Mount Crested Butte building permits

Verified

Mount Crested Butte, Colorado — as published 2026-07-07.

Verified 2026-07-06 · Source

Codes adopted

2021 International Building Code (IBC) — Town Code Chapter 6, Article II, adopted by Ordinance No. 6, Series 2024, in effect as of January 3, 2025, pursuant to Title 31, Article 16, Part 2, C.R.S.2021 International Residential Code (IRC) — Town Code Chapter 6, Article III, with local amendments including Table R301.2 climatic design criteria (Sec. 6-32, a 155 psf ground snow load) and a modified automatic fire sprinkler requirement (Sec. 6-59)2021 International Existing Building Code (IEBC) — referenced in the Town's Adopted Codes list on mtcb.colorado.gov/building2021 International Mechanical Code (IMC) — Town Code Chapter 6, Article IV (Sec. 6-73 through 6-75), with a local flat-fee Table 1-AM mechanical permit fee schedule2021 International Fuel Gas Code (IFGC) — adopted per the Town's Adopted Codes list; the State of Colorado is responsible for reviewing and inspecting plumbing rather than the Town2021 International Fire Code (IFC) — Town Code Chapter 8, Article I, enforced through the Crested Butte Fire Protection District (CBFPD), which performs all fire alarm/suppression/sprinkler inspections rather than the Town Building Division2021 International Property Maintenance Code — per the Town's Adopted Codes list2021 International Energy Conservation Code (IECC) — per the Town's Adopted Codes listColorado Model Electric Ready and Solar Ready Code — Town Code Chapter 6, Article X (Sec. 6-141 et seq.), adopted by Ordinance No. 6, Series 2024, in effect as of January 3, 2025; applies to new one- and two-family dwellings and townhouses (residential buildings are exempted from certain waiver provisions per Section 101.4.1/102.1)2025 Colorado Wildfire Resiliency Code (WRC) — per the Town's own 'Colorado Wildfire Resiliency Code' link and 'WRC Standards Summarized' summary sheet published on mtcb.colorado.gov/buildingNational Electrical Code and International Plumbing Code — the Town's own Adopted Codes page states: 'The State of Colorado is responsible for reviewing and inspecting electrical and plumbing. Please contact the State of Colorado to determine the following code editions: National Electrical Code, International Plumbing Code' — Mt. Crested Butte does not itself adopt/administer these trade codesFull Town Code Chapter 6 (Buildings and Building Regulations) and Chapter 8 (Fire Prevention and Protection) text and Ordinance No. 6, Series 2024 hosted at mtcb.colorado.gov and mirrored on ecode360.com/MT4975 and qcode.us/codes/mtcrestedbutte

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family homes, duplexes, townhomes, and similar residential structures within Town of Mt. Crested Butte limits. Reviewed under the 2021 IRC as locally amended (Town Code Chapter 6, Article III), including the Town's Table R301.2 climatic design criteria (155 psf ground snow load, 105 mph wind design speed, Seismic Design Category B, 9,400 ft Manual J elevation), a stricter automatic fire sprinkler trigger than neighboring Crested Butte, and a concurrent Design Review + Permit Review process administered directly by the Community Development Department.

