This is PermitBase’s published record for Unincorporated Teller County as of 2026-08-02. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Teller County building permits

Verified

Unincorporated Teller County, Colorado — as published 2026-08-02.

Verified 2026-07-06 · Source

Codes adopted

AUTHORITY MODEL: The Teller County Building Division is responsible for regulating building activities to ensure residential and commercial structures comply with applicable codes, and 'issues Permits and Inspects all land/property located within unincorporated Teller County.' Woodland Park, Cripple Creek, and Victor all have their own separate Building Departments for issuing permits and performing inspections within their own municipal jurisdictions. This is a direct, affirmative statement of first-party permit issuance to unincorporated-area residents (not a records/coordination-only office), independently confirmed live 2026-07-06. Source: https://www.tellercounty.gov/Building-DivisionColorado has no statewide mandatory building code for most jurisdictions (home-rule/county-adoption authority under C.R.S. Title 30, Article 28); Teller County adopts and amends its own construction codes for the unincorporated area via the Teller County Building Code, administered by a Board of Review created under C.R.S. 30-28-206 and 207.Teller County Building Code, as adopted by the Board of County Commissioners, effective 07/01/2023 (Resolution 06-22-2023 (21)), with subsequent amendment Resolution 11-09-2023 affecting contractor-license definitions and fees (Article II). This is the county's own current, in-force code compilation (58-page consolidated document), independently downloaded and read in full 2026-07-06. Source: Teller County Building Code (PDF), https://www.tellercounty.gov/DocumentCenter/View/242/Teller-County-Building-Code-PDFArticle III - 2021 International Residential Code (IRC), including Appendix Chapters AA, AB, AC, AG, AH, AJ, and AN, with numerous county-specific amendments (see localAmendments). Source: Teller County Building Code (PDF), Article IIIArticle IV - 2021 International Building Code (IBC), including Appendix Chapters G, H, and I, and the 'Building Safety Journal.' Source: Teller County Building Code (PDF), Article IVArticle V - 2021 International Plumbing Code (IPC) as amended by the State of Colorado, including Appendices B, E, and G. Colorado uses the International Plumbing Code (not the Uniform Plumbing Code) for this jurisdiction. Where Article V conflicts with Article III (IRC) or Article IV (IBC), Article V (the Plumbing Code) governs. Source: Teller County Building Code (PDF), Article V, Section 102.1Article VI - 2021 International Mechanical Code (IMC), including Appendix Chapter A. Source: Teller County Building Code (PDF), Article VIArticle VII - 2021 International Fuel Gas Code (IFGC), including Appendix Chapter A. Source: Teller County Building Code (PDF), Article VIIArticle VIII - Mobile/Factory Built/Manufactured Housing Code, with county-specific definitions of Manufactured Home, Factory Built Home (Modular/IRC Code Compliant Unit, per 8 CCR 1302-3), and Mobile Home; a building permit is required for the permanent foundation and all utility connections. Source: Teller County Building Code (PDF), Article VIIIArticle IX - 2023 National Electrical Code (NEC/NFPA 70), adopted directly by Teller County (not merely deferred to a state board), governing all electrical alterations, repairs, replacements, equipment, appliances, fixtures, fittings, and appurtenances; where the 2021 IRC/IBC conflict with the NEC, the NEC (Article IX) prevails as the more restrictive code. Source: Teller County Building Code (PDF), Article IXArticle X - 2003 International Fire Code, adopted as the Teller County Fire Code for the unincorporated area by Teller County Ordinance #16. Source: Teller County Building Code (PDF), Article XArticle XII - 2018 International Energy Conservation Code (IECC), including the IECC Appendix for reference only. This is the county's own current adopted edition as of this review (2026-07-06) -- it is the 2018 edition, not the 2021 or 2024 edition. Colorado's HB22-1362 (statewide 'model' energy code adoption requirements for larger/home-rule jurisdictions with updates on a rolling schedule) was checked for applicability: Teller County's own code text does not reference HB22-1362 or a more recent IECC edition anywhere in the 58-page Building Code document, and no separate county page or resolution updating the energy code to a post-2018 edition was found. This is reported honestly as the genuinely current adopted edition rather than assumed to have been superseded. Source: Teller County Building Code (PDF), Article XIIArticle XIII - Safety Code for Elevators and Escalators (ASME A17.1-2019, A17.3-2011, A18.1-2011, ASME QEI-2013, ANSI/ASSE A10.4-2007); all inspections performed by a State of Colorado-designated ANSI Certified Inspector with results submitted to the Building Department. Source: Teller County Building Code (PDF), Article XIIIArticle XIV - 2021 International Existing Building Code (IEBC). Source: Teller County Building Code (PDF), Article XIVArticle XV - Uniform Code for the Abatement of Dangerous Buildings, 1997 edition. Source: Teller County Building Code (PDF), Article XVArticle XVII - Penalties: violations of the Teller County Building Code are unlawful and punishable per C.R.S. 30-28-209 and 30-28-210. Source: Teller County Building Code (PDF), Article XVII

Permit types & fees

Single Family Dwelling (SFD) / New Residential Building Permit

Verified

Required for construction of a new single-family dwelling in unincorporated Teller County, reviewed against the 2021 IRC as amended by the Teller County Building Code (Article III), plus the 2018 IECC (Article XII) and the county's own design criteria (57 psf ground snow load, 115 mph wind, Seismic Design Category B, 30-inch frost depth).

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family dwelling construction in unincorporated Teller County; issued and inspected directly by the Teller County Building Division
  • Plans must comply with the 2021 IRC (Article III) plus the 2018 IECC (Article XII); must account for county design criteria: 57 psf ground snow load / 40 psf flat roof snow load (no ASCE 7 Chapter 7 reduction allowed), 115 mph ultimate wind speed with Exposure C, Seismic Design Category B, 30-inch minimum frost depth, and required ice-barrier underlayment
  • Site-specific soils report and engineer/architect-stamped foundation design required for habitable structures per Article III Sections R401-R407
  • Homeowner Builder permits limited to one new dwelling per owner in any 24-month period, and no more than two in any 10-year period, with primary-residency conditions on the second permit
  • IECC (Energy Conservation) Application and a permanent Thermal Envelope Certificate required at final
  • All contractors and sub-contractors working on the project must be licensed with Teller County (Board of Review-issued license) and insured per Article II

Required documents

  • RequiredSingle Family Dwelling (SFD) Permit ApplicationPrimary residential building permit application
  • RequiredSFD and Addition Requirements (PDF)Submittal checklist/guidelines for new single-family dwellings and additions
  • RequiredIECC (Energy Conservation) Application (PDF)Energy-code compliance submittal

Fee schedule

Fee typeAmountNotes

Residential Addition / Interior Remodel / Basement Finish Permit

Verified

Required for additions, interior remodels, and basement finish work on existing one- and two-family dwellings in unincorporated Teller County, reviewed against the 2021 IRC as amended by the Teller County Building Code.

Verified 2026-07-06 · Source

Requirements

  • Separate permit applications exist for Residential Addition, Residential Interior Remodel, and Residential Basement Finish -- each is its own listed application category
  • Design must meet county Design Criteria (57 psf snow load, 115 mph wind, Seismic Design Category B, 30-inch frost depth) where structurally applicable
  • SFD and Addition Requirements (PDF) applies to additions; ICC Basement Finish Building Guide referenced for basement finish projects
  • Foundation/structural work tied to an addition may require engineer/architect stamping per Article III Sections R401-R407

Required documents

  • RequiredResidential Addition Permit ApplicationApplication for additions to existing dwellings
  • RequiredSFD and Addition Requirements (PDF)Submittal checklist for additions
  • RequiredResidential Interior Remodel Permit ApplicationApplication for interior remodel work
  • RequiredResidential Basement Finish Permit ApplicationApplication for finishing an unfinished basement
  • OptionalICC Basement Finish Building GuideReference guide for basement-finish code compliance

Fee schedule

Fee typeAmountNotes

Electrical Permit

Verified

Required for electrical wiring, panel, and equipment installation, alteration, or repair in unincorporated Teller County. Governed by the 2023 National Electrical Code (NEC), directly adopted and enforced by Teller County (Article IX), not merely deferred to the state.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for installation, alteration, repair, or replacement of wiring, equipment, appliances, fixtures, fittings, and appurtenances
  • Governed by the 2023 NEC (Article IX of the Teller County Building Code); where the 2023 NEC conflicts with the 2021 IRC/IBC, the NEC prevails
  • Contractor/examinee must hold a current Colorado state electrical license (Master Electrician or equivalent), registered with the Teller County Building Department at no additional annual county fee for the registration itself
  • Existing-wiring alterations: if more than 50% of a building's wiring (by floor-area served) or more than 50% of a circuit's outlets are changed, the ENTIRE wiring installation or circuit must be brought up to new-building standards
  • Teller County performs its own electrical inspections and posts an Electrical Contemporaneous Review procedure per C.R.S. 12-23-116 to verify licensing/apprentice-ratio compliance

Required documents

  • RequiredElectrical Permit ApplicationApplication for electrical permit
  • OptionalElectrical Contemporaneous Review (PDF)State-mandated procedure Teller County posts as an Inspecting Entity performing its own electrical inspections, per C.R.S. 12-23-116(1)(a) and (10)

Fee schedule

Fee typeAmountNotes

Plumbing Permit

Verified

Required for installation, replacement, or repair of plumbing systems in unincorporated Teller County. Governed by the 2021 International Plumbing Code (IPC) as amended by the State of Colorado (Article V), directly enforced by Teller County.

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for fixture installation, water supply/drain-waste piping, and related plumbing work
  • Governed by the 2021 IPC as amended by the State of Colorado, per Article V of the Teller County Building Code; uses the International Plumbing Code, not the Uniform Plumbing Code
  • Where Article V (Plumbing Code) conflicts with Article III (IRC) or Article IV (IBC), Article V governs
  • Contractor/examinee must hold a current Colorado state plumbing license (Master Plumber or equivalent), registered with the county at no additional annual county fee for the registration itself
  • Teller County performs its own plumbing inspections and posts a Plumbing Contemporaneous Review procedure per HB19-1086

Required documents

  • RequiredPlumbing Permit Application (PDF)Application for plumbing permit
  • OptionalPlumbing Contemporaneous Review (PDF)State-mandated procedure Teller County posts as an Inspecting Entity performing its own plumbing inspections, per HB19-1086

Fee schedule

Fee typeAmountNotes

Mechanical / HVAC Permit

Verified

Required for installation, replacement, or repair of HVAC, ventilation, and fuel-gas-fired equipment in unincorporated Teller County. Governed by the 2021 International Mechanical Code (IMC, Article VI) and 2021 International Fuel Gas Code (IFGC, Article VII), with multiple county-specific amendments (floor furnaces and unvented room heaters prohibited).

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for HVAC, ventilation, ductwork, and fuel-gas-fired appliance installation/alteration/repair
  • Governed by the 2021 IMC and 2021 IFGC as amended by the Teller County Building Code
  • Floor furnaces are PROHIBITED (both Article VI Section 910/1408 and Article VII Section 609) -- a genuine county-specific prohibition, not merely a code cross-reference
  • Unvented room heaters may not be used for comfort heating in a dwelling unit and are prohibited in occupancy Groups A, E, I, and R
  • Gas piping: copper and copper-alloy piping/tubing may not be used on natural gas systems; underground gas piping must be listed polyethylene plastic or corrugated stainless steel (with limited exceptions) and buried a minimum of 18 inches
  • Contractor must hold a Teller County Mechanical Contractor A or B license (county-issued, in addition to any required state licensure)

Required documents

  • RequiredMechanical Permit Application (PDF)Application for mechanical/HVAC permit

Fee schedule

Fee typeAmountNotes
Mechanical Contractor A license (commercial/residential, annual)$75.00Teller County Building Code Article II Section 105.g; testing required
Mechanical Contractor B license (residential only, annual)$50.00Teller County Building Code Article II Section 105.g; testing required

Re-Roof Permit

Verified

Required for roof replacement or re-roofing in unincorporated Teller County, reviewed against the 2021 IBC/IRC roofing provisions with Teller County's own ice-barrier-underlayment and roof-penetration amendments.

Verified 2026-07-06 · Source

Requirements

  • A Re-Roof Permit Application (PDF) is a distinct, separately listed application category
  • Ice barrier required for heated/conditioned structures: installed per manufacturer specification, extending 6 feet beyond the interior wall face of the exterior wall and covering the entire overhang -- a stricter local amendment than the base IRC/IBC ice-barrier requirement
  • Roof jacks, attic vents, and similar penetrations must be located no less than 24 inches from the center of a valley to the closest edge of the penetration

Required documents

  • RequiredRe-Roof Permit Application (PDF)Application for roof replacement/re-roofing

Fee schedule

Fee typeAmountNotes

Solar Permit

Verified

Required for installation of solar photovoltaic or other alternative-energy systems in unincorporated Teller County. Contractors performing the DC (direct current) side of installation must hold Teller County's Alternative Energy Installation Contractor AE/DC-side license; AC-side electrical work requires state electrical licensure.

Verified 2026-07-06 · Source

Requirements

  • Solar Permit Application is a distinct, separately listed application category
  • Alternative Energy Installation Contractor AE/DC-side license required for the D/C side of photovoltaic system installation and repair (annual fee $75.00, no testing required, but state licensure may still be required for the A/C side and plumbing-adjacent work such as solar hot water)
  • Covers Photovoltaic Solar Electric, Wind/Water Generated Electric, Solar Hot Water, Solar Heat (Active Space Heating), and Geothermal Energy systems; contractors must follow industry standards/codes and design prepared by a State of Colorado-licensed design professional

Required documents

  • RequiredSolar Permit ApplicationApplication for solar PV or other alternative-energy system installation

Fee schedule

Fee typeAmountNotes
Alternative Energy Installation Contractor AE/DC-side license (annual)$75.00Teller County Building Code Article II Section 105.m; testing not required locally, but state licensure may be required for A/C-side electrical or plumbing work

Demolition Permit

Verified

Required for demolition of structures in unincorporated Teller County. Only a licensed Teller County Demolition Contractor (Building Contractor D specialty license) may perform demolition, except that a licensed general contractor may wreck minor buildings or remove portions of buildings as part of an alteration/remodeling program.

Verified 2026-07-06 · Source

Requirements

  • Demolition Permit Application (PDF) is a distinct, separately listed application category, alongside a State of Colorado Demolition Information (PDF) reference handout
  • Only a licensed demolition contractor may perform demolition (annual Class D specialty license fee $50.00, no testing required), except a licensed general contractor may wreck minor buildings/portions as part of alteration or remodeling
  • Demolition contractors must show proof of X, C, and U provisions in their liability insurance policy prior to issuance of each permit
  • Contractor is responsible for compliance with State asbestos/lead-based-paint removal regulations; all debris must be completely removed from the site

Required documents

  • RequiredDemolition Permit Application (PDF)Application for demolition permit
  • OptionalState of Colorado Demolition Information (PDF)State reference handout on demolition requirements (asbestos/lead-paint)

Fee schedule

Fee typeAmountNotes
Demolition Contractor (Building Contractor D specialty) license, annual$50.00Teller County Building Code Article II Section 105.f; testing not required

Residential Deck Permit

Verified

Required for construction of a new deck in unincorporated Teller County, with a separate 'Minor Deck' site-plan pathway for smaller projects. Reviewed against 2021 IRC deck provisions with county-specific ledger-flashing and lateral-load amendments.

Verified 2026-07-06 · Source

Requirements

  • Residential Deck Permit Application is a distinct, separately listed application category, with a separate Minor Deck Site Plan Requirements (PDF) pathway for smaller decks
  • A water-resistive barrier must be placed between the deck ledger and structure substrate (Article III Section R507.2.4)
  • The base IRC deck lateral-load-connection subsection (R507.9.2) is deleted in its entirety by Teller County -- confirm current lateral-load design approach directly with the Building Division rather than assuming the stock IRC prescriptive detail applies
  • Decks which support another structure, spa, or hot tub, or which have piers spaced greater than 8 ft on center, must be designed by a licensed Colorado architect or engineer (a required-design trigger under Article III Section R105.3)
  • Deck piers not exceeding 10 ft from the residence with =8 ft on-center spacing are exempt from the general engineered-foundation requirement

Required documents

  • RequiredResidential Deck Permit ApplicationApplication for new deck construction
  • OptionalICC Deck Building Guide (PDF)Reference guide for deck code compliance
  • OptionalMinor Deck Site Plan Requirements (PDF)Simplified site-plan pathway for smaller deck projects

Fee schedule

Fee typeAmountNotes

Electric Vehicle (EV) Charging Station / EVSE Permit

Teller County has no distinct EV charger/EVSE permit application, fee line, or process published separately from its general Electrical Permit. Installation of a residential or commercial electric vehicle charging station is billed and reviewed as ordinary electrical work under the county's standard Electrical Permit, governed by the 2023 NEC (Article IX of the Teller County Building Code) which includes Article 625 (Electric Vehicle Power Transfer System) provisions. The Building Permit Applications listing (26 categories checked) contains no separate 'EV Charger' or 'EVSE' application, and neither the Building Division homepage nor the Building Code text reference Colorado HB24-1173 (the 2024 state law requiring covered counties with population 20,000+ to adopt an EV charger permitting model code, custom objective standards, or retain existing process by 12/31/2025, plus a 3-business-day decision-notification requirement). Teller County's approx. 26,000 population places it near the HB24-1173 'covered county' population threshold, but no county-published confirmation of which HB24-1173 compliance track it selected (or that it qualifies at all) was found. Re-chased 2026-07-20: confirmed the county self-administers electrical permitting via its own Building Division Electrical Inspector, ruling out the Colorado State Electrical Board (DORA) statewide fee schedule as an applicable fallback for this jurisdiction.

Reviewed 2026-07-20 · Source

Requirements

  • No standalone EV charger/EVSE permit application exists; EV charging station circuits, disconnects, and charging equipment are permitted through the standard Electrical Permit Application
  • Governed by the 2023 NEC (Article IX of the Teller County Building Code), which includes NEC Article 625 (Electric Vehicle Power Transfer System) requirements for EVSE branch circuits and disconnects
  • Contractor must hold a current Colorado state electrical license (Master Electrician or equivalent), registered with Teller County at no additional annual county fee, per the same requirement as the general Electrical Permit
  • No county-published confirmation of Colorado HB24-1173 (EV Charging System Permits Act) compliance track (model code adoption, custom objective standards, or status-quo retention) or of the statute's 3-business-day permit-decision notification requirement was found on the Building Division's public pages

Required documents

  • RequiredElectrical Permit ApplicationSame application used for general electrical work; no EV-specific application exists

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (EV charger/EVSE circuit)Calculated via the county's online Fee Calculator based on job valuation/scope -- exact dollar figures not independently retrievable
Re-chased 2026-07-20: confirmed Teller County self-administers electrical permitting through its own Building Division Electrical Inspector (staff position held by Dan Wilson) -- this RULES OUT the… Show full citation

Re-chased 2026-07-20: confirmed Teller County self-administers electrical permitting through its own Building Division Electrical Inspector (staff position held by Dan Wilson) -- this RULES OUT the Colorado State Electrical Board (DORA/DPO) statewide fee schedule as a fallback mechanism, since DORA only issues/inspects permits for "state inspected areas" that have NOT retained their own local inspection authority, and Teller County has retained its own. The county's Fee Calculator (cdd.tellercounty.gov/permitweb/PublicAccess/FeeCalculator.aspx) is a dynamic ASP.NET web form requiring interactive selection of jurisdiction/work-type/construction-type dropdowns to compute a figure; its output could not be retrieved via static automated fetch tools, and no static fee-schedule PDF or table is published elsewhere on tellercounty.gov. Confirm the exact fee with the Building Division, 719-687-3048.

Commercial Building Permit

Required for new commercial building construction, additions to existing commercial buildings, and interior remodels in unincorporated Teller County. Reviewed against the 2021 International Building Code (IBC) as amended by the Teller County Building Code (Article IV), plus the 2018 IECC energy code (Article XII). Submitted via a dedicated Commercial Building Permit Application, entirely distinct from the county's residential application forms -- independently confirmed by downloading and reading both the application and its companion requirements handout directly, 2026-08-02.

Reviewed 2026-08-02 · Source

Requirements

  • Commercial Building Permit required for any new commercial building, addition to an existing commercial building, or interior remodel in unincorporated Teller County (application form's 'Type of Construction' checkboxes: New Build / Addition to existing building / Interior Remodel / Other); issued and inspected by the Teller County Building Division. Source: Commercial Building Permit Application (PDF)
  • Plans reviewed against the 2021 IBC (Article IV) as amended by the Teller County Building Code, plus the 2018 IECC (Article XII); the seal of a design professional licensed by the State of Colorado is required on each sheet of the commercial plans submittal, and electronic stamps must not lock the file from markups. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023)
  • Commercial building structures and all portions must be designed by a licensed Colorado engineer or architect -- explicitly including soils, footings, foundations, structural calculations/loads, energy, mechanical, plumbing, elevators, and electrical; electrical/mechanical/plumbing plans must bear the stamp and signature of the appropriate Colorado-licensed engineer except as provided in NEC Article 27. Source: Teller County Building Code (PDF), Article IV Section 1604.1
  • One complete plan set required, submitted electronically and NOT password-protected; incomplete submittals will not be accepted for review. Required items (per the Commercial Building - Required Documents checklist): site plan (by a professional surveyor/engineer/architect per Teller County Land Use Regulations Chapter 7, Table 7.1), driveway information, septic/wastewater information, well permit or water-district letter of service, site-specific soils report, foundation plans, elevation views, floor plans, cross-section details, floor framing plans, electrical/mechanical/plumbing plans, elevator plans (if applicable), roof framing plans, truss engineering, and an IECC energy-code compliance form. Source: Commercial Building Permit Application (PDF), page 2
  • All subcontractors must be individually listed by name on the application (Foundation, Excavator, Framing, HVAC, Electrical, Plumbing, Elevator, Roofing, Inside Gas, Outside Gas, Fire Sprinkler/Suppression, Fireplace/Woodstove) and must be licensed and insured per Article II of the Building Code. Source: Commercial Building Permit Application (PDF)
  • Change Orders (plan modifications submitted after the permit is issued) require a completed Change Order Request Form and carry a non-refundable $100 processing fee; additional inspections triggered by the change may require a separate inspection fee. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023)
  • Contractor must hold the applicable Teller County Building Contractor license for commercial work -- Building Contractor A (General, any type/size/occupancy) or Building Contractor B (General-Limited, excludes Type I/II fire-resistive construction and E/H/I-1/I-2/I-3 occupancies) for new commercial construction; Building Contractor B-1 (Remodel) for remodel/interior-remodel work, with similar occupancy and size exclusions -- in addition to any Colorado DORA trade licenses required for electrical/plumbing/mechanical subcontractors. Source: Teller County Building Code (PDF), Article II Sections 105.a, 105.b, 105.c
  • The Building Department will not issue a commercial permit on a property in violation of Teller County Land Use (zoning) Regulations, lacking demonstrated legal access, in violation of Sewage Disposal Regulations, or with an existing unresolved building-code violation. Source: Teller County Building Code (PDF), Article IV Section 105.8
  • Fire Department AHJ (Authority Having Jurisdiction) review and approval, and potentially other departments/entities (planning and zoning, floodplain, roads and bridges, environmental health, water, and wastewater), may require their own separate review in addition to the Building Division's plan review. Source: Commercial Building Permit Requirements handout

Required documents

  • RequiredCommercial Building Permit Application (PDF)Primary commercial building permit application, including a required subcontractor listing and a 'Commercial Building - Required Documents' submittal checklist (page 2)
  • OptionalCommercial Building Permit Requirements (PDF)Guidance handout summarizing plan-review submittal, corrections/resubmittal, change-order, and professional-seal requirements for commercial projects (COM HAND 11/2023)
  • OptionalChange Order Request FormRequired for any plan modification submitted after the commercial permit has been issued

Fee schedule

Fee typeAmountNotes
Change Order (post-issuance plan modification) processing fee$100.00 (non-refundable)
Plus an additional inspection fee if the change order requires extra inspections. Show full citation

Plus an additional inspection fee if the change order requires extra inspections. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023); consistent with the same $100 Change Order fee published county-wide in Teller County Building Code (PDF) Article III Section R108.2 (Fees).

Tenant Improvement (TI) Permit

CONFIRMED ABSENCE of a distinct Tenant Improvement (TI) permit in unincorporated Teller County. There is no standalone TI application, fee line, checklist, or process separate from the county's general Commercial Building Permit. Interior remodel / tenant-improvement work in an existing commercial building is submitted on the same Commercial Building Permit Application (PDF) by checking 'Interior Remodel' under Type of Construction, and is reviewed under the same 2021 IBC (Article IV)-based process as new commercial construction and additions. The 'Commercial Application Forms' table on the Building Permit Applications page (read in full, 2026-08-02) lists exactly two commercial documents -- the Commercial Building Permit Application and the Commercial Building Permit Requirements handout -- with no separate TI-specific application, checklist, or fee schedule anywhere on the page. The full 58-page Teller County Building Code (converted to text and searched, 2026-08-02) contains zero matches for 'tenant improvement' or 'TI permit.' This entry exists to document that confirmed absence with sources, per this corpus's data-integrity policy, rather than leaving the gap unexplained or fabricating a distinct process.

Reviewed 2026-08-02 · Source

Requirements

  • No standalone Tenant Improvement / TI permit application exists in unincorporated Teller County; interior remodel and tenant-improvement work in commercial space is permitted through the standard Commercial Building Permit Application by selecting 'Interior Remodel' under Type of Construction. Source: Commercial Building Permit Application (PDF)
  • The same design/submittal requirements apply as for new commercial construction: a State of Colorado-licensed design professional's seal is required on each plan sheet, and a full 'Building Code Analysis' (occupancy classification, mixed-occupancy separation, area, type of construction) is explicitly required 'for New builds, Additions and Remodels' -- remodels are not a reduced-requirement track. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023)
  • A tenant-improvement project that changes occupancy classification would trigger the same Article IV commercial provisions as new construction, including the licensed-engineer/architect design-stamp requirement of Article IV Section 1604.1
  • Change Orders on an in-progress tenant-improvement/interior-remodel permit carry the same non-refundable $100 processing fee (plus possible added inspection fee) as any other commercial permit. Source: Commercial Building Permit Requirements handout

Required documents

  • RequiredCommercial Building Permit Application (PDF)Same application used for all commercial work; select 'Interior Remodel' under Type of Construction -- no TI-specific application exists

Fee schedule

Fee typeAmountNotes

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Teller County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-20)Later version (2026-08-14) →View current record →All versions →

Permalink: /colorado/teller-county/unincorporated-teller/as-of/2026-08-02/

Snapshot date: 2026-08-02

Commit: 66a0895

Reproducible from PermitBase’s version-controlled dataset, commit 66a0895.