Dillon building permits

Verified

Dillon, Colorado — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

2024 International Building Code (IBC) series with local amendments — Summit County Building Inspection Department completed adoption of the 2024 I-Code series; per the department's live announcement (checked 2026-07-06), all plans submitted on or after July 1, 2026 must comply with the 2024 I-Codes2024 International Residential Code (IRC) with local amendments — part of the same 2024 I-Code series adoption2024 International Energy Conservation Code (IECC) with amendments — replaces the former 'Summit County Sustainable Code' option for single-family homes; the Sustainable Code is no longer an energy-compliance pathway as of this adoption, per the department's own announcementAppendix REMP (Renewable Energy Mitigation Program) — added with the 2024 code adoption, per Summit County Building Inspection Department announcementAppendix BC (Accessory Dwelling Units for existing construction) — added with the 2024 code adoption, per Summit County Building Inspection Department announcementColorado Wildfire Resiliency Code — any permit applied for on or after May 4, 2026 is subject to the newly adopted fire codes, including the updated sprinkler square-footage threshold; the full code is published by the Colorado Division of Fire Prevention & Control (dfpc.colorado.gov/colorado-wildfire-resiliency-code)Sprinkler requirement: all new residential structures 4,500 sq ft or greater must have fire sprinkler systems installed, per the Colorado Wildfire Resiliency Code as adopted by Summit CountyTown of Dillon Municipal Code, Chapter 18 — the Town has, 'in conjunction with Summit County... in general adopted the 2018 series of Building Codes with amendments' at the town-code level; however, the Summit County Building Inspection Department (which actually performs plan review/inspection for Dillon) has since moved forward to the 2024 I-Code series described above — this is a genuine, honestly-flagged discrepancy between the Dillon Municipal Code's own text (last referencing 2018) and the county department's current live practice (2024, effective July 1, 2026); applicants should confirm the currently-enforced edition directly with Summit County Building Inspection at time of submittal

Permit types & fees

Building Permit (New Construction / Foundation, Framing, Finish)

Verified

Required for construction of new single-family homes, foundations, framing, carpentry, and exterior/interior finish work in Dillon. A Town of Dillon Development Permit must be obtained FIRST from the Dillon Planning & Zoning Department; the building permit itself is then issued and inspected by the Summit County Building Inspection Department under the 2024 I-Code series (effective for submittals on or after July 1, 2026).

Verified 2026-07-06 · Source

Requirements

  • STEP 1 (prerequisite): Obtain a Town of Dillon Development Permit from the Planning & Zoning Department (Ned West, Sr. Town Planner, (970) 262-3421, nwest@townofdillon.com) before applying for the building permit
  • STEP 2: Submit the building permit application, plans, and all hard-copy materials IN PERSON to Summit County Building Inspection Department, County Commons, 0037 Peak One Drive, Frisco, CO 80443 — electronic, mailed, or couriered submittals are not accepted; cutoff 4:30 p.m. daily
  • Plans submitted on or after July 1, 2026 must comply with the 2024 I-Code series with Summit County amendments (2024 IBC/IRC/IECC, Appendix REMP, Appendix BC)
  • Any permit applied for on or after May 4, 2026 must comply with the Colorado Wildfire Resiliency Code, including the updated sprinkler square-footage threshold; new residential structures of 4,500 sq ft or greater require fire sprinkler systems
  • Plan review fee (65% of the building permit fee) is due at time of submittal
  • Affordable Housing Development Impact Fee applies based on square footage (see localAmendments)

Required documents

  • RequiredTown of Dillon Development Permit ApplicationZoning/land-use permit that must be approved before a Summit County building permit application will be accepted; available on the Dillon Planning & Zoning Department page
  • RequiredBuilding Permit Application (Summit County)Summit County Building Inspection Department's standard Building Permit Application, submitted in person
  • RequiredConstruction DrawingsFull plan set for foundation, framing, structural, mechanical, electrical, and plumbing scope, routed by Summit County to Planning, Engineering, Building Inspection, Environmental Health, and Housing departments for review

