Version history — Arvada, Colorado
This is PermitBase’s own verified record for Arvada, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Arvada’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-07-17Current record
- Arvada, Colorado — Roofing Permit (Re-Roofing) fee record added: Roofing Valuation Basis (per 100 sq ft) — used to compute the Table 18-1 fee when actual contract cost is not documented (3-tab: $187.50/100 sf; Dimensional shingles: $252.00/100 sf; Shakes (untreated): $439.00/100 sf; Light-weight tile: $439.00/100 sf; other/special/treated shakes: use actual contract amount)
- Arvada, Colorado — plan-review timeline record updated: 5–15 business days
- Arvada, Colorado — plan-review timeline record updated: 40–70 business days
- 2026-07-01Superseded
- Arvada, Colorado — Plumbing Permit fee record added: Plumbing Permit Fee — valuation-based (general/new plumbing work not on the Table 18-5 flat-rate list) (Assessed as the Table 18-1 valuation-based Building Permit Fee (same schedule as new construction; see Residential Building Permit fee tiers, $34 minimum up to $5,669.25 + $3.45/$1,000 over $1M) plus Use Tax)
- Arvada, Colorado — Accessory Dwelling Unit (ADU) Permit fee record updated: Varies by valuation — see Residential Building Permit fee tiers (Table 18-1) → Varies by valuation — see Residential Building Permit fee tiers (Table 18-1: $34 minimum up to $5,669.25 + $3.45/$1,000 over $1M)
- Arvada, Colorado — Plumbing Permit fee record removed: Plumbing Permit Fee
- 2026-06-30Initial record — coverage of Arvada began