This is PermitBase’s published record for Craig as of 2026-08-13. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Craig building permits

Craig, Colorado — as published 2026-08-13.

Reviewed 2026-08-13 · Source

Codes adopted

2018 International Building Code (IBC) — City of Craig and Moffat County, effective for all plan review and inspections as of January 1, 20202018 International Residential Code (IRC)2018 International Existing Building Code (IEBC)2018 International Mechanical Code (IMC)2018 International Fuel Gas Code (IFGC)2018 International Plumbing Code (IPC)2018 International Energy Conservation Code (IECC)2018 International Property Maintenance Code (IPMC) — City of Craig ONLY, not adopted by Moffat County for unincorporated areas2018 International Fire Code (IFC) — cited directly in the Residential Solar Installation Checklist for firefighter access path requirements (typically 36 inches)National Electrical Code (NEC), the version adopted by the State of Colorado — NOT locally enforced; the City of Craig and Moffat County both defer ALL electrical permits, plan review, and inspections to the Colorado Department of Regulatory Agencies (DORA), Division of Professions and Occupations, State Electrical Board2025 Colorado Wildfire Resiliency Code (CWRC), effective July 1, 2026 — verified directly from the City's own Colorado Wildfire Resiliency Code page; any complete Building Permit Application received by 5:30pm on June 30, 2026 is exempt from CWRC requirements provided the permit fee is paid within 30 days of approval notification; applications received July 1, 2026 or later are subject to CWRC. Applicability (Class 1 vs Class 2 requirements) is determined by an address/parcel lookup on the Colorado Resiliency Code Map (unshaded = no requirements, yellow = Class 1, orange/red = Class 2).Local IRC deletions (verified from the City's own Adopted Codes page): IRC Section R313 (Automatic Fire Sprinkler Systems) is deleted — sprinkler systems are NOT required in one- and two-family dwellings; IRC Section N1102.4.1.2 (Testing / blower door tests) is deleted — blower door tests are NOT required; IRC Section N1102.4.4 (Rooms containing fuel-burning appliances) is deleted; IRC Section R302.13 (Fire protection of floors) is deleted.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new construction of single-family and two-family dwellings, and detached/multi-dwelling residential buildings, within the Craig/Moffat County Regional Building Department's joint jurisdiction (City of Craig plus all of Moffat County except the Town of Dinosaur). Administered under the jointly-adopted 2018 IBC/IRC. Electrical permitting, plan review, and inspection are handled entirely by the State of Colorado (DORA), not this department.

Verified 2026-07-06 · Source

Requirements

  • Must comply with Table R301.2(1) Climatic and Geographic Design Criteria: 115 mph wind speed, Seismic Design Category B, 48-inch frost line depth, Ice Barrier Underlayment required, 40 psf non-reducible roof snow load (may be higher at elevation per Building Official determination, up to 100 psf on the west edge of the county)
  • 2 sets of plans including: Site Plan (address, owner contact info, footprint drawn to scale with lot-line/existing-structure distances, adjacent streets/alleys/easements), Soils Analysis/Report, Foundation Design Drawings stamped by a Colorado-licensed engineer, Elevation drawings, Floor plan with plumbing/HVAC fixture locations and window/door sizes, Framing details for load-bearing components, engineered beam/girder/joist/truss drawings where applicable
  • Sewer/Water Tap Application required with subdivision/block/lot legal description and property owner and plumbing contractor signatures
  • Names of General, Plumbing, and Mechanical contractors required — all contractors must hold the applicable City of Craig or Moffat County license/registration depending on jurisdiction
  • A bona-fide owner-occupant of a single-family dwelling may self-perform all labor if the home will be their actual primary residence upon completion
  • Applications received on or after July 1, 2026 are subject to the 2025 Colorado Wildfire Resiliency Code (CWRC); the applicable Class 1/Class 2 requirements depend on the property's location on the Colorado Resiliency Code Map
  • Electrical work is NOT part of this permit's scope — a separate electrical permit must be obtained directly from DORA's State Electrical Board; rough and final electrical inspections are performed by a State inspector, not the local building department
  • IRC Section R313 (automatic residential fire sprinklers) is deleted locally — sprinklers are not required in 1-2 family dwellings
  • Prior to any excavation, the owner/contractor must contact the Utility Notification Center of Colorado (UNCC), 1-800-922-1987

Required documents

  • RequiredBuilding Permit ApplicationSubmitted in person, by mail, or by email to the Craig/Moffat County Regional Building Department at Craig City Hall
  • RequiredSite Plan
  • RequiredSoils Analysis/Report
  • RequiredFoundation Design DrawingsStamped by a Colorado-licensed engineer
  • RequiredElevation Drawings
  • RequiredFloor PlanIncluding plumbing/HVAC fixture and window/door locations
  • RequiredSewer/Water Tap Application

Fee schedule

Fee typeAmountNotes
Building Permit Fee (structures over 200 sq ft)$100.00Flat fee per Moffat County's own Building Permit Information page; not a valuation-based table. Verified identically as the governing figure for the joint department; no separate, higher valuation-based schedule was found published for new residential construction specifically.

Residential Addition / Remodel Permit

Verified

Covers both major additions to existing structures and minor additions/modifications/repairs/renovations/remodeling. The Craig/Moffat County Regional Building Department's own checklist PDF splits these into two distinct document-requirement tiers.