Verified 2026-07-06 · Source

Requirements

  • Design Review and Permit Review are conducted CONCURRENTLY (not sequentially gated); Design Review approval, once granted, is valid for 1 year
  • Must meet Table R301.2 design criteria: 155 psf ground snow load (2016 SEAC Colorado Design Snow Loads), 105 mph wind design speed, Seismic Design Category B, 36-inch minimum frost line depth, mandatory roof ice barrier underlayment, -16 F winter design temperature, 9,400 ft Manual J elevation
  • Automatic residential fire sprinkler system required in all two-family dwellings/townhomes (no size threshold) and in one-family dwellings with gross floor area 4,800 sq ft or more (Town Code Sec. 6-59)
  • Crested Butte Fire Protection District (CBFPD) approval letter required confirming access, gas meter location, and water supply comply with Town Code Chapter 8
  • Construction Management Plan (CMP) required, addressing on-site parking, material staging, trash/toilets, and seasonal right-of-way parking restrictions (no parking in Town rights-of-way November 15-April 15)
  • Soils report required; engineer must address foundation design, driveway design, and retaining walls per the soils report recommendations
  • Site survey/plat prepared by a Colorado-licensed land surveyor required with the permit application (Town Code Sec. 6-49/R105.3)
  • Landscaping point schedule required, tied to Gross Residential Floor Area (GRFA) — minimum 2,000 base points in single-family residential plus 1 additional point per sq ft above 2,500 sq ft GRFA, with minimum tree/evergreen composition thresholds
  • Mt. CB Water & Sanitation District tap fee receipt required prior to permit issuance
  • Contractor must hold a current Mt. CB Business License (BOLF)
  • Design Review Compliance and Cleanup Deposit required for any permit with valuation $1,000 or more, tiered by total valuation (up to 2% of valuation for higher tiers), up to 50% refundable on substantial design-review completion
  • 3% Use Tax on construction/building materials, calculated on 50% of estimated total valuation, reconciled within 90 days of CO issuance or final inspection
  • Radon mitigation plan must be shown on drawings (per the Town's Radon Requirements IRC 2015 policy)
  • Electrical and plumbing work under this permit is NOT reviewed or inspected by the Town — those permits/inspections are obtained separately and directly from the State of Colorado (Colorado Electrical Board and Colorado State Plumbing Board)

Required documents

  • RequiredDesign and Permit Review Application (GovWell portal)Submitted online via app.govwell.com/mtcb; combined design and building permit review process
  • RequiredBuilding Permit Application (fillable form)
  • RequiredSite survey/plat by a Colorado-licensed land surveyor
  • RequiredCrested Butte Fire Protection District approval letter
  • RequiredConstruction Management Plan (CMP)
  • RequiredSoils/Geotechnical Report
  • RequiredLandscaping Plan with Point Table
  • RequiredMt. CB Water & Sanitation District Tap Fee Receipt
  • RequiredMt. CB Business License (BOLF) for General Contractor
  • OptionalProperty Owner Authorization FormRequired if the applicant is not the property owner

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$23.50Town Code Sec. 6-21 / Table 1-A (IBC) and Sec. 6-52 / Table R1-A (IRC), identical schedules, set directly in Ordinance No. 6, Series 2024
Building Permit Fee — valuation $501.00 to $2,000.00$23.50 for the first $500 plus $3.05 per additional $100 or fraction thereof
Building Permit Fee — valuation $2,001.00 to $25,000.00$69.25 for the first $2,000 plus $14.00 per additional $1,000 or fraction thereof
Building Permit Fee — valuation $25,001.00 to $50,000.00$391.75 for the first $25,000 plus $10.10 per additional $1,000 or fraction thereof
Building Permit Fee — valuation $50,001.00 to $100,000.00$643.75 for the first $50,000 plus $7.00 per additional $1,000 or fraction thereof
Building Permit Fee — valuation $100,001.00 to $500,000.00$993.75 for the first $100,000 plus $5.60 per additional $1,000 or fraction thereof
Building Permit Fee — valuation $500,001.00 to $1,000,000.00$3,233.75 for the first $500,000 plus $4.75 per additional $1,000 or fraction thereof
Building Permit Fee — valuation $1,000,001.00 and up$5,608.75 for the first $1,000,000 plus $3.65 per additional $1,000 or fraction thereof
Plan Check Fee65% of the Building Permit FeeSeparate from and in addition to the permit fee, per Town Code Sec. 109.5/R108.5
Use Tax3% of 50% of total estimated project valuationReconciled within 90 days of CO issuance or final inspection approval
Design Review Compliance and Cleanup Deposit — valuation $1,000-$4,999$500
Design Review Compliance and Cleanup Deposit — valuation $5,000-$9,999$1,000
Design Review Compliance and Cleanup Deposit — valuation $10,000-$49,999$2,000, or 2% of total valuation for higher tiers per the Building Official's determination
Work Done without a Building Permit$100.00 or the permit fee, whichever is greater2026 Fee Resolution No. 9, Series 2026, effective May 20, 2026

