuance process, but it does require and verify State of Colorado electrical licensure as a prerequisite ('contemporaneous review'). Governed by the 2023 NEC as amended by the City (effective Aug. 1, 2023).

Verified 2026-06-30 · Source

Requirements

  • Electrical Contractor license from the City of Boulder required for most work (Section 4-20-8), no separate licensing fee for the Electrical Contractor category per the 2026 fee schedule
  • City verifies State of Colorado electrical licensure/apprenticeship compliance under the 'Contemporaneous Reviews of Electrical and Plumbing Licenses' program (per Colorado SB19-156) — the city can request state licensure documentation before or at any time after permit issuance, and can perform random on-site inspections during active work
  • Electrical permits (including Photovoltaic) can be submitted online via the CSS Portal
  • Residential electrical fee is based on enclosed living area of new construction, remodels, and additions to one- and two-unit dwellings/townhomes
  • Nonresidential/multifamily electrical fee is based on total cost of the electrical installation (labor + materials)

Required documents

  • RequiredElectrical Permit Application (CSS Portal)Submitted online via the Customer Self-Service Portal

Fee schedule

Fee typeAmountNotes
Residential Electrical — under 500 sf$36.702026 Schedule of Fees, Electrical Permit Fees (Section 4-20-8)
Residential Electrical — 500 to 999 sf$51.75
Residential Electrical — 1,000 to 1,499 sf$69.60
Residential Electrical — 1,500 to 1,999 sf$90.25
Residential Electrical — 2,000 sf or more$90.25 + $5.90 per 100 sf over 2,000 sf
Residential Electrical — Service Change Only$36.70
Mobile Home Electrical (per space)$42.85
Nonresidential / Multifamily Electrical — $300 or less$42.85
Nonresidential / Multifamily Electrical — $300.01 to $3,000$50.90
Nonresidential / Multifamily Electrical — $3,000.01 or more$19.60 per $1,000 of electrical valuation or fraction thereof
Temporary Construction Power Permit$36.40, no tax
Electrical Contractor LicenseNo fee2026 Schedule of Fees, Building Contractor License Fee table (Section 4-20-8) — requires a valid State of Colorado Electrical Contractor's Card and a Colorado-licensed master electrician

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in the City of Boulder. The CITY issues and reviews plumbing permits directly (submitted via the CSS Portal) — Boulder requires and verifies State of Colorado plumbing licensure as a prerequisite ('contemporaneous review'), rather than the State DORA/DPO board issuing permits itself. Governed by the 2024 International Plumbing Code (IPC), effective August 1, 2025.

Verified 2026-06-30 · Source

Requirements

  • Plumbing Contractor license from the City of Boulder required (Section 4-20-15); applicant must be a master plumber currently licensed by the Colorado State Plumbing Examiner's Board
  • City verifies State of Colorado plumbing licensure/apprenticeship compliance under the 'Contemporaneous Reviews of Electrical and Plumbing Licenses' program (per Colorado HB19-1086)
  • Plumbing permits can be submitted online via the CSS Portal
  • Residential new-construction fee is based on the number of bathrooms and/or dwelling units (a roughed-in bathroom counts as a bathroom)
  • Nonresidential fee is based on total dollar value of the complete plumbing installation

Required documents

  • RequiredPlumbing Permit Application (CSS Portal)Submitted online via the Customer Self-Service Portal

Fee schedule

Fee typeAmountNotes
New Construction — 1 dwelling unit (1½ baths or less)$68.852026 Schedule of Fees, Plumbing Code Fee (Section 4-20-15(b))
New Construction — 1 dwelling unit (2 to 3½ baths)$94.00
New Construction — 1 dwelling unit (4 or more baths)$119.15
New Construction — 2 dwelling unit structure$111.75
New Construction — 3 to 15 dwelling units$42.25 per unit
Remodel and Addition — 1 dwelling unit$34.20
Nonresidential/Commercial, Industrial, Misc. — $100 or less$13.60
Nonresidential/Commercial, Industrial, Misc. — $100.01 to $400$16.75
Nonresidential/Commercial, Industrial, Misc. — $400.01 to $800$19.90
Nonresidential/Commercial, Industrial, Misc. — $800.01 or more$19.90 for the first $800 plus $3.75 for each additional $100 or fraction thereof
Plumbing Contractor License$278.952026 Schedule of Fees, Building Contractor License Fee table (Section 4-20-15); requires current Colorado State Plumbing Examiner's Board master plumber license

Mechanical / HVAC Permit

Verified

Required for heating, cooling, ventilation, and fuel-gas equipment installations in the City of Boulder. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC), both effective August 1, 2025. Residential HVAC and solar-thermal permits can be submitted online via the CSS Portal.

