You are viewing the permanent link for the record currently in effect, published 2026-08-20.
Unincorporated Teller County building permits
VerifiedUnincorporated Teller County, Colorado — as published 2026-08-20.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Single Family Dwelling (SFD) / New Residential Building Permit
VerifiedRequired for construction of a new single-family dwelling in unincorporated Teller County, reviewed against the 2021 IRC as amended by the Teller County Building Code (Article III), plus the 2018 IECC (Article XII) and the county's own design criteria (57 psf ground snow load, 115 mph wind, Seismic Design Category B, 30-inch frost depth).
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family dwelling construction in unincorporated Teller County; issued and inspected directly by the Teller County Building Division
- Plans must comply with the 2021 IRC (Article III) plus the 2018 IECC (Article XII); must account for county design criteria: 57 psf ground snow load / 40 psf flat roof snow load (no ASCE 7 Chapter 7 reduction allowed), 115 mph ultimate wind speed with Exposure C, Seismic Design Category B, 30-inch minimum frost depth, and required ice-barrier underlayment
- Site-specific soils report and engineer/architect-stamped foundation design required for habitable structures per Article III Sections R401-R407
- Homeowner Builder permits limited to one new dwelling per owner in any 24-month period, and no more than two in any 10-year period, with primary-residency conditions on the second permit
- IECC (Energy Conservation) Application and a permanent Thermal Envelope Certificate required at final
- All contractors and sub-contractors working on the project must be licensed with Teller County (Board of Review-issued license) and insured per Article II
Required documents
- RequiredSingle Family Dwelling (SFD) Permit ApplicationPrimary residential building permit application
- RequiredSFD and Addition Requirements (PDF)Submittal checklist/guidelines for new single-family dwellings and additions
- RequiredIECC (Energy Conservation) Application (PDF)Energy-code compliance submittal
Fee schedule
| Fee type | Amount | Notes |
|---|
Residential Addition / Interior Remodel / Basement Finish Permit
VerifiedRequired for additions, interior remodels, and basement finish work on existing one- and two-family dwellings in unincorporated Teller County, reviewed against the 2021 IRC as amended by the Teller County Building Code.
Verified 2026-07-06 · Source
Requirements
- Separate permit applications exist for Residential Addition, Residential Interior Remodel, and Residential Basement Finish -- each is its own listed application category
- Design must meet county Design Criteria (57 psf snow load, 115 mph wind, Seismic Design Category B, 30-inch frost depth) where structurally applicable
- SFD and Addition Requirements (PDF) applies to additions; ICC Basement Finish Building Guide referenced for basement finish projects
- Foundation/structural work tied to an addition may require engineer/architect stamping per Article III Sections R401-R407
Required documents
- RequiredResidential Addition Permit ApplicationApplication for additions to existing dwellings
- RequiredSFD and Addition Requirements (PDF)Submittal checklist for additions
- RequiredResidential Interior Remodel Permit ApplicationApplication for interior remodel work
- RequiredResidential Basement Finish Permit ApplicationApplication for finishing an unfinished basement
- OptionalICC Basement Finish Building GuideReference guide for basement-finish code compliance
Fee schedule
| Fee type | Amount | Notes |
|---|
Electrical Permit
VerifiedRequired for electrical wiring, panel, and equipment installation, alteration, or repair in unincorporated Teller County. Governed by the 2023 National Electrical Code (NEC), directly adopted and enforced by Teller County (Article IX), not merely deferred to the state.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for installation, alteration, repair, or replacement of wiring, equipment, appliances, fixtures, fittings, and appurtenances
- Governed by the 2023 NEC (Article IX of the Teller County Building Code); where the 2023 NEC conflicts with the 2021 IRC/IBC, the NEC prevails
- Contractor/examinee must hold a current Colorado state electrical license (Master Electrician or equivalent), registered with the Teller County Building Department at no additional annual county fee for the registration itself
- Existing-wiring alterations: if more than 50% of a building's wiring (by floor-area served) or more than 50% of a circuit's outlets are changed, the ENTIRE wiring installation or circuit must be brought up to new-building standards
- Teller County performs its own electrical inspections and posts an Electrical Contemporaneous Review procedure per C.R.S. 12-23-116 to verify licensing/apprentice-ratio compliance
Required documents
- RequiredElectrical Permit ApplicationApplication for electrical permit
- OptionalElectrical Contemporaneous Review (PDF)State-mandated procedure Teller County posts as an Inspecting Entity performing its own electrical inspections, per C.R.S. 12-23-116(1)(a) and (10)
Fee schedule
| Fee type | Amount | Notes |
|---|
Plumbing Permit
VerifiedRequired for installation, replacement, or repair of plumbing systems in unincorporated Teller County. Governed by the 2021 International Plumbing Code (IPC) as amended by the State of Colorado (Article V), directly enforced by Teller County.