Residential Addition / Remodel Permit

Verified

Required for additions, interior remodels, and exterior remodels to existing residential structures in Mt. Crested Butte, per the Town's own Permit Policy document covering remodels, additions, repairs, excavation, and driveway improvements. Reviewed under the 2021 IRC and IEBC as locally amended (Town Code Chapter 6); additions of 1,000 sq ft or more that bring total gross floor area to 4,800 sq ft or more trigger whole-structure fire sprinkler requirements.

Verified 2026-07-06 · Source

Requirements

  • Interior remodels requiring a permit include basement finishes, attic conversions, kitchen/bathroom remodels, structural changes (adding/removing doors, windows, walls, or changing rough opening sizes), new/rerouted ductwork or mechanical ventilation, insulation changes to the exterior thermal envelope, gas/solid-fuel appliance changes, and drywall teardown/replacement over a 4x8 ft sheet
  • Exterior remodels requiring a permit include roofing replacement or new roof, siding replacement, and deck structural element replacement or new deck
  • No permit required for like-for-like replacement of cabinets, countertops, tiling, flooring, windows, or doors (provided rough openings don't change), or drywall patching under a 4x8 ft sheet — all replacements must still meet International Energy Code requirements
  • Additions of 1,000 sq ft or more that bring total gross floor area to 4,800 sq ft or more require the ENTIRE structure to be protected with an automatic fire sprinkler system (Town Code Sec. 6-59)
  • Level 3 alterations to existing structures with gross floor area 4,800 sq ft or more require automatic fire sprinkler protection
  • Retaining walls over 4 feet require engineering and must be textured, colored, or faced per the Town's Design and Permit Review Punch List
  • Design Review Compliance and Cleanup Deposit required for permits with valuation $1,000 or more
  • 3% Use Tax on construction/building materials, calculated on 50% of estimated total valuation

Required documents

  • RequiredBuilding Permit Application (fillable form)
  • OptionalDesign and Permit Review Application (GovWell portal, for exterior-affecting projects)
  • RequiredMt. CB Business License (BOLF) for General Contractor

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-tiered schedule as new construction, Table R1-A)$23.50 minimum, scaling per Town Code Sec. 6-52Ordinance No. 6, Series 2024
Plan Check Fee65% of the Building Permit Fee
Use Tax3% of 50% of total estimated project valuation

Mechanical / HVAC Permit

Verified

Required for heating, cooling, ventilation, and appliance installation, alteration, or repair in Mt. Crested Butte. Governed by the 2021 International Mechanical Code (IMC), adopted by Town Code Chapter 6, Article IV, with a locally set flat-fee Table 1-AM schedule (Town Code Sec. 6-75) rather than a valuation-based fee.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2021 IMC as locally adopted (Town Code Sec. 6-73 through 6-75)
  • No separate mechanical permit required if the mechanical work is already covered by an issued building permit (Town Code amendment to IMC Sec. 106.2)
  • Flat per-unit fees apply by equipment category rather than a project-valuation-based fee
  • Contractor must hold a current Mt. CB Business License (BOLF)

Required documents

  • RequiredMechanical Permit Application
  • RequiredMt. CB Business License (BOLF)

