Gunnison building permits
VerifiedGunnison, Colorado — as published 2026-08-26.
Verified 2026-07-19 · Source
Codes adopted
Permit types & fees
Building Permit
VerifiedRequired for construction, enlargement, alteration, repair, moving, demolition, or change of occupancy of a building or structure within City of Gunnison limits, per the 2021 IBC/IRC as adopted and locally amended in Municipal Code Chapter 14.10. Issued and reviewed directly by the City's own Building Office (Community Development Department) — Gunnison County has no jurisdiction within City limits and there is no joint city-county building authority. This is the City's single UNIFIED permit for both residential (IRC) and commercial/multi-family (IBC) construction, including tenant improvements: neither the City's Building & Sign Permits page, the Community Development Applications & Forms page, nor the Jan. 1, 2026 Fee Table publishes a separate commercial building permit application, commercial permit type, or tenant-improvement permit. Commercial projects use the same Building Permit application and the same valuation-based Appendix L fee brackets, differing only in fee INPUTS — a 2.30% Regional Building Valuation Multiplier per sq ft versus 1.60% residential, a 65% Plan Review Fee versus 30% under the IRC, and a $600 pre-application Site Development Review tier versus $300.
Verified 2026-08-02 · Source
Requirements
- Property must be within City of Gunnison limits (Gunnison County's Building Office explicitly excludes all incorporated cities/towns, including Gunnison, from its jurisdiction)
- Parcel must have adequate public facilities — sewage disposal, water, electricity, drainage/water quality, fire protection, roads, transportation, pedestrian circulation, and refuse — per the Land Development Code and Building/Fire Codes
- Occupancy will not be granted until City water, sewer, and electrical utilities are in place and functional
- Work not listed under the IRC/IBC 'Building Exemptions' list (e.g., detached accessory structures under 120-200 sq ft, fences ≤8 ft, retaining walls ≤4 ft, re-roofing/re-siding without structural alteration) requires a permit
- Electrical and plumbing scopes of work are permitted and inspected separately by the State of Colorado, not the City
Required documents
- RequiredBuilding Permit ApplicationSubmitted through the City's online applications portal per the Community Development Applications & Forms page; a 'Building Permit Packet' is also referenced on the same page.
- OptionalDo I Need a Building Permit? (guide)City of Gunnison Building Office guide listing IRC and IBC permit exemptions in detail; available in English and Spanish.
- OptionalBuilding Valuation WorksheetCity of Gunnison worksheet template for calculating project valuation (used to determine permit fee, plan check fee, and use tax); an example version on file is dated 'Revised 08/2019' with an illustrative August 2022 square-foot construction cost rate — treated here as a process illustration only, not as a current fee citation, since it is not dated to the current (Jan. 2026) fee resolution.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Plan Review Fee — Multi-Family and Commercial | 65% of building permit fee | City of Gunnison Community Development, Building and Planning Fee Table, fees effective January 1, 2026 (footer cites Resolution No. 25, Series 2025); gunnisonco.gov/Community Development 01.01.2026 Fee Table.pdf. |
| Building Permit Plan Review Fee — All other projects under the IRC | 30% of building permit fee | Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| Change of Use/Occupancy (up to $5,000 valuation of permit) | $225.00 | Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| Change of Use/Occupancy (valuation of improvements over $5,000) | % per IBC/IRC Table — fee per Title 14 | Community Development, Building and Planning Fee Table, effective January 1, 2026; the underlying IBC/IRC valuation table dollar figures are not reproduced in the fee table itself. |
| Use Tax Prepayment Estimate | 50.00% of ICC table or provided valuation | Community Development, Building and Planning Fee Table, effective January 1, 2026 — this is the valuation base percentage used to estimate use tax prepayment, not a final tax rate; contact Finance for the applicable use tax rate. |
