Julesburg building permits
Julesburg, Colorado — as published 2026-08-26.
Reviewed 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new construction of single-family dwellings and other buildings within Town of Julesburg limits. Reviewed under the 2018 IRC/IBC as locally amended by Ordinance No. 23-470 (2023), including the Town's adopted Climatic and Geographic Design Criteria (20 psf ground snow load per source table, 112 mph wind design speed, 36-inch frost depth, slope-triggered ice barrier underlayment). Issued by the Town's Building Official out of Town Hall using a single-page paper application. THERE IS NO DISTINCT COMMERCIAL-BUILDING-PERMIT / TENANT-IMPROVEMENT-PERMIT TYPE: Julesburg's Municipal Code Title 17 (Zoning) shows the Town has genuine, actively-zoned 'D Business District' (Chapter 17.24), 'E Commercial District' (Chapter 17.28), and industrial-use (Chapter 17.32) districts, plus a 2023 Central Business Zoning Overlay (Ordinance No. 23-474) protecting the downtown commercial core — commercial construction and tenant improvement/build-out are real, occurring activities here, not a null land use. But the Town issues no separate commercial permit: the SAME 2018 IBC (adopted alongside the IRC by Ordinance No. 23-470) governs non-residential/commercial/industrial occupancies, the SAME single 'Application for Building Permit' form at Town Hall is used regardless of occupancy type, and Title 17's own enforcement section (17.14.240(C)) directs 'any application for a building permit' — commercial included — to the same Building Inspector under the same process, 'regardless of size, cost or purpose.' The 2018 IECC adoption (Ordinance No. 23-470) does create a parallel 'Commercial Energy Conservation Code' (Section C101.1) alongside the 'Residential Energy Conservation Code' (Section R101.1), so commercial projects are reviewed under a distinct energy-code section — but this does not create a separate permit type, fee line, or application. Title 5 (Business Taxes, Licenses and Regulations) was also checked and contains only a wine-tasting-permit chapter (5.01) — no general business license requirement exists that would gate commercial building permits. Do not add a parallel commercial-building-permit or TI-permit entry for Julesburg; this entry (IBC governs non-residential occupancies) is the correct one for commercial/TI projects too.
Verified 2026-08-02 · Source
Requirements
- Plans/work must comply with the 2018 IRC/IBC as locally amended: 36-inch minimum frost depth, ice barrier underlayment required on roof slopes at or below 4:12, automatic fire sprinkler requirement (IRC R313) deleted in its entirety by local amendment
- One-story detached accessory structures with floor area not exceeding 120 square feet are exempt from permit requirement
- Completed 'Application for Building Permit' form submitted to Town Hall, including a hand-sketch (with dimensions) of the proposed construction
- Block, Lot, and Zone identification required on the application
- Builder, plumber, and electrician identification required on the application
- Disclosure of products purchased within Town vs. outside Town (price), apparently for municipal use-tax purposes
- Unvented gas log heaters and unvented room/decorative heaters are prohibited under locally amended code sections
- Commercial/non-residential/industrial construction (including tenant improvements) uses this SAME generic building permit process and application form, reviewed under the 2018 IBC (rather than the IRC) as locally amended; there is no distinct commercial-building-permit or TI-permit application, fee line, or process — confirmed via Municipal Code Title 17 (Zoning, Chapters 17.14/17.24/17.28/17.32) and Title 5 (Business Taxes, Licenses and Regulations)
- Property must comply with the applicable zoning district's permitted uses and setback regulations under Title 17 (e.g., Chapter 17.24 'D Business District', Chapter 17.28 'E Commercial District', Chapter 17.32 industrial uses, and the 2023 Central Business Zoning Overlay for downtown parcels) in addition to the building code itself
Required documents
- RequiredApplication for Building PermitTown of Julesburg one-page paper application; completed and returned to Town Hall, 100 West 2nd Street, Julesburg. Requires a sketch with dimensions of proposed construction.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Not published; determined by Town Hall at time of application per a fee schedule adopted by Town Board resolution (not publicly posted online) | The application form itself has a blank 'Permit Fee' and 'Use Tax' field for staff to complete. Confirm current fee directly with Town Hall (970-474-3344) before budgeting. |
Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements)
VerifiedRequired for new construction, additions, remodels, and tenant improvements to commercial, industrial, or other non-residential structures within Town of Julesburg limits. The Town issues no permit type distinct from its residential process: commercial and industrial work is submitted on the same one-page 'Application for Building Permit' form used for residential construction, and is reviewed under the 2018 International Building Code (rather than the 2018 IRC) as adopted and locally amended by Ordinance No. 23-470 (passed June 5, 2023), including the 2018 IECC's separate Commercial Energy Conservation Code section. Zoning compliance under Municipal Code Title 17 ('D Business District,' 'E Commercial District,' industrial uses, and the 2023 Central Business Zoning Overlay) is a separate, co-applicable check for a commercial parcel.
Verified 2026-08-26 · Source
Requirements
- Completed 'Application for Building Permit' form submitted to Town Hall — the same generic form used for residential construction, with Block, Lot, and Zone identification and a hand-sketch (with dimensions) of proposed construction
- Reviewed under the 2018 International Building Code as locally amended by Ordinance No. 23-470, Section 15.04.010, rather than the 2018 IRC applied to residential work
- Energy compliance reviewed under the 2018 IECC's Commercial Energy Conservation Code section (Section C101.1), distinct from the Residential Energy Conservation Code section (R101.1) applied to residential work, per Ordinance No. 23-470
- Property must comply with the applicable zoning district's permitted uses and setbacks under Municipal Code Title 17 — Chapter 17.24 ('D Business District'), Chapter 17.28 ('E Commercial District'), Chapter 17.32 (industrial uses), or the 2023 Central Business Zoning Overlay (Ordinance No. 23-474) for downtown parcels — in addition to building-code review
- A one-percent municipal use tax applies to construction and building materials stored, used, or consumed in the project (Municipal Code Section 3.12.070); per Section 3.12.100 it may be paid by estimate at permit issuance, treating fifty percent of the project's current replacement cost as the taxable materials value, or by an applicant affidavit committing to purchase all building materials from a licensed retailer within Town
- Separate electrical and plumbing permits are required through the Town's own Electrical Inspector and Plumbing Inspector (Municipal Code Chapters 15.12 and 15.08) rather than through a Colorado DORA state trade board
- No Town business-license application gates a commercial building permit: Municipal Code Title 5 (Business Taxes, Licenses and Regulations) contains only a wine-tasting-permit chapter (5.01) and imposes no general business-license requirement on a commercial occupant
Required documents
- RequiredApplication for Building PermitTown of Julesburg's one-page paper application, the same form used for residential construction; completed and returned to Town Hall, 100 West 2nd Street, Julesburg. Requires a sketch with dimensions of proposed construction.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (commercial) | Not published; determined by Town Hall at time of application per a fee schedule adopted by Town Board resolution (not publicly posted online) | Town of Julesburg Application for Building Permit (the same form used for residential work) has a blank 'Permit Fee' field for Town Hall staff to complete; Show full citationHideTown of Julesburg Application for Building Permit (the same form used for residential work) has a blank 'Permit Fee' field for Town Hall staff to complete; Ordinance No. 23-470, Section 109.2/R108.2 ('Schedule of permit fees'), amending Municipal Code Chapter 15.04, states fees are set 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution.' Confirm current fee directly with Town Hall (970-474-3344). |
| Plan Review Fee (commercial) | Not published; due at the time submittal documents are filed, per a fee schedule adopted by Town Board resolution (not publicly posted online) | Ordinance No. 23-470, Section 109.5 ('Related fees'), amending Municipal Code Chapter 15.04: when Section 106 submittal documents are required, a plan review fee is paid at submittal, 'in accordance… Show full citationHideOrdinance No. 23-470, Section 109.5 ('Related fees'), amending Municipal Code Chapter 15.04: when Section 106 submittal documents are required, a plan review fee is paid at submittal, 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution.' No dollar figure is published. |
| Construction Use Tax | One percent of the deemed sale value of construction and building materials stored, used, or consumed in the project; if paid by estimate at permit issuance, fifty percent of the project's current replacement cost is treated as that materials value | Town of Julesburg Municipal Code Chapter 3.12 (Sales and Use Tax), Section 3.12.070 (use tax imposed on construction and building materials) and Section 3.12.100 (construction and building materials… Show full citationHideTown of Julesburg Municipal Code Chapter 3.12 (Sales and Use Tax), Section 3.12.070 (use tax imposed on construction and building materials) and Section 3.12.100 (construction and building materials — estimate method, or alternatively an applicant affidavit committing to purchase materials from a Town retailer in lieu of the tax). |
| Fire Department Review | Not published as a fee distinct from the Building Official's review | Town of Julesburg website and Julesburg Volunteer Fire Department contact (970-474-3475); Show full citationHideTown of Julesburg website and Julesburg Volunteer Fire Department contact (970-474-3475); no dedicated commercial fire-plan-review fee, application, or process distinct from the general building-permit review handled by the Building Official (Town Manager or designee) is published. |
Residential Addition / Remodel Permit
VerifiedRequired for additions, remodels, and accessory structures (sheds, garages, fences, sidewalks, porches/breezeways) at existing residences within Town of Julesburg limits, reviewed under the 2018 IRC as locally amended. Uses the same single-page 'Application for Building Permit' form as new construction.
Verified 2026-07-06 · Source
Requirements
- Same 'Application for Building Permit' form covers additions, basements (finished/unfinished), sheds/garages, exterior walls/siding, fences, sidewalks, porches/breezeways — one general-purpose form for most residential work types
- One-story detached accessory structures with floor area not exceeding 120 square feet are exempt from permit requirement
- Distance from property lines must be disclosed on the application
- Hand-sketch (with dimensions) of proposed construction required
Required documents
- RequiredApplication for Building PermitSame general Town of Julesburg form used for new construction, additions, and most residential alteration work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Not published; determined by Town Hall at time of application | Confirm current fee directly with Town Hall (970-474-3344). |
Electrical Permit
VerifiedRequired for installation, alteration, or removal of electrical wiring and apparatus within Town of Julesburg limits. Julesburg runs its OWN electrical licensing and inspection program under Municipal Code Chapter 15.12 (does not defer to Colorado DORA's State Electrical Board), administered by a Town-appointed Electrical Inspector (referred to in the code as the 'city electrician'), with licensure requirements updated by Ordinance No. 23-472 (2023).
Verified 2026-07-06 · Source
Requirements
- Written permit required before any wiring installation, alteration, or removal, or before increasing electrical load, obtained from the Town's license-issuing clerk (Municipal Code Section 15.12.050)
- Contractors/firms must hold a Town of Julesburg electrical license (fee set by the Board of Trustees) in addition to any bond/insurance required by Section 15.12.090 (as updated by Ordinance No. 23-472, 2023)
- Individual homeowners performing their own electrical work personally are not required to obtain the license or bond, but must still obtain the regular permit for that job (Section 15.12.080)
- All electrical construction/materials/apparatus must conform to the National Electrical Code rules in effect when work is performed (Section 15.12.100) — confirm currently enforced NEC edition directly with Town Hall, as no post-1967 NEC edition-adoption ordinance is published
- Upon completion, the person/firm must notify the Electrical Inspector, who inspects and issues a certificate of satisfactory inspection before current may be turned on (Section 15.12.120)
Required documents
- RequiredElectrical Permit ApplicationObtained from the Town's license-issuing clerk at Town Hall
- OptionalTown of Julesburg Electrical LicenseRequired for contractors/firms (not required for an individual doing their own work on their own job); fee set by the Board of Trustees
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical License Fee | Set by the Board of Trustees; not separately published online | Confirm current fee directly with Town Hall (970-474-3344). |
| Electrical Permit / Inspection Fee | Not published; determined by Town Hall at time of application | Legacy Section 15.12 does not itself state a dollar figure for permit/inspection fees beyond directing that inspection/certificate fees 'are to be fixed and determined by the board of trustees.' |
Electric Vehicle (EV) Charger / EVSE Permit
Julesburg has no dedicated EV charger/EVSE fee line, application, or standard — the Town's Municipal Code Chapter 15.12 (Electrical Code) and Ordinance No. 23-472 publish no EV-specific provisions, and no fee schedule of any kind is published online for any Julesburg permit type (fees are set case-by-case by the Board of Trustees / Town Hall). EV charger circuit installation is treated as ordinary electrical work, requiring the same written permit obtained through the Town's own electrical licensing and inspection program under Chapter 15.12 (Julesburg does not defer to Colorado DORA's State Electrical Board). Julesburg's population (approximately 1,200) is far below the 10,000-resident municipal threshold that triggers Colorado HB24-1173's requirement to adopt a standardized/expedited EV charging system permitting program, so the Town is not required to have adopted a distinct EV permitting track.
Reviewed 2026-07-20 · Source
Requirements
- Written permit required before any EV charger circuit installation, wiring alteration, or load increase, obtained from the Town's license-issuing clerk (Municipal Code Section 15.12.050) — the same permit used for any other electrical work
- Contractors/firms must hold a Town of Julesburg electrical license (fee set by the Board of Trustees); individual homeowners performing their own work on their own home are exempt from licensing/bonding but still need the permit
- All electrical construction/materials/apparatus must conform to the National Electrical Code rules in effect when work is performed (Section 15.12.100) — confirm the currently enforced NEC edition and its EV charging (Article 625) provisions directly with Town Hall
- Upon completion, the Electrical Inspector must inspect and issue a certificate of satisfactory inspection before current may be turned on (Section 15.12.120)
- Julesburg's population (approximately 1,200) is well below Colorado HB24-1173's 10,000-resident municipal threshold, so no distinct state-mandated EV charging permit standard applies here
Required documents
- RequiredElectrical Permit ApplicationObtained from the Town's license-issuing clerk at Town Hall; no EV-specific application form is published separately
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit / Inspection Fee | Not published; determined by Town Hall at time of application | No dedicated EV charger/EVSE fee line exists, and no dollar-denominated electrical permit fee schedule of any kind is published online for Julesburg — the Board of Trustees sets fees by resolution… Show full citationHideNo dedicated EV charger/EVSE fee line exists, and no dollar-denominated electrical permit fee schedule of any kind is published online for Julesburg — the Board of Trustees sets fees by resolution rather than in the Municipal Code itself. Confirm the current fee directly with Town Hall (970-474-3344) before budgeting. |
Plumbing Permit
VerifiedRequired for installation, alteration, or repair of plumbing within Town of Julesburg limits, wherever water and/or sewer service originating from the municipal system is furnished. Julesburg runs its OWN plumbing licensing and inspection program under Municipal Code Chapter 15.08 (does not defer to Colorado DORA's State Plumbing Board), with the Town Manager or designee now serving as Plumbing Inspector per Ordinance No. 23-472 (2023).
Verified 2026-07-23 · Source
Requirements
- Permit required from the Plumbing Inspector (or other designated official) before beginning any plumbing installation or alteration work in Town (Section 15.08.090)
- A permit may be issued to a homeowner to install/alter plumbing in their own owner-occupied single-family residence, provided the homeowner does the work personally
- Contractors/firms must hold a Town of Julesburg plumbing license (fee set by the Board of Trustees) plus bond or proof of insurance (Sections 15.08.180-15.08.210, as updated by Ordinance No. 23-472, 2023)
- Governed by the American Standard National Plumbing Code as locally adopted (Section 15.08.010) — confirm currently enforced plumbing code edition directly with Town Hall, as this base reference predates the Town's 2023 ICC-family code modernization and Ordinance No. 23-470's 2018 code adoptions did not explicitly reference a plumbing-code edition change in the portions reviewed
Required documents
- RequiredPlumbing Permit ApplicationObtained from the Plumbing Inspector or other designated official at Town Hall
- OptionalTown of Julesburg Plumbing LicenseRequired for contractors/firms; not required for a homeowner performing their own work on their own owner-occupied residence
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit / Inspection Fee (base application) | No fixed dollar figure is codified — 'all applications will be subject to the market fee for items to be inspected' (Municipal Code Section 15.08.100(A), text as fully replaced by Ordinance No. 23-472 § 2, 2023) | CONFIRMED 2026-07-23 via direct read of Ordinance No. Show full citationHideCONFIRMED 2026-07-23 via direct read of Ordinance No. 23-472's operative text (already an existing source in this entry): Section 15.08.100 was replaced IN ITS ENTIRETY by Ord. 472 § 2 (2023), which supersedes the legacy 1967 per-fixture dollar schedule (Ord. 268(4) — first-five-fixtures $2.00, each additional fixture $0.25, new/reconstructed sewer connection $0.50, hot water heater $0.50, final certificate of inspection $1.00) with an undefined 'market fee for items to be inspected' standard. This is not an omission: it is the Town's own currently codified language, and no numeric figure for the base fee is published anywhere (the paper application form also leaves the fee field blank). Confirm the current market-rate fee directly with Town Hall (970-474-3344) before budgeting; the 1967 per-fixture dollar amounts above are historical/superseded and should NOT be relied on. |
| Additional inspection trip (applicant not ready / re-inspection) | $25.00 | Set by Ordinance No. 23-472 § 2 (2023), Municipal Code Section 15.08.100(B) — this is the one specific dollar figure the 2023 replacement of Section 15.08.100 retained/set; current as of the Town's most recent (2023) plumbing licensure amendment. |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, and ventilation equipment installation or replacement within Town of Julesburg limits. Governed by the 2018 International Mechanical Code (IMC) as locally amended by Ordinance No. 23-470 (2023).
Verified 2026-07-06 · Source
Requirements
- Governed by the 2018 IMC as locally amended
- Fee for each permit paid in accordance with a fee schedule adopted from time to time by the Town Board by resolution (Section 106.5.2 as amended) — not separately published online
- Factory-built fireplaces, pellet fuel-burning appliances, and fireplace stoves/wood heaters must be listed in the EPA Certified Wood Heater Database as currently EPA-certified under the 2020 rule (local amendments to Sections 903.1/904.1/925.1)
- Unvented gas log heaters are prohibited (Section 903.3 local amendment)
- Masonry heaters must be approved by the Colorado Department of Public Health and Environment and listed on its currently published list of Colorado Approved Masonry Heaters (Section 925.1 local amendment)
Required documents
- RequiredApplication for Building PermitSame general Town of Julesburg application form used for building/mechanical work, submitted to Town Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee | Not published; determined by Town Hall per a fee schedule adopted by Town Board resolution | Confirm current fee directly with Town Hall (970-474-3344). |
Reroof / Residing Permit
VerifiedRequired for reroofing and residing work within Town of Julesburg limits. The Town publishes a dedicated, lighter-weight 'Application for Building Permit — Roofing & Siding' form distinct from its general building permit application. Governed by the 2018 IRC/IBC as locally amended, including the slope-triggered ice barrier underlayment requirement.
Verified 2026-07-06 · Source
Requirements
- Completed 'Application for Building Permit — Roofing & Siding' form submitted to Town Hall; Town Hall staff look up the Block, Lot, and Zone information for the applicant (a lighter-weight process than the general building permit form, which requires the applicant to supply this)
- Siding and roof dimensions (width, length, material) and number of squares (for roofing) must be disclosed
- Ice barrier underlayment required on roofs with a slope equal to or less than 4:12 (2018 IRC Section R905.1.2 as locally amended): not less than two layers of cemented underlayment or a self-adhering polymer-modified bitumen sheet, extending from the lowest roof edge to at least 24 inches inside the exterior wall line
- Contractor name and phone number required on the application
Required documents
- RequiredApplication for Building Permit — Roofing & SidingTown of Julesburg's dedicated lighter-weight paper form for reroof/residing work; submitted to Town Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Not published; determined by Town Hall at time of application | Confirm current fee directly with Town Hall (970-474-3344). |
Rooftop Solar Photovoltaic Permit
Required for rooftop or ground-mounted solar photovoltaic installations within Julesburg town limits. The Town runs its own genuine building-permit and electrical-inspection program (not deferred to Sedgwick County or Colorado DORA), but publishes no dollar-denominated fee schedule for any permit type online — fees for solar, as for every other permit type in this jurisdiction, are set 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution' with no such resolution published. Notably, the Town's own IRC Appendix Adoption Table (Ordinance No. 23-470, June 2023) explicitly lists Appendix RA (Solar-Ready Zone, Residential) as 'Not Adopted.' Colorado's statewide solar-fee cap (C.R.S. § 24-48.5-113, $500 residential/$1,000 commercial via HB21-1284) still applies as a ceiling on whatever fee the Town assesses.