Verified 2026-07-06 · Source

Requirements

  • Major additions require the same document scope as new construction: Site Plan, Soils Analysis/Report, Foundation Design Drawings (Colorado-licensed engineer stamp), Elevation drawings, Floor plan, Framing details, engineered beam/girder/joist/truss specs where applicable
  • Minor additions/modifications/repairs/remodels require a lighter document set: Site Plan, Proposed Footing/Foundation Design Drawings (may or may not require an engineer's stamp, per Building Official determination), Elevation drawings, Floor plan, Framing details
  • Names of General, Plumbing, and Mechanical contractors required for both tiers — all must hold applicable City or County licensing
  • A property owner may self-perform work if the structure is/will be their actual primary residence
  • Applications received on or after July 1, 2026 are subject to the 2025 Colorado Wildfire Resiliency Code based on the property's location on the Colorado Resiliency Code Map
  • Electrical scope is NOT covered by this permit — separate State of Colorado (DORA) electrical permit required if electrical work is part of the project

Required documents

  • RequiredBuilding Permit Application
  • RequiredSite Plan
  • RequiredFoundation/Footing Design DrawingsEngineer's stamp required for major additions; may or may not be required for minor remodels, per Building Official determination
  • RequiredElevation Drawings
  • RequiredFloor Plan

Fee schedule

Fee typeAmountNotes
Building Permit Fee (structures/additions over 200 sq ft)$100.00Flat fee per Moffat County's own Building Permit Information page

Electrical Permit (State-Administered)

Verified

Electrical work in both the City of Craig and unincorporated Moffat County is administered entirely by the State of Colorado, not the local Building Department. This permit type documents that state-administered pathway rather than a local process.

Verified 2026-07-06 · Source

Requirements

  • Both the City of Craig and Moffat County defer ALL electrical permits, plan reviews, and inspections to the Colorado Department of Regulatory Agencies (DORA), Division of Professions and Occupations, State Electrical Board — verified directly from the City's Residential Solar Installation Checklist and Standard Building Inspections checklist
  • Applicants must apply directly to DORA, typically through the DPO Online Permitting System, rather than through the Craig/Moffat County Regional Building Department
  • For a project also requiring a local Building Permit (e.g., new construction, solar), State electrical approval may be required BEFORE the local Building Permit can be issued (explicitly stated for solar projects)
  • Rough and Final Electrical inspections are performed by a State inspector, not a local building inspector, per the department's own Standard Building Inspections checklist

Required documents

  • RequiredDORA/DPO Electrical Permit ApplicationFiled directly with the Colorado Division of Professions and Occupations, State Electrical Board — not with the local Craig/Moffat County Regional Building Department

Fee schedule

Fee typeAmountNotes
State of Colorado DORA Electrical Permit FeeSet by DORA/DPO, not the local jurisdiction
Verified that the fee-setting and permit-issuing authority is the State of Colorado, not the City of Craig or Moffat County. Show full citation

Verified that the fee-setting and permit-issuing authority is the State of Colorado, not the City of Craig or Moffat County. See dpo.colorado.gov/ElectricalPlumbingPermits for the State's own current fee schedule — chasing a locally-set fee here would be inaccurate, since Craig/Moffat has no electrical fee to set.

Electric Vehicle Charging Station Permit (State-Administered)

Verified

Installing an EV charger/EVSE in Craig or unincorporated Moffat County is electrical work, and both the City and County defer ALL electrical permits, plan reviews, and inspections to the State of Colorado -- the same state-administered pathway documented in this file's electrical-permit entry. No Craig/Moffat County EV-charger-specific permit application, fee line, or webpage was found -- checked the City's Permits & Inspections page, Adopted Codes page, Residential Solar Installation Checklist, and the Checklists for Obtaining Permits & Scheduling Inspections PDF directly; none name electric vehicle charging stations, EV chargers, or EVSE.

Verified 2026-07-20 · Source

Requirements

  • Both the City of Craig and Moffat County defer ALL electrical permits, plan reviews, and inspections to the Colorado Department of Regulatory Agencies (DORA), Division of Professions and Occupations, State Electrical Board -- the same mechanism documented for all other electrical work in this file
  • Applicants must apply directly to DORA, typically through the DPO Online Permitting System, rather than through the Craig/Moffat County Regional Building Department
  • If the charger installation is mounted to or requires a new structure (e.g., a new carport), a separate local Building Permit ($100 flat fee) from the Craig/Moffat County Regional Building Department would additionally apply for that structural portion
  • Rough and Final Electrical inspections are performed by a State inspector, not a local building inspector, consistent with the department's Standard Building Inspections checklist

Required documents

  • RequiredDORA/DPO Electrical Permit ApplicationFiled directly with the Colorado Division of Professions and Occupations, State Electrical Board, for the charger's circuit/installation work -- not with the local Craig/Moffat County Regional Building Department

Fee schedule

Fee typeAmountNotes
State of Colorado DORA Electrical Permit FeeSet by DORA/DPO, not the local jurisdiction, consistent with this file's electrical-permit entry. No EV-charger-specific fee line was found published by either DORA or the City/County. See dpo.colorado.gov/ElectricalPlumbingPermits for the State's own current fee schedule.
Local Building Permit (flat fee, only if new structural work is involved)$100.00Craig/Moffat County Regional Building Department's flat building permit fee; applies only if the EV charger installation requires its own qualifying structure (e.g., over 200 sq ft) -- not the charger's electrical circuit itself, which is state-administered

Plumbing Permit

Verified

Required for plumbing renovation, repair, piping system extension, and fixture/appliance work not performed under a Building Permit, within the Craig/Moffat County Regional Building Department's joint jurisdiction. Governed by the jointly-adopted 2018 IPC.