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for fixture installation, water supply/drain-waste piping, and related plumbing work
- Governed by the 2021 IPC as amended by the State of Colorado, per Article V of the Teller County Building Code; uses the International Plumbing Code, not the Uniform Plumbing Code
- Where Article V (Plumbing Code) conflicts with Article III (IRC) or Article IV (IBC), Article V governs
- Contractor/examinee must hold a current Colorado state plumbing license (Master Plumber or equivalent), registered with the county at no additional annual county fee for the registration itself
- Teller County performs its own plumbing inspections and posts a Plumbing Contemporaneous Review procedure per HB19-1086
Required documents
- RequiredPlumbing Permit Application (PDF)Application for plumbing permit
- OptionalPlumbing Contemporaneous Review (PDF)State-mandated procedure Teller County posts as an Inspecting Entity performing its own plumbing inspections, per HB19-1086
Fee schedule
| Fee type | Amount | Notes |
|---|
Mechanical / HVAC Permit
VerifiedRequired for installation, replacement, or repair of HVAC, ventilation, and fuel-gas-fired equipment in unincorporated Teller County. Governed by the 2021 International Mechanical Code (IMC, Article VI) and 2021 International Fuel Gas Code (IFGC, Article VII), with multiple county-specific amendments (floor furnaces and unvented room heaters prohibited).
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for HVAC, ventilation, ductwork, and fuel-gas-fired appliance installation/alteration/repair
- Governed by the 2021 IMC and 2021 IFGC as amended by the Teller County Building Code
- Floor furnaces are PROHIBITED (both Article VI Section 910/1408 and Article VII Section 609) -- a genuine county-specific prohibition, not merely a code cross-reference
- Unvented room heaters may not be used for comfort heating in a dwelling unit and are prohibited in occupancy Groups A, E, I, and R
- Gas piping: copper and copper-alloy piping/tubing may not be used on natural gas systems; underground gas piping must be listed polyethylene plastic or corrugated stainless steel (with limited exceptions) and buried a minimum of 18 inches
- Contractor must hold a Teller County Mechanical Contractor A or B license (county-issued, in addition to any required state licensure)
Required documents
- RequiredMechanical Permit Application (PDF)Application for mechanical/HVAC permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Contractor A license (commercial/residential, annual) | $75.00 | Teller County Building Code Article II Section 105.g; testing required |
| Mechanical Contractor B license (residential only, annual) | $50.00 | Teller County Building Code Article II Section 105.g; testing required |
Re-Roof Permit
VerifiedRequired for roof replacement or re-roofing in unincorporated Teller County, reviewed against the 2021 IBC/IRC roofing provisions with Teller County's own ice-barrier-underlayment and roof-penetration amendments.
Verified 2026-07-06 · Source
Requirements
- A Re-Roof Permit Application (PDF) is a distinct, separately listed application category
- Ice barrier required for heated/conditioned structures: installed per manufacturer specification, extending 6 feet beyond the interior wall face of the exterior wall and covering the entire overhang -- a stricter local amendment than the base IRC/IBC ice-barrier requirement
- Roof jacks, attic vents, and similar penetrations must be located no less than 24 inches from the center of a valley to the closest edge of the penetration
Required documents
- RequiredRe-Roof Permit Application (PDF)Application for roof replacement/re-roofing
Fee schedule
| Fee type | Amount | Notes |
|---|
Solar Permit
VerifiedRequired for installation of solar photovoltaic or other alternative-energy systems in unincorporated Teller County. Contractors performing the DC (direct current) side of installation must hold Teller County's Alternative Energy Installation Contractor AE/DC-side license; AC-side electrical work requires state electrical licensure.
Verified 2026-07-06 · Source
Requirements
- Solar Permit Application is a distinct, separately listed application category
- Alternative Energy Installation Contractor AE/DC-side license required for the D/C side of photovoltaic system installation and repair (annual fee $75.00, no testing required, but state licensure may still be required for the A/C side and plumbing-adjacent work such as solar hot water)
- Covers Photovoltaic Solar Electric, Wind/Water Generated Electric, Solar Hot Water, Solar Heat (Active Space Heating), and Geothermal Energy systems; contractors must follow industry standards/codes and design prepared by a State of Colorado-licensed design professional
Required documents
- RequiredSolar Permit ApplicationApplication for solar PV or other alternative-energy system installation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Alternative Energy Installation Contractor AE/DC-side license (annual) | $75.00 | Teller County Building Code Article II Section 105.m; testing not required locally, but state licensure may be required for A/C-side electrical or plumbing work |
Demolition Permit
VerifiedRequired for demolition of structures in unincorporated Teller County. Only a licensed Teller County Demolition Contractor (Building Contractor D specialty license) may perform demolition, except that a licensed general contractor may wreck minor buildings or remove portions of buildings as part of an alteration/remodeling program.
Verified 2026-07-06 · Source
Requirements
- Demolition Permit Application (PDF) is a distinct, separately listed application category, alongside a State of Colorado Demolition Information (PDF) reference handout
- Only a licensed demolition contractor may perform demolition (annual Class D specialty license fee $50.00, no testing required), except a licensed general contractor may wreck minor buildings/portions as part of alteration or remodeling
- Demolition contractors must show proof of X, C, and U provisions in their liability insurance policy prior to issuance of each permit
- Contractor is responsible for compliance with State asbestos/lead-based-paint removal regulations; all debris must be completely removed from the site
Required documents
- RequiredDemolition Permit Application (PDF)Application for demolition permit
- OptionalState of Colorado Demolition Information (PDF)State reference handout on demolition requirements (asbestos/lead-paint)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Contractor (Building Contractor D specialty) license, annual | $50.00 | Teller County Building Code Article II Section 105.f; testing not required |
Residential Deck Permit
VerifiedRequired for construction of a new deck in unincorporated Teller County, with a separate 'Minor Deck' site-plan pathway for smaller projects. Reviewed against 2021 IRC deck provisions with county-specific ledger-flashing and lateral-load amendments.
Verified 2026-07-06 · Source
Requirements
- Residential Deck Permit Application is a distinct, separately listed application category, with a separate Minor Deck Site Plan Requirements (PDF) pathway for smaller decks
- A water-resistive barrier must be placed between the deck ledger and structure substrate (Article III Section R507.2.4)
- The base IRC deck lateral-load-connection subsection (R507.9.2) is deleted in its entirety by Teller County -- confirm current lateral-load design approach directly with the Building Division rather than assuming the stock IRC prescriptive detail applies
- Decks which support another structure, spa, or hot tub, or which have piers spaced greater than 8 ft on center, must be designed by a licensed Colorado architect or engineer (a required-design trigger under Article III Section R105.3)
- Deck piers not exceeding 10 ft from the residence with =8 ft on-center spacing are exempt from the general engineered-foundation requirement
Required documents
- RequiredResidential Deck Permit ApplicationApplication for new deck construction
- OptionalICC Deck Building Guide (PDF)Reference guide for deck code compliance
- OptionalMinor Deck Site Plan Requirements (PDF)Simplified site-plan pathway for smaller deck projects
Fee schedule
| Fee type | Amount | Notes |
|---|
Electric Vehicle (EV) Charging Station / EVSE Permit
Teller County has no distinct EV charger/EVSE permit application, fee line, or process published separately from its general Electrical Permit. Installation of a residential or commercial electric vehicle charging station is billed and reviewed as ordinary electrical work under the county's standard Electrical Permit, governed by the 2023 NEC (Article IX of the Teller County Building Code) which includes Article 625 (Electric Vehicle Power Transfer System) provisions. The Building Permit Applications listing (26 categories) contains no separate 'EV Charger' or 'EVSE' application, and neither the Building Division homepage nor the Building Code text reference Colorado HB24-1173 (the 2024 state law requiring covered counties with population 20,000+ to adopt an EV charger permitting model code, custom objective standards, or retain existing process by 12/31/2025, plus a 3-business-day decision-notification requirement). Teller County's approx. 26,000 population places it near the HB24-1173 'covered county' population threshold, but the county publishes no confirmation of which HB24-1173 compliance track it selected (or that it qualifies at all). The county self-administers electrical permitting via its own Building Division Electrical Inspector, ruling out the Colorado State Electrical Board (DORA) statewide fee schedule as an applicable fallback for this jurisdiction.
Reviewed 2026-07-20 · Source
Requirements
- No standalone EV charger/EVSE permit application exists; EV charging station circuits, disconnects, and charging equipment are permitted through the standard Electrical Permit Application
- Governed by the 2023 NEC (Article IX of the Teller County Building Code), which includes NEC Article 625 (Electric Vehicle Power Transfer System) requirements for EVSE branch circuits and disconnects
- Contractor must hold a current Colorado state electrical license (Master Electrician or equivalent), registered with Teller County at no additional annual county fee, per the same requirement as the general Electrical Permit
- No county-published confirmation of Colorado HB24-1173 (EV Charging System Permits Act) compliance track (model code adoption, custom objective standards, or status-quo retention) or of the statute's 3-business-day permit-decision notification requirement appears on the Building Division's public pages
Required documents
- RequiredElectrical Permit ApplicationSame application used for general electrical work; no EV-specific application exists
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee (EV charger/EVSE circuit) | Calculated via the county's online Fee Calculator based on job valuation/scope -- no fixed dollar figure is published | Teller County self-administers electrical permitting through its own Building Division Electrical Inspector (staff position held by Dan Wilson) -- this RULES OUT the Colorado State Electrical Board… Show full citationHideTeller County self-administers electrical permitting through its own Building Division Electrical Inspector (staff position held by Dan Wilson) -- this RULES OUT the Colorado State Electrical Board (DORA/DPO) statewide fee schedule as a fallback mechanism, since DORA only issues/inspects permits for "state inspected areas" that have NOT retained their own local inspection authority, and Teller County has retained its own. The county's Fee Calculator (cdd.tellercounty.gov/permitweb/PublicAccess/FeeCalculator.aspx) requires interactive selection of jurisdiction/work-type/construction-type dropdowns to compute a figure; no static fee-schedule PDF or table is published elsewhere on tellercounty.gov. Confirm the exact fee with the Building Division, 719-687-3048. |
Commercial Building Permit
Required for new commercial building construction, additions to existing commercial buildings, and interior remodels in unincorporated Teller County. Reviewed against the 2021 International Building Code (IBC) as amended by the Teller County Building Code (Article IV), plus the 2018 IECC energy code (Article XII). Submitted via a dedicated Commercial Building Permit Application, entirely distinct from the county's residential application forms -- independently confirmed by downloading and reading both the application and its companion requirements handout directly, 2026-08-02.
Reviewed 2026-08-02 · Source
Requirements
- Commercial Building Permit required for any new commercial building, addition to an existing commercial building, or interior remodel in unincorporated Teller County (application form's 'Type of Construction' checkboxes: New Build / Addition to existing building / Interior Remodel / Other); issued and inspected by the Teller County Building Division. Source: Commercial Building Permit Application (PDF)
- Plans reviewed against the 2021 IBC (Article IV) as amended by the Teller County Building Code, plus the 2018 IECC (Article XII); the seal of a design professional licensed by the State of Colorado is required on each sheet of the commercial plans submittal, and electronic stamps must not lock the file from markups. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023)
- Commercial building structures and all portions must be designed by a licensed Colorado engineer or architect -- explicitly including soils, footings, foundations, structural calculations/loads, energy, mechanical, plumbing, elevators, and electrical; electrical/mechanical/plumbing plans must bear the stamp and signature of the appropriate Colorado-licensed engineer except as provided in NEC Article 27. Source: Teller County Building Code (PDF), Article IV Section 1604.1
- One complete plan set required, submitted electronically and NOT password-protected; incomplete submittals will not be accepted for review. Required items (per the Commercial Building - Required Documents checklist): site plan (by a professional surveyor/engineer/architect per Teller County Land Use Regulations Chapter 7, Table 7.1), driveway information, septic/wastewater information, well permit or water-district letter of service, site-specific soils report, foundation plans, elevation views, floor plans, cross-section details, floor framing plans, electrical/mechanical/plumbing plans, elevator plans (if applicable), roof framing plans, truss engineering, and an IECC energy-code compliance form. Source: Commercial Building Permit Application (PDF), page 2
- All subcontractors must be individually listed by name on the application (Foundation, Excavator, Framing, HVAC, Electrical, Plumbing, Elevator, Roofing, Inside Gas, Outside Gas, Fire Sprinkler/Suppression, Fireplace/Woodstove) and must be licensed and insured per Article II of the Building Code. Source: Commercial Building Permit Application (PDF)
- Change Orders (plan modifications submitted after the permit is issued) require a completed Change Order Request Form and carry a non-refundable $100 processing fee; additional inspections triggered by the change may require a separate inspection fee. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023)
- Contractor must hold the applicable Teller County Building Contractor license for commercial work -- Building Contractor A (General, any type/size/occupancy) or Building Contractor B (General-Limited, excludes Type I/II fire-resistive construction and E/H/I-1/I-2/I-3 occupancies) for new commercial construction; Building Contractor B-1 (Remodel) for remodel/interior-remodel work, with similar occupancy and size exclusions -- in addition to any Colorado DORA trade licenses required for electrical/plumbing/mechanical subcontractors. Source: Teller County Building Code (PDF), Article II Sections 105.a, 105.b, 105.c
- The Building Department will not issue a commercial permit on a property in violation of Teller County Land Use (zoning) Regulations, lacking demonstrated legal access, in violation of Sewage Disposal Regulations, or with an existing unresolved building-code violation. Source: Teller County Building Code (PDF), Article IV Section 105.8
- Fire Department AHJ (Authority Having Jurisdiction) review and approval, and potentially other departments/entities (planning and zoning, floodplain, roads and bridges, environmental health, water, and wastewater), may require their own separate review in addition to the Building Division's plan review. Source: Commercial Building Permit Requirements handout
Required documents
- RequiredCommercial Building Permit Application (PDF)Primary commercial building permit application, including a required subcontractor listing and a 'Commercial Building - Required Documents' submittal checklist (page 2)
- OptionalCommercial Building Permit Requirements (PDF)Guidance handout summarizing plan-review submittal, corrections/resubmittal, change-order, and professional-seal requirements for commercial projects (COM HAND 11/2023)
- OptionalChange Order Request FormRequired for any plan modification submitted after the commercial permit has been issued
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Change Order (post-issuance plan modification) processing fee | $100.00 (non-refundable) | Plus an additional inspection fee if the change order requires extra inspections. Show full citationHidePlus an additional inspection fee if the change order requires extra inspections. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023); consistent with the same $100 Change Order fee published county-wide in Teller County Building Code (PDF) Article III Section R108.2 (Fees). |
Tenant Improvement (TI) Permit
Unincorporated Teller County has no distinct Tenant Improvement (TI) permit. There is no standalone TI application, fee line, checklist, or process separate from the county's general Commercial Building Permit. Interior remodel / tenant-improvement work in an existing commercial building is submitted on the same Commercial Building Permit Application (PDF) by checking 'Interior Remodel' under Type of Construction, and is reviewed under the same 2021 IBC (Article IV)-based process as new commercial construction and additions. The 'Commercial Application Forms' table on the Building Permit Applications page lists exactly two commercial documents — the Commercial Building Permit Application and the Commercial Building Permit Requirements handout — with no separate TI-specific application, checklist, or fee schedule anywhere on the page. The full 58-page Teller County Building Code contains no mention of 'tenant improvement' or 'TI permit.'
Reviewed 2026-08-02 · Source
Requirements
- No standalone Tenant Improvement / TI permit application exists in unincorporated Teller County; interior remodel and tenant-improvement work in commercial space is permitted through the standard Commercial Building Permit Application by selecting 'Interior Remodel' under Type of Construction. Source: Commercial Building Permit Application (PDF)
- The same design/submittal requirements apply as for new commercial construction: a State of Colorado-licensed design professional's seal is required on each plan sheet, and a full 'Building Code Analysis' (occupancy classification, mixed-occupancy separation, area, type of construction) is explicitly required 'for New builds, Additions and Remodels' -- remodels are not a reduced-requirement track. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023)
- A tenant-improvement project that changes occupancy classification would trigger the same Article IV commercial provisions as new construction, including the licensed-engineer/architect design-stamp requirement of Article IV Section 1604.1
- Change Orders on an in-progress tenant-improvement/interior-remodel permit carry the same non-refundable $100 processing fee (plus possible added inspection fee) as any other commercial permit. Source: Commercial Building Permit Requirements handout
Required documents
- RequiredCommercial Building Permit Application (PDF)Same application used for all commercial work; select 'Interior Remodel' under Type of Construction -- no TI-specific application exists
Fee schedule
| Fee type | Amount | Notes |
|---|
Sign Permit
VerifiedSign standards for unincorporated Teller County are set by the Teller County Land Use Regulations (TCLUR), Chapter 5, Section 5.8 (Signs), administered by the Planning Department (540 Manor Court, Woodland Park, 719-687-3048). Per Section 5.8.D, 'a permit for a new sign may be required in accordance with the Teller County Building Code' — meaning the sign PERMIT itself is issued through the Building Division's general permitting process (the Building Permit Applications page's document listing contains no dedicated standalone 'Sign Permit' application), while Section 5.8's substantive standards (size, placement, lighting, prohibited types) are set by the Planning Department's Land Use Regulations. Many common on-premise sign types are exempt from a permit altogether under Section 5.8.D.1.
Verified 2026-08-14 · Source
Requirements
- A permit for a new sign 'may be required in accordance with the Teller County Building Code' per TCLUR Section 5.8.D; no permit is required for a legal pre-existing non-conforming sign, sign maintenance, or a change of sign copy provided the sign conforms to Section 5.8
- No permit required for numerous specifically listed on-premise sign types (Section 5.8.D.1), including: address/mailbox signs under 6 sq ft, entry features (unless over 6 ft high, which may require a Building Permit), flags up to 64 sq ft, gravestones, hazard warning signs, historic plaques, information signs on public property, legally non-conforming signs, official government notices/signs, political signs (max 32 sq ft, limited to 60 days before through 10 days after an election), public notices, real estate signs (per Table 5-8 size limits by lot size/zoning), scoreboards under 20 ft/128 sq ft, signs explicitly exempted by the BOCC, signs required by law, traffic signs, temporary signs under 14 consecutive days per 120-day period, and private/public art under 6 ft high
- Off-premise signs are prohibited in all zone districts EXCEPT: Business Directional Signs (requires a Teller County Building Permit for On-Site Projects PLUS approval by the Board of County Commissioners with Planning Commission recommendation, per Section 5.8.E.1), Construction Directional and Access Signs (a separate, distinct permit application issued to the General Contractor upon payment of the BOCC fee schedule fee), Real Estate Open House signs (max 3 signs, max 3 sq ft each, Friday 5pm-Sunday 5pm only), and Tourist-Oriented Directional Signs (TODS, per a separate handout under C.R.S. §43-1-420(3) and §43-1-416)
- All signs adjacent to the State highway system (visible from the main-traveled way and within 660 feet of the right-of-way, or beyond 660 feet outside urban areas if erected to be read from the main-traveled way) must ALSO obtain a State Sign Permit in addition to any Teller County permit, per the Colorado Division of Highways' 'Rules and Regulations Pertaining to Outdoor Advertising' and the Outdoor Advertising Act, C.R.S. §43-1-401 et seq.
- Evidence of ability to comply with the Teller County Building Code and National Electric Code is a required Sign Plan submittal element (Section 5.8.B.1.d) where a Sign Plan is required as part of another development permit's submittal requirements
Required documents
- RequiredSigns — General Sign Information (PDF)Teller County Planning Department handout summarizing TCLUR Chapter 5, Section 5.8 (Signs) requirements, exemptions, and off-premise sign categories
Fee schedule
| Fee type | Amount | Notes |
|---|
Fire Sprinkler / Fire Alarm System Permit
VerifiedUnincorporated Teller County has adopted its own Teller County Fire Code (2003 International Fire Code, including Appendix Chapters A, B, and C) by reference under Article X of the Teller County Building Code, per Teller County Ordinance #16. Unlike the county's direct-enforcement model for the NEC (electrical) and IPC (plumbing) — where the county's own Building Division performs inspections — Article X's fire code adoption is a bare one-paragraph clause with no further local amendments, and the Building Code text does not designate a 'fire code official' or otherwise state that the County Building Division itself issues fire alarm/sprinkler system permits. The County's own Commercial Building Permit Requirements handout instead confirms that 'Fire Department AHJ review and approval may be required' as an ADDITIONAL, separate review from the Teller County Building Department. Unincorporated Teller County is covered by seven separate fire protection districts, per the County's own Emergency Service Agencies directory: Cripple Creek Fire District, Divide Fire District, Florissant Fire District, Four Mile Fire District, Green Mountain Falls-Chipita Park Fire District, Mountain Communities Fire District, and Northeast Teller County Fire District — coverage is split by location, and the applicable district's fire marshal is most likely the fire code official (AHJ) for a given property's fire alarm/sprinkler plan review, though this was not explicitly confirmed in the public Building Code text.
Verified 2026-08-14 · Source
Requirements
- Governed by the 2003 International Fire Code (Teller County Fire Code), adopted by reference under Article X of the Teller County Building Code per County Ordinance #16, including Appendix Chapters A, B, and C
- The Building Permit Applications page links no standalone 'Fire Alarm Permit' or 'Fire Sprinkler Permit' application category; fire protection systems installed as part of new commercial construction are addressed through the Commercial Building Permit process
- The Commercial Building Permit Requirements handout states 'Fire Department AHJ review and approval may be required' in addition to, and separate from, the Teller County Building Department's own plan review — confirming a fire protection district's fire marshal, not the County Building Division, is the likely AHJ for fire alarm/sprinkler plan review
- The Teller County Building Code's Article X fire-code adoption clause does not itself designate a 'fire code official' or state which entity (County Building Division vs. the covering fire protection district) issues fire alarm/sprinkler permits or performs inspections — confirmed by searching the full 58-page Building Code text directly, no match for 'fire code official,' 'fire marshal,' or 'fire district'
- For RESIDENTIAL construction specifically, Teller County's own IRC amendment (Section R313.1, replacing base IRC R313.1/R313.2) requires an automatic fire sprinkler system for a dwelling if the driveway does NOT meet the access requirements of Chapter 14 of the Teller County Roadway Design and Construction Standards — a direct county-specific sprinkler-system trigger, processed as part of the Single Family Dwelling (SFD) Permit rather than a separate fire permit
- Unincorporated Teller County is covered by seven separate fire protection districts (Cripple Creek, Divide, Florissant, Four Mile, Green Mountain Falls-Chipita Park, Mountain Communities, and Northeast Teller County Fire Districts), per the County's own Emergency Service Agencies directory — confirm which district covers a specific property before assuming which fire marshal's office is the applicable AHJ
Required documents
- RequiredCommercial Building Permit Application (PDF)Fire protection systems installed as part of commercial construction are addressed through this application; there is no separate fire alarm/sprinkler-specific application form
- OptionalCommercial Building Permit Requirements (PDF)States that Fire Department AHJ review and approval may be required in addition to Teller County Building Department plan review
Fee schedule
| Fee type | Amount | Notes |
|---|
Change of Use Permit
VerifiedUnincorporated Teller County has no standalone 'Change of Use Permit' or 'Change of Occupancy Permit.' The full 58-page Teller County Building Code contains no reference to 'change of use,' 'change of occupancy,' or 'change in occupancy.' A change in occupancy classification is instead processed through the same Commercial Building Permit Application used for all commercial work: the form's 'Type of Construction' field offers checkboxes for New Build, Addition to existing building, Interior Remodel, or 'Other: ___', alongside a required 'Occupancy Classification' field — there is no dedicated 'change of use' or 'change of occupancy' checkbox, so such a project would be declared via the 'Other' field and the Occupancy Classification entry. The technical compliance framework for an occupancy change is supplied by the County's adopted 2021 International Existing Building Code (Article XIV of the Teller County Building Code), which is adopted by reference with no county-specific amendments addressing change of occupancy.
Verified 2026-08-14 · Source
Requirements
- No standalone Change of Use or Change of Occupancy Permit application exists in unincorporated Teller County; a change in occupancy classification is submitted on the standard Commercial Building Permit Application by marking 'Other' under Type of Construction and completing the required Occupancy Classification field
- The Commercial Building Permit Requirements handout requires a full 'Building Code Analysis' (occupancy classification, mixed-occupancy separation, area, type of construction) for 'New builds, Additions and Remodels' alike — a change of occupancy would be evaluated under this same analysis requirement, not a reduced-scope process
- Technical compliance for an occupancy change is governed by the County's adopted 2021 International Existing Building Code (Article XIV of the Teller County Building Code), adopted by reference with no county-specific amendments to its change-of-occupancy provisions found in the Building Code text
- Fire Department AHJ review and approval may separately be required per the Commercial Building Permit Requirements handout, in addition to County Building Department review — relevant to a change of occupancy that affects fire/life-safety classification
- Confirmed by searching the complete 58-page Teller County Building Code text for 'change of use,' 'change of occupancy,' and 'change in occupancy' — zero matches for any of the three phrases
Required documents
- RequiredCommercial Building Permit Application (PDF)Same application used for all commercial work; a change of occupancy is declared via the 'Other' Type of Construction checkbox and the Occupancy Classification field — no change-of-use-specific application exists
- RequiredCommercial Building Permit Requirements (PDF)Requires a full Building Code Analysis (occupancy classification, mixed-occupancy separation, area, type of construction) for new builds, additions, and remodels alike
Fee schedule
| Fee type | Amount | Notes |
|---|
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Teller County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.