This is PermitBase’s published record for Evans as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Evans building permits

Verified

Evans, Colorado — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

2018 International Building Code (IBC), adopted and enforced per the City's 'Current Codes and Zoning' page2018 International Residential Code (IRC)2018 International Mechanical Code (IMC)2018 International Plumbing Code (IPC)2018 International Fuel Gas Code (IFGC)2023 National Electrical Code (NEC), adopted 'per the State of Colorado' — per the City's current 'Current Codes and Zoning' page, https://www.evanscolorado.gov/building-business-development/building-and-renovating/current-codes-and-zoning/2018 International Property Maintenance Code2018 International Existing Building Code (IEBC)2018 International Energy Conservation Code (IECC), applied together with the Colorado Model Energy Efficiency Construction and Renovation Standards2018 International Fire Code (IFC)2018 International Swimming Pool and Spa CodeEvans Municipal Code (Title 15, Buildings and Construction) governs adoption — https://library.municode.com/co/evans/codes/municipal_code?nodeId=MUCO_TIT15BUCODISCREPANCY NOTE: the City's dedicated 'Current Codes and Zoning' webpage (the canonical source, checked live) lists 2023 NEC, while several of the City's own downloadable application PDFs (One Stop Building Application, 'Last Revised 2/2020'; Commercial/Residential Addition or Remodel Application) still print the older line 'Current Adopted Code is 2018 IRC, IMC, IFGC, IPC, IFC; 2017 NEC, 2012 IECC.' This corpus follows the live Current Codes and Zoning page as authoritative since it is the City's dedicated, more recently-maintained code-reference source and 2023 NEC aligns with the statewide NEC adoption cycle other Colorado jurisdictions (e.g., Northglenn) are also on; the application-PDF text appears to be an un-updated holdover from before the 2025 in-house transition and should be re-verified directly with Building Division staff before treating it as current.

Permit types & fees

Residential Building Permit (New Primary Structure)

Verified

Required for new single-family homes and other new residential primary structures in Evans. Falls under the City's 'Building New Primary Structure' permit category, which requires a full plan review and inspection set. Reviewed under the 2018 IBC/IRC as adopted (2023 NEC per the State of Colorado).

Verified 2026-07-06 · Source

Requirements

  • Categorized as 'Building New Primary Structure' per the City's 'What Type of Permit Do I Need?' guide — reserved for new residential and commercial primary structures, requiring a full plan review and inspection set
  • Application materials must include plot plans with full elevations called out, a completed raw water dedication form, and a fire impact fee form
  • All contractors (general, electrical, plumbing) must hold a current City of Evans business license
  • Applications submitted electronically via CitizenServe (citizenserve.com/cityofevans) as PDF documents; as of May 19, 2025 all contractors must apply directly through CitizenServe
  • New Residential Plan Review Fee of $700.00 due at time of application submittal

Required documents

  • RequiredNew Residential Building Permit Application (CitizenServe)Submitted electronically via CitizenServe
  • RequiredPlot Plan with Full ElevationsDrawn to scale (typically 1" = 20'), showing lot dimensions, setbacks, and structure elevations
  • RequiredCity of Evans Certification of Raw Water DedicationRequired for new primary structures
  • RequiredFire Impact Fee Form2026 Fire Impact Fee Form (fillable)
  • RequiredStructural DrawingsFloor framing and roof framing, bearing an original seal and signature of a Colorado-registered architect or engineer

Fee schedule

Fee typeAmountNotes
Administration Fee$75.00Charged to review building permit applications and issue permits
New Residential Plan Review Fee$700.00Due at time of application submittal; new plan review/pre-rewrite
Building Permit Fee — valuation $1 to $500$26.24
Building Permit Fee — valuation $100,000.01 to $500,000$1,109.38 for the first $100,000 plus $6.26 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $1,000,000.01 and up$6,228.38 for the first $1,000,000 plus $4.02 for each additional $1,000 or fraction thereof
Use Tax4.5% of half the total building valuationExample: $100,000 valuation -> $50,000 half -> 4.5% = $2,250 use tax; per 2024 Fee Schedule (rate not restated in 2026 schedule)
Transportation, Fire/Rescue, Park, Police, and School Impact FeesVary by unit type — e.g., Single Unit Transportation Impact Fee $11,558.00, Fire/Rescue $1,241.00, Park $6,111.00, Police $940.00, School $2,498.00 (single family detached), per 2026 Fee Schedule

Residential/Commercial Addition or Remodel Permit

Verified

Required for additions, basement finishes, remodels, and tenant finishes in Evans. Falls under the City's 'Building Addition and Remodel' permit category (plan review plus more than one inspection), or 'Building Accessory Structure' for detached garages, sheds, carports, and gazebos.

Verified 2026-07-06 · Source

Requirements

  • Categorized as 'Building Addition and Remodel' (patio covers, pergolas, basement finishes, additions, tenant finishes) or 'Building Accessory Structure' (detached garages, shops, sheds, carports, gazebos) per the City's 'What Type of Permit Do I Need?' guide
  • A site plan displaying setbacks is required for both categories; accessory structures additionally require evidence the structure's materials/colors match the primary structure
  • Structural drawings (floor/roof framing) must bear an original seal and signature of a Colorado-registered architect or engineer where applicable
  • A plot plan is required if adding onto an existing structure, placing a new detached structure on the lot, or replacing an existing structure
  • All commercial submittals must be stamped and signed by a Colorado Registrant
  • Final inspection must occur within 2 years of permit issuance; permit is void if construction doesn't commence within 180 days or halts for 180 continuous days

Required documents

  • RequiredCommercial and Residential Addition or Remodel Application (CitizenServe)Submitted electronically via CitizenServe
  • RequiredPlot PlanDrawn to scale (typically 1" = 20'), showing lot boundaries, setbacks, easements, and all existing/proposed structures; 2 copies required for single- and two-family residential
  • OptionalStructural DrawingsFloor and roof framing, stamped/signed by a Colorado-registered architect or engineer if applicable

Fee schedule

Fee typeAmountNotes
Administration Fee$75.00
Plan Review Fee — Stock Plans/Rewrites/Addition and Remodel$50.00Due at time of submittal
Building Permit Fee (general valuation table)$26.24 minimum, scaling per the valuation tiers2026 Fee Schedule
Use Tax4.5% of half the total valuation

Electrical Permit

Verified

Required for electrical service upgrades and modifications in Evans. Standalone electrical upgrades fall under the City's 'Building One Stop' category (single inspection, no plan review, quick approval). Residential electrical permits are billed on a distinct area-based fee schedule; commercial on a valuation-based schedule.

Verified 2026-07-06 · Source

Requirements

  • Electrical upgrades are explicitly listed among 'Building One Stop' permit examples in the City's 'What Type of Permit Do I Need?' guide — one inspection, no plan review, quick approval
  • Governed by the 2023 NEC 'per the State of Colorado' per the City's live Current Codes and Zoning page (note: some older application PDFs still print 2017 NEC — see codesAdopted discrepancy note)
  • Electrical contractors must hold current state licensure; state license number recorded on the application
  • Photovoltaic (solar) electrical upgrades must be submitted as a separate permit from the PV system permit itself

Required documents

  • RequiredOne Stop Building Application (CitizenServe)Used for electrical upgrades among other One Stop categories

Fee schedule

Fee typeAmountNotes
Residential Electrical Permit — 0 to 1,000 sq ft$60.002026 Fee Schedule
Residential Electrical Permit — 1,001 to 1,500 sq ft$90.00
Residential Electrical Permit — 1,501 to 2,000 sq ft$120.00
Residential Electrical Permit — each additional 100 sq ft above 2,000 sq ftadd $6.00 (on top of the $120.00 base)
Commercial Electrical Permit — valuation up to $2,000$60.00
Commercial Electrical Permit — every $1,000 above $2,000add $6.00 (on top of the $120.00 base)
Temp Meter Release$60.00
Electrical Inspection (one-time)$57.50
Reinspection Fee$75.00/hour (minimum 1 hour)

Plumbing Permit

Verified

Required for plumbing modifications and water heater installation/replacement in Evans, governed by the 2018 IPC as adopted. Water heater replacement is explicitly a 'Building One Stop' category item; other plumbing work is billed under the general valuation-based Building Permit Fee, as no separate flat plumbing fee schedule is published.

Verified 2026-07-06 · Source

Requirements

  • Water heaters are explicitly listed among 'Building One Stop' permit examples in the City's 'What Type of Permit Do I Need?' guide
  • Governed by the 2018 International Plumbing Code (IPC) as adopted per the City's Current Codes and Zoning page
  • Water Service Inspection and Sanitary Sewer Inspection are separately fee-scheduled one-time inspections

Required documents

  • RequiredOne Stop Building Application (CitizenServe)Used for water heater installation/replacement and similar plumbing-adjacent One Stop items

Fee schedule

Fee typeAmountNotes
Building Permit Fee (general valuation table)$26.24 minimum, scaling per valuation tiersNo separate flat-fee plumbing schedule was found published; billed under the same Valuation Chart used for building permits generally
Water Service Inspection (one-time)$60.00
Sanitary Sewer Inspection (one-time)$60.00
Reinspection Fee$75.00/hour (minimum 1 hour)

Mechanical / HVAC Permit

Verified

Required for furnace, air conditioner, and fireplace installation or replacement in Evans, governed by the 2018 IMC/IFGC as adopted. Furnaces, air conditioners, and fireplaces are explicitly 'Building One Stop' category items — single inspection, no plan review, quick approval.

Verified 2026-07-06 · Source

Requirements

  • Furnace, air conditioning, and fireplace (gas or wood) installation/replacement are explicitly listed as 'Building One Stop' permit examples on the City's 'What Type of Permit Do I Need?' guide and on the One Stop Building Application itself (which has dedicated checkboxes for Furnace, Air Conditioning New/Replacement, and Fireplace Gas/Wood)
  • Governed by the 2018 International Mechanical Code (IMC) and International Fuel Gas Code (IFGC) as adopted
  • Gas Piping Test is a separately fee-scheduled one-time inspection

Required documents

  • RequiredOne Stop Building Application (CitizenServe)Has dedicated fields for Furnace, Air Conditioning (New/Replacement), and Fireplace (Gas/Wood)

Fee schedule

Fee typeAmountNotes
Building Permit Fee (general valuation table)$26.24 minimum, scaling per valuation tiersNo separate flat-fee mechanical schedule was found published; billed under the same Valuation Chart used for building permits generally. 'Valuation for Installation' assumed figures were published in the 2024 Fee Schedule for specific equipment: Fireplace (non-masonry) $1,800.00; Air Conditioner $1,500.00; Sprinkler System $600.00 — not restated in the 2026 schedule
Gas Piping Test (one-time)$57.50
Reinspection Fee$75.00/hour (minimum 1 hour)

Roofing Permit (Re-Roof)

Verified

Required for re-roofing in Evans. Explicitly named as a 'Building One Stop' category item on both the City's permit-type guide and the One Stop Building Application itself, which includes a dedicated field for 'number of squares.'

Verified 2026-07-06 · Source

Requirements

  • Re-roofing is explicitly listed as a 'Building One Stop' permit example — single inspection, no plan review, quick approval
  • The One Stop Building Application includes a specific 're-roof' checkbox with a field for '# of Squares'
  • Contractors must hold a current City of Evans business license

Required documents

  • RequiredOne Stop Building Application (CitizenServe)Includes a dedicated Re-Roof field with number-of-squares entry

Fee schedule

Fee typeAmountNotes
Building Permit Fee (general valuation table)$26.24 minimum, scaling per valuation tiersNo separate flat-fee roofing schedule was found published; billed under the same Valuation Chart used for building permits generally
Reinspection Fee$75.00/hour (minimum 1 hour)

Photovoltaic (Solar) Permit

Verified

Required for solar panel installation in Evans. Explicitly its own named permit category ('Photovoltaic') distinct from the Building One Stop / Addition-Remodel / New Primary Structure categories, for both commercial and residential systems.

Verified 2026-07-06 · Source

Requirements

  • Photovoltaic (commercial and residential) is its own named category on the City's 'What Type of Permit Do I Need?' guide
  • Electric upgrades associated with a solar installation must be submitted as a SEPARATE permit from the Photovoltaic permit itself, per the City's own guide
  • Governed by the 2023 NEC (per the State of Colorado, per the City's Current Codes and Zoning page) for electrical scope, and 2018 IBC/IRC for structural/roof-mounting scope

Required documents

  • RequiredPhotovoltaic Permit Application (CitizenServe)Submitted electronically; a distinct application category from the One Stop or Addition/Remodel forms
  • OptionalElectrical Upgrade Permit (if applicable)Filed as a separate permit from the PV system permit per the City's own guide

Fee schedule

Fee typeAmountNotes
Building Permit Fee (general valuation table)$26.24 minimum, scaling per valuation tiersNo solar-specific flat fee was found published; billed under the same Valuation Chart as other valuation-based permits
Administration Fee$75.00

Demolition Permit

Verified

Required for demolition of whole or partial buildings in Evans. Its own named category on the City's 'What Type of Permit Do I Need?' guide, requiring a State of Colorado Asbestos Mitigation form.

Verified 2026-07-06 · Source

Requirements

  • Demolition is its own named permit category, for whole or partial building demolition
  • Requires a State of Colorado Asbestos Mitigation form to be submitted with the application

Required documents

  • RequiredDemolition Permit Application (CitizenServe)Submitted electronically
  • RequiredState of Colorado Asbestos Mitigation FormRequired to be turned in with the application

Fee schedule

Fee typeAmountNotes
Building Permit Fee (general valuation table)$26.24 minimum, scaling per valuation tiersNo demolition-specific flat fee was found published; billed under the same Valuation Chart as other permits

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Evans building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /colorado/weld-county/evans/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: 07095f3

Reproducible from PermitBase’s version-controlled dataset, commit 07095f3.