| Regional Building Valuation Multiplier — Residential | 1.60% cost multiplier per sq ft (by occupancy type per building code) | Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| Regional Building Valuation Multiplier — Commercial | 2.30% cost multiplier per sq ft (by occupancy type per building code) | Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| Preliminary Site Development Review (3+ Residential Units and Commercial) | $600.00 | Preapplication admin review fee per submittal review — the commercial/multi-family pre-application tier that precedes a commercial Building Permit submittal. Show full citationHidePreapplication admin review fee per submittal review — the commercial/multi-family pre-application tier that precedes a commercial Building Permit submittal. The 1-and-2-unit residential counterpart ('Site Development Review') is $300.00 per submittal review. Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| Engineering/Consultant Support Services | 15.00% (Actual Cost Plus Overhead %) | Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| Fireplace/Solid Fuel | $65.00 per application | Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| Base Building Permit Fee (valuation-based schedule) | $1.00-$500.00: $24.00. $501.00-$2,000.00: $24.00 for the first $500 plus $3.00 for each additional $1,000 or fraction thereof. $2,001.00-$40,000.00: $69.00 for the first $2,000 plus $11.00 for each additional $1,000 or fraction thereof. $40,001.00-$100,000.00: $487.00 for the first $40,000 plus $9.00 for each additional $1,000 or fraction thereof. $100,001.00-$500,000.00: $1,027.00 for the first $100,000 plus $7.00 for each additional $1,000 or fraction thereof. $500,001.00-$1,000,000.00: $3,827.00 for the first $500,000 plus $5.00 for each additional $1,000 or fraction thereof. $1,000,001.00-$5,000,000.00: $6,327.00 for the first $1,000,000 plus $3.00 for each additional $1,000 or fraction thereof. $5,000,001.00 and over: $18,327.00 for the first $5,000,000 plus $1.00 for each additional $1,000 or fraction thereof. | Chapter 14.10 on ecode360.com (ecode360.com/47882243) does render client-side, but was successfully loaded and read via a real browser (not a plain fetch), confirming Section 109.2 still directs that… Show full citationHideChapter 14.10 on ecode360.com (ecode360.com/47882243) does render client-side, but was successfully loaded and read via a real browser (not a plain fetch), confirming Section 109.2 still directs that 'a fee shall be determined in accordance with the attached permit fee schedule, Appendix L' (unchanged as of ecode360's 'legislation through 03-24-2026' currency notice). Appendix L itself is not transcribed into ecode360's codified section text (it is an attached exhibit), so it was located in the original enacting document instead: Ordinance No. 9, Series 2022, City of Gunnison, '2021 PERMIT FEE SCHEDULE APPENDIX L' table, adopted 11/08/2022 — linked from the City Clerk Ordinances page (gunnisonco.gov/departments/city_clerk/ordinances.php) at gunnisonco.gov/departments/city_clerk/ordinance.no9.series2022.pdf. This valuation-to-fee bracket table is the 'base building permit fee' that the Jan. 1, 2026 Fee Table's Plan Review Fee percentages (65%/30%) and Regional Building Valuation Multiplier are layered on top of. Also re-checked the full Jan. 1, 2026 Community Development Fee Table PDF (2 pages) and the citywide Resolution No. 3, Series 2026 fee schedule (10-page scanned PDF, OCR'd in full) — neither reproduces this bracket table; it remains solely in the 2022 ordinance exhibit, which has not been found superseded by any later ordinance (Ordinance No. 4, Series 2025 amended only the Chapter 14.10 appeals process, not fees). |
Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement)
VerifiedReviewed under the same City of Gunnison Building Permit that covers all occupancies — the City publishes no separate commercial application, commercial permit type, or tenant-improvement permit. Commercial and multi-family projects are reviewed against the 2021 IBC as adopted and locally amended in Municipal Code Chapter 14.10 (Ordinance No. 9, Series 2022, Section 2), issued directly by the City's own Building Office; Gunnison County has no jurisdiction inside City limits. What differs from residential IRC projects is the fee inputs: a 2.30% Regional Building Valuation Multiplier per square foot versus 1.60% residential, a Plan Review Fee of 65% of the building permit fee versus 30% under the IRC, and a $600 Preliminary Site Development Review pre-application tier for 3+ unit residential and commercial projects versus $300 for 1-2 unit residential — all per the Community Development, Building and Planning Fee Table effective January 1, 2026.
