This is PermitBase’s published record for Florence as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Florence building permits

Verified

Florence, Colorado — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

2006 International Building Code (IBC) — City of Florence Building Department page states plainly: 'The City of Florence follows the 2006 International Building Code'2006 International Energy Conservation Code (IECC) — per the Building Permit Application Submittal Checklist (PDF): 'Energy Code – City of Florence adopts the 2006 Edition of the International Energy Conservation Code'Florence Municipal Code Title 15 (Buildings and Construction), Section 15.04.040: 'The requirement for obtaining building permits relative to the construction, alteration, moving, demolition, repair, maintenance, and use of any building or structure within the City of Florence shall be governed by the most recent adopted edition of the appropriate adopted codes and building standards, including amendments thereto.' Per Municode search indexing of Title 15, Chapter 15.08 (amendments) is where local amendments to the 2006 IBC are set forth (Section 15.08.010).Electrical: 2023 National Electrical Code (NEC) — administered by the State of Colorado, NOT the City (see localAmendments). Source: City of Florence Building Department page, linking to the Colorado Division of Professions and Occupations (DORA) Electrical Board page, which states the current adopted edition as the 2023 NEC.Plumbing: 2021 (Colorado) Plumbing Code — administered by the State of Colorado, NOT the City. Source: City of Florence Building Department page, linking to the DORA Plumbing Board page, which lists the 2021 edition.No separate local IRC, IMC, IFGC, or IFC edition is published by the City on its Building Department or Building Permits pages, or in the Building Permit Application Submittal Checklist — only the 2006 IBC (general building code) and 2006 IECC (energy code) are explicitly named by the City itself. The zero-tolerance policy governing this corpus prohibits inferring an IRC/IMC/IFGC/IFC edition the City has not itself published; note this as a gap rather than assuming a matching 2006 cycle for the unlisted codes.HB22-1362 (Colorado statewide energy code floor, effective for jurisdictions adopting/updating codes on specified triggers starting July 2023 for larger jurisdictions and July 2026 for smaller ones) does not appear reflected on the City's Building Department page or Submittal Checklist, both of which still affirmatively state the 2006 IECC as current and were the live, actively-maintained pages as of this review (2026-07-06) — checked directly, no updated energy code notice found. Flagged honestly rather than assumed; Florence's population (under the HB22-1362 tiered compliance triggers) and its home-rule status both bear on whether/when the floor applies, but the City has not published any code update reflecting it as of this review.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new construction of single-family homes and other residential structures within Florence city limits, per Florence Municipal Code 15.04.040. Reviewed under the City's adopted 2006 IBC and 2006 IECC. Electrical and plumbing scopes of the project are permitted separately and directly through the State of Colorado (DORA), not the City.

Verified 2026-07-06 · Source

Requirements

  • Florence Municipal Code 15.04.040: building permits govern construction, alteration, moving, demolition, repair, maintenance, and use of any building or structure; no permit or certificate of occupancy issued until all requirements are met
  • Reviewed under the City's adopted 2006 International Building Code and 2006 International Energy Conservation Code
  • Copy of Warranty Deed / Title Commitment or other documentation showing property ownership, including easement information
  • Site Plan or Improvement Location Certificate showing setbacks and dimensions to all lot lines
  • Floodplain Development Permit required if the structure is located within a recognized floodplain (FEMA FIRM Map Panel 08043C0___F referenced on the application)
  • Proof of Water/Water Tap Application (paid receipt from the supplying water purveyor)
  • Proof of Sewer (paid receipt from Fremont Sanitation District) or Septic (approved application from Fremont County)
  • Engineered, site-specific foundation plans prepared by a Colorado-licensed professional engineer (required for new structures and additions, except small unheated utility buildings under 576 sq ft)
  • Site-specific soils investigation & lab analysis report
  • Two sets of all building and foundation plans (large size) required
  • Full site plan package: orientation/north arrow, legal description, lot lines/size, adjacent road names, easements/setbacks/building envelopes, utility improvements, existing/proposed structures, drainage plan with direction/slope arrows, driveway access/grades, sidewalks/paving/curb cuts, parking plan, structure footprint square footage, backflow preventer location, Sidewalk Plan (FMC 17.68.025), Landscaping and Screening Plan (FMC 17.64.150)
  • Floor plan, floor framing plan, roof framing plan, elevation drawings (all sides), and structural detail drawings per the Submittal Checklist's itemized requirements
  • Florence City Contractor's License required for the general contractor (Limited $50/yr or General $100/yr, per Ordinance No. 3-2026)
  • Electrical and plumbing work require SEPARATE permits obtained directly from the State of Colorado DORA — not included in or issued alongside this City building permit