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$50.00Summit County Building Permit Fee Schedule, summitcountyco.gov/services/community_development/building_inspection/building_permit_fee_schedule.php
Building Permit Fee — valuation $501.00 to $2,000.00$50.00 for the first $500.00 plus $1.25 for each additional $100.00 or fraction thereof, to and including $2,000.00
Building Permit Fee — valuation $2,001.00 to $25,000.00$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
Building Permit Fee — valuation $25,001.00 to $50,000.00$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
Building Permit Fee — valuation $50,001.00 to $100,000.00$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
Building Permit Fee — valuation $100,001.00 to $500,000.00$1,169.55 for the first $100,000.00 plus $6.73 for each additional $1,000.00 or fraction thereof, to and including $500,000.00
Building Permit Fee — valuation $500,001.00 to $1,000,000.00$3,663.00 for the first $500,000.00 plus $5.34 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00
Building Permit Fee — valuation $1,000,001.00 and up$6,332.22 for the first $1,000,000.00 plus $3.90 for each additional $1,000.00 or fraction thereof
Plan Review Fee65% of the Building Permit FeeMandatory, due at time of submittal when plan review is required by code
Affordable Housing Development Impact Fee (single-family)$0/sq ft up to 1,499 sq ft; $0.50/sq ft (1,500-2,499); $1.00/sq ft (2,500-3,499); $1.50/sq ft (3,500-4,999); $2.00/sq ft at 5,000+ sq ftApplies to new detached single-family homes and duplexes; also applies to additions and attached/detached accessory structures at these same tiers

Building Permit — Addition, Remodel, Deck, Guard Replacement

Verified

Required for additions, remodels, decks, and guard replacements to existing structures in Dillon. Same two-step process as new construction: a Town of Dillon Development Permit first, then the building permit through Summit County Building Inspection Department.

Verified 2026-07-06 · Source

Requirements

  • Town of Dillon Development Permit required first — the Town's own guidance explicitly lists 'building additions,' 'remodels,' 'tenant finish,' and 'large sheds' among projects requiring this permit
  • Decks and guard replacements require a Summit County building permit per the department's own Building Permits page
  • Submit in person at the Summit County Building Inspection Department, Frisco office, before 4:30 p.m.
  • Plan review fee of 65% of the building permit fee due at submittal when plans are required
  • Affordable Housing Development Impact Fee applies to additions to existing detached single-family structures at the same tiered rates as new construction

Required documents

  • RequiredTown of Dillon Development Permit ApplicationRequired first for additions, remodels, tenant finish, and similar projects
  • RequiredBuilding Permit Application (Summit County)Submitted in person; select the appropriate alteration/addition project type

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation tiers as new construction)$50.00 minimum (valuation $1-$500) up to $6,332.22 for the first $1,000,000 plus $3.90 per additional $1,000Summit County Building Permit Fee Schedule — same table used for new construction, additions, and remodels
Plan Review Fee65% of the Building Permit Fee
Affordable Housing Development Impact Fee$0/sq ft up to 1,499 sq ft, scaling to $2.00/sq ft at 5,000+ sq ftApplies to new additions to existing detached single-family structures per Summit County's fee schedule

Electrical Permit

Verified

Required for installation of wiring, receptacles, switches, light fixtures, electrical equipment, fixed-in-place appliances, and their connection to utility service in Dillon. Issued and inspected by the Summit County Building Inspection Department; a Town of Dillon Development Permit is required first only if the electrical work is part of a broader project that itself triggers a Development Permit (e.g., new structure, addition, solar panels) — confirm with the Dillon Town Planner if unsure.

Verified 2026-07-06 · Source

Requirements

  • Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether your specific electrical scope also requires a Town Development Permit
  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office
  • Fees for residential electrical work are based on unit area (sq ft) unless the work is valuation-based (job/material cost)
  • Plan review fee (when required) is 65% of the electrical permit fee

Required documents

  • RequiredTechnical Permit Application (or Technical Permit Application Writeable)Summit County's standard technical-permit application, covering electrical, plumbing, and mechanical scopes

