Fruita building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Fruita, Colorado.
Verified 2026-07-13 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 325 E Aspen Avenue, Suite 155, Fruita, CO 81521
- Phone
- 970-639-9919 (Building Division main line); Community Development Department (970) 858-0786
- Office hours
- Monday through Thursday, 7:30 a.m. - 5:00 p.m. (closed Fridays and Municipal Holidays), per the City of Fruita Building Division page
- Website
- Official site
Published scheduling rules
- All permit applications and inspection requests go through Cloudpermit — create your account before you need to apply, since account setup can add a day of lead time. (Residential Building Permit (New Construction))
- Applications, plan submittals, and inspection requests are made through the City's Cloudpermit online portal (Residential Building Permit (New Construction))
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Required before concrete pour; a Top of Foundation Compliance Form is part of Fruita's standard submittal package
- 2
Rough Frame / Rough Electrical / Rough Plumbing / Rough Mechanical
Framing, electrical, plumbing, and mechanical rough-ins inspected before concealment
- 3
Insulation
Energy Code Checklist compliance verified before drywall/cover, per the 2021 IECC as locally amended
- 4
Final Inspection
All work complete per approved plans and applicable codes; floodplain administrator sign-off required first if the parcel is in a mapped flood hazard area
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Before concrete pour
- 2
Rough Frame / Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 3
Final Inspection
All work complete per approved plans
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (if new footings)
Before concrete pour, for addition footings or deck posts requiring a permit
- 2
Rough Frame / Rough Electrical / Rough Plumbing / Rough Mechanical
Trade rough-ins before concealment; structural connections to the existing structure verified
- 3
Final Inspection
All work complete per approved plans
Applies to: Roofing Permit (Reroof)
- 1
Roof Sheathing
Inspects the framing of the roof system and sheathing before it is covered — per Fruita's own Reroof Information page
- 2
Mid-Roof
Required when 10% to 40% of the shingles are installed; verifies roof deck, all flashings, drip edge, underlayment, nailing, and roof ventilation — per Fruita's own Reroof Information page
- 3
Final Inspection
ALWAYS required, per Fruita's own Reroof Information/FAQ page
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel inspected before concealment/insulation
- 2
Final Electrical
Devices installed, panel labeled, system energized and verified
Applies to: EV Charger / EVSE Permit
- 1
Rough Electrical
EVSE circuit wiring and disconnect inspected before concealment, per the City's standard electrical rough-in practice
- 2
Final Electrical
EVSE unit connections verified, circuit labeled, system energized
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment rough-in inspected before concealment
- 2
Final Mechanical
Equipment operational; combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Underground/in-slab and rough-in plumbing inspected before concealment
- 2
Final Plumbing
Fixtures connected, no leaks, proper venting verified
Applies to: Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement verified before energizing, per standard electrical permit inspection practice; electrical plans must be on site for this inspection
- 2
Final Inspection
Racking, roof penetrations, electrical connections, and all required NEC labeling (Sections 690.54, 690.13(b), 705.10, 705.12, 690.56) verified
Final inspection only: Demolition Permit, Fence / Retaining Wall Permit (Planning Clearance)
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fruita building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Fruita building permits
Get alerts for Fruita
We'll email you when Fruita's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.