Reviewed 2026-07-20 · Source
Requirements
- Building permit required for the structural/mounting portion of a solar PV installation, submitted on the Town's generic 'Application for Building Permit' one-page form at Town Hall (100 West 2nd Street)
- Electrical interconnection is inspected by the Town's OWN local electrical inspector (Municipal Code Chapter 15.12, 'city electrician') — Julesburg does NOT defer electrical inspection to Colorado DORA's State Electrical Board, unlike many small Colorado towns
- The Town's adopted IRC Appendix RA (Solar-Ready Zone, Residential) is explicitly 'Not Adopted' per Ordinance No. 23-470 — meaning Julesburg does not impose the model code's solar-ready wiring/conduit pre-installation requirements on new construction
- Colorado's statewide C.R.S. § 24-48.5-113 (HB21-1284) caps the aggregate of all fees a local government may charge to install an active solar energy system at $500 for a residential permit and $1,000 for a commercial permit, applying regardless of what the Town's (unpublished) fee resolution otherwise specifies
- Same 180-day permit expiration and blank Permit Fee/Use Tax fields on the paper application apply as with any other Julesburg building permit
Required documents
- RequiredApplication for Building PermitTown of Julesburg's generic one-page building permit application, covering new construction, additions, and other scopes including solar; block/lot/zone identification and a hand-sketch of proposed construction required
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (solar, structural/mounting portion) | Not published — set 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution'; no such resolution PDF is published online, and the paper application form leaves the Permit Fee field blank for Town Hall staff to fill in | Confirm current fee directly with Town Hall (970-474-3344). Show full citationHideConfirm current fee directly with Town Hall (970-474-3344). Subject to Colorado's statewide C.R.S. § 24-48.5-113 cap of $500 (residential) / $1,000 (commercial) on the aggregate of all local fees for an active solar energy system, regardless of what the Town's own unpublished resolution otherwise specifies. |
| Electrical Inspection Fee (interconnection, Town's own local electrical inspector) | Not published — same 'fee schedule adopted... by resolution' gap applies to electrical work generally in this jurisdiction | Julesburg Municipal Code Chapter 15.12 creates a Town 'city electrician' who inspects electrical work directly, rather than deferring to Colorado DORA's State Electrical Board |
Sign Permit
Julesburg is a small statutory town (population roughly 1,200) in Sedgwick County. The Town publishes no dedicated sign-permit page, sign code chapter, or fee schedule distinct from the general building-permit process on its website (townofjulesburg.com), and the Town's separately hosted codified-ordinance library is currently offline (see the confidence note). Permitting is administered out of Town Hall by the Building Official (Town Manager or designee, per Municipal Code Section 15.04.030).
Reviewed 2026-08-14 · Source
Requirements
- No dedicated sign-permit page, sign code chapter, or fee schedule distinct from the general building-permit process is published on the Town's website
- Contact the Town of Julesburg Town Hall / Building Official (970-474-3344) to confirm whether a sign permit is required for a specific sign and what standards apply
- No numeric sign-permit fee schedule or review-timeline figure is published on the Town's website
Required documents
- RequiredSign Permit / Building Permit ApplicationContact Town Hall to confirm the current application form and requirements; Julesburg has no dedicated Building Department webpage separate from Town Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Fee | Not published as a numeric figure on the Town's website | Contact the Town of Julesburg Town Hall (970-474-3344) for a current fee quote |
Fire Sprinkler / Fire Alarm System Permit
Fire protection for the Town of Julesburg is provided by the Julesburg Volunteer Fire Department (510 E 1st St, Julesburg, CO 80737, 970-474-3475). No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure distinct from the general Town building-permit process is published on the Town's website, and no separate fire district website distinct from the volunteer department itself exists.
Reviewed 2026-08-14 · Source
Requirements
- Fire protection for Julesburg is provided by the Julesburg Volunteer Fire Department
- No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure is published on the Town's website
- In Colorado, a final Certificate of Occupancy is generally contingent on satisfying all local departments with jurisdiction, which may include Fire, in addition to the Building Official
- Contact Town Hall (970-474-3344) or the Julesburg Volunteer Fire Department (970-474-3475) directly to confirm current fire-protection-system permitting procedures for a specific project
Required documents
- RequiredFire Sprinkler/Alarm System PlansContact Town Hall or the Julesburg Volunteer Fire Department to confirm current submittal requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Sprinkler/Alarm Plan Review & Permit Fee | Not published on the Town's or fire department's website | Contact Town Hall (970-474-3344) or the Julesburg Volunteer Fire Department (970-474-3475) for a current fee quote |
Change of Use / Change of Occupancy
Julesburg does not publish a standalone 'Change of Use' or 'Change of Occupancy' permit application distinct from the general building-permit process on its website; the Town's separately hosted codified-ordinance library is currently offline, so whether a specific International Existing Building Code edition has been adopted is unconfirmed. A use/occupancy change is presumed to be processed through the Town's general building-permit process administered by the Building Official (Town Manager or designee).
Reviewed 2026-08-14 · Source
Requirements
- No standalone change-of-use or change-of-occupancy application distinct from the general Town building-permit process is published on the Town's website
- In Colorado, a final Certificate of Occupancy is generally contingent on satisfying all local departments with applicable jurisdiction
- Processed, if at all, through the Town's general building-permit process, administered out of Town Hall by the Building Official (Town Manager or designee, per Municipal Code Section 15.04.030)
- Contact Town Hall (970-474-3344) to confirm requirements for a specific change-of-use project
Required documents
- RequiredBuilding Permit ApplicationContact Town Hall to confirm the current application form and requirements for a change-of-use project
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (if construction accompanies the change) | Not published as a standalone change-of-use fee line | Contact Town Hall (970-474-3344) for a current fee quote |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Julesburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.