Verified 2026-06-30 · Source

Requirements

  • Furnace, A/C, heat pump, boiler replacement or new installation
  • Ductwork installation or significant modification
  • Solar thermal (solar water heating) systems are processed as a Mechanical Permit, not an Electrical Permit
  • Mechanical HVAC (Residential Only)/Solar Water Heater/Wood Burning permits can be submitted online via the CSS Portal
  • Mechanical Contractor license classes are trade- and code-section-specific (Class A/B/C/D/E per BRC Section 4-20-13)

Required documents

  • RequiredMechanical Permit Application (CSS Portal)Submitted online for residential HVAC, solar water heater, and wood-burning appliance permits

Fee schedule

Fee typeAmountNotes
Mechanical Permit — labor & materials $100 or less$13.602026 Schedule of Fees, Mechanical Permit Fee (Section 4-20-13)
Mechanical Permit — $100.01 to $400$16.75
Mechanical Permit — $400.01 to $800$19.90
Mechanical Permit — $800.01 and above$19.90 for the first $800 plus $3.75 for each additional $100 or fraction thereof
Solar Thermal System — Residential$69.60
Solar Thermal System — Nonresidential and Multifamily$139.20
Mechanical Contractor License — Class A (any IMC/IFGC construction)$253.502026 Schedule of Fees, Building Contractor License Fee table (Section 4-20-13)
Mechanical Contractor License — Class C (one- and two-family dwellings under IRC)$127.25
Mechanical Contractor License — Class E (boilers, water heaters, hydronics)$63.50

Roofing Permit (Reroof)

Verified

Required for roof replacement (tear-off and reroof) on residential and commercial buildings in the City of Boulder. Residential 'Roofing Replacement' permits can be submitted online via the CSS Portal; fee follows the standard valuation-based Building Permit Fee schedule.

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and reroof)
  • Roofing Replacement permit type available for online submittal via the CSS Portal
  • Must comply with the Roofing Inspection and Insulation Guidelines for New & Existing Residential and Commercial Structures
  • Solar shading/access analysis may be required per the Solar Access Guide when a reroof affects solar access to neighboring properties
  • Fee based on applicant's valuation per the standard Building Permit Fee schedule — Boulder does not publish a separate flat reroof fee

Required documents

  • RequiredRoofing Permit Application (CSS Portal)Submit online as 'Roofing Replacement' permit type
  • OptionalRoofing Inspection and Insulation GuidelinesCity of Boulder's roofing scope, underlayment, and inspection reference document for new and existing residential/commercial structures

Fee schedule

Fee typeAmountNotes
Roofing Permit Fee — valuation-basedPer the standard Building Permit Fee schedule (see Residential Building Permit fee tiers)2026 Schedule of Fees, Other Building Permit Fees — 'Roofing Permit Fee: Per Building Permit Fee schedule; fee based on applicant's valuation'

Solar PV Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in the City of Boulder. Solar PV is processed as an Electrical Permit (not a separate solar-specific permit category); small roof-mounted systems under 10 kW are typically eligible for over-the-counter processing when the application package is complete. Solar thermal (solar water heating) is processed separately as a Mechanical Permit.

Verified 2026-06-30 · Source

Requirements

  • All solar PV installations require an Electrical Permit; solar thermal systems require a Mechanical Permit
  • Systems under 10 kW roof-mounted are typically eligible for over-the-counter/expedited issuance with a complete application
  • Documentation must include PV system capacity in watts and system type (stand-alone, grid-tied, or hybrid)
  • Location of all disconnects and array layout with required minimum access/pathways per the applicable Fire Code section must be shown
  • An engineer's evaluation of the existing roof structure's dead-load capability (referencing required wind and snow load for the site) is required
  • Applicants are encouraged to discuss the proposed installation with a Project Specialist at the Planning & Development Services Center before submitting
  • Photovoltaic permits can be submitted online via the CSS Portal

Required documents

  • RequiredElectrical Permit Application — Photovoltaic (CSS Portal)Submitted online via the Customer Self-Service Portal, Photovoltaic Solar category
  • RequiredRoof Structural EvaluationEngineer's evaluation of dead-load capability of the existing roof structure for the added PV weight, referencing site wind and snow load design criteria
  • RequiredEquipment / Array Layout PlanPV system capacity, disconnect locations, array layout, and required access/pathways

Fee schedule

Fee typeAmountNotes
Photovoltaic System Permit Fee — Residential$69.602026 Schedule of Fees, Electrical Permit Fees — Photovoltaic System Permit Fee
Photovoltaic System Permit Fee — Nonresidential and Multifamily$139.20

EV Charger / EVSE Permit

Verified

Installation of a Level 1 or Level 2 electric vehicle charging station (EVSE) at a residential or commercial property in the City of Boulder is permitted as an Electrical Permit — there is no separate EV-charger-specific permit type or fee line item in the city's published fee schedule. As a 'covered municipality' under Colorado HB24-1173 (population over 10,000), Boulder was required to either adopt the state's EV Charging Model Land Use Code, adopt its own standards with an applicant checklist, or formally opt to keep its existing process by December 31, 2025; no distinct EV-charger permitting page, checklist, or model-code adoption notice was found on bouldercolorado.gov as of this research, indicating the city continues to route EV charger installs through its standard Electrical Permit / CSS Portal process rather than a new dedicated pathway.

Verified 2026-07-20 · Source

Requirements

  • Submitted as an Electrical Permit via the CSS Portal (EnerGov-based), same portal used for photovoltaic and other electrical work
  • Dedicated branch circuit sized to the EVSE manufacturer's specifications, per the 2023 NEC as amended by the City of Boulder (Article 625, Electric Vehicle Charging Systems)
  • Panel/service capacity load calculation required if the added EVSE circuit could exceed existing service capacity
  • State of Colorado electrical licensure verified under Boulder's 'Contemporaneous Reviews of Electrical and Plumbing Licenses' program for the installing contractor
  • No EV-charger-specific application form, checklist, or fee category was found published separately from the general Electrical Permit

Required documents

  • RequiredElectrical Permit Application (CSS Portal)Same online application used for all electrical work, including EVSE circuit installation

Fee schedule

Fee typeAmountNotes
Residential Electrical — Service Change Only (typical for a dedicated EVSE circuit added to an existing panel)$36.702026 Planning and Development Services Schedule of Fees, Electrical Permit Fees (Section 4-20-8) — no distinct 'EV charger' or 'EVSE' line item exists in the fee schedule; an EVSE circuit is billed under the standard residential or nonresidential electrical fee tiers depending on scope
Nonresidential / Multifamily Electrical — valuation-based (if a commercial/multifamily EVSE installation)$19.60 per $1,000 of electrical valuation or fraction thereof (for installations over $3,000)Same Electrical Permit Fees table applies to commercial EVSE circuit work

Accessory Dwelling Unit (ADU) Permit

Verified

Required for construction of a new attached or detached ADU on a residential property in the City of Boulder. ADUs are permitted by-right in most residential zoning districts (except RH-6, MH, BMS, BCS, IS-1, and IM). As of September 1, 2023, ADUs are reviewed and approved through the standard building permit process without a prior administrative review step, and off-street parking and owner-occupancy requirements were removed for all ADUs.

Verified 2026-06-30 · Source

Requirements

  • Permitted by-right on lots with detached dwelling units in most zoning districts — verify via the city's interactive zoning map
  • Detached ADU: maximum 800 sq ft (standard); up to 1,000 sq ft for an affordable ADU (75% AMI) or on a historic property
  • Attached ADU: maximum 1/2 of the principal structure's floor area or 1,000 sq ft, whichever is less (standard); up to 2/3 of principal floor area or 1,200 sq ft, whichever is less, for an affordable ADU/historic property
  • Height: detached ADU 20 ft standard, up to 25 ft with an 8:12 or steeper roof pitch; attached ADU up to 35 ft (same as principal structure)
  • As of Sept. 1, 2023, off-street parking and owner-occupancy requirements were removed for all ADUs
  • Short-term rental (under 30 days) of an ADU is prohibited unless the short-term rental use was established before February 1, 2019
  • Long-term rental of the ADU and/or principal unit is permitted; a rental license is required to rent
  • An ADU may not be sold or conveyed separately from the principal dwelling unit
  • Homeowner self-permitting does NOT apply to detached ADUs — a licensed contractor is required for detached ADU construction (the primary-residence homeowner exception is limited to the owner's single-family detached home and its accessory structures other than a detached ADU)

Required documents

  • RequiredAccessory Dwelling Unit (ADU) ApplicationBuilding permit application with ADU-specific supplemental documentation
  • OptionalAccessory Dwelling Unit (ADU) GuideCity of Boulder's current ADU zoning, size, height, and process guidance document
  • RequiredSite PlanZone lot lines, existing structures, proposed ADU location, setbacks
  • OptionalDeclaration of Use (for Affordable ADU)Required for ADUs seeking the increased affordable-ADU size allowance

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (same table as new construction)Varies by valuation — see Residential Building Permit fee tiers (City of Boulder Valuation Table, R-3 ADU use category)2026 Schedule of Fees — ADU is explicitly listed under the R-3 Residential building-use category on the City of Boulder Valuation Table (e.g., $170.80–$182.23/sf for Type V-B construction)
Plan Check Fee25% of the Building Permit Fee (single-family residential, initial application) or per applicable Compatible Development rate2026 Schedule of Fees, Plan Check Fee
Energy Code Fee — Residential$83.902026 Schedule of Fees, Energy Code Fee

Demolition Permit

Verified

Required for demolition of structures in the City of Boulder. A multi-step process requiring asbestos testing (now administered as part of the building-permit process), utility disconnects, and — for full-structure demolitions and Level 4 alterations — an approved Sustainable Deconstruction Plan demonstrating diversion of building materials from the landfill. Non-designated structures over 50 years old also require a separate Historic Preservation Demolition Review.

Verified 2026-06-30 · Source

Requirements

  • Full or partial demolition removing 50% or more of roof area, 50% or more of exterior walls (measured contiguously around building coverage), or any exterior wall facing a public street triggers the BRC demolition definition
  • Asbestos testing required above trigger thresholds: Residential — 32 sq ft of disturbed surfaces, 50 linear ft of disturbed pipe, or 55-gallon-drum volume of waste; Commercial — 160 sq ft of disturbed surfaces, 260 linear ft of disturbed pipe, or 55-gallon-drum volume of waste
  • If asbestos-containing materials are found, a copy of the state-issued asbestos mitigation permit or state-issued demolition approval notice is required before city demolition permit issuance
  • Full-structure demolitions and Level 4 Alteration projects require an approved Sustainable Deconstruction Plan (via Green Halo Systems) demonstrating diversion of building materials from landfill disposal
  • Non-designated structures over 50 years old require a separate Historic Preservation Demolition Review (separate from, and can run alongside, the Demolition Permit Application)
  • Utility disconnects (electric, gas, water) required with provider written confirmation; sewer line capped/removed to main, inspected and approved by public works
  • Additional fees apply for buildings over 50 years old (Historic Preservation Application Fees)

Required documents

  • RequiredDemolition Permit Application (CSS Portal)Online application through the Customer Self-Service Portal
  • RequiredSustainable Deconstruction Plan (Green Halo Systems)Required for full structure demolition and Level 4 Alteration projects, demonstrating diversion of materials from landfill
  • RequiredAsbestos Test Report or State Asbestos Mitigation/Demolition ApprovalTest report if no ACM found; state-issued mitigation permit or demolition approval notice if ACM found and removed
  • OptionalHistoric Preservation Demolition Review ApplicationRequired separately for non-designated structures over 50 years old

Fee schedule

Fee typeAmountNotes
Demolition Permit — Interior non-load bearing$24.552026 Schedule of Fees, Demolition Permit Fee (Section 4-20-4(f)1)
Demolition Permit — All other (full/exterior/structural)$173.70
Construction and Demolition Deposit Administrative Fee$219.002026 Schedule of Fees, Section 4-20-72 — required when a deposit is required under Section 3601.2.3 of the Boulder Building Code / Section R328.2.3 of the Boulder Residential Code
Historic Preservation Demolition/Moving/Removal — Primary Building (built before 1940)$282.002026 Schedule of Fees, Historic Preservation Application Fees; applies to non-landmarked buildings over 50 years old
Historic Preservation Demolition/Moving/Removal — Primary Building (built 1940 or after)$51.00
Historic Preservation Demolition/Moving/Removal — Accessory Building$51.00

Commercial Tenant Improvement Permit

Verified

Required for interior remodels, additions, and tenant improvements in commercial, multifamily, and mixed-use buildings in the City of Boulder. Governed by the 2024 IBC family and the 2024 City of Boulder Energy Conservation Code (CoBECC), with the CoBECC Mandatory Measures Checklist now required to be integrated directly into the plan set.

Verified 2026-06-30 · Source

Requirements

  • Use the 'Multi-family and Non-residential Building Permit Checklist' / Multi-family, Commercial, or Mixed-Use Tenant Finish Guide to prepare the application package
  • Incomplete applications or plans not meeting submittal requirements will not be accepted for review
  • Required core documents: Scope of Work Form, Building Owner Authorization Form, Plumbing Fixture Count and Irrigation Form, Energy Modeling Summary Report
  • 2024 CoBECC Mandatory Measures Checklist must be integrated into the construction plan set
  • Conditional requirements depending on scope/location: asbestos inspection reports (commercial trigger: 160 sq ft disturbed surfaces / 260 linear ft disturbed pipe), stormwater fee calculations, Historic Preservation approvals, floodplain/wetland permits, Wildland-Urban Interface compliance documentation
  • Plan Check Fee for nonresidential/multifamily initial application = 65% of the building permit fee

Required documents

  • RequiredMulti-family and Non-residential Building Permit ChecklistCity of Boulder's checklist for commercial/multifamily permit applications
  • RequiredScope of Work FormStructure-type-specific scope form
  • RequiredBuilding Owner Authorization FormAuthorization from the building owner for the proposed tenant finish work
  • RequiredPlumbing Fixture Count and Irrigation FormDetermines plumbing permit fee tier and potential water/irrigation impact
  • RequiredEnergy Modeling Summary ReportDemonstrates CoBECC compliance for the tenant finish scope
  • Required2024 CoBECC Mandatory Measures ChecklistIntegrated directly into the construction plan set to document energy code compliance

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (Table applies; Tenant Finish scope = 50% of Table valuation)Per the City of Boulder Valuation Table – Scope: Tenant Finish = 50%, Core and Shell = 75%, New = 100%2026 Schedule of Fees, City of Boulder Valuation Table — Scope percentages apply to the ICC August 2025 square-foot construction cost table by occupancy group and construction type
Plan Check Fee — Nonresidential, initial application65% of the Building Permit Fee2026 Schedule of Fees, Plan Check Fee (Section 4-20-4(f)7)
Energy Code Fee — Commercial$104.052026 Schedule of Fees, Energy Code Fee (Section 4-20-4(f)8)

Deck / Covered Patio Permit

Verified

Required for construction of attached or free-standing decks on one- and two-family dwellings and townhomes in the City of Boulder. Reviewed against the 2024 IRC and Boulder Revised Code Title 9 zoning (setbacks, building coverage exemptions for low decks).

Verified 2026-06-30 · Source

Requirements

  • Uncovered decks, stoops, patios, terraces, and stairways under 30 inches high are excluded from the Building Coverage calculation (BRC 9-16 definition) — but may still need to meet zoning setback requirements
  • Attached or free-standing decks use the 'Residential - Decks Requirements Checklist'
  • Site Survey (stamped by a Colorado Licensed Land Surveyor) required in the application package
  • Distances to property lines from existing and proposed structures must be shown, with setback requirements identified for the applicable zoning district
  • No structure or portion of a structure may encroach into a recorded easement
  • Stormwater & Flood Management Plant Investment Fee Calculation Form required
  • Covered decks/patios use the Residential Additions and Alterations Checklist instead of the deck-specific checklist