Fee schedule

Fee typeAmountNotes
Mechanical Permit Issuance Fee$50.00Town Code Sec. 6-75, Table 1-AM, per permit issued — set directly in Ordinance No. 6, Series 2024
Supplemental Permit (original permit not expired/canceled/finished)$50.00
Repair/Addition of Heating, Cooling, Absorption, or Evaporative-Cooling System$50.00
Air-Handling Unit (up to 10,000 cfm, including attached ducts)$50.00
Air-Handling Unit (over 10,000 cfm)$50.00
Evaporative Cooler (non-portable)$50.00
Ventilation Fan (single duct)$50.00
Ventilation System (not part of a heating/cooling system on a permit)$50.00
Exhaust Hood Installation (including ducts)$50.00
Miscellaneous Appliance/Equipment (not otherwise classified)$50.00

Roofing Permit (Re-Roof)

Verified

Required for re-roofing work in Mt. Crested Butte, reviewed under the 2021 IBC/IRC as adopted, with mandatory ice barrier underlayment per Table R301.2. If the re-roof affects 25% or more of the structure, the entire roof must meet Colorado Wildfire Resiliency Code (WRC) Class A roof-covering, valley-flashing, and vent-mesh requirements per the Town's own WRC Standards Summary.

Verified 2026-07-06 · Source

Requirements

  • Roof Ice Barrier Underlayment Required: Yes, per Table R301.2 (Mt. CB Design Criteria 2021)
  • If the re-roof project affects 25% or more of the structure, the ENTIRE roof must meet Colorado Wildfire Resiliency Code requirements: Class A roofing materials, minimum 26-gauge metal roof valleys, noncombustible gutters/downspouts, noncombustible corrosion-resistant vent mesh with 1/8-inch maximum openings
  • Roofing is explicitly listed as one of the design-review application types that 'does not require drawings/engineering' under the Town's own Design Review Fees schedule, carrying a lower flat design-review fee than projects requiring drawings
  • Contractor must hold a current Mt. CB Business License (BOLF)

Required documents

  • RequiredBuilding Permit Application — Roofing scope
  • RequiredDesign Review Application (no-drawings track)
  • RequiredMt. CB Business License (BOLF)

Fee schedule

Fee typeAmountNotes
Design Review Fee — application not requiring drawings/engineering (e.g., roofing, mechanical)$100.00Resolution No. 9, Series 2026 Fee Schedule, effective May 20, 2026
Building Permit Fee (valuation-based, same schedule as new construction)$23.50 minimum, scaling per Town Code Sec. 6-52 / Table R1-ANo standalone flat re-roof fee is published; billed under the general valuation-based Building Permit fee table based on roofing project valuation
Plan Check Fee65% of the Building Permit Fee

Solar Photovoltaic (PV) Permit

Verified

Required for rooftop or ground-mounted solar photovoltaic installation in the Town of Mt. Crested Butte. The Town's own Building Division does NOT issue or inspect electrical permits at all — electrical work, including PV wiring and utility interconnection, is handled entirely by the Colorado State Electrical Board (Division of Professions and Occupations), capped at $500 for a residential permit and $1,000 for a commercial permit under the statewide solar permit fee cap, C.R.S. § 24-48.5-113 (HB21-1284). The Town's own Building Permit (valuation-based Table 1-A fee, or the Design Review 'no drawings/engineering' $100 fee for simple roof-mounted work) covers only the structural/mounting scope. The Town has adopted the Model Colorado Electric and Solar Ready Code provisions for new construction.

Verified 2026-07-19 · Source

Requirements

  • Town Building Permit required for the array mounting/structural scope, submitted via the Town's GovWell online portal
  • Electrical permit for PV wiring/interconnection must be obtained directly from the Colorado State Electrical Board (dpo.colorado.gov/Electrical), NOT from the Town — the Town's Building Division does not issue or inspect electrical permits
  • Colorado State Electrical Board Solar/Alternative Energy System permits may use a SolarApp+ or Symbium expedited plan review pathway per the Board's published process
  • State Electrical Board permit is valid for one year from the date of issuance
  • Design Review approval required through the Community Development Department; a solar-only installation that does not require drawings/engineering (e.g., a straightforward roof-mount) falls under the $100 Design Review fee tier; installations requiring drawings/engineering are billed at the $200+ tier