Verified 2026-08-26 · Source
Requirements
- Property must be within City of Gunnison limits — Gunnison County's Building Office states it has no jurisdiction inside any city or town in the county, including Gunnison
- Reviewed under the 2021 International Building Code, adopted by Municipal Code Chapter 14.10 (Ordinance No. 9, Series 2022, Section 2), including Appendix Chapters E, I, J and the Errata to the IBC, First Printing, October 2020
- A Preliminary Site Development Review pre-application submittal, at $600.00 per review submittal, applies to 3+ unit residential and commercial projects, per the Community Development, Building and Planning Fee Table effective January 1, 2026
- Commercial valuation for fee-calculation purposes uses a 2.30% Regional Building Valuation Multiplier per square foot by occupancy type, versus 1.60% for residential, per the same Fee Table
- Building Permit Plan Review Fee for commercial and multi-family projects is 65% of the building permit fee, versus 30% for other IRC projects, per the same Fee Table
- Use tax on construction materials is calculated per the City of Gunnison Use Tax Formula — project valuation times 50% times 4% — per the 2021 Permit Fee Schedule Appendix L exhibit to Ordinance No. 9, Series 2022
- Electrical and plumbing scopes are permitted and inspected separately by the State of Colorado, not the City, consistent with the City's general electrical/plumbing carve-out
- Fire protection review is provided by the Gunnison Volunteer Fire Department, a City-affiliated department rather than a separate special fire protection district; the City publishes no fire plan-review fee bundled into or itemized alongside the Building Permit fee
Required documents
- RequiredBuilding Permit ApplicationSubmitted through the City's online applications portal per the Community Development Applications & Forms page — the same application used for residential and commercial projects, including tenant improvements; no separate commercial or TI application form is published.
- OptionalDo I Need a Building Permit? (guide)City of Gunnison Building Office guide listing IRC and IBC permit exemptions in detail; available in English and Spanish.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Building Permit Fee (valuation-based schedule) | $1.00-$500.00: $24.00. $501.00-$2,000.00: $24.00 for the first $500 plus $3.00 for each additional $1,000 or fraction thereof. $2,001.00-$40,000.00: $69.00 for the first $2,000 plus $11.00 for each additional $1,000 or fraction thereof. $40,001.00-$100,000.00: $487.00 for the first $40,000 plus $9.00 for each additional $1,000 or fraction thereof. $100,001.00-$500,000.00: $1,027.00 for the first $100,000 plus $7.00 for each additional $1,000 or fraction thereof. $500,001.00-$1,000,000.00: $3,827.00 for the first $500,000 plus $5.00 for each additional $1,000 or fraction thereof. $1,000,001.00-$5,000,000.00: $6,327.00 for the first $1,000,000 plus $3.00 for each additional $1,000 or fraction thereof. $5,000,001.00 and over: $18,327.00 for the first $5,000,000 plus $1.00 for each additional $1,000 or fraction thereof. | 2021 Permit Fee Schedule Appendix L, an exhibit to Ordinance No. Show full citationHide2021 Permit Fee Schedule Appendix L, an exhibit to Ordinance No. 9, Series 2022, City of Gunnison, adopted 11/08/2022 — same bracket table used for both residential and commercial valuations; gunnisonco.gov/departments/city_clerk/ordinance.no9.series2022.pdf, page bearing the '2021 PERMIT FEE SCHEDULE APPENDIX L' heading. |
| Building Permit Plan Review Fee — Commercial and Multi-Family | 65% of building permit fee | Community Development, Building and Planning Fee Table, effective January 1, 2026 (Resolution No. 25, Series 2025); gunnisonco.gov/Community Development 01.01.2026 Fee Table.pdf. |