Verified 2026-07-06 · Source

Requirements

  • Location/address, property owner contact info, and name of performing contractor required at application
  • Residential property owners may obtain permits and perform plumbing work on their own occupied residence
  • Floor plan and accurate scope description required (e.g., 'extend existing DWV & water line to half bath in finished basement')
  • A Contemporaneous Review Standards & Guidelines document governs how plumbing plan review is conducted alongside active construction (per the department's own published guidance document)
  • Contractors must hold applicable City of Craig or Moffat County licensing depending on jurisdiction, plus required State of Colorado plumber registration

Required documents

  • RequiredPlumbing Permit Application
  • RequiredFloor Plan with scope description

Fee schedule

Fee typeAmountNotes
Plumbing Permit FeeNot separately published as a standalone line item distinct from the general $100 structure permit fee
The department's own published materials (Checklists PDF, Permits & Inspections page) do not break out a distinct standalone plumbing-only fee figure separate from the $100 general building/structure permit fee; Show full citation

The department's own published materials (Checklists PDF, Permits & Inspections page) do not break out a distinct standalone plumbing-only fee figure separate from the $100 general building/structure permit fee; checked directly rather than assumed. If plumbing work is scoped as its own permit (not part of a Building Permit), contact the Building Official to confirm current fee treatment.

Mechanical / HVAC Permit

Verified

Required for HVAC/mechanical renovation, major repairs, piping system extension, and appliance replacement (including A/C unit or evaporative cooler installation/replacement) not performed under a Building Permit. Governed by the jointly-adopted 2018 IMC/IFGC.

Verified 2026-07-06 · Source

Requirements

  • Location/address, property owner contact info, and name of performing contractor required at application
  • Residential property owners may obtain permits and perform HVAC/mechanical work on their own occupied residence
  • Floor plan and accurate description of scope required (e.g., 'install direct-vent gas fireplace and connect to existing gas piping system')
  • Gas piping and combustion air/venting must comply with IMC/IFGC or manufacturer installation instructions
  • Contractors must hold applicable City of Craig or Moffat County licensing depending on jurisdiction

Required documents

  • RequiredMechanical/HVAC Permit Application
  • RequiredFloor Plan with scope description

Fee schedule

Fee typeAmountNotes
Mechanical/HVAC Permit FeeNot separately published as a standalone line item distinct from the general $100 structure permit feeNo distinct standalone mechanical-only fee figure was found published separate from the $100 general building/structure permit fee; checked the Checklists PDF and Permits & Inspections page directly rather than assumed.

Roofing Permit (Re-Roof)

Verified

Required for re-roofing work within the Craig/Moffat County Regional Building Department's joint jurisdiction. A simpler, lighter-document permit category than new construction per the department's own checklist.

Verified 2026-07-06 · Source

Requirements

  • Location/address of work, property owner contact info required
  • Name of contractor performing the work — residential property owners may obtain permits and perform re-roofing on their own occupied residence
  • If performed by a licensed roofing contractor, a written bid price on company letterhead is required
  • Size of the roof area to be re-roofed and the number of existing roofing material layers currently on the structure must be disclosed
  • Pre-Roof inspection required before work begins, and a Roofing inspection at completion, per the Standard Building Inspections list

Required documents

  • RequiredRe-Roof Building Permit Application
  • OptionalContractor bid (if using a licensed contractor)Written price on company letterhead

Fee schedule

Fee typeAmountNotes
Re-Roof Permit FeeNot separately published as a standalone line item distinct from the general $100 structure permit feeNo distinct standalone re-roof-only fee figure was found published separate from the department's general $100 flat structure permit fee; checked the Checklists PDF and Permits & Inspections page directly.

Solar Permit (Photovoltaic)

Verified

Required for residential solar installations. The Craig/Moffat County Regional Building Department handles structural/racking/fire-access plan review and inspection; the electrical portion is handled entirely separately and independently by the State of Colorado, with State approval required BEFORE the local Building Permit is issued.

