Skip to main content
PermitBase

This is PermitBase’s published record for Garden City as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Garden City building permits

Garden City, Colorado — as published 2026-07-06.

Reviewed 2026-07-06 · Source

Codes adopted

2018 International Building Code (IBC), as adopted by reference with local amendments2018 International Residential Code (IRC), as adopted by reference with local amendments2018 International Mechanical Code (IMC), as adopted by reference with local amendments2018 International Fuel Gas Code (IFGC), as adopted by reference with local amendments2018 International Plumbing Code (IPC), as adopted by reference with local amendments2012 International Energy Conservation Code (IECC) — NOTE: Garden City's 2020 code-adoption ordinance explicitly adopts the 2012 IECC edition (not 2018), and further amends IRC Chapter 11 (Energy Efficiency) by deleting it in its entirety and replacing it with the 2012 IECC. This is an older energy-code edition than most Front Range peers in this corpus.2018 International Property Maintenance Code (IPMC), as adopted by reference with local amendments2018 International Existing Building Code (IEBC), as adopted by reference with local amendments2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference with no local amendmentsElectrical work is governed by the electrical code adopted by the State of Colorado (the Town's own IPMC amendment to Section 604.2 explicitly replaces the referenced 'NFPA 70' with 'Electrical Code adopted by the State of Colorado' rather than a locally-adopted NEC edition), consistent with Garden City deferring electrical licensing/code authority to the state rather than adopting its own NEC edition.Source: Ordinance No. 02-2020 ('AN ORDINANCE ADOPTING BY REFERENCE THE INTERNATIONAL BUILDING CODE, 2018 EDITION...'), read and introduced March 3, 2020, passed and adopted April 7, 2020, effective 12:01 a.m. June 1, 2020, repealing and replacing prior code-adoption provisions of Ordinance No. 03-2016. This is the most recent code-adoption ordinance found after full search of the Town's Ordinances and Resolutions archive and Municode; no more recent adoption ordinance (e.g., updating to a 2021/2024 ICC cycle) was located as of this review, and HB22-1362's statewide model energy/low-carbon code requirements (which apply prospectively when a jurisdiction next updates its energy code) do not appear to have yet been triggered by any subsequent Garden City ordinance found in this search.

Permit types & fees

Residential Building Permit (New Construction / Additions / Structures Over 120 sq ft)

Verified

Required for new residential construction, additions, garages, carports, and any structure exceeding 120 square feet of floor area in Garden City. Reviewed and inspected under contract by ProCode Inc. (SAFEbuilt) against the Town's 2018 IBC/IRC as locally amended, including the Town's specific climatic and geographic design criteria (30 psf ground snow load, 115 mph wind design speed, 30-inch frost line).

Verified 2026-07-06 · Source

Requirements

  • Permit required for additions, garages, carports, structures exceeding 120 sq ft of floor area, and any new residential construction
  • Plans must comply with the 2018 IRC/IBC as locally amended, including the Town's climatic/geographic design criteria: 30 psf ground snow load, 115 mph wind design speed (Seismic Design Category B), 30-inch minimum frost line, ice barrier underlayment required, Winter Design Temp 1 F
  • Foundation design and construction drawings must be stamped by a Colorado-registered design professional and based on an engineer's soils report; a site certification by a Colorado-registered design professional is required for setback verification on new Group R Division 3 occupancies
  • Carbon monoxide detectors required within 15 feet of each sleeping area and on every level
  • Permit must be obtained BEFORE work commences, or the Building Inspector (ProCode/SAFEbuilt) may charge an additional investigation fee up to the normal permit fee amount
  • Permit expires if work is not commenced within 180 days of issuance, or is suspended/abandoned for 180 days

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the CommunityCore online portal
  • RequiredConstruction Plans / SketchPer the Town's public guidance, smaller projects do not require full plans but may require a sketch; larger new-construction and addition projects require full stamped plans
  • RequiredSoils Report and Stamped Foundation DrawingsRequired per local amendment to IRC R401.2/R405.1: engineer's soils report referenced by name/location/report number on drawings stamped by a Colorado-registered design professional

Fee schedule

Fee typeAmountNotes

Residential Addition / Remodel / Demolition Permit

Verified

Required for additions, remodels, basement finishes, retaining walls over 4 feet in height, and demolition in Garden City. Reviewed under contract by ProCode Inc. (SAFEbuilt) against the Town's 2018 IRC as locally amended.

Verified 2026-07-06 · Source

Requirements

  • Permit required for: additions, basement finish, remodel or demolition, retaining walls over 4 feet in height, and structures exceeding 120 sq ft of floor area
  • A Licensed engineer's report/stamped drawings required if the scope affects structural elements or foundations, per the Town's locally-amended foundation provisions
  • Permit must be obtained before work commences to avoid an additional investigation fee

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the CommunityCore online portal
  • RequiredSketch or PlansSmaller projects may only require a sketch rather than full stamped plans, per the Town's published guidance; scope determines what the contracted building department requires

Fee schedule

Fee typeAmountNotes

Electrical Permit

Verified

Required for electrical work in Garden City. Colorado's State Electrical Board (DORA) governs electrical contractor licensure; the Town's own code amendment (IPMC 604.2) explicitly defers to 'Electrical Code adopted by the State of Colorado' rather than adopting its own NEC edition, and the Town's contracted building department performs the state-mandated contemporaneous review of electrical licensure at inspection.

Verified 2026-07-06 · Source

Requirements

  • Electrical work listed among projects requiring a Building/Electrical Permit in the Town's published permit-requirement chart
  • Electrical contractors must hold current Colorado State Electrical Board (DORA) licensure; contemporaneous review of licensure is performed at inspection per C.R.S. 12-23-116, consistent with the statewide-mandated procedure that all Colorado inspecting entities (including Garden City's contracted building department) must follow and publicly post
  • Garden City has not adopted its own local NEC edition or local electrical licensing program; electrical code authority defers to the State of Colorado per the Town's own IPMC Section 604.2 amendment

Required documents

  • RequiredElectrical Permit ApplicationSubmitted via the CommunityCore online portal

Fee schedule

Fee typeAmountNotes

Plumbing Permit

Verified

Required for plumbing addition or extension work in Garden City. Governed by the 2018 International Plumbing Code (IPC) as locally amended. Plumbing contractors must hold Colorado State Plumbing Board (DORA) licensure, verified contemporaneously at inspection by the Town's contracted building department.

Verified 2026-07-06 · Source

Requirements

  • Plumbing addition or extension listed among projects requiring a permit in the Town's published permit-requirement chart
  • Governed by the 2018 IPC as locally amended (minimum sewer depth 12 inches per amended P2603.5.1/P305.4.1; roof extension minimum 12 inches per amended P3103.1.1/P903.1)
  • Plumbing contractors must hold current Colorado State Plumbing Board (DORA) license and registration; contemporaneous review performed at inspection per C.R.S. 12-155-120(1) and (10), effective January 1, 2020
  • Lawn sprinkler back-flow prevention devices explicitly listed as requiring a permit

Required documents

  • RequiredPlumbing Permit ApplicationSubmitted via the CommunityCore online portal
  • OptionalPlumbing Contemporaneous Review Educational BulletinState DORA Plumbing Board bulletin describing the contemporaneous license/registration review procedure that Garden City's contracted building department follows and posts publicly

Fee schedule

Fee typeAmountNotes

Mechanical / HVAC Permit

Verified

Required for central air conditioners (new and replacement), furnaces, wood-burning stoves/fireplaces/gas logs, and jetted/hot tubs in Garden City. Governed by the 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) as locally amended.

Verified 2026-07-06 · Source

Requirements

  • Central air conditioner (new and replacement) explicitly listed as requiring a permit
  • Furnaces, wood-burning stoves, fireplaces, and gas logs explicitly listed as requiring a permit
  • Jetted or hot tubs explicitly listed as requiring a permit
  • Governed by the 2018 IMC/IFGC as locally amended (fuel gas piping minimum 18 inches below grade; IFGC test pressure amended to 10 psig)

Required documents

  • RequiredMechanical/HVAC Permit ApplicationSubmitted via the CommunityCore online portal

Fee schedule

Fee typeAmountNotes

Re-Roof Permit

Verified

Required for re-roofing in Garden City, with a narrow permit-exempt carve-out for very small shingle repairs. Governed by the 2018 IBC/IRC as locally amended.

Verified 2026-07-06 · Source

Requirements

  • Re-roof explicitly listed as requiring a permit in the Town's published permit-requirement chart
  • Local amendment carve-out: shingle repair or replacement work NOT exceeding 100 square feet (one 'square') of covering per building is exempt from permit (IBC Building Exception #14 / IRC Exception #10) — anything larger requires a permit
  • Ice barrier underlayment is required per the Town's adopted climatic design criteria

Required documents

  • RequiredRe-Roof Permit ApplicationSubmitted via the CommunityCore online portal

Fee schedule

Fee typeAmountNotes

Demolition Permit

Verified

Required for demolition work in Garden City, explicitly listed in the Town's published permit-requirement chart alongside remodel.

Verified 2026-07-06 · Source

Requirements

  • Demolition explicitly listed as requiring a permit in the Town's published permit-requirement chart
  • Permit must be obtained before demolition work commences, or an additional investigation fee may apply per the locally-amended code

Required documents

  • RequiredDemolition Permit ApplicationSubmitted via the CommunityCore online portal

Fee schedule

Fee typeAmountNotes

Deck / Patio Cover / Retaining Wall Permit

Verified

Required for patio covers and retaining walls over 4 feet in height in Garden City; decks less than 30 inches above grade and not attached to an existing structure are exempt, per the Town's own published permit-exempt list.

Verified 2026-07-06 · Source

Requirements

  • Patio covers explicitly listed as requiring a permit
  • Retaining walls over 4 feet in height require a permit; retaining walls under 4 feet are exempt
  • Decks less than 30 inches above grade AND not attached to an existing structure are exempt from permit, per the Town's published exemption list; decks attached to a structure or 30 inches or more above grade require a permit

Required documents

  • RequiredDeck / Patio Cover Permit ApplicationSubmitted via the CommunityCore online portal

Fee schedule

Fee typeAmountNotes

Water Heater and Boiler Replacement Permit

Verified

Required for water heater and boiler replacements in Garden City, explicitly and separately listed in the Town's published permit-requirement chart distinct from general mechanical/HVAC work.

Verified 2026-07-06 · Source

Requirements

  • Water heater and boiler replacements explicitly listed as requiring a permit, distinct from the general furnace/central-AC line item
  • Governed by the 2018 IMC/IFGC/IPC as locally amended
  • If gas service must be shut off (Atmos Energy) for the replacement, a Building Inspector pressure test is required before gas service is restored

Required documents

  • RequiredWater Heater/Boiler Replacement Permit ApplicationSubmitted via the CommunityCore online portal

Fee schedule

Fee typeAmountNotes

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Garden City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /colorado/weld-county/garden-city-co/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: dc2fcc8

Reproducible from PermitBase’s version-controlled dataset, commit dc2fcc8.