| Regional Building Valuation Multiplier — Commercial | 2.30% cost multiplier per sq ft (by occupancy type per building code) | Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| Preliminary Site Development Review (3+ Residential Units and Commercial) | $600.00 | Preapplication admin review fee per submittal review — precedes a commercial Building Permit submittal. Show full citationHidePreapplication admin review fee per submittal review — precedes a commercial Building Permit submittal. The 1-and-2-unit residential counterpart ('Site Development Review') is $300.00 per submittal review. Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| Use Tax on Construction Materials | Project valuation x 50% x 4% | 'City of Gunnison Use Tax Formula = Valuation of project x 50% x .04 = Use Tax', printed directly on the 2021 Permit Fee Schedule Appendix L exhibit page, Ordinance No. Show full citationHide'City of Gunnison Use Tax Formula = Valuation of project x 50% x .04 = Use Tax', printed directly on the 2021 Permit Fee Schedule Appendix L exhibit page, Ordinance No. 9, Series 2022, City of Gunnison — the same exhibit as the Base Building Permit Fee bracket table above. This is the applied rate behind the Fee Table's separate 'Use Tax Prepayment Estimate: 50.00% of ICC table or provided valuation' line. |
| Change of Use/Occupancy (up to $5,000 valuation of permit) | $225.00 | Community Development, Building and Planning Fee Table, effective January 1, 2026 — applies where a tenant improvement changes the occupancy classification. |
| Change of Use/Occupancy (valuation of improvements over $5,000) | % per IBC/IRC Table — fee per Title 14 | Community Development, Building and Planning Fee Table, effective January 1, 2026; the underlying IBC/IRC valuation table dollar figures are not reproduced in the fee table itself. |
| Fire Department Plan Review | Not published on the City's website | Contact the Gunnison Volunteer Fire Department (970-641-8153) for a current fee quote — the Fire Department page publishes no plan-review fee schedule, and no line for it appears on the Community Development, Building and Planning Fee Table. |
| Engineering/Consultant Support Services | 15.00% (Actual Cost Plus Overhead %) | Community Development, Building and Planning Fee Table, effective January 1, 2026 — applies when the City engages outside consultants for plan review or inspection. |
Sign Permit
VerifiedRequired for all signs erected within the City of Gunnison. Signs placed within the public right-of-way additionally require a separate License Agreement with the City. Sign standards are set out in the City's Land Development Code, Section 4.8.
Verified 2026-07-19 · Source
Requirements
- Required for all signs erected within City of Gunnison limits
- Signs placed in the public right-of-way require a separate Revocable License Agreement with the City, in addition to the Sign Permit
- Must conform to the Sign Standards in Land Development Code Section 4.8
Required documents
- RequiredSign Permit ApplicationSubmitted through the City's Building & Sign Permits application process, per the City's Building & Sign Permits page.
- OptionalLicense Agreement Application for Personal Property or UseRequired in addition to the Sign Permit for any sign placed within the public right-of-way, per the City's Applications & Forms and Sign Permits pages.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit | $60.00 | Application admin review fee. Community Development, Building and Planning Fee Table, effective January 1, 2026. |
| License Agreements (Except Sandwich Boards) | $300.00 | Application fee, required for signs placed within the public right-of-way in addition to the Sign Permit. Community Development, Building and Planning Fee Table, effective January 1, 2026. |
Mechanical Permit
VerifiedRequired for installation, alteration, or replacement of mechanical systems (HVAC, furnaces, boilers, evaporative coolers, etc.) within City of Gunnison limits, under the City-adopted 2021 International Mechanical Code (Chapter 14.20), except for the specific mechanical work items listed as exempt in the City's 'Do I Need a Building Permit?' guide (e.g., portable heating/cooling/ventilation appliances, minor part replacement, self-contained refrigeration systems ≤10 lbs refrigerant).
Verified 2026-07-19 · Source
Requirements
- Applies to mechanical system installation, alteration, or replacement within City of Gunnison limits not covered by the Mechanical Exemptions list (portable appliances, minor repairs, small self-contained refrigeration units, etc.)