Fee schedule

Fee typeAmountNotes
Electrical Permit — not more than 1,000 sq ft$146.00Summit County Building Permit Fee Schedule
Electrical Permit — over 1,000 sq ft to 1,500 sq ft$218.00
Electrical Permit — over 1,500 sq ft to 2,000 sq ft$292.00
Electrical Permit — over 2,000 sq ft$292.00 plus $15.00 per 100 sq ft or fraction thereof, over 2,000 sq ft
All other electrical work — valuation not more than $2,000.00$146.00
All other electrical work — valuation more than $2,000.00$15.00 per $1,000 or fraction thereof plus $146.00
Mobile homes and travel parks, per space$146.00
Temporary power permit$146.00
Hot tub electrical permit$146.00
Initial plan review65% of the electrical permit fee
Additional plan review$65.00 per hour or fraction thereof
Reinspection$65.00

EV Charger / EVSE Permit (Standard Electrical Permit)

Verified

Installation of an electric vehicle charging station in Dillon is not a distinct permit type — it is billed and processed as ordinary electrical work through the Summit County Building Inspection Department's standard Technical Permit Application, the same process and fee schedule documented on this file's electrical-permit entry. Summit County's published Building Permit Fee Schedule (directly fetched and reviewed this session) has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item; a dedicated Level 2 charger circuit is billed under the same unit-area or valuation-based standalone electrical fee tiers used for any other electrical work. Summit County's Sustainability/Electric Vehicles page (which covers the County's own public charging infrastructure) likewise describes no dedicated EV-charger permitting process, fee, or land-use code, and does not reference Colorado's HB24-1173 (Electric Vehicle Charging System Permits, 2024) despite Summit County's population exceeding that law's 20,000-resident county threshold — no evidence of a HB24-1173-driven adoption of streamlined EV-charging land-use permitting was found published by the County as of this session.

Verified 2026-07-20 · Source

Requirements

  • Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether the specific EV charger installation also requires a Town Development Permit (e.g., if bundled with a larger project) — the same check documented on this file's electrical-permit entry
  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office, the same form used for all standalone electrical work
  • Confirmed directly against the Summit County Building Permit Fee Schedule: no distinct EV-charger/EVSE fee line exists; a dedicated charger circuit is billed under the standard unit-area (if part of a larger area calculation) or valuation-based 'All other electrical work' tiers
  • Work must comply with the 2024 National Electrical Code series as adopted by Summit County (same code cited on this file's electrical-permit entry)

Required documents

  • RequiredTechnical Permit Application (or Technical Permit Application Writeable)Same Summit County standard technical-permit application used for the file's general electrical-permit entry

Fee schedule

Fee typeAmountNotes
All other electrical work — valuation not more than $2,000.00 (typical dedicated EV charger circuit)$146.00Summit County Building Permit Fee Schedule — same flat fee already documented on this file's electrical-permit entry; no distinct EV-charger/EVSE line item exists
All other electrical work — valuation more than $2,000.00 (e.g., charger install bundled with a panel upgrade)$15.00 per $1,000 or fraction thereof plus $146.00Summit County Building Permit Fee Schedule
Initial plan review65% of the electrical permit feeSummit County Building Permit Fee Schedule

Plumbing Permit

Verified

Required for installation of drain, waste and vent piping; potable water piping; fuel gas piping; and plumbing appliances and fixtures in Dillon. Issued and inspected by the Summit County Building Inspection Department under the 2024 IPC series (as part of the 2024 I-Code adoption).

Verified 2026-07-06 · Source

Requirements

  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office
  • Fee is calculated by multiplying total plumbing valuation by a constant of 0.0075, with a $65.00 minimum fee
  • Plumbing permit fees associated with an existing Building Permit must use the Building Permit's valuation to calculate fees, rather than a separate plumbing-only valuation
  • For new SFR/commercial projects, plumbing valuation is based on 10% of the project's total valuation
  • Plan review fee (when required) is 65% of the plumbing permit fee, minimum $65.00 per hour

Required documents

  • RequiredTechnical Permit Application (or Technical Permit Application Writeable)Summit County's standard technical-permit application

Fee schedule

Fee typeAmountNotes
Plumbing Permit FeeTotal plumbing valuation x 0.0075, $65.00 minimumSummit County Building Permit Fee Schedule; for new SFR/commercial work, valuation is based on 10% of total project valuation
Plan Review Fee (when required)65% of the plumbing permit fee, minimum $65.00 per hour

Mechanical Permit

Verified

Required for installation of furnaces and ducts, boilers and circulation piping, and exhaust fans and ducts in Dillon. Issued and inspected by the Summit County Building Inspection Department under the 2024 IMC series (as part of the 2024 I-Code adoption). Gas fireplaces, wood stoves, and outdoor fire pits are billed as a distinct Fireplace Permit.