Required documents

  • RequiredResidential - Decks Requirements ChecklistCity of Boulder checklist for an attached or free-standing, uncovered/unenclosed deck on a one- and two-family dwelling or townhome
  • RequiredSite Survey (Colorado Licensed Land Surveyor stamp)Shows property lines, setbacks, easements, and distances from existing/proposed structures
  • RequiredStormwater & Flood Management Plant Investment Fee Calculation FormDetermines stormwater PIF obligation for added impervious area

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Utility (misc.) use group, Deck / Patio Cover / Porch, Type V-A$36.44 per sq ft (Type V-A) or $34.82 per sq ft (Type V-B) under the ICC Valuation Table, applied through the standard Building Permit Fee tiers2026 Schedule of Fees, City of Boulder Valuation Table — 'U Utility (misc.) — Carport-Attached, Carport-Detached, Deck, Patio Cover, Porch' listed under Group U; not permitted (N.P.) for construction types I-A through IV
Plan Check Fee — single-family residential, initial application25% of the Building Permit Fee

Sign Permit

Verified

Required before installing or altering most permanent signs on commercial, institutional, or multi-family property in the City of Boulder, per Boulder Revised Code Section 9-9-21. Only a City of Boulder-licensed sign contractor (Class A or Class B) may obtain the permit and install the sign; fees are tiered by review complexity (BRC 4-20-21(b)) rather than a single flat rate, ranging from $92 for a sign needing no plan check to $344 for one needing both plan check and electrical review.

Verified 2026-08-13 · Source

Requirements

  • Most signs require a permit under BRC 9-9-21; a defined list of small/temporary sign types is exempt (see exemptions below)
  • Only a City of Boulder-licensed Sign Contractor may obtain the permit and install the sign — Class A covers manufacture, installation, and servicing of signs, awnings, and canvas canopies; Class B covers painted signs only (BRC 4-20-21)
  • Building Owner Authorization Form required if the applicant is not the property owner
  • Scaled site plan required showing property lines, streets, easements, building frontage, and all existing/proposed sign locations
  • Scaled building elevation drawings required showing heights, facade dimensions, and sign positioning
  • Projecting/suspended signs require projection and vertical-clearance dimensions plus engineering for attachment to the structure
  • Free-standing signs require a scaled site plan showing setbacks/easements and engineer-stamped foundation details
  • Internally illuminated signs require full specification sheets including lumen rating and color temperature
  • Prohibited outright, not just unpermitted: signs in the public right-of-way (including A-frame sandwich boards), signs over 25 feet in height or on a roof, animated/moving/twinkling/rotating/pulsating signs, strings of lights, and off-premises signs
  • Exempt from a permit: construction-site signs ≤16 sq ft (must be placed by the licensed contractor working the site), up to 3 flags totaling ≤70 sq ft, garage-sale signs, lost-animal notices, noncommercial signs, private traffic signs ≤3 sq ft, real estate signs, utility warning signs ≤16 sq ft, window signs ≤4 sq ft, and vehicle-displayed signs
  • Applications submitted via the CSS Portal

Required documents

  • RequiredSign Permit Application (CSS Portal)Submitted online by a City of Boulder-licensed Sign Contractor via the Customer Self-Service Portal
  • OptionalBuilding Owner Authorization FormRequired only if the applicant is not the property owner
  • RequiredSite PlanScaled drawing showing property lines, streets, easements, building frontage, and all existing/proposed sign locations
  • RequiredBuilding Elevation DrawingsScaled elevations showing heights, facade dimensions, and sign positioning
  • OptionalAttachment/Foundation EngineeringEngineering for structural attachment (projecting/suspended signs) or engineer-stamped foundation details (free-standing signs)

Fee schedule

Fee typeAmountNotes
Sign Permit — no plan check, no electrical review$92.002026 Schedule of Fees, Sign Permit Fee (BRC 4-20-21(b))
Sign Permit — no plan check, including electrical review$178.002026 Schedule of Fees, Sign Permit Fee (BRC 4-20-21(b))
Sign Permit — plan check required, no electrical review$252.002026 Schedule of Fees, Sign Permit Fee (BRC 4-20-21(b))
Sign Permit — plan check and electrical review required$344.002026 Schedule of Fees, Sign Permit Fee (BRC 4-20-21(b))
Sign Contractor License — Class A (manufacture/install signs, awnings, canvas canopies)$332.902026 Schedule of Fees, Contractor License Fees (BRC 4-20-21(a))
Sign Contractor License — Class B (painted signs only)$174.052026 Schedule of Fees, Contractor License Fees (BRC 4-20-21(a))