Required documents

  • RequiredTown Building Permit Application (GovWell)Covers the array mounting/structural scope of work
  • RequiredColorado State Electrical Board Solar/Alternative Energy Permit ApplicationFiled directly with the state board (dpo.colorado.gov), independent of the Town's building permit; may use SolarApp+ or Symbium expedited plan review
  • RequiredDesign Review ApplicationCommunity Development Department review; fee tier depends on whether the installation requires drawings/engineering

Fee schedule

Fee typeAmountNotes
Town Building Permit Fee (valuation-based, Table 1-A)Per the Total Valuation bracket table (e.g., $69.25 for the first $2,000 plus $14.00 per additional $1,000 up to $25,000)No solar-specific Town Building Permit fee line found in the 2026 Fee Schedule (Resolution No. 9, Series 2026); billed under the same valuation table as other construction
Design Review Fee (no drawings/engineering required, e.g. simple roof-mount)$100.00Town of Mt. Crested Butte Resolution No. 9, Series 2026 Fee Schedule, Design Review Fees table
Design Review Fee (drawings/engineering required)$200.00Applies if the installation requires drawings/engineering (e.g., structural analysis for a heavier array or non-standard mount)
Colorado State Electrical Board Solar/Alternative Energy Permit Fee (Residential)$500.00 maximumStatewide cap under C.R.S. § 24-48.5-113 (HB21-1284); set and collected by the State Electrical Board, not the Town. Consult dpo.colorado.gov/Electrical/PermitsandInspections for the current exact amount
Colorado State Electrical Board Solar/Alternative Energy Permit Fee (Commercial)$1,000.00 maximumStatewide cap under C.R.S. § 24-48.5-113 (HB21-1284)
Plan Check Fee65% of the Town Building Permit FeeApplies to the valuation-based Town Building Permit portion per Town Code Sec. 109.5/R108.5; not confirmed whether it applies to the flat Design Review fee tiers

Electric Vehicle (EV) Charger Permit

Verified

Required for installing a new electrical circuit, outlet, or panel/service upgrade to serve an EV charger in the Town of Mt. Crested Butte. As with solar PV interconnection work, the Town's Building Division does NOT issue or inspect electrical permits of any kind — all electrical work, including a new EV charger circuit, is handled directly by the Colorado State Electrical Board (Division of Professions and Occupations), independent of the Town's own Building Permit process (which only applies if structural work, such as a new garage, accompanies the charger installation).

Verified 2026-07-20 · Source

Requirements

  • Electrical permit for the EV charger circuit/outlet/service-upgrade must be obtained directly from the Colorado State Electrical Board (dpo.colorado.gov/Electrical), NOT from the Town — the Town's Building Division does not issue or inspect electrical permits
  • If the charger installation is bundled with structural work (e.g., a new garage or carport), a separate Town Building Permit is required for that scope, submitted via the Town's GovWell online portal
  • No dedicated EV-charger permit application, checklist, or expedited review track is published by the Town or by the Colorado State Electrical Board as of 2026-07-20
  • No EV-charger line item was found in the Town's Resolution No. 9, Series 2026 Fee Schedule, which does include dedicated flat fees for Solar (item 8) and Geothermal (item 9)

Required documents

  • RequiredColorado State Electrical Board Permit ApplicationFiled directly with the state board (dpo.colorado.gov) for the EV charger circuit/outlet/service-upgrade scope, independent of any Town building permit

Fee schedule

Fee typeAmountNotes
Colorado State Electrical Board Permit FeeSet and collected by the State Electrical Board, not the Town of Mt. Crested Butte; no statewide EV-specific fee cap comparable to the solar HB21-1284 cap was found published. Consult dpo.colorado.gov/Electrical/PermitsandInspections for the current amount.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mount Crested Butte building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /colorado/gunnison-county/mt-crested-butte/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356