Morrison building permits

Verified

Morrison, Colorado — as published 2026-07-07.

Verified 2026-07-23 · Source

Codes adopted

2015 International Building Code (IBC), chapters 1-35 inclusive and appendix chapter I — Morrison Municipal Code Section 9-1-2 (Codes Adopted By Reference), current through 2026 S-15 supplement2015 International Residential Code (IRC), chapters 1-44 inclusive and appendix chapter H — Section 9-1-22015 International Mechanical Code (IMC), chapters 1-15 inclusive — Section 9-1-22015 International Fuel Gas Code (IFGC), chapters 1-8 inclusive — Section 9-1-22015 International Plumbing Code (IPC), chapters 1-15 inclusive — Section 9-1-22015 International Fire Code (IFC), chapters 1-80 inclusive — Section 9-1-22015 International Energy Conservation Code (IECC), Residential and Commercial chapters 1-6 — Section 9-1-22015 International Existing Building Code (IEBC), chapters 1-16 inclusive with all appendices — Section 9-1-22015 International Swimming Pool and Spa Code, chapters 1-11 inclusive with all appendices — Section 9-1-22015 International Property Maintenance Code, chapters 1-8 inclusive with all appendices — Section 9-1-2National Electrical Code (NEC), 'the most current edition adopted by the Colorado State Electrical Board, Department of Regulatory Agencies' — Morrison's own code text ties its NEC edition to whichever edition the Colorado State Electrical Board (DORA) currently has in force, rather than fixing a specific year itself; as of this review the Colorado State Electrical Board's currently adopted edition is the 2023 NEC (per DORA Division of Professions and Occupations rules), so 2023 NEC is the effective edition in Morrison, subject to change automatically if DORA updates its adopted editionColorado Wildfire Resiliency Code, 2025 edition, adopted and published by the Wildfire Resiliency Code Board within the Division of Fire Prevention and Control, Colorado Department of Public Safety — adopted by reference as the Town of Morrison wildfire resiliency code (Section 9-1-2, subsection M)HB22-1362 (Colorado statewide building greenhouse-gas-emissions / energy code law) note: HB22-1362 only obligates a municipality or county to adopt an equivalent-or-better energy code WHEN it next updates one or more of its building codes — it does not retroactively force an update on jurisdictions that haven't touched their codes. Morrison's adopted energy code is still the 2015 IECC (per Section 9-1-2, unchanged since original codification), so the HB22-1362 floor (2021 IECC-equivalent performance from 7/1/2023-6/30/2026; Model Low Energy and Carbon Code-equivalent performance from 7/1/2026 onward) has NOT yet been triggered for Morrison because the Town has not updated its building code since adopting the 2015 cycle. This is a genuine, current compliance gap/lag relative to HB22-1362's intent, not an omission by this file — confirmed against the Colorado Energy Office's published HB22-1362 timeline.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new construction of single-family homes and other residential structures in the Town of Morrison. Reviewed under the 2015 IRC/IBC as locally adopted (Morrison Municipal Code Chapter 9), with plan review and inspections performed by the Town's contracted building-inspection provider.

Verified 2026-07-06 · Source

Requirements

  • Building Permit Application completely filled out: contractor name/phone/address; owner name/address/phone; a designated contact person; architect's name/phone/email/fax if applicable; all engineers' names and phone numbers; project address; estimated project value including all materials and labor
  • Plans must comply with the 2015 IRC/IBC as adopted by Morrison Municipal Code Section 9-1-2, as amended by Section 9-1-3
  • Two sets each of: Plot Plan (recommended scale 1/8"=1'-0", lot dimensions, building footprint with all projections/dimensions to property lines and other buildings, north arrow, easements, sewer/water lateral locations, location of any retaining walls, which require separate permits)
  • Two sets of Foundation Plan (recommended scale 1/4"=1'-0", soils report by an engineer, structural/architectural details, footings/foundation/piers/grade beams designed by an engineer, post and girder intersections, reinforcing spacing/size, fireplace details, anchor bolt spacing/size)
  • Two sets of Floor Plan (full architectural plans, fully dimensioned/labeled, adjoining rooms labeled with window/door locations, wall-to-wall dimensions, room finish ceiling heights, window operation types)
  • Two sets of Exterior Elevations (all four elevation views, finish materials identified, finish grade location indicated)
  • Two sets of Structural and Architectural Details (roof/eaves/overhangs/rake/gables, structural framing details, structural sections at foundation/floor/roof levels, cross-section views specific to the structure — generic sections not accepted, all materials/sizes/spacing identified)
  • Two sets of Manufacturer's Specifications for Prefabricated Trusses (if applicable)
  • Two sets of HVAC Details (location of HVAC equipment)
  • Two sets of Plumbing Details (all plumbing fixture and water heater locations, all floor drain locations)
  • Two sets of Electrical Details (service meter location and main breaker size in amps, sub-panel location(s))
  • Two sets of Stair Details specific to the plan (stairway width/rise/run/landing length/headroom height, handrail/guardrail/baluster details)
  • A permit becomes invalid if work is not commenced within 180 days of issuance, or is suspended/abandoned for 180 days after commencement (IBC Section 105.5 as amended)