Fire Sprinkler and Fire Alarm System Permit

Verified

Required for installation of fire sprinkler/suppression systems, kitchen-hood suppression systems, and fire alarm detection systems in the City of Boulder. Fire contractor licensing is administered directly by the City of Boulder Fire Department — separately from the Planning & Development Services Building Division that handles most other trade contractor licenses. Permit fees are published in the same 2026 Planning & Development Services Schedule of Fees used for building/mechanical permits, but split by track under BRC 4-20-52(c): the Mechanical Permit Fee schedule applies to fire suppression, sprinkler systems, and hoods, while the valuation-based Building Permit Fee schedule applies to fire alarm detection systems. Reviewed against the 2024 International Fire Code (IFC), part of the 2024 ICC suite adopted March 20, 2025 (Ordinance 8684), effective August 1, 2025.

Verified 2026-08-13 · Source

Requirements

  • Fire suppression, sprinkler systems, and range/kitchen hoods are billed under the Mechanical Permit Fee schedule; fire alarm detection systems are billed under the valuation-based Building Permit Fee schedule (BRC 4-20-52(c))
  • Installing contractor must hold a current City of Boulder Fire Contractor License in the applicable class: Class A (fire sprinkler systems — requires State of Colorado Fire Suppression System Contractor registration, and sprinkler fitters must be Colorado-registered), Class C (fire alarm systems — requires a Colorado low-voltage wire installer license, a Colorado-licensed electrician for any line-voltage work, and NICET Level II certification or an accepted equivalent), Class D (special hazard systems), or Class E (hand/portable fire extinguisher installation and servicing)
  • Fire contractor licensing is administered separately by the City of Boulder Fire Department, not the main Planning & Development Services office — apply via firecontractors@bouldercolorado.gov with a current Certificate of Insurance (BRC 4-1-8)
  • Sprinkler/suppression submittals require hydraulic calculations and shop drawings; fire alarm submittals require a riser diagram and point-to-point wiring plans, consistent with the adopted 2024 IFC and referenced NFPA 13/NFPA 72 standards
  • Applications submitted via the CSS Portal, the same EnerGov-based portal used for building, electrical, plumbing, and mechanical permits
  • Reviewed against the 2024 International Fire Code (IFC), effective August 1, 2025 as part of the 2024 ICC suite (Ordinance 8684)

Required documents

  • RequiredFire Systems Permit Application (CSS Portal)Submitted online via the Customer Self-Service Portal
  • RequiredHydraulic Calculations and Shop DrawingsRequired for fire sprinkler/suppression system submittals
  • RequiredRiser Diagram and Point-to-Point Wiring PlansRequired for fire alarm detection system submittals
  • OptionalCertificate of InsuranceRequired of the fire contractor as part of Fire Contractor License application/renewal (BRC 4-1-8) — a licensing-side document, not a per-project submittal

Fee schedule

Fee typeAmountNotes
Fire Suppression / Sprinkler Systems and Range HoodsPer the Mechanical Permit Fee schedule — $13.60 (labor & materials $100 or less) up to $19.90 for the first $800 plus $3.75 for each additional $100 or fraction thereof2026 Schedule of Fees, Fire Systems Permit Fees (BRC 4-20-52(c)): 'Mechanical Permit Fee schedule applies to fire suppression, sprinkler systems, and hoods.'
Fire Alarm Detection SystemsPer the standard valuation-based Building Permit Fee schedule2026 Schedule of Fees, Fire Systems Permit Fees (BRC 4-20-52(c)): 'Building Permit Fee schedule applies to fire alarm detection systems, based on applicant's valuation.'
Fire Contractor License — Class A (Fire Sprinkler Systems)$307.002026 Schedule of Fees, Contractor License Fees (BRC 4-20-56)
Fire Contractor License — Class C (Fire Alarm Systems)$180.002026 Schedule of Fees, Contractor License Fees (BRC 4-20-56)
Fire Contractor License — Class D (Special Hazard Systems)$180.002026 Schedule of Fees, Contractor License Fees (BRC 4-20-56)
Fire Contractor License — Class E (Hand/Portable Fire Extinguisher Systems)$90.002026 Schedule of Fees, Contractor License Fees (BRC 4-20-56)

Change of Occupancy / Change of Use Permit

Verified

Required whenever an existing building or space's use or occupancy classification changes in the City of Boulder, whether alone or as part of a tenant finish/remodel-alteration project. Billed as a distinct $81.00 Change of Use Fee (BRC 4-20-4(f)(5)) due at the time of the change-of-use request, creditable toward the Building Permit Fee if a permit application is submitted and issued within 90 days. Requires a code analysis and, for existing buildings, an accessibility-compliance analysis under the city's adopted Existing Building Code — Boulder's own Detailed Multi-family, Commercial, Non-Residential or Mixed-Use Guide still instructs applicants to demonstrate compliance with '2018 IEBC,' though the city's currently codified edition (per the 2024 ICC suite adopted via Ordinance 8684, effective Aug. 1, 2025, BRC Title 10 Chapter 5.6) is the 2024 International Existing Building Code.

Verified 2026-08-13 · Source

Requirements

  • Applies whenever a change from the previous occupancy of a space is proposed, whether standalone or as part of a tenant finish/remodel-alteration project
  • A comprehensive code analysis is required, identifying the applicable code (IRC, IEBC, or IBC), the scope (repair, alteration, addition, change of occupancy/use, or relocation), and the level of alteration
  • For multi-family, commercial, or mixed-use remodels/alterations: must state type of construction, area of the scope of work, level of alteration, use (occupancy), and whether the use is a change from the space's previous occupancy
  • For an existing building undergoing a change of occupancy: applicant must provide an analysis of current accessibility features and a breakout of project costs showing how Existing Building Code compliance is being achieved — Boulder's own live guide currently cites '2018 IEBC' for this analysis, though the city's codified adopted edition is the 2024 IEBC (Ordinance 8684, effective Aug. 1, 2025)
  • Energy code documentation scaled to alteration level: Mandatory Measures Checklist integrated into construction plans; Prescriptive Measures Checklist for Level 1-2 alterations; Energy Modeling Summary Report required for Level 3-4 alterations exceeding $500,000 in project cost
  • Change of Use Fee ($81.00, BRC 4-20-4(f)(5)) due at time of request for the change-of-use analysis; credited toward the Building Permit Fee if the permit application and issuance occur within 90 days
  • Additional prerequisite approvals may apply depending on scope: variances, site review, health department approvals, growth management allocation (if adding residential units), and affordable housing compliance verification (for residential conversions)
  • A new Certificate of Occupancy is issued once the change of use/occupancy is approved and any required work is completed

Required documents

  • RequiredChange of Use Request / Code Analysis Submittal (CSS Portal)Identifies the applicable code, scope, and level of alteration; triggers the $81.00 Change of Use Fee
  • RequiredAccessibility Compliance AnalysisAnalysis of current accessibility features and a project-cost breakout showing how Existing Building Code compliance is achieved, required for existing buildings changing occupancy
  • RequiredEnergy Code DocumentationMandatory Measures Checklist, Prescriptive Measures Checklist (Level 1-2 alterations), or Energy Modeling Summary Report (Level 3-4 alterations over $500,000), scaled to the alteration level

Fee schedule

Fee typeAmountNotes
Change of Use Fee$81.002026 Schedule of Fees, BRC 4-20-4(f)(5); due at time of request for the change-of-use analysis; may be credited to the Building Permit Fee if permit application and issuance occur within 90 days
Building Permit Fee (where change of use is accompanied by construction/tenant improvement work)Per the valuation-based Building Permit Fee schedule — City of Boulder Valuation Table Scope: Tenant Finish = 50%, Core and Shell = 75%, New = 100%2026 Schedule of Fees — a change of use with no accompanying construction is billed only the $81.00 Change of Use Fee; one accompanied by tenant improvement work is additionally billed the standard Building Permit Fee, per the same Valuation Table Scope documented in this file's Commercial Tenant Improvement Permit entry

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Boulder building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →