Unincorporated Pueblo County building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Pueblo County, Colorado.
Verified 2026-07-23 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 201 W. 8th St. #120, Pueblo, CO 81003
- Phone
- 719-583-6100
- Office hours
- Monday-Friday, 7:30 a.m.-4:30 p.m., closed on County holidays. Same-day inspection requests must be submitted before 8:30 a.m.; inspections may otherwise be scheduled in advance. Source: Pueblo County Building Division homepage and Request an Inspection page, https://pueblopermits.com/ and https://pueblopermits.com/request-an-inspection/
- Website
- Official site
Published scheduling rules
- Same-day inspection requests (with an active permit number and, for contractors, a CLR number) must be submitted before 8:30 a.m. (Electrical Permit)
- Same-day inspection requests must be submitted before 8:30 a.m.; inspections may otherwise be scheduled in advance. A permit number is required for all inspection requests, and contractors must provide an active CLR (Contractor License Registration) number. Source: https://pueblopermits.com/request-an-inspection/ (General)
Inspection sequence
Applies to: Residential Addition / Remodel / Alteration Permit
- 1
Footing/Foundation
Required before concrete pour for deck posts, garage foundations, or addition footings
- 2
Framing
Structural framing and connections to existing structure
- 3
Final
All work complete per approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour — verify forms, rebar, and foundation depth meets the 26-inch minimum frost depth
- 2
Framing
Structural framing per 2021 IRC and approved plans
- 3
Final
All work complete per approved plans
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and service connections before walls are closed
- 2
Final
Devices installed, panel labeled, protections verified per 2023 NEC
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
EVSE wiring, box placement, and service connections inspected before walls are closed, if applicable
- 2
Final
EVSE equipment installed and protections verified per 2023 NEC
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Gas Pressure Test
Ductwork and equipment rough-in before concealment; gas piping pressure test before concealment or utility turn-on
- 2
Final
Equipment operational, combustion air/clearances verified
Applies to: Plumbing Permit
- 1
Underground/Rough-In
Before concealment — verify pipe slope, materials, and cleanouts
- 2
Final
Fixtures connected, backflow protection verified, no leaks
Applies to: Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before energizing
- 2
Final
Panel mounting, roof penetration sealing, electrical connections, inverter, and interconnection verified
Final inspection only: Roof Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Pueblo County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Pueblo County building permits
Get alerts for Unincorporated Pueblo County
We'll email you when Unincorporated Pueblo County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.