Verified 2026-07-06 · Source

Requirements

  • 3 sets of plans, minimum 11x17 inches, submitted to the Community Development Department at 300 W 4th Street, Craig CO 81625 or emailed to meckhoff@ci.craig.co.us; larger plans may also require paper copies even if submitted electronically
  • All plans must be stamped by a Colorado State licensed engineer (exceptions may apply)
  • The local Building Department reviews and inspects: racking systems, fire access setbacks, wind zones, snow and wind loads, and existing roof structure
  • A SEPARATE electrical permit is required from the Colorado Department of Regulatory Agencies (DORA), Division of Professions & Occupations — the State reviews and inspects the electrical portion; State approval is required PRIOR to the local Building Permit being issued
  • Plans must show: all disconnects, modules, batteries, inverters, grounding conductors; racking system locations/attachment details per manufacturer; dimensions/clearances around equipment; firefighter access paths per the 2018 IFC (typically 36 inches); existing roof vents/penetrations/structure (if roof-mounted); design criteria; safety/disconnect labeling locations; panel locations, amperages, and line diagrams
  • Design criteria specific to solar: ground snow load 57 psf countywide, but 40 psf non-reducible roof snow load design value used locally (up to 100 psf at higher west-county elevations — location/elevation must be disclosed); 115 mph wind speed; 48-inch frost depth; adopted codes 2018 IFC/IRC/IBC plus the Colorado-adopted NEC edition (enforced by the State, not locally)

Required documents

  • RequiredSolar Installation Permit Application (structural/racking scope)Submitted to the Craig/Moffat County Regional Building Department
  • RequiredSite Plan and equipment location plansStamped by a Colorado-licensed engineer
  • RequiredSeparate State of Colorado DORA Electrical PermitRequired before the local Building Permit is issued; covers the electrical portion of the installation

Fee schedule

Fee typeAmountNotes
Local Building/Structural Permit Fee (solar)Not separately published as a standalone solar-specific figure distinct from the department's general $100 flat structure fee
Checked the Residential Solar Installation Checklist page directly — it does not itself state a dollar fee figure, only the submission and review process. Show full citation

Checked the Residential Solar Installation Checklist page directly — it does not itself state a dollar fee figure, only the submission and review process. The department's general $100 flat structure fee is the only published local figure found; it is not explicitly confirmed to apply verbatim to solar, so treat as unconfirmed for this specific permit type pending direct confirmation from the Building Official.

State of Colorado DORA Electrical Permit Fee (separate)Set by DORA/DPO, not the local jurisdiction
Colorado's Fair Permit Act (HB1199, 2011) caps solar permit fees statewide at $500 residential / $1,000 commercial across local jurisdictions generally, though this cap was not independently… Show full citation

Colorado's Fair Permit Act (HB1199, 2011) caps solar permit fees statewide at $500 residential / $1,000 commercial across local jurisdictions generally, though this cap was not independently re-verified against a Craig/Moffat-specific citation in this file's research; the local structural fee plus the separate State electrical fee would need to jointly respect that state cap if it applies here.

Demolition Permit

Verified

Required for demolition work within the Craig/Moffat County Regional Building Department's joint jurisdiction. Asbestos inspection and CDPHE notification are mandatory prerequisites administered at the state level, in addition to a local General Demolition Application.

Verified 2026-07-06 · Source

Requirements

  • A local General Demolition Information and Application must be submitted to the Craig/Moffat County Regional Building Department
  • A certified asbestos building inspection is required before any demolition work takes place, per Colorado Department of Public Health and Environment (CDPHE) requirements
  • A minimum 10-business-day notification to CDPHE is required before commencement of demolition, via an Asbestos Abatement Notification and Permit Application plus a state permit fee, if asbestos-containing material is present or must be ruled out
  • Applicants should reference CDPHE's own General Information on Asbestos and Asbestos Inspection Flow Chart documents, both linked directly from the City's Demolition and Asbestos Abatement page

Required documents

  • RequiredGeneral Demolition Information and ApplicationLocal application submitted to the Craig/Moffat County Regional Building Department
  • RequiredAsbestos Inspection ReportBy a Colorado-certified asbestos building inspector
  • OptionalCDPHE Asbestos Abatement Notification and Permit ApplicationState-level filing, minimum 10 business days before demolition commencement, if applicable

Fee schedule

Fee typeAmountNotes
Local Demolition Permit FeeNot separately published as a standalone figure distinct from the general $100 flat structure permit feeChecked the City's Demolition and Asbestos Abatement page directly — it links to application/informational documents but does not itself state a local dollar fee figure.
CDPHE Asbestos Abatement Notification and Permit fee (state, if applicable)Set by CDPHE, not the local jurisdictionSeparate state-level fee tied to the asbestos notification/permit process, distinct from any local demolition permit fee.

Fence / Retaining Wall Permit

Verified

Required for fences over 6 feet high and retaining walls over 4 feet high within the Craig/Moffat County Regional Building Department's joint jurisdiction.

Verified 2026-07-06 · Source

Requirements

  • Location/address of work and property owner contact info required at application
  • Name of performing contractor — residential property owners may obtain permits and perform the work on their own occupied residence
  • If work is performed by a contractor, a written bid price on company letterhead is required
  • Site plan and accurate scope description required (e.g., '6 foot high, 100 feet long, cedar privacy fence on north and south side property lines')
  • Fences, walls, and hedges must comply with height and setback restrictions in Craig Municipal Code Chapter 16, Section 16.02.0140
  • Retaining walls over 4 feet (48 inches) in height must be designed by a Colorado-licensed design professional
  • Fences 6 feet or under, and retaining walls 4 feet or under, are exempt from a permit per the general permit thresholds published by both the City and County

Required documents

  • RequiredFence or Retaining Wall Permit Application
  • RequiredSite Plan with scope description
  • OptionalEngineered retaining wall designRequired only for retaining walls exceeding 4 feet in height

Fee schedule

Fee typeAmountNotes
Fence/Retaining Wall Permit FeeNot separately published as a standalone figure distinct from the general $100 flat structure permit feeChecked the Checklists for Obtaining Permits PDF directly — it does not break out a distinct fence/wall-specific dollar figure separate from the department's general $100 flat fee.

Commercial Building Permit (New Structure)

Verified

Required for new commercial buildings within the Craig/Moffat County Regional Building Department's joint jurisdiction (City of Craig plus all of Moffat County except the Town of Dinosaur). There is NO separately-branded commercial permit application or process here: the department's own Checklists for Obtaining Permits & Scheduling Inspections handout runs commercial buildings through the same 'New Structure Permits' checklist as residential — its heading reads 'New Structure Permits (Includes single and two family dwellings, multi-family dwellings and commercial buildings)' — with commercial-specific plan-detail requirements layered on top. Governed by the jointly-adopted 2018 IBC/IMC/IFGC/IPC/IECC/IFC; electrical permitting, plan review, and inspection are handled entirely by the State of Colorado (DORA), not this department.

Verified 2026-08-02 · Source

Requirements

  • 2 sets of plans required, same base checklist as residential new construction: Site Plan (physical address, owner name/mailing address/phone, footprint drawn to scale with distances from lot lines and existing/proposed structures, all adjacent streets/alleys/easements), Soils Analysis/Report, Foundation Design Drawings stamped by a Colorado-licensed engineer, Elevation drawings (roof slope, roofing type, exterior coverings), Floor plan with all plumbing/HVAC fixture locations plus window/door locations and sizes, Framing details for all load-bearing components, drawings/specifications for any engineered beams, girders, joists, and floor or ceiling trusses
  • Commercial-specific plan standard, quoted from the department's own checklist: 'for commercial projects plans must be more detailed and include details and specifications for plumbing, mechanical/HVAC plans'
  • ResCheck (or comparable analysis) of building envelope and fenestration for energy-code compliance, plus Heat Gain/Loss analysis IAW ASHRAE Manual J indicating size of proposed heating, cooling, and water heating appliances (the checklist cites '2006 IEEC' for the envelope analysis even though the department's adopted code set is the 2018 IECC — follow the Building Official's direction on which vintage to run)
  • Names of General, Plumbing, and Mechanical contractors required at application; a properly licensed contractor is mandatory for ALL commercial work — per the City's Permits & Inspections page, the owner-self-perform allowance 'applies to one and two-family dwellings only, all commercial properties require a properly licensed contractor to acquire the permit and perform the work'
  • Contractors must hold a City of Craig Contractor License for work inside city limits or Moffat County Contractor Registry registration for unincorporated county work; plumbers must additionally be state-registered
  • Sewer/Water Tap Application required, with address and legal designation of subdivision/block/lot, property owner name/signature/mailing address/phone, and the plumbing contractor's business name, authorized-rep signature, and license number
  • Electrical work is NOT part of this permit's scope — a separate electrical permit must be obtained directly from DORA's State Electrical Board, and rough/final electrical inspections are performed by a State inspector
  • Applications received on or after July 1, 2026 are subject to the 2025 Colorado Wildfire Resiliency Code (CWRC); applicability (none/Class 1/Class 2) is determined by address/parcel lookup on the Colorado Resiliency Code Map
  • Prior to ANY excavation activity, the owner/contractor must contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987
  • A Certificate of Occupancy is required before moving into a business, per Moffat County's own Building Permit Information page — basic CO requirements include a complete and approved electrical system, functional bathroom and sink with hot/cold running water, approved sewage disposal, functional heating, no hazardous conditions, and the address posted conspicuously

Required documents

  • RequiredBuilding Permit ApplicationSame application track as all new-structure permits; submitted to the Craig/Moffat County Regional Building Department at Craig City Hall
  • RequiredSite Plan (2 sets)
  • RequiredSoils Analysis/Report
  • RequiredFoundation Design DrawingsStamped by a Colorado-licensed engineer
  • RequiredElevation Drawings
  • RequiredFloor Plan with detailed plumbing and mechanical/HVAC details and specificationsCommercial projects must provide more detailed plans than residential, per the department's own checklist
  • RequiredResCheck (or comparable) energy analysis plus ASHRAE Manual J Heat Gain/Loss analysis
  • RequiredSewer/Water Tap Application

Fee schedule

Fee typeAmountNotes
Building Permit Fee (structures over 200 sq ft)$100.00
Flat fee, re-confirmed live 2026-08-02 on Moffat County's own Building Permit Information page ('These permits are issued through the building department and cost $100'). Show full citation

Flat fee, re-confirmed live 2026-08-02 on Moffat County's own Building Permit Information page ('These permits are issued through the building department and cost $100'). The page draws no residential/commercial distinction, and no valuation-based fee table or separate commercial fee schedule is published anywhere on the City's or County's sites — checked the City's Building Department, Permits & Inspections, and Informational Handouts pages plus the full Checklists PDF directly. Confirm fee treatment for a large commercial project with the Building Official before budgeting, since a flat $100 on a major commercial build is unusually low relative to Colorado peers.

Plan Review FeeNone publishedNo separate commercial plan review fee line is published by this department anywhere that was checked (City Building/Permits/Handouts pages, Checklists PDF, County Building Permit Information page). Not asserted as $0 — genuinely unpublished; verify with the Building Official.