Verified 2026-07-06 · Source

Requirements

  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office
  • Fee is total mechanical valuation multiplied by a constant of 0.0075, $65.00 minimum
  • Mechanical permit fees associated with an existing Building Permit must use the Building Permit's valuation to calculate fees
  • For new SFR/commercial projects, mechanical valuation is based on 10% of the project's total valuation
  • A separate Fireplace Permit (flat valuation x 0.0075, $65.00 minimum) applies to gas fireplaces, wood stoves, and outdoor fire pits — check the department's list of approved wood-burning devices

Required documents

  • RequiredTechnical Permit Application (or Technical Permit Application Writeable)Summit County's standard technical-permit application

Fee schedule

Fee typeAmountNotes
Mechanical Permit FeeTotal mechanical valuation x 0.0075, $65.00 minimumSummit County Building Permit Fee Schedule; for new SFR/commercial work, valuation is based on 10% of total project valuation
Fireplace Permit Fee (gas fireplace, wood stove, or outdoor fire pit)Total fireplace valuation x 0.0075, $65.00 minimum
Plan Review Fee (when required)65% of the mechanical permit fee, minimum $65.00 per hour

Photovoltaic (Solar) Permit

Verified

Required for residential and commercial photovoltaic (solar) system installations in Dillon. A Town of Dillon Development Permit is required first (solar panels are explicitly listed among projects requiring a Development Permit). The Summit County Building Inspection Department then issues the PV permit; residential roof-mounted systems under 15kW may be issued over the counter if the submittal is complete, while larger, ground-mounted, and commercial systems require plan review.

Verified 2026-07-06 · Source

Requirements

  • Town of Dillon Development Permit required first — solar panels are explicitly named on the Town's list of projects requiring this permit
  • Residential roof-mounted PV systems under 15kW may be issued over the counter with a complete submittal
  • Plan review is required for all residential PV systems 15kW and over, all ground-mounted systems, and all commercial systems
  • Submit the PV Permit Application, PV Submittal Requirements, and PV Checklist materials in person at Summit County Building Inspection Department

Required documents

  • RequiredTown of Dillon Development Permit ApplicationRequired first for solar panel installations
  • RequiredPhotovoltaic Permit ApplicationSummit County's PV-specific application, with an accompanying writable PDF version
  • RequiredPV Submittal Requirements / PV ChecklistSummit County's published PV systems requirements and submittal checklist documents

Fee schedule

Fee typeAmountNotes
Residential Plan Review$175.00Summit County Building Permit Fee Schedule
Residential Permit Fee$325.00
Commercial Plan Review$350.00
Commercial Permit Fee$650.00

Demolition Permit

Verified

Required for the removal of structures and safe disconnection of utility services in Dillon. Issued by the Summit County Building Inspection Department. A Town of Dillon Development Permit is not explicitly listed among the Town's named Development Permit project types, but applicants should confirm with the Dillon Town Planner whether a demolition triggers Town-level review given the scope of the specific project.

Verified 2026-07-06 · Source

Requirements

  • Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether the specific demolition project also requires a Town of Dillon Development Permit or Grading and Excavation Permit
  • Demolition permit authorizes removal of structures and safe disconnection of utility services to the structure
  • Submit in person at the Summit County Building Inspection Department Frisco office

Required documents

  • RequiredBuilding Permit ApplicationSummit County's demolition permits are processed under the same Building Permit Application as new construction

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeNot separately published on the Summit County Building Permit Fee Schedule as a distinct line itemGAP: Summit County's live Building Permits page confirms a Demo Permit exists ('required for the removal of structures and safe disconnection of utility services') but the Building Permit Fee Schedule page does not list a distinct demolition fee tier separate from the general Building Permit Fee table; likely billed under the standard valuation-based Building Permit Fee schedule, but this was not explicitly confirmed in the source text and is not invented here

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dillon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →