Codes adopted

2024 International Building Code (IBC) series with local amendments — Summit County Building Inspection Department completed adoption of the 2024 I-Code series; per the department's live announcement, all plans submitted on or after July 1, 2026 must comply with the 2024 I-Codes2024 International Residential Code (IRC) with local amendments — part of the same 2024 I-Code series adoption2024 International Energy Conservation Code (IECC) with amendments — replaces the former 'Summit County Sustainable Code' option for single-family homes; the Sustainable Code is no longer an energy-compliance pathway as of this adoption, per the department's own announcementAppendix REMP (Renewable Energy Mitigation Program) — added with the 2024 code adoption, per Summit County Building Inspection Department announcementAppendix BC (Accessory Dwelling Units for existing construction) — added with the 2024 code adoption, per Summit County Building Inspection Department announcementColorado Wildfire Resiliency Code — any permit applied for on or after May 4, 2026 is subject to the newly adopted fire codes, including the updated sprinkler square-footage threshold; the full code is published by the Colorado Division of Fire Prevention & Control (dfpc.colorado.gov/colorado-wildfire-resiliency-code)Sprinkler requirement: all new residential structures 4,500 sq ft or greater must have fire sprinkler systems installed, per the Colorado Wildfire Resiliency Code as adopted by Summit CountyTown of Dillon Municipal Code, Chapter 18 — the Town has, 'in conjunction with Summit County... in general adopted the 2018 series of Building Codes with amendments' at the town-code level; however, the Summit County Building Inspection Department (which actually performs plan review/inspection for Dillon) has since moved forward to the 2024 I-Code series described above — this is a genuine, honestly-flagged discrepancy between the Dillon Municipal Code's own text (last referencing 2018) and the county department's current live practice (2024, effective July 1, 2026); applicants should confirm the currently-enforced edition directly with Summit County Building Inspection at time of submittal

Permit types & fees

Building Permit (New Construction / Foundation, Framing, Finish)

Verified

Required for construction of new single-family homes, foundations, framing, carpentry, and exterior/interior finish work in Dillon. A Town of Dillon Development Permit must be obtained FIRST from the Dillon Planning & Zoning Department; the building permit itself is then issued and inspected by the Summit County Building Inspection Department under the 2024 I-Code series (effective for submittals on or after July 1, 2026).

Verified 2026-07-06 · Source

Requirements

  • STEP 1 (prerequisite): Obtain a Town of Dillon Development Permit from the Planning & Zoning Department (Ned West, Sr. Town Planner, (970) 262-3421, nwest@townofdillon.com) before applying for the building permit
  • STEP 2: Submit the building permit application, plans, and all hard-copy materials IN PERSON to Summit County Building Inspection Department, County Commons, 0037 Peak One Drive, Frisco, CO 80443 — electronic, mailed, or couriered submittals are not accepted; cutoff 4:30 p.m. daily
  • Plans submitted on or after July 1, 2026 must comply with the 2024 I-Code series with Summit County amendments (2024 IBC/IRC/IECC, Appendix REMP, Appendix BC)
  • Any permit applied for on or after May 4, 2026 must comply with the Colorado Wildfire Resiliency Code, including the updated sprinkler square-footage threshold; new residential structures of 4,500 sq ft or greater require fire sprinkler systems
  • Plan review fee (65% of the building permit fee) is due at time of submittal
  • Affordable Housing Development Impact Fee applies based on square footage (see localAmendments)

Required documents

  • RequiredTown of Dillon Development Permit ApplicationZoning/land-use permit that must be approved before a Summit County building permit application will be accepted; available on the Dillon Planning & Zoning Department page
  • RequiredBuilding Permit Application (Summit County)Summit County Building Inspection Department's standard Building Permit Application, submitted in person
  • RequiredConstruction DrawingsFull plan set for foundation, framing, structural, mechanical, electrical, and plumbing scope, routed by Summit County to Planning, Engineering, Building Inspection, Environmental Health, and Housing departments for review

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$50.00Summit County Building Permit Fee Schedule, summitcountyco.gov/services/community_development/building_inspection/building_permit_fee_schedule.php
Building Permit Fee — valuation $501.00 to $2,000.00$50.00 for the first $500.00 plus $1.25 for each additional $100.00 or fraction thereof, to and including $2,000.00Summit County Building Permit Fee Schedule, Building Permit Fees table; same amount in Exhibit B (2026 Fee Schedule) to the adopted 2024 code amendments
Building Permit Fee — valuation $2,001.00 to $25,000.00$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00Summit County Building Permit Fee Schedule, Building Permit Fees table; same amount in Exhibit B (2026 Fee Schedule) to the adopted 2024 code amendments
Building Permit Fee — valuation $25,001.00 to $50,000.00$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00Summit County Building Permit Fee Schedule, Building Permit Fees table; same amount in Exhibit B (2026 Fee Schedule) to the adopted 2024 code amendments
Building Permit Fee — valuation $50,001.00 to $100,000.00$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00Summit County Building Permit Fee Schedule, Building Permit Fees table; same amount in Exhibit B (2026 Fee Schedule) to the adopted 2024 code amendments
Building Permit Fee — valuation $100,001.00 to $500,000.00$1,169.55 for the first $100,000.00 plus $6.73 for each additional $1,000.00 or fraction thereof, to and including $500,000.00Summit County Building Permit Fee Schedule, Building Permit Fees table; same amount in Exhibit B (2026 Fee Schedule) to the adopted 2024 code amendments
Building Permit Fee — valuation $500,001.00 to $1,000,000.00$3,663.00 for the first $500,000.00 plus $5.34 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00Summit County Building Permit Fee Schedule, Building Permit Fees table; same amount in Exhibit B (2026 Fee Schedule) to the adopted 2024 code amendments
Building Permit Fee — valuation $1,000,001.00 and up$6,332.22 for the first $1,000,000.00 plus $3.90 for each additional $1,000.00 or fraction thereofSummit County Building Permit Fee Schedule, Building Permit Fees table; same amount in Exhibit B (2026 Fee Schedule) to the adopted 2024 code amendments
Plan Review Fee65% of the Building Permit FeeMandatory, due at time of submittal when plan review is required by code
Affordable Housing Development Impact Fee (single-family)$0/sq ft up to 1,499 sq ft; $0.50/sq ft (1,500-2,499); $1.00/sq ft (2,500-3,499); $1.50/sq ft (3,500-4,999); $2.00/sq ft at 5,000+ sq ftApplies to new detached single-family homes and duplexes; also applies to additions and attached/detached accessory structures at these same tiers

Building Permit — Addition, Remodel, Deck, Guard Replacement

Verified

Required for additions, remodels, decks, and guard replacements to existing structures in Dillon. Same two-step process as new construction: a Town of Dillon Development Permit first, then the building permit through Summit County Building Inspection Department.

Verified 2026-07-06 · Source

Requirements

  • Town of Dillon Development Permit required first — the Town's own guidance explicitly lists 'building additions,' 'remodels,' 'tenant finish,' and 'large sheds' among projects requiring this permit
  • Decks and guard replacements require a Summit County building permit per the department's own Building Permits page
  • Submit in person at the Summit County Building Inspection Department, Frisco office, before 4:30 p.m.
  • Plan review fee of 65% of the building permit fee due at submittal when plans are required
  • Affordable Housing Development Impact Fee applies to additions to existing detached single-family structures at the same tiered rates as new construction

Required documents

  • RequiredTown of Dillon Development Permit ApplicationRequired first for additions, remodels, tenant finish, and similar projects
  • RequiredBuilding Permit Application (Summit County)Submitted in person; select the appropriate alteration/addition project type

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation tiers as new construction)$50.00 minimum (valuation $1-$500) up to $6,332.22 for the first $1,000,000 plus $3.90 per additional $1,000Summit County Building Permit Fee Schedule — same table used for new construction, additions, and remodels
Plan Review Fee65% of the Building Permit FeeSummit County Building Permit Fee Schedule, Building Permit Fees section; also stated in Exhibit B (2026 Fee Schedule) to the adopted 2024 code amendments
Affordable Housing Development Impact Fee$0/sq ft up to 1,499 sq ft, scaling to $2.00/sq ft at 5,000+ sq ftApplies to new additions to existing detached single-family structures per Summit County's fee schedule

Electrical Permit

Verified

Required for installation of wiring, receptacles, switches, light fixtures, electrical equipment, fixed-in-place appliances, and their connection to utility service in Dillon. Issued and inspected by the Summit County Building Inspection Department; a Town of Dillon Development Permit is required first only if the electrical work is part of a broader project that itself triggers a Development Permit (e.g., new structure, addition, solar panels) — confirm with the Dillon Town Planner if unsure.

Verified 2026-07-06 · Source

Requirements

  • Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether your specific electrical scope also requires a Town Development Permit
  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office
  • Fees for residential electrical work are based on unit area (sq ft) unless the work is valuation-based (job/material cost)
  • Plan review fee (when required) is 65% of the electrical permit fee

Required documents

  • RequiredTechnical Permit Application (or Technical Permit Application Writeable)Summit County's standard technical-permit application, covering electrical, plumbing, and mechanical scopes

Fee schedule

Fee typeAmountNotes
Electrical Permit — not more than 1,000 sq ft$146.00Summit County Building Permit Fee Schedule
Electrical Permit — over 1,000 sq ft to 1,500 sq ft$218.00Summit County Building Permit Fee Schedule, Electrical Permit Fees unit-area table
Electrical Permit — over 1,500 sq ft to 2,000 sq ft$292.00Summit County Building Permit Fee Schedule, Electrical Permit Fees unit-area table
Electrical Permit — over 2,000 sq ft$292.00 plus $15.00 per 100 sq ft or fraction thereof, over 2,000 sq ftSummit County Building Permit Fee Schedule, Electrical Permit Fees unit-area table
All other electrical work — valuation not more than $2,000.00$146.00Summit County Building Permit Fee Schedule, Electrical Permit Fees — All Other Fees valuation table
All other electrical work — valuation more than $2,000.00$15.00 per $1,000 or fraction thereof plus $146.00Summit County Building Permit Fee Schedule, Electrical Permit Fees — All Other Fees valuation table
Mobile homes and travel parks, per space$146.00Summit County Building Permit Fee Schedule, Electrical Permit Fees — All Other Fees valuation table
Temporary power permit$146.00Summit County Building Permit Fee Schedule, Electrical Permit Fees — All Other Fees valuation table
Hot tub electrical permit$146.00Summit County Building Permit Fee Schedule, Electrical Permit Fees — All Other Fees valuation table
Initial plan review65% of the electrical permit feeSummit County Building Permit Fee Schedule, Electrical Permit Fees — All Other Fees valuation table
Additional plan review$65.00 per hour or fraction thereofSummit County Building Permit Fee Schedule, Electrical Permit Fees — All Other Fees valuation table
Reinspection$65.00Summit County Building Permit Fee Schedule, Electrical Permit Fees — All Other Fees valuation table (“Reinspection on all above”)

EV Charger / EVSE Permit (Standard Electrical Permit)

Verified

Installation of an electric vehicle charging station in Dillon is not a distinct permit type — it is billed and processed as ordinary electrical work through the Summit County Building Inspection Department's standard Technical Permit Application, the same process and fee schedule as the Electrical Permit entry. Summit County's published Building Permit Fee Schedule has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item; a dedicated Level 2 charger circuit is billed under the same unit-area or valuation-based standalone electrical fee tiers used for any other electrical work. Summit County's Sustainability/Electric Vehicles page (which covers the County's own public charging infrastructure) likewise describes no dedicated EV-charger permitting process, fee, or land-use code, and does not reference Colorado's HB24-1173 (Electric Vehicle Charging System Permits, 2024) despite Summit County's population exceeding that law's 20,000-resident county threshold — the County has published no HB24-1173-driven adoption of streamlined EV-charging land-use permitting.

Verified 2026-07-20 · Source

Requirements

  • Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether the specific EV charger installation also requires a Town Development Permit (e.g., if bundled with a larger project) — the same check as for the Electrical Permit
  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office, the same form used for all standalone electrical work
  • The Summit County Building Permit Fee Schedule has no distinct EV-charger/EVSE fee line; a dedicated charger circuit is billed under the standard unit-area tier (where it is part of a larger area calculation) or under the valuation-based 'All other electrical work' tiers
  • Work must comply with the 2024 National Electrical Code series as adopted by Summit County (same code as the Electrical Permit entry)

Required documents

  • RequiredTechnical Permit Application (or Technical Permit Application Writeable)Same Summit County standard technical-permit application used for the file's general electrical-permit entry

Fee schedule

Fee typeAmountNotes
All other electrical work — valuation not more than $2,000.00 (typical dedicated EV charger circuit)$146.00Summit County Building Permit Fee Schedule — same flat fee as the Electrical Permit entry; no distinct EV-charger/EVSE line item exists
All other electrical work — valuation more than $2,000.00 (e.g., charger install bundled with a panel upgrade)$15.00 per $1,000 or fraction thereof plus $146.00Summit County Building Permit Fee Schedule
Initial plan review65% of the electrical permit feeSummit County Building Permit Fee Schedule

Plumbing Permit

Verified

Required for installation of drain, waste and vent piping; potable water piping; fuel gas piping; and plumbing appliances and fixtures in Dillon. Issued and inspected by the Summit County Building Inspection Department under the 2024 IPC series (as part of the 2024 I-Code adoption).

Verified 2026-07-06 · Source

Requirements

  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office
  • Fee is calculated by multiplying total plumbing valuation by a constant of 0.0075, with a $65.00 minimum fee
  • Plumbing permit fees associated with an existing Building Permit must use the Building Permit's valuation to calculate fees, rather than a separate plumbing-only valuation
  • For new SFR/commercial projects, plumbing valuation is based on 10% of the project's total valuation
  • Plan review fee (when required) is 65% of the plumbing permit fee, minimum $65.00 per hour

Required documents

  • RequiredTechnical Permit Application (or Technical Permit Application Writeable)Summit County's standard technical-permit application

Fee schedule

Fee typeAmountNotes
Plumbing Permit FeeTotal plumbing valuation x 0.0075, $65.00 minimumSummit County Building Permit Fee Schedule; for new SFR/commercial work, valuation is based on 10% of total project valuation
Plan Review Fee (when required)65% of the plumbing permit fee, minimum $65.00 per hourSummit County Building Permit Fee Schedule, Plumbing Permit Fees table

Mechanical Permit

Verified

Required for installation of furnaces and ducts, boilers and circulation piping, and exhaust fans and ducts in Dillon. Issued and inspected by the Summit County Building Inspection Department under the 2024 IMC series (as part of the 2024 I-Code adoption). Gas fireplaces, wood stoves, and outdoor fire pits are billed as a distinct Fireplace Permit.

Verified 2026-07-06 · Source

Requirements

  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office
  • Fee is total mechanical valuation multiplied by a constant of 0.0075, $65.00 minimum
  • Mechanical permit fees associated with an existing Building Permit must use the Building Permit's valuation to calculate fees
  • For new SFR/commercial projects, mechanical valuation is based on 10% of the project's total valuation
  • A separate Fireplace Permit (flat valuation x 0.0075, $65.00 minimum) applies to gas fireplaces, wood stoves, and outdoor fire pits — check the department's list of approved wood-burning devices

Required documents

  • RequiredTechnical Permit Application (or Technical Permit Application Writeable)Summit County's standard technical-permit application

Fee schedule

Fee typeAmountNotes
Mechanical Permit FeeTotal mechanical valuation x 0.0075, $65.00 minimumSummit County Building Permit Fee Schedule; for new SFR/commercial work, valuation is based on 10% of total project valuation
Fireplace Permit Fee (gas fireplace, wood stove, or outdoor fire pit)Total fireplace valuation x 0.0075, $65.00 minimumSummit County Building Permit Fee Schedule, Fireplace Permit Fees table
Plan Review Fee (when required)65% of the mechanical permit fee, minimum $65.00 per hourSummit County Building Permit Fee Schedule, Mechanical Permit Fees table

Photovoltaic (Solar) Permit

Verified

Required for residential and commercial photovoltaic (solar) system installations in Dillon. A Town of Dillon Development Permit is required first (solar panels are explicitly listed among projects requiring a Development Permit). The Summit County Building Inspection Department then issues the PV permit; residential roof-mounted systems under 15kW may be issued over the counter if the submittal is complete, while larger, ground-mounted, and commercial systems require plan review.

Verified 2026-07-06 · Source

Requirements

  • Town of Dillon Development Permit required first — solar panels are explicitly named on the Town's list of projects requiring this permit
  • Residential roof-mounted PV systems under 15kW may be issued over the counter with a complete submittal
  • Plan review is required for all residential PV systems 15kW and over, all ground-mounted systems, and all commercial systems
  • Submit the PV Permit Application, PV Submittal Requirements, and PV Checklist materials in person at Summit County Building Inspection Department

Required documents

  • RequiredTown of Dillon Development Permit ApplicationRequired first for solar panel installations
  • RequiredPhotovoltaic Permit ApplicationSummit County's PV-specific application, with an accompanying writable PDF version
  • RequiredPV Submittal Requirements / PV ChecklistSummit County's published PV systems requirements and submittal checklist documents

Fee schedule

Fee typeAmountNotes
Residential Plan Review$175.00Summit County Building Permit Fee Schedule
Residential Permit Fee$325.00
Summit County Building Permit Fee Schedule, Photovoltaic Permit Fees table — RESIDENTIAL PERMIT FEE at $325.00. Show full citation

Summit County Building Permit Fee Schedule, Photovoltaic Permit Fees table — RESIDENTIAL PERMIT FEE at $325.00. Summit County publishes two incompatible bases for photovoltaic fees: this flat-fee table, and its Exhibit A/B code-amendment PDF, which instead says to see the electrical valuation table “not to exceed $400.00” residential and “$1,000.00” commercial. Both are current County publications. The flat figures are recorded here because they are the more specific and the ones the fee-schedule page states outright.

Commercial Plan Review$350.00
Summit County Building Permit Fee Schedule, Photovoltaic Permit Fees table — COMMERCIAL PLAN REVIEW at $350.00. Show full citation

Summit County Building Permit Fee Schedule, Photovoltaic Permit Fees table — COMMERCIAL PLAN REVIEW at $350.00. Summit County publishes two incompatible bases for photovoltaic fees: this flat-fee table, and its Exhibit A/B code-amendment PDF, which instead says to see the electrical valuation table “not to exceed $400.00” residential and “$1,000.00” commercial. Both are current County publications. The flat figures are recorded here because they are the more specific and the ones the fee-schedule page states outright.

Commercial Permit Fee$650.00
Summit County Building Permit Fee Schedule, Photovoltaic Permit Fees table — COMMERCIAL PERMIT FEE at $650.00. Show full citation

Summit County Building Permit Fee Schedule, Photovoltaic Permit Fees table — COMMERCIAL PERMIT FEE at $650.00. Summit County publishes two incompatible bases for photovoltaic fees: this flat-fee table, and its Exhibit A/B code-amendment PDF, which instead says to see the electrical valuation table “not to exceed $400.00” residential and “$1,000.00” commercial. Both are current County publications. The flat figures are recorded here because they are the more specific and the ones the fee-schedule page states outright.

Demolition Permit

Verified

Required for the removal of structures and safe disconnection of utility services in Dillon. Issued by the Summit County Building Inspection Department. A Town of Dillon Development Permit is not explicitly listed among the Town's named Development Permit project types, but applicants should confirm with the Dillon Town Planner whether a demolition triggers Town-level review given the scope of the specific project.

Verified 2026-07-06 · Source

Requirements

  • Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether the specific demolition project also requires a Town of Dillon Development Permit or Grading and Excavation Permit
  • Demolition permit authorizes removal of structures and safe disconnection of utility services to the structure
  • Submit in person at the Summit County Building Inspection Department Frisco office

Required documents

  • RequiredBuilding Permit ApplicationSummit County's demolition permits are processed under the same Building Permit Application as new construction

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeNot separately published on the Summit County Building Permit Fee Schedule as a distinct line item
Summit County's live Building Permits page confirms a Demo Permit exists ('required for the removal of structures and safe disconnection of utility services') but the Building Permit Fee Schedule… Show full citation

Summit County's live Building Permits page confirms a Demo Permit exists ('required for the removal of structures and safe disconnection of utility services') but the Building Permit Fee Schedule page does not list a distinct demolition fee tier separate from the general Building Permit Fee table; likely billed under the standard valuation-based Building Permit Fee schedule, but this was not explicitly confirmed in the source text and is not invented here

Commercial Building Permit (including Tenant Improvement / Tenant Finish)

Verified

Required for new commercial construction, commercial remodels, and tenant finish/tenant improvement work in Dillon. Same two-agency process as all Dillon building work: a Town of Dillon Development Permit must be issued FIRST by the Dillon Planning & Zoning Department, then the building permit itself is issued and inspected by the Summit County Building Inspection Department (the Town has no building department of its own). Summit County publishes NO separate commercial building permit type — its Building Permits page lists a single 'Building Permit' and its fee schedule applies one valuation-based fee table to all occupancies. Tenant improvement is likewise NOT a distinct county permit type or fee line; 'tenant finish' appears only at the Town level, as one of the named project types requiring a Dillon Development Permit. What IS commercially distinct in Dillon: all commercial and multi-family developments (new or remodel) must be designed in conformance with the Town's adopted Architectural Design Guidelines (2017), which adds a paid design-review step at the Town stage (see fees).

Verified 2026-08-02 · Source

Requirements

  • STEP 1 (prerequisite): Obtain a Town of Dillon Development Permit via the Town's online Development Application Form — 'tenant finish,' 'remodels,' 'new structures,' and 'buildings' are all explicitly named on the Town's list of projects requiring a Development Permit; Town Staff reviews the application and responds by email with the required Development Permit fee and next steps (contact Ned West, Sr. Town Planner, (970) 262-3421, nwest@townofdillon.com)
  • Architectural Design Guidelines conformance (commercial-specific): all commercial and multi-family residential developments, new OR remodel, must be designed in conformance with the Town of Dillon Design Guidelines (2017); the applicant must submit the guideline checklists with a site plan, building elevations, roof plan, and floor plans, and must enter into a cost reimbursement agreement with the Town covering a minimum of one meeting with the Town's architectural consultant
  • STEP 2: Submit the building permit application, plans, and all hard-copy materials IN PERSON to Summit County Building Inspection Department, County Commons, 0037 Peak One Drive, Frisco, CO 80443 — electronic, mailed, or couriered submittals are not accepted; submittals not accepted after 4:30 p.m.
  • Plans submitted on or after July 1, 2026 must comply with the 2024 I-Code series with Summit County amendments (2024 IBC/IECC et al.); any permit applied for on or after May 4, 2026 is also subject to the Colorado Wildfire Resiliency Code as adopted by Summit County
  • Plan review fee (65% of the building permit fee) is due at time of submittal; county plan review is routed through Planning, Engineering, Building Inspection, Environmental Health, and Housing departments
  • Affordable Housing Development Impact Fee applies to commercial/industrial structures at a flat $2.00 per square foot (Copper Mountain and Keystone PUD are exempt; Dillon is not listed as exempt)
  • Associated plumbing and mechanical permit fees for new commercial projects use a valuation based on 10% of the project's total valuation (x 0.0075, $65.00 minimum each), per the county fee schedule

Required documents

  • RequiredTown of Dillon Development Permit Application (online form)Zoning/land-use permit that must be issued before Summit County will accept a building-related permit application; submitted via the Town's online Development Application Form
  • RequiredArchitectural Design Guidelines checklists with site plan, building elevations, roof plan, and floor plansRequired for all commercial and multi-family developments (new or remodel) at the Town design-review stage, per the Dillon Development Permit Application page
  • RequiredCost reimbursement agreement (Town of Dillon architectural consultant review)Commercial/multi-family applicants must enter a cost reimbursement agreement with the Town and pay for a minimum of one meeting with the Town's architectural consultant
  • RequiredBuilding Permit Application (Summit County)Summit County Building Inspection Department's standard Building Permit Application — the same form for all occupancies; there is no separate commercial application — submitted in person at the Frisco office
  • RequiredConstruction DrawingsFull plan set routed by Summit County to Planning, Engineering, Building Inspection, Environmental Health, and Housing departments for review

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (same table for all occupancies)$50.00 minimum (valuation $1-$500), scaling through $1,169.55 for the first $100,000.00 plus $6.73 per additional $1,000.00 (to $500,000), $3,663.00 for the first $500,000.00 plus $5.34 per additional $1,000.00 (to $1,000,000), and $6,332.22 for the first $1,000,000.00 plus $3.90 per additional $1,000.00 above thatSummit County Building Permit Fee Schedule — one valuation table applies to residential and commercial alike; no commercial-specific or tenant-improvement-specific fee tier exists
Plan Review Fee65% of the Building Permit FeeMandatory, due at time of submittal when plan review is required by code
Town of Dillon architectural consultant design-review meeting (commercial/multi-family only)Typically $500.00-$800.00 per review meetingVia cost reimbursement agreement with the Town; minimum one meeting required; actual cost depends on complexity, completeness, and nature of the proposal, per the Dillon Development Permit Application page
Town of Dillon Development Permit FeeDetermined by Town Staff after application reviewThe Town's page states staff will respond by email 'with the required Development Permit Fee' — no published fee table for the Development Permit itself was found on the Town's site
Affordable Housing Development Impact Fee (commercial/industrial)$2.00 per square footFlat rate for all commercial or industrial structures, per the Summit County fee schedule; property owners may instead voluntarily record a private transfer-fee covenant in lieu of paying at permit issuance
Plumbing and Mechanical Permit Fees (new commercial projects)Each: valuation x 0.0075, $65.00 minimum, where valuation is based on 10% of the project's total valuationSummit County Building Permit Fee Schedule rule for new SFR/commercial work

Sign Permit (Class 1 or Class 2)

Verified

Required for most permanent and several temporary signs in Dillon, administered by the Town's own Planning Department under Dillon Municipal Code Chapter 16, Article XI (Sign Regulations) — NOT by Summit County Building Inspection Department, since sign review is a zoning/land-use function the Town retains directly even though it contracts building-code plan review to the County. Signs requiring a permit are split into two tiers: Class 1 (individual permanent signs, master sign plans, PUD sign plans — reviewed by the Planning Commission) and Class 2 (temporary banners, directional signs, menu display boxes larger than 4 sq ft, sandwich boards, and individual tenant signs within an already-approved master sign plan — reviewed administratively by the Town Manager). Multi-tenant buildings must first obtain Planning Commission approval of a Master Sign Plan before individual tenant sign permits can be issued by Town Staff.

Verified 2026-08-13 · Source

Requirements

  • Determine whether the proposed sign is Class 1 (awnings, business area directory signs, directory signs, freestanding signs, official signs, projecting/hanging signs, subdivision entrance signs, wall signs, residential complex signs, property management signs, directory way-finding signs, master sign plans, PUD sign plans) or Class 2 (each individual sign within an approved master/PUD sign plan, menu display boxes over 4 sq ft, civic event banners in Town right-of-way) per Sec. 16-11-200
  • For single-tenant buildings, an individual Class 1 sign permit must be approved by the Planning and Zoning Commission for each sign; for multi-tenant buildings, the property owner must first obtain Planning Commission approval of a Master Sign Plan (sizes, numbers, locations, shapes, materials of every sign on the building) before Town Staff can issue individual Class 2 tenant sign permits
  • A preapplication conference with Town staff is required before submittal, unless waived in writing by the Town Manager (Sec. 16-11-210(b), 16-11-220(b))
  • Class 1 application: submit the application, all required materials, and the nonrefundable fee at least fourteen (14) calendar days before the Planning Commission meeting (Sec. 16-11-210(d)(1)); the Commission meets the first Wednesday of each month at 5:30 p.m.
  • Class 2 application: submit to the Town Manager, who determines completeness and schedules review within ten (10) days if complete (Sec. 16-11-220(d)(1))
  • The mere act of applying does not guarantee issuance — the Town explicitly advises against fabricating, constructing, or purchasing a sign before permit issuance (Sec. 16-11-200(c))
  • Temporary banners and temporary signs must be professionally printed on durable waterproof material with grommets — hand-drawn banners on bedsheets, fabric, canvas, or poster board are not permitted
  • Sandwich board (A-frame) signs require an annual permit and may only be displayed during business hours, on private property only — never in Town rights-of-way or on Town sidewalks/roads
  • Attention-getting devices (balloons, costumed characters, animated air dancers, strings of flags/pennants) are specifically prohibited by Town Code regardless of permit
  • Signs for which approval has been granted must be erected within ninety (90) days of approval (freestanding signs: one hundred eighty (180) days), or the approval expires and a new application is required (Sec. 16-11-230)
  • Variances from the Sign Code's literal requirements may be sought under Article X of Chapter 16

Required documents

  • RequiredPermanent Signage Application (Class 1)Town of Dillon's standard application for individual permanent signs, master sign plans, and PUD sign plans; includes scaled drawings (size, shape, design, colors, materials, lighting, letter styles), a plot plan for any freestanding sign, and an architectural elevation or photo for wall signs
  • OptionalTemporary Banners & Signage Application (Class 2)Covers temporary banners, directional signs, menu display boxes over 4 sq ft, sandwich boards, and individual tenant signs within an approved master sign plan
  • OptionalMaster Sign Plan (multi-tenant buildings)Required before individual tenant sign permits can be issued in a multi-tenant building; approved by the Planning Commission
  • OptionalConstruction/foundation drawingsTwo drawings showing details of construction and foundation, required only for freestanding signs

Fee schedule

Fee typeAmountNotes
Class 1 — Master Sign Plan$350.00Dillon Municipal Code, Chapter 19, Appendix 19-A Schedule of Fees, Sec. 16-11-70 (effective per Ord. 10-25, adopted Nov. 4, 2025)
Class 1 — Amendments to Master Sign Plan$175.00Sec. 16-11-70
Class 1 — Individual signs, permanent$175.00Sec. 16-11-70
Class 2 — Temporary banner$25.00Sec. 16-11-80
Class 2 — Temporary grand opening banner$25.00Sec. 16-11-80
Class 2 — Directional sign$25.00Sec. 16-11-80
Class 2 — Menu display box (over 4 sq ft)$25.00Sec. 16-11-80
Class 2 — Temporary sandwich board / moveable sign$25.00Sec. 16-11-80
Class 2 — Permanent tenant sign within an approved Master Sign Plan$55.00Sec. 16-11-80
Variance (from Sign Code requirements)$525.00Chapter 16, Article X; nonrefundable, per Sec. 16-11-210(c)

Fire Sprinkler and Fire Alarm System Permit (Summit Fire & EMS District)

Verified

Required for installation, modification, or replacement of an automatic fire-extinguishing (sprinkler) system or a monitored fire-alarm/detection system anywhere in Dillon. This permit is issued, plan-reviewed, and inspected by Summit Fire & EMS District — a special fire protection district (not the Town of Dillon, and not Summit County Building Inspection Department, which handles Dillon's building/electrical/plumbing/mechanical permits under contract). Summit Fire & EMS's own live service-area description confirms it 'serves the communities of Copper Mountain, Dillon, Frisco, Keystone and Silverthorne and the surrounding areas,' with a dedicated Dillon station (Station 8, 225 Lake Dillon Drive, Dillon, CO 80435). This is the same general two-agency pattern as in Breckenridge and Blue River (served there by the Red, White & Blue Fire Protection District), but Dillon is served by a genuinely different, separately governed fire district with its own fee schedule and code adoption.

Verified 2026-08-13 · Source

Requirements

  • Issued and inspected by Summit Fire & EMS District, not the Town of Dillon or Summit County Building Inspection Department — apply online through the District's AccessGov portal ('Apply for a Permit' at co.accessgov.com/summit-fire)
  • A fire-department permit is required for all Life Safety Systems (sprinklers, fire alarms) as well as Tenant Finishes/Remodels, New Construction, and other permits required by the currently adopted fire code, per the District's own live Permits page
  • Governed by the District's adopted International Fire Code (2018 edition, re-adopted by District Resolution in 2021) plus the current editions of NFPA 13/13R/13D (building fire sprinklers) and NFPA 72 (fire alarms), and the District's own Life Safety Policy (SOG 1407, 2024)
  • Permit fees are due at time of application, payable by electronic check or credit card (3% surcharge applies to card payments); if work starts before a permit is obtained, the permit fee is doubled
  • Plan submittal: one digital PDF copy at minimum 1/8-inch-to-the-foot scale, with owner/contractor contact information and contractor license number, equipment data sheets with relevant information highlighted, ceiling heights and detail, square footage, and NFPA 170-compliant symbols — incomplete or inaccurate submittals may be rejected and incur a resubmittal fee
  • No work may be performed without an approved set of plans, and all fire-system piping and wiring must remain visible for inspection
  • Inspections must be requested at least two business days in advance by calling (970) 262-5215 or using the District's online inspection-request tool; each permitted contractor must request inspections for that contractor's own scope of work
  • Fire sprinkler and fire alarm final inspections must be coordinated and scheduled for the same time; certification letters are required before a system receives final approval
  • Incomplete inspections and cancellations within 24 hours of a scheduled inspection may incur a re-inspection fee
  • Approved permits must be maintained on the site of the permitted work (may be kept electronically)

Required documents

  • RequiredSummit Fire & EMS Permit Application (AccessGov portal)District-issued online application, filed directly with Summit Fire & EMS, not the Town of Dillon or Summit County
  • RequiredFire Sprinkler / Fire Alarm System DrawingsOne digital PDF copy, 1/8-inch-to-foot minimum scale, with contractor license number, equipment data sheets, ceiling heights, square footage, and NFPA 170 symbols
  • RequiredCertification LettersRequired before any fire sprinkler or fire alarm system receives final approval

Fee schedule

Fee typeAmountNotes
Sprinkler Systems$400 base fee, plus $4.00 per deviceSummit Fire & EMS Fee Schedule, Resolution 2024-06, effective January 1, 2025 (Section II.6.B)
Fire Alarm Systems$400 base fee, plus $4.00 per deviceResolution 2024-06, Section II.6.F
Fire Alarm or Sprinkler Systems in One & Two Family Dwellings and Group R-3's$400 base fee, plus $4.00 per deviceResolution 2024-06, Section II.6.H
Standpipe System$400 base fee for the first riser, $250 for each additional riserResolution 2024-06, Section II.6.A
Clean Agent Systems$400 base fee, plus $4.00 per deviceResolution 2024-06, Section II.6.C
Fire Pumps$500 (excluding one & two family dwellings)Resolution 2024-06, Section II.6.D
Additional plan review (revisions or incomplete submittals)$150.00 per hour, one-hour minimumResolution 2024-06, Section II.2
Required additional/re-inspections$200.00 for the first two hours (minimum), $75.00 for each additional hour or portion thereofResolution 2024-06, Section II.15
After-hours inspections (outside 8:00 a.m.-5:00 p.m. Mon-Fri)$150.00 per hour, two-hour minimumResolution 2024-06, Section II.22
Construction/installation without a permitPermit fees set forth above may be doubledResolution 2024-06, Section II.16
Credit card payment surcharge3% of totalResolution 2024-06, Section II.25

Change of Use / Conditional Use Permit

Verified

Dillon has no standalone 'change of use permit' by that name. A change of use is instead handled through whichever mechanism actually governs the specific situation: (1) a Conditional Use Permit ($525.00, Dillon Municipal Code Sec. 16-4-120) is required when the proposed use is listed as a conditional use within the applicable zoning district, requiring Planning Commission approval after at least one public hearing; (2) Sec. 16-4-80(1) separately allows a nonconforming use to be changed to any conforming use, or to any use of a more restrictive classification, without triggering the conditional-use track; and (3) whichever Level I-IV Development Permit matches any accompanying physical construction still applies on its own terms (e.g., 'Tenant finish or remodel of one (1) unit in a commercial, office, and/or industrial structure' is a Level I Development Application, $85.00, Sec. 16-2-30(a) — the same Level I/II/III/IV classification system, current per Chapter 19 Appendix 19-A as amended by Ord. 10-25 (adopted Nov. 4, 2025), that governs Dillon's other Development Permit applications). Separately and additionally, Summit Fire & EMS District's own Permits page lists 'Change of use in business establishments' among its own required fire-department permit categories — a genuinely distinct agency-level touchpoint from the Town's zoning process (see the Fire Sprinkler/Alarm Permit entry for that District's general contact and fee-schedule information).

Verified 2026-08-13 · Source

Requirements

  • No standalone 'change of use permit' application exists in Dillon — a preapplication conference with the Town Planner (unless waived) determines which mechanism actually governs: a Conditional Use Permit, a Level I-IV Development Permit for any accompanying construction, or neither (per Sec. 16-4-80(1))
  • Conditional Use Permit ($525.00, Sec. 16-4-120) required when the proposed use is listed as a conditional use within the applicable zoning district; approved by the Planning Commission (meets the first Wednesday of each month) after at least one (1) public hearing
  • Public hearing notice must be mailed, published in a newspaper of general circulation, and posted on the property at least seven (7) but not more than fourteen (14) calendar days before the hearing (Sec. 16-2-300)
  • Sec. 16-4-80(1): 'A nonconforming use may be changed to any conforming use or to any use of a more restrictive classification' — this specific scenario is not itself described as requiring a Conditional Use Permit
  • Conditional use approval criteria (Sec. 16-4-130) include consistency with the Comprehensive Plan and applicable zoning district, parcel suitability, no significant adverse air/water-quality impacts, no substantial impairment of surrounding permitted uses, and availability of adequate public utilities/services
  • If tenant finish or remodel work accompanies the use change within a single commercial, office, or industrial unit, a Level I Development Permit ($85.00, Sec. 16-2-30(a)) governs that physical work; larger-scope construction is classified Level II, III, or IV per Sec. 16-2-30
  • A Conditional Use Permit runs with the land and transfers automatically to a new owner or occupant (Sec. 16-4-160), but expires if the applicant fails to obtain a building permit to construct the conditional use within one (1) year of issuance, unless it is tied to the concurrent duration of an approved development permit (Sec. 16-4-170)
  • Separately, confirm with Summit Fire & EMS District (permits@summitfire.org) whether the specific change of use also requires a District permit — the District's own live Permits page lists 'Change of use in business establishments' as one of its required fire-department permit categories, distinct from and in addition to the Town's zoning process

Required documents

  • OptionalConditional Use Permit ApplicationTown of Dillon standard form for uses listed as conditional within the applicable zoning district, per Sec. 16-4-120
  • OptionalLevel I, II, III, or IV Development Permit ApplicationWhichever level matches the physical scope of any accompanying construction/tenant-finish work; not required if the change of use involves no construction
  • OptionalPreapplication Conference MaterialsConcept plan/drawing and other information pertinent to the proposal, encouraged (not strictly required) ahead of the mandatory preapplication conference with the Town Planner

Fee schedule

Fee typeAmountNotes
Conditional Use Permit Fee$525.00Dillon Municipal Code, Chapter 19, Appendix 19-A Schedule of Fees, Sec. 16-4-120 (effective per Ord. 10-25, adopted Nov. 4, 2025)
Level I Development Application Fee (tenant finish or non-residential remodel without addition)$85.00Sec. 16-2-30(a); applies only if physical tenant-finish work accompanies the use change
Appeal of Decision on Level I or II Development Application$525.00Ch. 16, Art. II, Div. 9; applies only if a Level I/II decision tied to the change of use is appealed
Summit Fire & EMS District change-of-use feeGAP — not separately itemized in the District's published Fee Schedule
Resolution 2024-06 (effective Jan. 1, 2025) lists a general 'Construction Permit/Tenant Finish Permit' fee ($400 flat for building-department valuation of $50,000 or less, or valuation x $0.008 above… Show full citation

Resolution 2024-06 (effective Jan. 1, 2025) lists a general 'Construction Permit/Tenant Finish Permit' fee ($400 flat for building-department valuation of $50,000 or less, or valuation x $0.008 above that) but does not include a distinct line item for a pure change-of-use with no construction; confirm directly with the District (permits@summitfire.org) whether and how that scenario is billed

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Online permit portal

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dillon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-13)View current record →All versions →

Permalink: /colorado/summit-county/dillon-co/as-of/2026-08-26/

Snapshot date: 2026-08-26

Commit: 8a5b335

Reproducible from PermitBase’s version-controlled dataset, commit 8a5b335.