Sign Permit

Verified

Required to erect, construct, enlarge, alter, move or convert most signs within Craig city limits, per Craig Municipal Code Title 16 (Land Use Code), Chapter 16.07 (Signs), Sections 16.07.010 through 16.07.120. Unlike Cortez's standalone sign-permit process, Craig's own code text explicitly ties the sign permit to the building permit: 'In addition to the sign permit, a building permit is also required' (16.07.100.A). Signs are reviewed by the city's building department (16.07.040 intro) -- the same Craig/Moffat County Regional Building Department that administers every other permit type in this file -- rather than a separate planning/zoning sign office. Craig's own Land Use Application master form additionally lists 'Sign Permit' as one of its circle-one application types, alongside a dedicated stand-alone Sign Permit Application Form; it is not resolved from published materials whether both forms are required together or whether the dedicated form supersedes the master form for signs specifically.

Verified 2026-08-13 · Source

Requirements

  • Permit required for the erection, construction, enlargement, alteration, moving or conversion of any sign not on the exempt list, per Sec. 16.07.020 ('Sign permit' definition) and Sec. 16.07.060
  • Exempt without a permit, city-wide, per Sec. 16.07.050(A): garage sale signs, historic place signs (max 3 sq ft), official/public signs (max 3 sq ft, non-commercial only), political signs, real estate signs (max 6 sq ft residential / 32 sq ft central business or enterprise district / 6 sq ft residential and 32 sq ft multi-family(4+)/commercial in the MU District), and address signs
  • Additionally exempt, but ONLY in the central business and enterprise districts and at commercial properties in the MU District, subject to stated size caps, per Sec. 16.07.050(B): announcements (max 6 sq ft), business hours signs (max 4 sq ft), credit card signs (max 2 sq ft), Open/Closed signs (max 4 sq ft), parking signs (max 2 per access, 6 sq ft per entrance total), and window signs (max 2 per window/door, max 25% of window area)
  • Temporary signs are exempt without a permit but capped at 16 sq ft per side, 1 per 20 linear feet, 4 ft max height, and may not be displayed for more than 2 months, per Sec. 16.07.050(C)
  • All signs not falling under Sec. 16.07.050 require a permit; permitted sign area/number/height varies by category -- business frontage signage (freestanding, hanging, roof, wall) is allotted 2 sq ft of sign per 1 linear ft of street-level business frontage (500 sq ft max) or 1 sq ft per linear ft on other levels (50 sq ft max), per Sec. 16.07.060(A)
  • Freestanding signs: 2 ft minimum setback from property lines, max 35 ft height, limited to 2 on-premises signs per business, per Sec. 16.07.060(A)(3)(a)
  • Hanging signs: max 24 sq ft per side, minimum 8 ft clearance from grade, limited to 1 per business, and the business/property owner must agree in writing to assume liability if the sign is within the right-of-way, per Sec. 16.07.060(A)(3)(b)
  • Off-premises signs: freestanding only, permitted ONLY in the enterprise district, max 150 sq ft total per business, max 2 per business, minimum 150 ft spacing from other off-premises signs, per Sec. 16.07.060(C)
  • Signs in residential zones require Planning Commission approval (not just Building Department review), are capped at 8 ft height, and are subject to use-specific size caps (home occupation 3 sq ft max/1 sign; community facilities 32 sq ft max; condo/townhouse/subdivision ID signs 50 sq ft max; all others 6 sq ft max/2 signs), per Sec. 16.07.060(B)
  • Multi-use buildings (more than one business/tenant) follow their own frontage-based area formula and are subject to Building Department design approval, per Sec. 16.07.060(D)
  • All permits for signs must be obtained by a licensed contractor UNLESS the sign is under 16 square feet and unilluminated, per Sec. 16.07.040(K)
  • Signs subject to Colorado Department of Transportation (CDOT) jurisdiction must be approved by CDOT before construction and, if applicable, before the city issues its sign and/or building permit, per Sec. 16.07.100(E)
  • Application materials required per Sec. 16.07.100(C): a fully dimensioned site plan showing location and property-line setbacks, plus a drawing showing sign width, sign area, sign copy, and construction date of the sign structure
  • Violations are misdemeanors punishable by a minimum $50.00 and maximum $1,000.00 fine; the building inspector is the designated enforcement official, per Sec. 16.07.110

Required documents

  • RequiredSign Permit Application FormCity of Craig's dedicated sign-specific form; requires applicant/owner/erector/contractor/subcontractor contact info, sign type (new/moved/altered/repaired/removed; temporary/permanent; off-premises), and must be signed in blue ink
  • OptionalLand Use Application (master form)The City's general master Land Use form also lists 'Sign Permit' as a circle-one application type in Section 1, alongside Existing Use / Proposed Use fields; not confirmed from published materials whether this master form is required in addition to, or as an alternative to, the dedicated Sign Permit Application Form
  • RequiredSite PlanFully dimensioned, showing the sign's specific location and setbacks from adjacent property lines and buildings
  • RequiredDetailed Sign DrawingDimensions, materials, and colors of the proposed sign and support structure, plus a graphic drawing or photograph of the sign copy
  • OptionalStructural Engineer CertificationRequired only for freestanding or projecting signs, per the Sign Permit Application Form
  • OptionalProof of Liability InsuranceRequired only for freestanding signs and projecting wall signs, per the Sign Permit Application Form
  • OptionalWritten Lease or Property-Owner PermissionRequired only for off-premises signs, per the Sign Permit Application Form

Fee schedule

Fee typeAmountNotes
Sign Permit Fee
No standalone Sign Permit fee line is published on the City's own Land Use Fee Schedule (checked directly -- it itemizes Conditional Use $200, Temporary Use $100, Home Occupation $100, Zoning… Show full citation

No standalone Sign Permit fee line is published on the City's own Land Use Fee Schedule (checked directly -- it itemizes Conditional Use $200, Temporary Use $100, Home Occupation $100, Zoning Variance $250, etc., but no Sign Permit line). Since Sec. 16.07.100(A) states a building permit is also required in addition to the sign permit, the sign permit itself may carry no separate fee, with the accompanying building permit's flat $100 fee being the only dollar figure that applies -- but this is not confirmed by any published City document. Confirm current fee treatment directly with the Building Official before budgeting.

Fire Sprinkler / Fire Alarm System Permit

Verified

Unlike Cortez in this corpus (which has an in-house city Fire Inspector embedded in its Building Division) or a jurisdiction that routes fire-suppression review to an independent fire-protection district's own prevention office, Craig/Moffat County has NEITHER: fire-protection/suppression-system code compliance is folded directly into the Craig/Moffat County Regional Building Department's own standard 'Public Safety' inspection category -- alongside Egress & Lighting and Maximum Occupancy Load Posted -- performed under the jointly-adopted 2018 International Fire Code (IFC) by Building Official Marlin Eckhoff's office, confirmed directly from the department's own Checklists for Obtaining Permits & Scheduling Inspections PDF (the same document already cited elsewhere in this file for the commercial-building-permit entry's inspection sequence). Craig Rural Fire Protection District, operating publicly as Craig Fire Rescue (a separate special taxing district governed by an elected 5-person board, 419 Yampa Avenue, 970-824-5914, craigfirerescue.org), provides emergency fire/EMS response across the roughly 180-square-mile district -- but its own website publishes no fire-prevention division, fire marshal, plan-review, or permitting content of any kind, checked directly. No standalone fire-sprinkler/alarm permit application, project-type checklist entry, or fee line was found on the City's or County's own sites; this scope is filed through whichever standard Building Permit track (new construction, addition, or minor remodel) matches the project.

Verified 2026-08-13 · Source

Requirements

  • Fire sprinkler and fire alarm system installations are reviewed and inspected as part of the standard Building Permit process by the Craig/Moffat County Regional Building Department, NOT by a dedicated fire-marshal or fire-prevention office -- confirmed directly from the department's own Checklists for Obtaining Permits & Scheduling Inspections PDF, which lists 'Fire Protection / Suppression System / Fire-Smoke Alarms/Detectors' under its own 'Public Safety' inspection category
  • Craig Rural Fire Protection District (dba Craig Fire Rescue), the jurisdiction's emergency-response fire department, is a separate special taxing district from the City of Craig and Moffat County; its own website (craigfirerescue.org) publishes no fire-prevention, plan-review, or permit content -- checked directly across its homepage and About Us/History pages
  • Governed by the jointly-adopted 2018 International Fire Code (IFC), per this file's codesAdopted list; no separate NFPA 13 (sprinkler) or NFPA 72 (alarm) standard is itemized beyond the general IFC adoption -- checked the City's Adopted Codes and Building & Construction Codes pages directly and found no more specific citation
  • IRC Section R313 (automatic residential fire sprinklers) is locally deleted -- sprinklers are NOT required in one- and two-family dwellings, per this file's codesAdopted list and residential-building-permit entry; this permit type therefore applies chiefly to commercial, multi-family, and other IFC-governed fire-suppression/alarm work rather than typical single-family construction
  • The department's own 'New Structure Permits' checklist (which folds commercial buildings into the same track as residential/multi-family, per this file's commercial-building-permit entry) has no dedicated Fire Sprinkler or Fire Alarm project-type checkbox or standalone checklist page -- checked the full 11-page Checklists PDF directly; fire-suppression/alarm scope is filed as part of whichever governing Building Permit (new construction, addition, or minor remodel/renovation) applies to the project
  • Commercial buildings are subject to the department's 'Public Safety' inspection items (Egress & Lighting; Fire Protection/Suppression System/Fire-Smoke Alarms & Detectors; Maximum Occupancy Load Posted) as part of the standard inspection sequence before Final/Certificate of Occupancy, per the Checklists PDF's Standard Building Inspections list

Required documents

  • RequiredBuilding Permit ApplicationFire-suppression/alarm scope is filed under whichever governing project type applies (New Structure, Major Addition, or Minor Addition/Modification/Remodel) -- no dedicated fire-sprinkler/alarm application or checklist exists

Fee schedule

Fee typeAmountNotes
Fire Sprinkler / Fire Alarm Permit Fee
No standalone fire-sprinkler or fire-alarm permit fee line is published on the City's or County's sites, or in the Checklists PDF -- checked directly. Show full citation

No standalone fire-sprinkler or fire-alarm permit fee line is published on the City's or County's sites, or in the Checklists PDF -- checked directly. This scope most likely bills against the department's general $100 flat structure permit fee as part of whatever project type it is filed under, but no City or County document confirms a fire-suppression-specific fee line. Genuinely unresolved; confirm with the Building Official (Marlin Eckhoff, 970-826-2013) for a project-specific determination.