- Governed by the 2021 International Mechanical Code as adopted in Municipal Code Chapter 14.20
Required documents
- RequiredMechanical Permit ApplicationListed as a distinct application on the City's Community Development Applications & Forms page, separate from the general Building Permit Application.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee | Permit issuance fee $22.00 (plus $6.50 for each supplemental permit while the original permit has not expired). Itemized fees (do not include the issuance fee): Furnaces (forced air/gravity furnace or burner, incl. ducts/vents) $13.25; suspended heater, recessed wall heater, or floor-mounted unit heater $13.25; Appliance Vents $6.50; Repairs/Additions to a heating, refrigeration, cooling, or absorption unit or system (incl. controls) $12.25; Boilers, Hot Water Heaters, and Compressors $16.50; Air Handler Equipment $16.50; Evaporative Cooler (non-portable) $9.50; ventilation/exhaust fan connected to a single duct $6.50; ventilation/exhaust system not part of a heating/AC system $9.50; mechanical-exhaust hood incl. ductwork $9.50; Solid Fuel Burning Device (chimney-connected) $20.00; Miscellaneous appliance/equipment not otherwise listed $9.50. Other inspections outside normal business hours and re-inspections: $64.25/hr (two-hour minimum for after-hours; one-hour minimum for re-inspection). | Found in the same Ordinance No. 9, Series 2022 exhibit as the Building Permit 'Appendix L' table (see building-permit permitType) — a 'MECHANICAL/FUEL GAS CODE FEE SCHEDULE' table attached to Chapter… Show full citationHideFound in the same Ordinance No. 9, Series 2022 exhibit as the Building Permit 'Appendix L' table (see building-permit permitType) — a 'MECHANICAL/FUEL GAS CODE FEE SCHEDULE' table attached to Chapter 14.10's International Mechanical Code Section 109.2, which reads: 'The fees for mechanical work shall be as set forth in the Mechanical/Fuel Gas Code fee schedule, attached hereto.' Source: Ordinance No. 9, Series 2022, City of Gunnison, adopted 11/08/2022, at gunnisonco.gov/departments/city_clerk/ordinance.no9.series2022.pdf (linked from the City Clerk Ordinances page). This schedule is not reproduced in the Jan. 1, 2026 Community Development Fee Table PDF or the citywide Resolution No. 3, Series 2026 fee schedule (both re-checked in full 2026-07-19, 2 and 10 pages respectively) — those cover only Community Development/Building & Planning line items, not the Mechanical/Fuel Gas-specific table, which remains governed by this still-current (unamended, per ecode360's 'legislation through 03-24-2026' notice) 2022 ordinance exhibit. This SUPERSEDES the previously-flagged 'Example SFR Building Valuation Worksheet' (revised 08/2019) as the correct current source — that worksheet was a staff-created illustrative estimate, not the actual adopted fee ordinance, though its rates were in the same ballpark. |
Mobile Home Permit
VerifiedRequired for mobile/manufactured home placement within City of Gunnison limits, listed as a distinct application on the City's Community Development Applications & Forms page, separate from the general Building Permit Application.
Verified 2026-07-19 · Source
Requirements
- Applies to mobile/manufactured home placement within City of Gunnison limits
- Property must have adequate public facilities and City utilities in place, per the general Building Permit requirements published on the City's Building & Sign Permits page
Required documents
- RequiredMobile Home Permit ApplicationListed as a distinct application on the City's Community Development Applications & Forms page.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mobile Home Permit Fee | Same valuation-based fee structure as the general Building Permit (the 'Appendix L' bracket schedule — see the building-permit permitType's 'Base Building Permit Fee' entry), applied to a valuation equal to the actual cost of the manufactured/mobile home plus the actual cost of the foundation — not the ICC Building Valuation Data Table used for site-built construction. | Municipal Code Chapter 14.10, Section 109.3 'Building Permit Valuations' (added by Ordinance No. Show full citationHideMunicipal Code Chapter 14.10, Section 109.3 'Building Permit Valuations' (added by Ordinance No. 9, Series 2022 § 2; current per ecode360.com/47882243, legislation through 03-24-2026) states: 'Valuation for any factory-built housing or factory-built non-residential unit shall be the actual cost, as those terms are defined in the Colorado Housing Act of 1970, C.R.S 24-32-701, plus the actual cost of the foundation.' Colorado's factory-built-structure statutes (C.R.S. Title 24, Article 32, Part 33, the successor scheme to the 1970 Housing Act provisions cited in the ordinance) define 'manufactured home' to expressly include mobile homes. Section 109.2 routes 'buildings, structures, additions, and/or alterations requiring a permit' generally through the Appendix L fee schedule (same Ordinance No. 9, Series 2022 exhibit; see the building-permit entry), and no separate mobile-home-specific fee schedule is adopted anywhere else — mobile home placement is billed under the general valuation-based Building Permit fee structure, just with a different (actual-cost) valuation input than site-built construction. Source: gunnisonco.gov/departments/city_clerk/ordinance.no9.series2022.pdf. |
Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop or ground-mount solar photovoltaic systems within Gunnison city limits, reviewed by the City's own Community Development Department, Building Office under the 2021 IBC/IRC (Chapter 14.10). No standalone solar/photovoltaic fee line exists on the City's Community Development, Building and Planning Fee Table — a solar installation is billed under the general valuation-based Base Building Permit Fee (2021 Permit Fee Schedule Appendix L, Ordinance No. 9, Series 2022) plus the applicable Plan Review Fee percentage. Electrical interconnection work is separately permitted and inspected by the State of Colorado, not the City, consistent with Gunnison's general electrical carve-out.