Required documents

  • RequiredBuilding Permit ApplicationCity of Florence Building Permit Application form; includes fields for Plan Check Fee, Flood Permit Fee ($75), Driveway Access Permit Fee, Building Permit Fee, 2.5% Fremont County Use Tax, and 2.5% Florence City Use Tax, all completed by City staff based on the City's own valuation of the work
  • RequiredBuilding Permit Application Submittal Checklist itemsWarranty Deed/Title Commitment, Site Plan/ILC, Floodplain Development Permit (if applicable), proof of water tap and sewer/septic, full site plans, engineered foundation plans, soils report, floor/framing/elevation/structural detail drawings
  • RequiredEngineered Foundation PlansPrepared by a Colorado-licensed professional engineer, site-specific; required for new structures/additions except small unheated utility buildings under 576 sq ft

Fee schedule

Fee typeAmountNotes
Flood Permit Fee$75.00Flat fee, printed directly on the Building Permit Application; applies when a Floodplain Development Permit is required
Fremont County Use Tax2.5% of the City's valuation of workPrinted on the Building Permit Application; assessed by the City on behalf of Fremont County
Florence City Use Tax2.5% of the City's valuation of workPrinted on the Building Permit Application; combined with the County use tax, total use tax is 5% of the City's valuation
Plan Check FeeNot published as a numeric tableLine item exists on the Building Permit Application form (hand-calculated by City staff); no published valuation-based fee schedule was found on the Building Department page, Building Permits page, Building Permit Application, or Submittal Checklist. The City's 2026 Citywide Fee Schedule (Resolutions No. 7-2026 and 8-2026 under Ordinance No. 4-2026) lists a 'Building/ Planning' section in its table of contents, but the numeric fee page for Building was not found populated as of this review. Checked directly; omitted rather than invented.
Building Permit FeeNot published as a numeric tableSame as Plan Check Fee note above — a line item on the application form, but no published valuation-based schedule found
Driveway Access Permit FeeNot published as a numeric tableLine item on the Building Permit Application form; amount not separately published
Florence City Contractor's License (General)$100.00 per calendar yearOrdinance No. 3-2026; administered by the City Clerk, not the Building Department; required in addition to any building permit fees

Residential Addition / Remodel Permit

Verified

Required for additions, alterations, and repairs to existing residential structures in Florence, per Florence Municipal Code 15.04.040. Reviewed under the same 2006 IBC/IECC standard and Submittal Checklist requirements as new construction, though the required document set scales with project scope.

Verified 2026-07-06 · Source

Requirements

  • Florence Municipal Code 15.04.040 governs alterations and repairs the same as new construction
  • Engineered foundation plans required for additions (site-specific, Colorado-licensed engineer), except small unheated utility buildings under 576 sq ft
  • Site plans showing existing and proposed structures, drainage, and utility improvements
  • Floor plan, framing plan, and structural detail drawings scaled to the addition/remodel scope
  • Florence City Contractor's License required for the general contractor
  • Electrical and plumbing scopes require separate State of Colorado DORA permits

Required documents

  • RequiredBuilding Permit ApplicationSame form used for all building permit types; 'Use of Building' field includes Addition, Alteration, and Repair checkboxes
  • RequiredSite PlanShowing existing and proposed structures, setbacks, and utility improvements per the Submittal Checklist

Fee schedule

Fee typeAmountNotes
Fremont County Use Tax2.5% of the City's valuation of work
Florence City Use Tax2.5% of the City's valuation of work
Plan Check Fee / Building Permit FeeNot published as a numeric tableLine items on the Building Permit Application; no published valuation-based schedule found after direct review of all available City documents

Electrical Permit

Verified

Electrical permits within Florence city limits are issued and scheduled entirely by the State of Colorado Department of Regulatory Agencies (DORA) Electrical Board, NOT by the City of Florence. The City's Building Department page directs applicants to the state DORA Electrical page and confirms the currently adopted electrical code edition as the 2023 NEC.

Verified 2026-07-06 · Source

Requirements

  • Electrical permits and inspections are issued and scheduled by the State of Colorado DORA, per the City of Florence Building Department page: 'Electrical and Plumbing permits and inspections are issued and scheduled by the State of Colorado Department of Regulatory Agencies (DORA)'
  • Governed by the 2023 National Electrical Code (NEC), per DORA's Electrical page as linked by the City
  • Per state statute (referenced on the Building Permit Application Submittal Checklist's Notice to Homeowner), only a licensed/registered Electrical Contractor — not the homeowner — may pull the permit and perform the work, except where the homeowner is personally performing work permitted under state homeowner exemptions
  • For solar photovoltaic installations, the City requires a copy of the State Electrical Permit as part of the City's own Building Permit Application package

Required documents

  • RequiredState of Colorado DORA Electrical PermitApplied for directly through DORA's Electrical Board, not the City of Florence

Fee schedule

Fee typeAmountNotes
State-set electrical permit feeSet by the State of Colorado DORA Electrical Board, not the City of FlorenceNot within the City's fee authority; consult DORA's Electrical Board directly for current fee schedule

Plumbing Permit

Verified

Plumbing permits within Florence city limits are issued and scheduled entirely by the State of Colorado Department of Regulatory Agencies (DORA) Plumbing Board, NOT by the City of Florence. The City's Building Department page directs applicants to the state DORA Plumbing page and confirms the currently adopted plumbing code edition as the 2021 Plumbing Code.

Verified 2026-07-06 · Source

Requirements

  • Plumbing permits and inspections are issued and scheduled by the State of Colorado DORA, per the City of Florence Building Department page
  • Governed by the 2021 (Colorado) Plumbing Code, per DORA's Plumbing page as linked by the City
  • Per state statute, only a licensed/registered Plumbing Contractor — not the homeowner (except under state homeowner exemptions) — may pull the permit and perform the work

Required documents

  • RequiredState of Colorado DORA Plumbing PermitApplied for directly through DORA's Plumbing Board, not the City of Florence

Fee schedule

Fee typeAmountNotes
State-set plumbing permit feeSet by the State of Colorado DORA Plumbing Board, not the City of FlorenceNot within the City's fee authority; consult DORA's Plumbing Board directly for current fee schedule

Mechanical / HVAC Permit

Required for mechanical (HVAC, gas-fired equipment) work as part of the City's building permit process under the 2006 IBC as adopted. Unlike electrical and plumbing, the City's Building Department page does not identify mechanical permitting as state-administered, so it is treated as part of the standard City Building Permit Application (mechanical layout requirements — exhaust systems, venting, combustion air — are explicitly listed in the Submittal Checklist's structural details section).

Reviewed 2026-07-06 · Source

Requirements

  • Mechanical layout documentation required as part of the Structural Details submittal: exhaust system for kitchen, baths, and dryer; venting systems; combustion make-up air for fuel-burning appliances (per the Submittal Checklist)
  • Reviewed under the City's adopted 2006 IBC (no separate IMC/IFGC edition is separately published by the City)
  • Florence City Contractor's License required for the contractor performing the work

Required documents

  • RequiredBuilding Permit ApplicationSame general application form used for building permits; mechanical scope described under 'Describe Work'
  • RequiredMechanical Layout / Structural DetailsExhaust, venting, and combustion air documentation per the Submittal Checklist

Fee schedule

Fee typeAmountNotes
Plan Check Fee / Building Permit FeeNot published as a numeric tableLine items on the Building Permit Application; no published valuation-based schedule found for mechanical work specifically

Re-Roof Permit

Verified

Required for re-roofing projects in Florence. The City imposes a firm advance-notice requirement: all re-roofing projects must submit the application and required documentation at least three (3) business days prior to the scheduled start date.

Verified 2026-07-06 · Source

Requirements

  • ALL RE-ROOFING PROJECTS MUST SUBMIT THE APPLICATION AND REQUIRED DOCUMENTATION AT LEAST THREE (3) BUSINESS DAYS PRIOR TO THE SCHEDULED START DATE (stated in capital letters on the Building Permits page)
  • Signed copy of contract or estimate sheet with the homeowner required alongside the Building Permit Application
  • Note: the same Building Permits page also contains a second, inconsistent sentence stating 'at least two days prior to the scheduled start date' — the three-business-day requirement is stated first and in emphasis, and is treated as the governing figure in this file; the inconsistency itself is flagged rather than silently resolved

Required documents

  • RequiredBuilding Permit ApplicationRe-roof scope, submitted at least 3 business days before the scheduled start date
  • RequiredSigned Contract or Estimate SheetSigned copy of the contract or estimate sheet with the homeowner

Fee schedule

Fee typeAmountNotes
Plan Check Fee / Building Permit FeeNot published as a numeric tableNo separate flat re-roof fee is published; billed via the general Building Permit Application line items

Rooftop Solar Photovoltaic Permit

Verified

Required for solar photovoltaic installations in Florence. The City's building permit for a solar installation requires a copy of the State Electrical Permit (since electrical work itself is DORA-administered) alongside engineered structural documentation for roof-mounted systems.

Verified 2026-07-06 · Source

Requirements

  • Building Permit Application required for the solar installation scope
  • Copy of the State Electrical Permit required (electrical interconnection work is separately permitted through DORA, not the City)
  • Engineered Stamped Structural Letter required specifically for roof-mounted units
  • Engineered Stamp Design Plans required

Required documents

  • RequiredBuilding Permit ApplicationSolar Installation scope
  • RequiredCopy of State Electrical PermitFrom the State of Colorado DORA Electrical Board
  • RequiredEngineered Stamped Structural LetterRequired for roof-mounted photovoltaic units
  • RequiredEngineered Stamp Design PlansStamped design plans for the PV installation

Fee schedule

Fee typeAmountNotes
Plan Check Fee / Building Permit FeeNot published as a numeric tableBilled via the general Building Permit Application line items; the electrical portion is billed separately by DORA

Demolition Permit

Required for demolition/removal of a building or structure within Florence, per Florence Municipal Code 15.04.040, which explicitly includes 'demolition' among the activities requiring a building permit. Applied for using the same Building Permit Application form, checking the 'Remove' use-of-building box.

Reviewed 2026-07-06 · Source

Requirements

  • Florence Municipal Code 15.04.040 explicitly lists demolition among the activities requiring a building permit
  • Building Permit Application with 'Remove' checked under Use of Building
  • Proof of property ownership (Warranty Deed/Title Commitment)
  • Site plan showing existing structures to be removed

Required documents

  • RequiredBuilding Permit ApplicationDemolition/Remove scope

Fee schedule

Fee typeAmountNotes
Plan Check Fee / Building Permit FeeNot published as a numeric tableNo demolition-specific fee is separately published; billed via the general Building Permit Application line items

Commercial / Industrial / Multi-Family Tenant Improvement Permit

Required for commercial, industrial, and multi-family tenant improvement, alteration, or new construction projects in Florence. Requires plans prepared by a Colorado-licensed Architect or Engineer, and a separate off-street parking plan submitted to the City Planner.

Reviewed 2026-07-06 · Source

Requirements

  • Construction plans must be prepared by a Colorado-licensed Architect or Engineer, with signed and dated stamp/seal
  • Commercial, Industrial, Multi-Family Off-Street Parking Plan must be submitted to the City Planner for review and approval, showing parking access, number of handicap spaces, and paved surface type
  • Same site plan, drainage, utility, and engineered foundation requirements as residential projects, scaled to the commercial scope
  • Florence City Contractor's License (General, $100/yr) required for the general contractor

Required documents

  • RequiredBuilding Permit ApplicationCommercial/Industrial/Multi-Family scope
  • RequiredStamped Architectural/Engineering PlansFloor and building plans, signed and dated stamp/seal of the Colorado-licensed architect or engineer
  • RequiredOff-Street Parking PlanSubmitted to the City Planner for review and approval

Fee schedule

Fee typeAmountNotes
Plan Check Fee / Building Permit FeeNot published as a numeric tableNo published commercial-specific valuation fee schedule found; billed via the general Building Permit Application line items plus applicable use tax
Fremont County + Florence City Use Tax5% combined (2.5% + 2.5%) of the City's valuation of work

Deck / Covered Patio Permit

Required for construction of decks and covered patios attached or detached from a residential structure in Florence, under the general Building Permit Application and Submittal Checklist requirements (structural details, foundation/footing requirements where applicable).

Reviewed 2026-07-06 · Source

Requirements

  • Building Permit Application with structure/addition scope
  • Structural detail drawings showing connections at post and beam, beam to wall, footing and post, ledger and wall
  • Stairs, guardrail, and handrail details (shown in profile) where applicable
  • Engineered foundation/footing plans if required by span or structural load
  • Site plan showing the proposed structure's location, setbacks, and lot coverage

Required documents

  • RequiredBuilding Permit ApplicationAddition/Alteration scope for the deck or covered patio
  • RequiredStructural Detail DrawingsConnections, footings, ledger, stairs/guardrail/handrail details per the Submittal Checklist

Fee schedule

Fee typeAmountNotes
Plan Check Fee / Building Permit FeeNot published as a numeric tableNo deck/patio-specific fee is separately published; billed via the general Building Permit Application line items

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /colorado/fremont-county-co/florence/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: 3b98004

Reproducible from PermitBase’s version-controlled dataset, commit 3b98004.