Change of Use / Change of Occupancy Permit

Verified

Unlike Cortez in this corpus, whose standard Building Permit Application has an explicit 'Change of Occupancy' project-type checkbox, the City of Craig's master Land Use Application form -- described on its own face as 'the master land use form for the City of Craig' -- lists no Change of Use or Change of Occupancy option among its circle-one application types (Administrative Subdivision, Annexation, Conditional Use, Major/Minor Subdivision, Planned Development Overlay, Rezoning, RV Park, Sign Permit, Site Plan, Temporary Use, Variance or Appeal, Waiver, or an open 'Other' field) -- confirmed directly from the form. A change of use/occupancy is governed by the jointly-adopted 2018 International Existing Building Code (IEBC), Chapter 10 (Change of Occupancy), per this file's codesAdopted list, and by Craig Municipal Code Title 16 zoning provisions where the new use requires a Conditional Use Permit; absent a dedicated application or checklist, it is processed either as a Conditional Use filing (if the new use is not permitted-by-right in the applicable zoning district) or folded into whichever Building Permit track matches the project's physical construction scope, with the Land Use Application's own Existing Use / Proposed Use fields capturing the change regardless of which box is checked.

Verified 2026-08-13 · Source

Requirements

  • No dedicated 'Change of Use' or 'Change of Occupancy' checkbox exists on the City's master Land Use Application form -- confirmed directly; the form's circle-one application types are limited to Administrative Subdivision, Annexation, Conditional Use, Major/Minor Subdivision, Planned Development Overlay, Rezoning, RV Park, Sign Permit, Site Plan, Temporary Use, Variance or Appeal, Waiver, and an open 'Other' field
  • Governed by the jointly-adopted 2018 IEBC, Chapter 10 (Change of Occupancy), per this file's codesAdopted list -- no local amendment to this specific chapter was found published on the City's Adopted Codes or Building & Construction Codes pages
  • The Land Use Application's Property Description section (Section 4) requires stating both Existing Zoning/Existing Use and Proposed Zoning/Proposed Use regardless of which application-type box is checked -- so a pure use change is captured on the form even without a dedicated checkbox, most likely via the 'Other' field or a 'Site Plan' filing depending on scope
  • If the new use is not permitted-by-right in the applicable zoning district, a Conditional Use Permit application is the City's general mechanism -- requires a $200.00 application fee (Land Use Fee Schedule), a completed Land Use Application marked for Conditional Use, a title commitment or proof of ownership, a written statement addressing the review criteria in Craig Municipal Code Sec. 16.03.050(C), a 24-inch by 36-inch site development map, preliminary building plans/elevations, and a current list of surrounding property owners within 150 feet -- and culminates in a public hearing before City Council with published/mailed/posted notice
  • If the change of use also involves construction, remodeling, or modification of the structure, the applicable Minor or Major Additions/Modifications/Repairs/Remodeling Building Permit checklist governs (documented in this file's residential-addition-remodel entry), including the same document tiers and $100 flat building-permit fee
  • A Certificate of Occupancy is required before moving into a business, per Moffat County's own Building Permit Information page -- basic requirements include a complete and approved electrical system, a functional bathroom and kitchen sink with hot/cold running water, approved sewage disposal, functional heating, no hazardous conditions, and the address posted conspicuously
  • All commercial work requires a properly licensed contractor; the owner-self-perform allowance applies only to one- and two-family dwellings intended as the owner's actual primary residence

Required documents

  • RequiredLand Use Application (master form)Check 'Other' (describing the change of use) or 'Conditional Use' if the new use requires zoning approval; Section 4 (Property Description) requires stating Existing Use and Proposed Use regardless of which box is checked
  • OptionalConditional Use Request ApplicationRequired only if the new use is not permitted-by-right in the applicable zoning district; includes a written statement addressing Sec. 16.03.050(C) review criteria, a site development map, and a list of surrounding property owners within 150 feet
  • OptionalBuilding Permit ApplicationRequired only if the change of use also involves construction, remodeling, or modification of the structure; filed under the applicable Minor/Major Addition-Remodel checklist

Fee schedule

Fee typeAmountNotes
Conditional Use Permit Fee$200.00City of Craig Land Use Fee Schedule; applies only if the new use is not permitted-by-right in the applicable zoning district and a Conditional Use Permit is required
Building Permit Fee (if construction accompanies the use change)$100.00Flat fee per Moffat County's own Building Permit Information page; applies only if the change of use also involves qualifying construction/remodeling scope
Change of Use Filing Fee (no construction, use permitted by right)A pure change of use that requires neither a Conditional Use Permit nor accompanying construction has no clearly published fee line on the City's Land Use Fee Schedule -- genuinely unresolved; confirm directly with the Building Official or Planning & Zoning staff.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Craig building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-02)Later version (2026-08-25) →View current record →All versions →

Permalink: /colorado/moffat-county/craig-co/as-of/2026-08-13/

Snapshot date: 2026-08-13

Commit: a51bd13

Reproducible from PermitBase’s version-controlled dataset, commit a51bd13.