Verified 2026-07-20 · Source
Requirements
- Building Permit Application submitted to the City's Building Office (not Gunnison County — the County's Building Office has no jurisdiction within City limits)
- Electrical interconnection/wiring scope is permitted and inspected separately by the State of Colorado (DORA Division of Professions and Occupations, Electrical Board), not the City, consistent with the City's general electrical carve-out documented on the Building & Sign Permits page
- Colorado's statewide solar-permit fee cap (C.R.S. 24-48.5-113, enacted via HB21-1284) limits the aggregate LOCAL GOVERNMENT building-permit fees chargeable for a residential solar installation to $500 (and $1,000 for commercial), regardless of what the general valuation-based table would otherwise calculate
- Colorado HB25-1096 (Automated Permits for Clean Energy Technology) required municipalities with population over 5,000 to adopt an automated residential solar permitting platform (e.g., SolarAPP+) by July 1, 2026; Gunnison's population is approximately 6,500-7,000 (over the threshold), but no City-published confirmation of SolarAPP+ or equivalent adoption was found on the Building Department page, Building & Sign Permits page, or Fee Table as of the last verification
- Governed by the 2021 IBC/IRC as adopted and locally amended in Municipal Code Chapter 14.10
Required documents
- RequiredBuilding Permit ApplicationCity of Gunnison Building Office application, used for all building trades including solar structural/racking scope
- OptionalDo I Need a Building Permit? guidance (PDF)City of Gunnison Building Office reference confirming when a permit is required
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Building Permit Fee — valuation $2,001 to $40,000 (typical residential solar range) | $69.00 for the first $2,000 plus $11.00 for each additional $1,000 or fraction thereof | 2021 Permit Fee Schedule Appendix L, Ordinance No. 9, Series 2022 — no dedicated solar/photovoltaic line exists; billed under this general valuation table, subject to Colorado's statewide $500 residential solar-fee cap (C.R.S. 24-48.5-113) |
| Plan Review Fee — projects under the IRC | 30% of building permit fee | Community Development, Building and Planning Fee Table, effective January 1, 2026 |
| Use Tax Prepayment Estimate | 50.00% of ICC table or provided valuation (base for use tax rate) | Community Development, Building and Planning Fee Table, effective January 1, 2026 |
EV Charger / Electric Vehicle Charging Station Permit
VerifiedInstalling an EV charger circuit in Gunnison is electrical work, and under the City's general electrical carve-out, documented on the Building & Sign Permits page, electrical permits and inspections within City limits are administered directly by the State of Colorado (DORA Division of Professions and Occupations, Electrical Board) rather than the City. The City does not issue or fee-assess electrical permits at all, so there is no City fee line for EV chargers. A City of Gunnison Building Permit is required in addition only if the installation includes new structural work, such as a carport or accessory structure to house the charger, billed under the City's general valuation-based Base Building Permit Fee — the same mechanism that covers solar racking.
Verified 2026-07-20 · Source
Requirements
- The EV charger circuit itself must be permitted and inspected directly through the State of Colorado DORA Electrical Board (apply at dpo.colorado.gov/EandP/Permits) -- not through the City of Gunnison, which has no electrical permitting function
- Local State Electrical Inspector for Gunnison: Dustin Behounek, 303.869.3451, per the City's own Building Department and Building & Sign Permits pages
- A City of Gunnison Building Permit is required only if new structural work (e.g., a carport, canopy, or accessory structure) is built to house the charger -- submitted to the City's Building Office, not the County (Gunnison County's Building Office has no jurisdiction within City limits)
- Unlike solar, which is subject to Colorado's statewide $500 local-government fee cap for residential installations (C.R.S. 24-48.5-113), no equivalent statutory fee cap was found for EV charger permits
- Governed by the City's adopted 2021 IBC/IRC (Municipal Code Chapter 14.10) for any structural component, and the state-adopted NEC for the electrical scope
Required documents
- RequiredState of Colorado Electrical Permit (DORA Electrical Board)Obtained directly from the State, not the City, for the EVSE circuit itself
- OptionalCity of Gunnison Building Permit Application (only if new structure is built)City Building Office application, used only if the EV charger installation includes new structural work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State of Colorado electrical permit fees (EVSE circuit) | Set by the State of Colorado (DORA Electrical Board), not the City of Gunnison | The City of Gunnison publishes no electrical permit fee because it is not the issuing authority — electrical is carved out to the State of Colorado. Confirm the current state fee schedule directly with DORA. |
| Base Building Permit Fee — valuation $2,001 to $40,000 (only if new structure, e.g. carport, is built to house the charger) | $69.00 for the first $2,000 plus $11.00 for each additional $1,000 or fraction thereof | 2021 Permit Fee Schedule Appendix L, Ordinance No. 9, Series 2022 — applies only when new structural work is involved; a standalone wall/pedestal charger with no new structure does not require this |
| Plan Review Fee — projects under the IRC (only if a City Building Permit applies) | 30% of building permit fee | Community Development, Building and Planning Fee Table, effective January 1, 2026 |
Fire Sprinkler / Fire Alarm System Permit
VerifiedFire protection in Gunnison is provided by the Gunnison Volunteer Fire Department (201 W Virginia Ave, 970-641-8153), whose Fire Marshal enforces fire codes, conducts fire and mechanical inspections, and investigates fires within city limits. No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure distinct from the general City Building & Sign Permits process was located on the City's website as of the last verification — the Building & Sign Permits page confirms that building occupancy is not granted until City utilities (water, sewer, electrical) are functional, but does not itemize fire-system permitting separately.
Verified 2026-08-13 · Source
Requirements
- Fire sprinkler and fire alarm systems within Gunnison city limits are subject to review by the Gunnison Fire Marshal, part of the Gunnison Volunteer Fire Department
- No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure distinct from the general City Building & Sign Permits process was located on the City's website as of the last verification
- Contact the Gunnison Fire Marshal (Gunnison Volunteer Fire Department, 970-641-8153) or the City Building Office (970-641-8151, building@gunnisonco.gov) to confirm current submittal requirements for a specific project
Required documents
- RequiredFire Sprinkler/Alarm System PlansContact the Gunnison Fire Marshal to confirm current submittal requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Sprinkler/Alarm Plan Review & Permit Fee | Not published on the City's website as of the last verification | Contact the Gunnison Fire Marshal (970-641-8153) or Building Office (970-641-8151) for a current fee quote |
Change of Use / Change of Occupancy
Gunnison County (the surrounding jurisdiction, administratively distinct from the City) requires a building permit to change the occupancy of a building or structure, per Colorado state regulation. Within City of Gunnison limits specifically, the City publishes no standalone 'change of use' application distinct from the general Building & Sign Permits process; the City's Building & Sign Permits page confirms building occupancy is withheld until City utilities (water, sewer, electrical) are in place and functional. No City-specific adopted International Existing Building Code (IEBC) edition is confirmed for Gunnison (see codesAdopted).
Reviewed 2026-08-13 · Source
Requirements
- A building permit is required to change the occupancy of a building or structure under Colorado building-permit practice (Gunnison County context) — confirm whether this applies identically within City of Gunnison limits, since no City-specific change-of-use language is published
- No standalone change-of-use application distinct from the general City Building & Sign Permits process was found published on the City's website as of the last verification
- Building occupancy will not be granted until all City utilities (water, sewer, and electrical) are in place and functional, per the City's Building & Sign Permits page
- No City-specific adopted International Existing Building Code (IEBC) edition was confirmed in the code-adoption research
- Contact the City Building Office (970-641-8151, building@gunnisonco.gov) to confirm requirements for a specific change-of-use project
Required documents
- RequiredBuilding Permit ApplicationStandard City building permit application; contact the Building Office to confirm current requirements for a change-of-use project
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (if construction accompanies the change) | Not published as a standalone change-of-use fee line | Contact the Building Office (970-641-8151) for a current fee quote |
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Applications & forms
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gunnison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.