Version history — Saguache, Colorado

This is PermitBase’s own verified record for Saguache, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Saguache’s actual law was at that time.

Permanent link to today’s record

/colorado/saguache-county/saguache-town/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
  • 2026-08-20Superseded
  • 2026-08-17Superseded
  • 2026-08-14Superseded
  • 2026-08-13Superseded
  • 2026-08-02Superseded
    • Saguache, Colorado — Historic Preservation Alteration Certificate (Historic District / Landmark, IN ADDITION to Building Permit) record added
  • 2026-07-23Superseded
    • Saguache, Colorado — Building Permit fee record added: Town of Saguache Building Permit Fee ($20.00)
    • Saguache, Colorado — EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit) fee record updated: null → $20.00
    • Saguache, Colorado — Solar PV Permit (Town Building Permit, Statewide Fee Cap) fee record updated: null → $20.00
  • 2026-07-20Superseded
    • Saguache, Colorado — Solar PV Permit (Town Building Permit, Statewide Fee Cap) record added
    • Saguache, Colorado — Solar PV Permit (Town Building Permit, Statewide Fee Cap) fee record updated: Set by the State of Colorado (DORA State Electrical Board), not the Town of Saguache → Statewide valuation-based schedule under C.R.S. § 12-23-117: base fee ~$100-$120 for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that — capped in aggregate (with the Town's building-permit fee) at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113
    • Saguache, Colorado — EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit) fee record added: State of Colorado Electrical Permit -- Residential, up to 1,000 SF (statewide DORA State Electrical Board schedule, C.R.S. 12-23-117) ($200)
    • Saguache, Colorado — EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit) fee record removed: State of Colorado electrical permit fees (electrical-connection scope)
    • Saguache, Colorado — EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit) record added
  • 2026-07-07Superseded
    • Saguache, Colorado — adopted-codes record updated
    • Saguache, Colorado — adopted-codes record updated
  • 2026-07-06Initial record — coverage of Saguache began