This is PermitBase’s published record for Castle Pines as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Castle Pines building permits

Verified

Castle Pines, Colorado — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

2021 International Building Code (IBC), Chapters 1-35 inclusive, exclusive of Appendices — adopted by Ordinance No. 23-02 (Feb. 28, 2023), City of Castle Pines Municipal Code Chapter 18, Article I2021 International Residential Code (IRC), 1st printingChapter 11 of the 2018 edition of the International Residential Code (retained separately alongside the 2021 IRC per Ordinance No. 23-02's title recitals — Chapter 11 of the IRC covers energy efficiency; the City kept the 2018 version of this chapter rather than adopting the 2021 IRC's Chapter 11 wholesale)2020 National Electrical Code (NEC) — City of Castle Pines Municipal Code Chapter 18, Article III, Sec. 18-3-10, adopted pursuant to Title 31, Article 16, Part 2, C.R.S., 'as adopted, amended and updated to the most current edition by the Colorado State Electrical Board from time to time' per the authority in Article 23 of Title 12, C.R.S. — the City ties its NEC edition to whatever the Colorado State Electrical Board currently recognizes, rather than freezing a single print edition2021 International Mechanical Code (IMC), Chapters 1-15 inclusive — Article IV2021 International Plumbing Code (IPC), Chapters 1-13 inclusive — Article V2021 International Fire Code (IFC) — adopted by Ordinance No. 23-07 (2023); enforced by the South Metro Fire Rescue Fire Protection District, which Ordinance No. 23-02/23-07 designates as the Fire Marshal's Office / fire code official for the City2021 International Fuel Gas Code (IFGC)2018 International Energy Conservation Code (IECC)2021 International Swimming Pool and Spa Code (ISPSC)2021 International Existing Building Code (IEBC)Note on code-adoption sourcing: the 2021 IBC/IRC/IMC/IPC/IFGC/IECC(2018)/ISPSC/IEBC + 2020 NEC list above is drawn directly from the recitals and Sections 1-5 of Ordinance No. 23-02 (a scanned/image PDF, read via rendered page images since it is not machine-text-extractable), the definitive code-adoption ordinance for Chapter 18 of the Municipal Code. The City's own Building Department FAQ page states more casually that the City 'is currently under the 2021 International Building Code/International Residential Code and the 2023 National Electrical Code' — this FAQ-page NEC reference (2023) is NOT used as the governing citation in this file because it conflicts with the specific, dated ordinance text (2020 NEC, floating to the State Electrical Board's current edition); the ordinance is treated as authoritative and the FAQ's '2023 NEC' is noted as a likely informal/rounded reference to whatever edition the State Electrical Board currently recognizes, consistent with the ordinance's own floating-adoption mechanism.HB22-1362 (Colorado statewide energy code floor via updated model electrical/energy provisions): no City of Castle Pines ordinance, code-adoption page, or fee schedule references HB22-1362 or a specific electric-vehicle-readiness / electrification-readiness local amendment as of this review (Ordinance No. 23-02 predates HB22-1362's later compliance deadlines and does not mention it); not asserted as inapplicable, simply unconfirmed for this jurisdiction after checking the governing ordinance and the Building Department's public-facing pages directly.

Permit types & fees

New Residential Building Permit

Verified

Required for new single-family or duplex residential construction in Castle Pines. Categorized as a Plan Review Permit under the 2021 IRC/IBC as locally adopted; requires two identical, scaled, stamped drawing sets.

Verified 2026-07-06 · Source

Requirements

  • Plan Review Permit track: two identical drawing sets required, showing all structural components, drawn to scale
  • Two foundation drawings stamped by a Colorado-licensed engineer or architect required for residential construction
  • Site plan required showing dimensions, setbacks, easements, utilities, other structures, and distances to property lines
  • Energy Code Compliance Report (energycodes.gov) or REScheck calculations required
  • All contractors (general, electrical, plumbing, mechanical) must hold a current City of Castle Pines contractor license; electrical and plumbing contractors must additionally hold current Colorado DORA Electrical Board / Plumbing Board licenses
  • Total project valuation (materials + labor, including owner labor at fair market value) must be accurately estimated on the application

Required documents

  • RequiredBuilding Permit ApplicationCity of Castle Pines Building Permit Application, submitted via the SmartGov online portal
  • RequiredSite PlanScaled drawing showing dimensions, setbacks, easements, utilities, and distances to property lines
  • RequiredTwo Stamped Foundation DrawingsStamped by a Colorado-licensed engineer or architect
  • RequiredEnergy Code Compliance Report or REScheckPer energycodes.gov calculations

Fee schedule

Fee typeAmountNotes
Building Permit Fee — $1.00 to $500.00$42.002026 Fee Schedule (effective document dated May 2026)
Building Permit Fee — $501.00 to $2,000.00$42.00 for the first $500.00 plus $5.45 for each additional $100.00 or fraction thereof, up to and including $2,000.00
Building Permit Fee — $2,001.00 to $25,000.00$123.75 for the first $2,000.00 plus $25.00 for each additional $1,000.00 or fraction thereof, up to and including $25,000.00
Building Permit Fee — $25,001.00 to $50,000.00$698.75 for the first $25,000.00 plus $18.00 for each additional $1,000.00 or fraction thereof, up to and including $50,000.00
Building Permit Fee — $50,001.00 to $100,000.00$1,148.75 for the first $50,000.00 plus $12.45 for each additional $1,000.00 or fraction thereof, up to and including $100,000.00
Building Permit Fee — $100,001.00 to $500,000.00$1,771.25 for the first $100,000.00 plus $9.95 for each additional $1,000.00 or fraction thereof, up to and including $500,000.00
Building Permit Fee — $500,001.00 to $1,000,000.00$5,751.25 for the first $500,000.00 plus $8.45 for each additional $1,000.00 or fraction thereof, up to and including $1,000,000.00
Building Permit Fee — $1,000,001.00 and up$9,976.25 for the first $1,000,000.00 plus $6.50 for each additional $1,000.00 or fraction thereof
Plan Review Fee65% of total building permit fee
Zoning Fee$60.00 flat (Plan Review Permits only)
Douglas County Use Tax1% of 50% of total project value
Castle Pines Use Tax3.75% of 50% of total project value
Electrical Permit FeeAs outlined by Colorado state statute (CRS 12-23-117(3))Residential: based on square footage; Commercial: based on value

Residential Addition / Remodel Permit

Verified

Required for additions and remodels to existing single-family dwellings. Categorized as a Plan Review Permit under the 2021 IRC as locally adopted.

Verified 2026-07-06 · Source

Requirements

  • Plan Review Permit track: two identical drawing sets, scaled, showing all structural components
  • Additions require two foundation drawings stamped by a Colorado-licensed engineer or architect
  • Site plan required; structures may not be built over setback lines, easements, or property lines
  • New openings exceeding 6 feet in a bearing wall require detailed structural specifications
  • Additions cannot enclose bedroom or basement egress windows; heat required in all habitable rooms
  • Existing electric service amperage must be indicated; may require upgrade or relocation
  • Energy Code Compliance Report (energycodes.gov) or REScheck calculations required

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via SmartGov online portal
  • RequiredSite PlanScaled drawing showing project dimensions relative to setbacks, easements, and property lines
  • RequiredFloor PlanExisting and new dimensions, new openings, relocated items
  • RequiredFoundation Detail / Construction DetailsFoundation detail, exterior elevations, energy code compliance

Fee schedule

Fee typeAmountNotes
Building Permit FeeSame valuation-based schedule as new residential construction (2026 Fee Schedule Table)
Plan Review Fee65% of total building permit fee
Zoning Fee$60.00 flat
Douglas County Use Tax1% of 50% of project value
Castle Pines Use Tax3.75% of 50% of project value

Electrical Permit

Verified

Required for electrical service changes, wiring, and equipment installation in Castle Pines. Governed by the National Electrical Code as adopted (2020 NEC base edition, floating to the Colorado State Electrical Board's current recognized edition). Fees follow the Colorado state-mandated schedule rather than a City-set table; electrical contractors need only a current Colorado Electrical Board (DORA) license (no City license fee) plus City contractor registration.

Verified 2026-07-06 · Source

Requirements

  • Governed by the National Electrical Code (NEC), 2020 edition as adopted, 'amended and updated to the most current edition by the Colorado State Electrical Board from time to time' (Municipal Code Sec. 18-3-10)
  • Electrical Service Amp Change qualifies as a 1-Stop Permit (no drawings required)
  • Contractors must hold a current Colorado Electrical Board (DORA) license and a City of Castle Pines Class E Electrical Contractor registration (no City license fee for this class)
  • Fee set by Colorado state statute (CRS 12-23-117(3)), not a City-determined table

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted via SmartGov online portal
  • RequiredCity of Castle Pines Contractor License (Class E)Requires proof of current Colorado Electrical Board (DORA) license; $0.00 City license fee

Fee schedule

Fee typeAmountNotes
Electrical Permit FeeAs outlined by Colorado state statute (CRS 12-23-117(3))Residential: based on square footage of the project; Commercial: based on value. City's own 2026 Fee Schedule lists this line item as 'As outlined by State Statute' rather than a City-set dollar table.
Contractor License Fee — Class E Electrical$0.00 annually2026 Fee Schedule; contingent on proof of current State of Colorado Electrical Board license

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair. Governed by the 2021 International Plumbing Code as locally adopted. Plumbing contractors must hold a Colorado Plumbing Board (DORA) Master Plumber license plus a City of Castle Pines Class F Plumbing Contractor registration ($50/year).

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2021 IPC as adopted (Municipal Code Chapter 18, Article V)
  • Water/Sewer Line Repair/Replacement qualifies as a 1-Stop Permit (no drawings required)
  • Contractors must hold a current Colorado Plumbing Board Master Plumber license plus a City Class F Plumbing Contractor registration
  • If on a septic system, county health department approval is required before permit issuance

Required documents

  • RequiredBuilding/Plumbing Permit ApplicationSubmitted via SmartGov online portal
  • RequiredCity of Castle Pines Contractor License (Class F)Requires copy of current Colorado Plumbing Board Master Plumber license

Fee schedule

Fee typeAmountNotes
Building Permit Fee (plumbing billed under general valuation-based schedule)Per 2026 Fee Schedule Table 1-A valuation tiers
Contractor License Fee — Class F Plumbing$50.00 annually
Douglas County / Castle Pines Use Tax1% / 3.75% of 50% of project value, respectively

Mechanical / HVAC Permit

Verified

Required for heating, cooling, and ventilation equipment installation or replacement. Governed by the 2021 International Mechanical Code as adopted. Air Conditioning System and Furnace Replacement qualify as 1-Stop Permits.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2021 IMC as adopted (Municipal Code Chapter 18, Article IV)
  • Air Conditioning System, Furnace Replacement, and Gas Fireplace installation qualify as 1-Stop Permits (no drawings required)
  • Separate mechanical permits are not required where mechanical work is included within a general building permit for the structure (IMC Sec. 106.1 local amendment)
  • Contractors must hold a City of Castle Pines Class G Mechanical/HVAC/Warm-Air & Ventilation Contractor registration; all electrical work within a mechanical/HVAC project must be performed by a State of Colorado Licensed Master Electrician

Required documents

  • RequiredBuilding/Mechanical Permit ApplicationSubmitted via SmartGov online portal; 1-Stop track for AC/furnace/gas fireplace
  • RequiredCity of Castle Pines Contractor License (Class G)Mechanical/HVAC/Warm-Air & Ventilation

Fee schedule

Fee typeAmountNotes
Building Permit Fee (mechanical billed under general valuation-based schedule)Per 2026 Fee Schedule Table 1-A valuation tiers
Contractor License Fee — Class G Mechanical/HVAC$75.00 annually
Douglas County / Castle Pines Use Tax1% / 3.75% of 50% of project value, respectively

Reroof Permit

Verified

Required for any re-roofing project or roof repair replacing more than 100 square feet of roofing. Qualifies as a 1-Stop Permit (no drawings required). Governed by the 2021 IRC/IBC and the City's own Residential Roofing Requirements handout, which explicitly waives the ice-barrier-underlayment requirement.

Verified 2026-07-06 · Source

Requirements

  • Permit required for any re-roofing project or roof repair replacing more than 100 square feet of roof
  • 1-Stop Permit: no drawings required
  • Asphalt shingles must meet ASTM D-3161 Class A, D, or F testing/installation requirements, or ASTM D 7158 Class G or H
  • Drip edge flashing required on all eaves and rake edges
  • Roofing nails must penetrate through the roof sheathing or a minimum of 3/4 inch into the decking
  • All existing roofing layers must be removed on a tear-off (no roofing over multiple existing layers)
  • Design Criteria: 105 mph, 3-second gust wind speed; Wind Exposure Category B
  • Ice Barrier underlayment is explicitly NOT required in Castle Pines
  • Mid-roof inspections required only on flat and tile roofs; a ladder must be on-site and tied off to the roof for all roof inspections

Required documents

  • RequiredBuilding Permit Application (Reroof, 1-Stop track)Submitted via SmartGov online portal

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as new construction)Per 2026 Fee Schedule Table 1-A
Douglas County / Castle Pines Use Tax1% / 3.75% of 50% of project value, respectively

Rooftop Solar Photovoltaic Permit

Required for rooftop photovoltaic system installations. Not explicitly listed among the City's 1-Stop Permit examples, so it is treated as falling under the Plan Review Permit track (structural roof-mounting plus electrical interconnection). Electrical portion governed by the NEC as adopted; a Colorado statutory fee cap applies to the aggregate of all local solar permit fees.

Reviewed 2026-07-06 · Source

Requirements

  • Requires both a building permit (structural/mounting compliance) and an electrical permit (NEC-compliant wiring/interconnection), consistent with the general Colorado approach to rooftop PV
  • Electrical portion governed by the National Electrical Code (2020 NEC as adopted, updated to the Colorado State Electrical Board's current recognized edition)
  • Contractors must hold City of Castle Pines contractor licenses (Class E Electrical at minimum) plus applicable Colorado DORA licenses
  • IFC fire-code amendments (Ordinance No. 23-02/23-07) explicitly allow the fire code official to exempt or modify fire apparatus access road requirements for solar photovoltaic power generation facilities
  • Colorado HB21-1284 caps the aggregate of all City-imposed fees and charges related to installing an active solar energy system at $500.00 for a residential permit ($1,000.00 for commercial)

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted via SmartGov online portal
  • RequiredStructural/Roof-Mounting Plan SetShowing panel placement, mounting attachment method, and roof structural adequacy

Fee schedule

Fee typeAmountNotes
Aggregate solar permit fee cap (residential)$500.00 maximum, per Colorado HB21-1284Statutory statewide cap on all City-imposed fees/charges related to installing an active solar energy system
Aggregate solar permit fee cap (commercial)$1,000.00 maximum, per Colorado HB21-1284
Electrical Permit Fee componentAs outlined by Colorado state statute (CRS 12-23-117(3)), Section B (All Other/valuation-based) typically applies to PV installations

Demolition Permit

Verified

Required for interior or whole-structure demolition. Listed on the Building Permit Application as a distinct permit type and separately as a 1-Stop Permit example on the Building Department FAQ.

Verified 2026-07-06 · Source

Requirements

  • 1-Stop Permit: no drawings required
  • Listed as a distinct checkbox permit type ('Demolition (interior or whole structure)') on the City's Building Permit Application form
  • All contractors performing demolition work must hold a City of Castle Pines Class J Demolition Contractor registration

Required documents

  • RequiredBuilding Permit Application (Demolition, 1-Stop track)Submitted via SmartGov online portal
  • RequiredCity of Castle Pines Contractor License (Class J Demolition)Requires copies of current licenses from two other jurisdictions

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Per 2026 Fee Schedule Table 1-A
Contractor License Fee — Class J Demolition$75.00 annually
Douglas County / Castle Pines Use Tax1% / 3.75% of 50% of project value, respectively

Commercial Alteration / Tenant Improvement Permit

Required for commercial tenant finish and alteration work. Listed as 'Commercial Alteration' on the City's Building Permit Application; categorized under the Plan Review Permit track with the City's longer 10-business-day commercial review timeline.

Reviewed 2026-07-06 · Source

Requirements

  • Listed as 'Commercial Alteration' on the Building Permit Application (distinct checkbox from 'New Commercial')
  • Plan Review Permit track: two identical scaled drawing sets required
  • All contractors must hold applicable City of Castle Pines contractor licenses
  • No Castle-Pines-specific published tenant-improvement submittal checklist was located; the general Plan Review Permit submittal standard applies (site plan/floor plan/construction details as applicable to scope)

Required documents

  • RequiredBuilding Permit Application (Commercial Alteration)Submitted via SmartGov online portal
  • RequiredPlan SetTwo identical scaled drawings showing all structural, electrical, mechanical, and plumbing components affected by the tenant finish

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Per 2026 Fee Schedule Table 1-A
Plan Review Fee65% of total building permit fee
Zoning Fee$60.00 flat
Douglas County / Castle Pines Use Tax1% / 3.75% of 50% of project value, respectively

Deck / Patio Cover / Carport Permit

Verified

Required for decks, carports, patio covers/pergolas, and fences over seven feet. Categorized as a Plan Review Permit under the 2021 IRC as locally adopted.

Verified 2026-07-06 · Source

Requirements

  • Plan Review Permit track: two identical scaled drawing sets required, showing all structural components
  • Foundation details required (Foundation Detail A for 200-600 sq ft accessory structures, Detail B for over 600 sq ft, per the City's Accessory Structures guide, though decks/patio covers have their own dedicated guides)
  • Structures may not be built over setback lines, easements, or property lines
  • An as-built survey is required if proposed within 12 inches of a required minimum setback

Required documents

  • RequiredBuilding Permit Application (Plan Review track)Submitted via SmartGov online portal
  • RequiredSite PlanScaled drawing showing dimensions relative to setbacks, easements, and property lines
  • RequiredFloor Plan / Construction DetailsStructure dimensions, foundation detail, bracing

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Per 2026 Fee Schedule Table 1-A
Plan Review Fee65% of total building permit fee
Zoning Fee$60.00 flat
Douglas County / Castle Pines Use Tax1% / 3.75% of 50% of project value, respectively

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Castle Pines building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /colorado/douglas-county-co/castle-pines/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: dd6e440

Reproducible from PermitBase’s version-controlled dataset, commit dd6e440.