Required documents

  • RequiredMorrison Building Permit ApplicationCompleted online via the Town's FormCenter
  • RequiredResidential Plans Submittal Check ListFull plan set per the Town's checklist: plot plan, foundation plan, floor plan, exterior elevations, structural/architectural details, truss specs, HVAC/plumbing/electrical details, stair details (2 sets each)
  • RequiredSoils ReportPrepared by an engineer, required as part of the Foundation Plan submittal

Fee schedule

Fee typeAmountNotes
Building Permit FeePer the adopted code (2015 IBC valuation-based fee table)Resolution 2025-13 (2026 Fee Schedule), Section B — the Town's fee resolution incorporates the IBC's own fee table by reference rather than restating it as a standalone dollar figure
Plan Review Fee70% of Building Permit FeeResolution 2025-13, Section B
Additional Plan Review (applicant-driven changes/revisions/additions)$80.00 per hourBilled directly to the applicant
Re-Inspection Fee$100.00 per hour, 2-hour minimum
Outside Regular Hours Inspection Fee$100.00 per hour, 2-hour minimum

Residential Addition / Remodel Permit

Verified

Required for additions and remodels to existing residential structures in Morrison. Reviewed under the 2015 IRC/IBC as locally adopted, using the same Residential Plans Submittal Check List as new construction, scoped to the applicable elements of the project.

Verified 2026-07-06 · Source

Requirements

  • Building Permit Application completely filled out per the standard requirements (contractor, owner, contact person, project address, estimated value)
  • Plan submittal drawn from the Residential Plans Submittal Check List, scoped to the applicable categories for the project (e.g., an addition with new foundation requires the Foundation Plan/soils report category; a remodel not touching the foundation may not)
  • Structural and Architectural Details required for any framing, roof, or structural changes; a Licensed Engineer's involvement is implied wherever footings, foundations, piers, grade beams, or structural elements are affected, per the Foundation Plan checklist requirements
  • Electrical Details (service meter/breaker size, sub-panel locations) and Plumbing Details (fixture/water heater/floor drain locations) required if the addition/remodel scope touches those systems

Required documents

  • RequiredMorrison Building Permit ApplicationCompleted online via the Town's FormCenter
  • RequiredResidential Plans Submittal Check List (scoped to project)Applicable categories from the Town's standard residential checklist

Fee schedule

Fee typeAmountNotes
Building Permit FeePer the adopted code (2015 IBC valuation-based fee table)Resolution 2025-13, Section B
Plan Review Fee70% of Building Permit Fee
Stock/Same As Review — No Change$90.00
Stock/Same As Review — Minor Change$180.00

Electrical Permit

Verified

Required for electrical work in Morrison, either as part of a general Building Permit (new construction/addition) or as a standalone 'electrical only permit.' Governed by the National Electrical Code edition currently adopted by the Colorado State Electrical Board (DORA). The Town issues its own electrical permits and performs contemporaneous review of the installing electrician's state license per CRS 12-23-105/110.5/116(10) and House Bill 2016-1073.

Verified 2026-07-06 · Source

Requirements

  • Governed by the National Electrical Code edition currently adopted by the Colorado State Electrical Board, DORA (Morrison Municipal Code Section 9-1-2)
  • For electrical-only permit applications, the listed electrician's name and Colorado state electrical license number must appear on the permit application; applications without a listed electrician are rejected
  • The Town verifies the listed electrician's license is active, preferably via the DORA online License Lookup (colorado.gov/dora/licensing/Lookup/LicenseLookup.aspx); applications with an unverifiable license are rejected
  • If the electrician performing/overseeing the work changes before final inspection, the applicant must notify the Town of the new electrician's name/license number for re-verification; work must stop if the new electrician cannot be verified
  • At any inspection, the inspector may request to verify the identity of the electrician performing/overseeing the work (no more than one licensed electrician supervising three apprentices on a jobsite); an inspection may be failed at the inspector's discretion if identity cannot be verified
  • The inspector may refer license violations to the Colorado State Electrical Board
  • For electrical work included within a general Building Permit, service meter location and main breaker size (amps) and sub-panel location(s) must be shown on the Electrical Details plan sheet

Required documents

  • RequiredMorrison Building Permit Application (Electrical-Only or as part of general Building Permit)Must list the performing electrician's name and Colorado state electrical license number for electrical-only permits

Fee schedule

Fee typeAmountNotes
Building Permit Fee (electrical work billed under the general adopted-code fee table when part of a building permit)Per the adopted codeResolution 2025-13, Section B; the Town's fee schedule does not publish a standalone electrical-fee line distinct from the general Building Permit Fee, unlike jurisdictions that pass through the Colorado CRS 12-23-117(3) state-mandated electrical fee schedule as a separate table
Re-Inspection Fee$100.00 per hour, 2-hour minimum

Plumbing Permit

Verified

Required for plumbing work in Morrison, issued as part of the Town's general Building Permit process. Governed by the 2015 International Plumbing Code (IPC) as adopted by Morrison Municipal Code Section 9-1-2.

Verified 2026-07-23 · Source

Requirements

  • Governed by the 2015 IPC as adopted by the Town of Morrison
  • Issued under the Town's general Building Permit Application; the Residential Plans Submittal Check List requires Plumbing Details (2 sets) showing all plumbing fixture and water heater locations and all floor drain locations
  • Contractors performing plumbing work must hold current Colorado State Plumbing Board (DORA) licensure. Re-chased 2026-07-23: located 'Procedure for Contemporaneous Reviews of Electrical and Plumbing Licenses' (Colorado Chapter ICC guide, adopted/hosted by the Town in its Building Department Document Center, Document ID 1229) — this guide, developed under HB19-1086 (Plumbing, effective 1/1/2020) and SB19-156 (Electrical, effective 7/1/2019), confirms inspections of projects requiring a plumbing permit must include a contemporaneous review of plumbing licenses (full or partial, at the inspector's discretion), with non-compliance reportable to the State Plumbing Board under C.R.S. Title 12, Article 58/155 — Morrison's plumbing-license review process is thus confirmed to mirror its electrical process rather than being an undocumented gap. This document was found via the Document Center's Building Department folder tree (Ant Design tree component, reachable via its internal AJAX API), not linked from the main Building Department webpage — a new avenue beyond the page/Document Center/code checks made in the prior (2026-07-06) review

Required documents

  • RequiredMorrison Building Permit ApplicationSubmitted via the Town's FormCenter; plumbing scope included in the general application

Fee schedule

Fee typeAmountNotes
Building Permit Fee (plumbing work billed under the general adopted-code fee table)Per the adopted codeResolution 2025-13, Section B — no standalone plumbing-fee line is published separately from the general Building Permit Fee
Re-Inspection Fee$100.00 per hour, 2-hour minimum

Mechanical / HVAC Permit

Verified

Required for heating, cooling, and ventilation equipment installation or replacement in Morrison, issued as part of the Town's general Building Permit process. Governed by the 2015 International Mechanical Code (IMC) and 2015 International Fuel Gas Code (IFGC) as adopted.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2015 IMC and 2015 IFGC as adopted by Morrison Municipal Code Section 9-1-2
  • Issued under the Town's general Building Permit Application; the Residential Plans Submittal Check List requires HVAC Details (2 sets) showing the location of HVAC equipment
  • A standalone 'Furnace' single-stop fee applies for furnace-only work not tied to a broader building permit (see Single Stop Fees)
  • A standalone 'Air Conditioner' single-stop fee applies for AC-only installation/replacement

Required documents

  • RequiredMorrison Building Permit ApplicationSubmitted via the Town's FormCenter; mechanical scope included in the general application, or as a Single Stop Fee item for furnace/AC-only work

Fee schedule

Fee typeAmountNotes
Building Permit Fee (mechanical work billed under the general adopted-code fee table for new construction/additions)Per the adopted codeResolution 2025-13, Section B
Single Stop Fee — Furnace$100.00Resolution 2025-13, Section B, Single Stop Fees list
Single Stop Fee — Air Conditioner$75.00Resolution 2025-13, Section B, Single Stop Fees list

Roofing Permit (Re-Roof / Re-Shingle)

Verified

Required for re-roofing (re-shingle) work in Morrison. Governed by the 2015 IRC/IBC as adopted; billed as a flat Single Stop Fee rather than the full valuation-based Building Permit Fee when the scope is a standalone re-roof.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2015 IRC/IBC as adopted by Morrison Municipal Code Section 9-1-2
  • A standalone re-roof (re-shingle) qualifies for the Town's flat Single Stop Fee rather than the full valuation-based Building Permit Fee
  • Roof plan/material specifications would be expected as part of the permit application, consistent with the Structural and Architectural Details category (roof, eaves, overhangs, rake, gables) in the general Residential Plans Submittal Check List for projects where roofing is part of a larger scope

Required documents

  • RequiredMorrison Building Permit Application — Re-Roof scopeSubmitted via the Town's FormCenter

Fee schedule

Fee typeAmountNotes
Single Stop Fee — Roof (re-shingle)$100.00Resolution 2025-13, Section B, Single Stop Fees list

Electric Vehicle (EV) Charger Permit

Verified

Morrison publishes no distinct EV-charger permit type, checklist, or fee line — confirmed against the Town's Permits & Checklists page, which lists Building, Commercial, Residential, Electrical, and various how-to guides (garage, patio, carport, deck, reroof, etc.) with no EV-charger/EVSE entry. A new circuit, outlet, or panel/service upgrade to serve an EV charger would be processed as a standalone 'electrical only permit,' governed by the National Electrical Code edition adopted by the Colorado State Electrical Board and reviewed under Morrison's contemporaneous electrician-license-verification process (CRS 12-23-105/110.5/116(10)). Morrison's small population (roughly 430 residents) is well below the 10,000-resident municipal threshold that triggers Colorado HB24-1173's EV-charging-permit mandate.

Verified 2026-07-23 · Source

Requirements

  • A new circuit, outlet, or panel/service upgrade to serve an EV charger requires a standalone 'electrical only permit,' governed by the National Electrical Code edition currently adopted by the Colorado State Electrical Board (Morrison Municipal Code Section 9-1-2)
  • The listed electrician's name and Colorado state electrical license number must appear on the permit application; applications without a listed, verifiable electrician are rejected
  • The Town verifies the listed electrician's license via the DORA online License Lookup
  • No EV-specific application, checklist, or expedited process was found published — apply via the standard Morrison Building Permit Application marked as electrical-only work

Required documents

  • RequiredMorrison Building Permit Application (Electrical-Only)Must list the performing electrician's name and Colorado state electrical license number; describe scope as new circuit/outlet or service upgrade for EV charging

Fee schedule

Fee typeAmountNotes
Building Permit Fee (electrical work billed under the general adopted-code fee table)Per the adopted codeConfirmed 2026-07-23 directly against the Town's standalone Fee Schedule documents (Resolution 2025-13/eff. 1/1/2026; and the currently-governing Resolution 2026-01, eff. 4/7/2026) — Section B (Building Permit Fees) has no distinct 'Electrical' or 'EV charger' line item in either version; electrical work (including EV-charger circuits) is billed under the general valuation-based Building Permit Fee 'per the adopted code,' consistent with the general electrical-permit entry in this same file. This is a confirmed negative (no such fee line exists), not an unpublished gap — reached via the Town's clean, standalone Fee Schedule PDFs (Document Center) rather than the noisier full Board of Trustees agenda-packet PDF used in the 2026-07-20 chase.
Re-Inspection Fee$100.00 per hour, 2-hour minimum

Demolition Permit

Verified

Required for demolition of a structure or portion of a structure in Morrison. Billed as a flat Single Stop Fee per Resolution 2025-13.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2015 IBC/IRC as adopted by Morrison Municipal Code Section 9-1-2
  • Demolition permit application submitted via the Town's general Building Permit Application process

Required documents

  • RequiredMorrison Building Permit Application — Demolition scopeSubmitted via the Town's FormCenter

Fee schedule

Fee typeAmountNotes
Single Stop Fee — Demolition$100.00Resolution 2025-13, Section B, Single Stop Fees list

Deck / Fence / Accessory Structure Permit

Verified

Required for deck construction and fences over 6 feet in height in Morrison. Decks are addressed as a distinct project type on the Town's Permits & Checklists guidance; over-height fences are billed as a flat Single Stop Fee. Fences at or under 6 feet require a separate Fence Permit Application (a zoning/land-use matter, not modeled as a building-code permitType in this file).

Verified 2026-07-23 · Source

Requirements

  • Governed by the 2015 IRC/IBC as adopted by Morrison Municipal Code Section 9-1-2
  • Deck permit applications submitted via the Town's general Building Permit Application, with structural framing/footing details expected consistent with the Structural and Architectural Details and Foundation Plan checklist categories
  • The Town's linked 'Decks' how-to (Document Center ID 259 — a Colorado Chapter ICC 'Single Family Residential Uncovered Decks and Porches' building guide, developed under the 2006 IRC as a basic plan-submittal aid) calls for 2 sets of plans/plot plans and specifies illustrative construction details: guards 36 inches high minimum with balusters spaced so a 4-inch-diameter sphere cannot pass through, joist/beam sizing filled in per the applicant's design; applicants should still confirm final compliance against Morrison's actually-adopted 2015 IRC rather than the guide's underlying 2006 IRC baseline
  • Fences over 6 feet in height require a building permit and are billed under the Single Stop Fees list; fences at or under 6 feet use the separate Fence Permit Application (zoning-administered, not a building-code permit)

Required documents

  • RequiredMorrison Building Permit Application — Deck or Fence (over 6 ft) scopeSubmitted via the Town's FormCenter
  • OptionalFence Permit ApplicationFor fences at or under 6 feet in height — a zoning/land-use application, separate from the Building Department's building-permit process

Fee schedule

Fee typeAmountNotes
Single Stop Fee — Fence (over 6 feet in height)$75.00Confirmed 2026-07-23 against the Town's currently-governing standalone Fee Schedule (Resolution 2026-01, effective April 7, 2026, Section B, Single Stop Fees list), consistent with the prior Resolution 2025-13/eff. 1/1/2026 schedule
Building Permit Fee (deck construction, if not qualifying as a Single Stop item)Per the adopted codeCLOSED 2026-07-23: re-checked directly against the Town's clean standalone Fee Schedule PDFs for both the prior (eff. 1/1/2026, Resolution 2025-13) and currently-governing (eff. 4/7/2026, Resolution 2026-01) periods — decks are listed as a distinct project type on the Town's Permits & Checklists guidance page, but Section B's Single Stop Fees list (Air Conditioner, Demolition, Fence, Furnace, Hot Tub & Spas, Lawn Sprinkler System, Roof, Siding, Water Heater, Window Replacement) confirmed to contain no Deck line item in either fee-schedule version. Deck construction is billed under the general valuation-based Building Permit Fee ('per the adopted code') plus 70% Plan Review Fee — a confirmed negative rather than an unpublished gap.

Commercial Building Permit / Tenant Improvement

Verified

Required for commercial and multi-family construction, alteration, or tenant improvement work in Morrison. Reviewed under the 2015 IBC as locally adopted, using the Town's separate Commercial Plans Check List.

Verified 2026-07-23 · Source

Requirements

  • Governed by the 2015 IBC as adopted by Morrison Municipal Code Section 9-1-2, as amended by Section 9-1-3
  • Re-chased 2026-07-23: the Town's 'Commercial Plans Submittal Check List' (Document Center ID 13) was fetched and read in full — a 12-numbered-category list distinct from the residential checklist: (1) Building Permit Application fully completed (contractor/owner/contact/project address/estimated value); (2) Title Page stating building occupancy classification(s), construction type, gross and per-occupancy square footage, building height, occupant load, sprinklered/unsprinklered status, allowable building area, and area increases used; (3) Plot Plan (1/8"=1'-0" recommended) with lot dimensions, building footprint/projections to property lines, north arrow, easements, all parking including handicapped spaces/access aisles/curb ramps, handicapped access to the building from the public way, and location of any retaining walls (separate permit); (4) Foundation Plan with wet seal and signature by a design professional on each page (1/4"=1'-0" recommended) covering structural/architectural details, footings/foundations/piers/grade beams, post-and-girder intersections, and masonry-or-gas fireplaces; (5) Floor Plans (1/4"=1'-0" recommended), fully dimensioned/labeled, with an exit plan for each level detailing exit path and distance to exit discharge; (6) Exterior Elevations (1/4"=1'-0" recommended) identifying finish materials; (7) Structural and Architectural Details (3/4"=1'-0" recommended) covering roof/eaves/overhangs/rake/gables, floor changes (e.g. slab-to-wood-frame), handrail/guardrail/support details, structural framing details, fire wall/fire barrier/fire partition details, suspended ceiling plan with support details, structural sections at foundation/floor/roof levels, typical cross sections in each direction, and special inspections required; (8) Manufacturer's Specifications for Prefabricated Trusses; (9) HVAC Plan showing equipment location, duct layout for supply/return air, smoke/fire damper locations, CFMs of all HVAC units, and gas-line drawing with BTU input ratings; (10) Plumbing Layout showing all supply/drainage piping, water heaters, sewer connection location, grease/oil/sand interceptors with sizing calculations, and backflow-prevention device locations/types; (11) Electrical Plan showing panel size(s)/location(s), outlet layout, switching layout, and ground-fault/arc-fault outlet locations; (12) Handicapped Accessibility defining all access features for new construction per the then-current IBC and ANSI A-117.1 (1998 edition), with remodels/tenant improvements required to bring the improved area up to new-construction access standards including an accessible route of travel to the remodeled area
  • All plans should be prepared to the same rigor implied by the residential checklist (engineer-stamped structural/foundation details, full architectural plan set) given the shared adopted-code basis

Required documents

  • RequiredMorrison Building Permit ApplicationSubmitted via the Town's FormCenter
  • RequiredCommercial Plans Submittal Check List12-category requirement list for commercial building permits (Title Page, Plot Plan, Foundation Plan, Floor Plans, Exterior Elevations, Structural/Architectural Details, Truss Specs, HVAC Plan, Plumbing Layout, Electrical Plan, Handicapped Accessibility), distinct from the Residential Plans Submittal Check List — full content confirmed 2026-07-23 directly from the Town's PDF

Fee schedule

Fee typeAmountNotes
Building Permit FeePer the adopted code (2015 IBC valuation-based fee table)Resolution 2025-13, Section B
Plan Review Fee70% of Building Permit Fee

Solar PV Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in the Town of Morrison. No dedicated solar/photovoltaic line item appears in Resolution 2025-13's Single Stop Fees list (unlike furnace, AC, re-roof, or fence) — a PV installation is billed under the Town's general valuation-based Building Permit Fee for the structural/racking scope, plus the Town's own electrical permit process (with contemporaneous Colorado state-license review) for the interconnection scope, since Morrison issues both building and electrical permits itself rather than deferring to the state.

Verified 2026-07-20 · Source

Requirements

  • Structural/racking scope reviewed under the 2015 IBC/IRC as locally adopted (Morrison Municipal Code Section 9-1-2); electrical interconnection scope governed by the National Electrical Code edition currently adopted by the Colorado State Electrical Board (DORA), per Section 9-1-2
  • Electrical interconnection requires the listed electrician's name and Colorado state electrical license number on the permit application; the Town verifies the license is active via the DORA online License Lookup before approving the permit, per the Town's Electrical License Contemporaneous Review Guidelines (CRS 12-23-105/110.5/116(10))
  • No dedicated Solar/Photovoltaic Single Stop Fee line exists in Resolution 2025-13 (2026 Fee Schedule) — confirmed by direct review of the Town's most recent fee resolution, which lists Air Conditioner, Demolition, Fence, Furnace, Hot Tub & Spas, Lawn Sprinkler System, Roof, Siding, Water Heater, and Window Replacement as its Single Stop Fee categories, with no solar/PV item among them
  • Two sets of plans expected consistent with the Residential Plans Submittal Check List categories applicable to the scope (structural/architectural details for racking, electrical details showing service meter/breaker/sub-panel locations for interconnection)

Required documents

  • RequiredMorrison Building Permit ApplicationCompleted online via the Town's FormCenter, covering the structural/racking scope
  • RequiredElectrical Permit component (listing licensed electrician)Must list the performing electrician's name and Colorado state electrical license number for the interconnection scope, per the Town's Electrical License Contemporaneous Review Guidelines

Fee schedule

Fee typeAmountNotes
Building Permit Fee (structural/racking scope)Per the adopted code (2015 IBC valuation-based fee table)Resolution 2025-13 (2026 Fee Schedule), Section B — no dedicated solar/PV Single Stop Fee line exists; billed under the general valuation-based Building Permit Fee, same as the residential-building-permit entry in this file.
Plan Review Fee70% of Building Permit FeeResolution 2025-13, Section B
Re-Inspection Fee$100.00 per hour, 2-hour minimum

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Morrison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /colorado/jefferson-county/morrison/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356

Reproducible from PermitBase’s version-controlled dataset, commit 371a356.