This is PermitBase’s published record for Lochbuie as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Lochbuie building permits
Lochbuie, Colorado — as published 2026-07-06.
Reviewed 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for construction of a new single-family home, duplex, or multi-family building in the Town of Lochbuie. Classified as a 'Plan Review Permit' requiring building (and where applicable planning) review before issuance; plan review and inspections are performed by the Town's contracted building-services firm, SAFEbuilt. Reviewed against the Town's adopted codes (2021 IPC/IECC and 2023 NEC per the live Building Department webpage; 2018-cycle IRC/IBC design criteria per the Design Criteria Town of Lochbuie chart) and the applicable zoning-district setback table.
Verified 2026-07-06 · Source
Requirements
- Online Building Permit Application submitted via the CommunityConnect portal (app.communitycore.com), including applicant/property details, contractor information, construction details, and site/floor plans
- Verify property's zoning district and subdivision-specific setbacks via Weld County's Property Portal or by calling 303-990-5776 before applying — Spacious Living (R-1)/Lochwood Farms (R-R)/Lochwood PUD, Blue Lake/Bella Vista PUD, Highplains/Berkshire PUD, and Silver Peaks PUD each have distinct setback tables
- Contractors must hold a current Town of Lochbuie contractor license (Class A Unlimited General or Class B Limited General, or Class C Residential as applicable) before portal access is granted
- Design Criteria: 30 psf ground snow load, 115 mph ultimate wind speed, Seismic Design Category B, 30-inch frost line, severe weathering exposure, slight-to-moderate termite probability, ice and water shield required, assumed 1,500 psf soils bearing capacity (per the Design Criteria Town of Lochbuie chart)
- Reviewed by SAFEbuilt (contracted Building Division plan reviewers/inspectors) per the Town's adopted codes
Required documents
- RequiredBuilding Permit ApplicationTown of Lochbuie Building Permit Application form, submitted online via the CommunityConnect portal; captures property owner, contractor (general/electrical/plumbing/heating with registration numbers), lot/setback information, proposed use, project valuation, square footage breakdown, and itemized fee lines
- RequiredSite/Floor PlansRequired for plan-review permit types; scope depends on project type
- RequiredContractor LicenseCurrent Town of Lochbuie contractor license appropriate to project scope (Class A/B/C)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1 to $500 | $33.80 | Town of Lochbuie Fees, updated April 2026 |
| Building Permit Fee — valuation $501 to $2,000 | $33.80 for the first $500 plus $3.44 for each additional $100 or fraction thereof, to and including $2,000 | — |
| Building Permit Fee — valuation $2,001 to $25,000 | $85.40 for the first $2,000 plus $15.77 for each additional $1,000 or fraction thereof, to and including $25,000 | — |
| Building Permit Fee — valuation $25,001 to $50,000 | $448.11 for the first $25,000 plus $11.49 for each additional $1,000 or fraction thereof, to and including $50,000 | — |
| Building Permit Fee — valuation $50,001 to $100,000 | $735.36 for the first $50,000 plus $7.88 for each additional $1,000 or fraction thereof, to and including $100,000 | — |
| Building Permit Fee — valuation $100,001 to $500,000 | $1,129.36 for the first $100,000 plus $6.30 for each additional $1,000 or fraction thereof, to and including $500,000 | — |
| Building Permit Fee — valuation $500,001 to $1,000,000 | $3,649.36 for the first $500,000 plus $5.35 for each additional $1,000 or fraction thereof, to and including $1,000,000 | — |
| Building Permit Fee — valuation $1,000,001 and up | $6,324.36 for the first $1,000,000 plus $4.11 for each additional $1,000 or fraction thereof | — |
| Initial Plan Review Fee | 65% of total permit fees | — |
| Use Tax | 2% of gross purchase price of construction materials | — |
| Administrative Fee (project valuation under $10,000) | $20.00 | — |
| Administrative Fee (project valuation $10,000-$80,000) | $100.00 | — |
| Administrative Fee (project valuation $80,000-$150,000) | $150.00 | — |
| Administrative Fee (project valuation $150,000 and over) | $200.00 | — |
| Additional utility/impact fee lines (Water Meter, Water Resource Charge, Water Plant Investment Fee, WATA Fee, Storm Drainage Impact Fee, Sewer Tap Fee, School Contribution, Interstate Fee, Infrastructure Fee, Public Safety Fee, etc.) | Project-specific, calculated at application; no published flat-rate schedule found | These line items appear on the Town's own Building Permit Application form but no corresponding rate table was found on the Building Permits, Requirements, Fees, or Guides pages during this research pass |
Residential Addition / Remodel Permit
VerifiedRequired for additions, remodels, and basement finishes to existing residential structures in Lochbuie. Classified as a 'Plan Review Permit' under the Town's permit taxonomy (Additions, Remodels, and Basement Finish are all separately named in this category), requiring building/planning review by SAFEbuilt before issuance.
Verified 2026-07-06 · Source
Requirements
- Online Building Permit Application via the CommunityConnect portal
- Basement Finish and Addition guides available on the Guides and Checklists page (Residential Basement Finish Guide, Additions to Single Family Dwellings Guide, both with Spanish-language versions)
- Project valuation must reflect total cost including labor and materials
- Setback verification via Weld County's Property Portal for any addition affecting the building footprint
Required documents
- RequiredBuilding Permit ApplicationSubmitted via CommunityConnect portal
- OptionalAdditions to Single Family Dwellings Guide / Residential Basement Finish GuideTown-published guidance documents (English and Spanish versions available) detailing project requirements, construction details, and inspections
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as new construction) | $33.80 minimum, scaling per the valuation tiers in the April 2026 Town Fee Schedule | Town of Lochbuie Fees, updated April 2026 |
| Initial Plan Review Fee | 65% of total permit fees | — |
| Use Tax | 2% of gross purchase price of construction materials | — |
| Administrative Fee | $20-$200 depending on project valuation tier | — |
Electrical Permit
Required for electrical service changes, wiring, and related electrical work in Lochbuie. Fee-setting is explicitly deferred to the Colorado State Electrical Board (DORA) schedule plus a 15% Town surcharge — Lochbuie does NOT run its own locally-set electrical fee table, per the Town's April 2026 Fee Schedule. Electrical Service Change (residential only, by amp upgrade count) qualifies as a One Stop Permit not requiring plan review.
Reviewed 2026-07-06 · Source
Requirements
- Fee calculated per the State of Colorado Electrical Board's own fee schedule (CRS 12-23-117(3)) plus a 15% Town surcharge — confirms Colorado-specific rule #3 (state board default) applies to Lochbuie electrical permits
- Electrical contractors must hold current Colorado Electrical Board (DORA) licensure and register with the Town (Class E registration)
- Residential Electrical Service Change qualifies as a One Stop Permit (no plan review required, typically issued within 24 hours) — application must state the number of amps being upgraded
- Other electrical work not meeting the One Stop criteria is processed as a standard permit
Required documents
- RequiredBuilding/Electrical Permit ApplicationSubmitted via CommunityConnect portal, includes electrical contractor name and registration number field
- RequiredTown of Lochbuie Contractor License (Class E - Electrical)Required for all electrical contractors performing work in Lochbuie, in addition to Colorado DORA Electrical Board licensure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee | Electrical Permit fees as charged by the State of Colorado Electrical Board, plus 15% | Town of Lochbuie Fees, updated April 2026, Section C item 7 — this is a direct pass-through of the CRS 12-23-117(3) state-mandated schedule, not a locally-set fee table |
| Class E (Electrical) Contractor License — All Classes Registration Fee | $15.00 per calendar year | Prorated quarterly by month of issue per the April 2026 fee schedule; the Contractor Licenses webpage separately lists a $0.00 'Registration' line for Class E, distinct from this $15 flat fee — see tips for the discrepancy |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair in Lochbuie, including water/sewer line repair or replacement. Unlike electrical, plumbing permit fees are set entirely by the Town's own general valuation-based Building Permit Fee Schedule — no state-board pass-through applies. Water/Sewer Line repair (footage-based, residential) qualifies as a One Stop Permit.
Verified 2026-07-06 · Source
Requirements
- Plumbing contractors must hold Town of Lochbuie contractor license (Class P - Plumbing, or Class MP - Mechanical/Plumbing)
- Water/Sewer Line repair (One Stop Permit category) application must state the number of feet and the repair type
- Repair or replacement of an existing gas or water line for a single-family dwelling is billed at a flat Specialized Permit fee
- Fee is set locally per the Town's own Building Permit Fee Schedule — not routed to the Colorado State Plumbing Board fee schedule, confirming Colorado-specific rule #3 resolves to local fee-setting for plumbing in Lochbuie
Required documents
- RequiredBuilding/Plumbing Permit ApplicationSubmitted via CommunityConnect portal, includes plumbing contractor registration number field
- RequiredTown of Lochbuie Contractor License (Class P or MP)Required for plumbing contractors performing work in Lochbuie
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Repair or replace an existing gas or water line for SFD | $50.00 each | Town of Lochbuie Fees, updated April 2026, Specialized Permit Fee Schedule item 9 |
| Plumbing work not otherwise specified (valuation-based) | Uses the general Building Permit Fee Schedule ($33.80 minimum, scaling by valuation) | No separate state-board pass-through applies to plumbing, unlike electrical |
| Class P (Plumbing) or Class MP (Mechanical/Plumbing) Contractor Registration | $75.00/year (Class P) or $100.00/year (Class MP), prorated quarterly by month of issue, plus the $15.00 All Classes Registration Fee | — |
Mechanical / HVAC Permit
VerifiedRequired for furnace, air conditioning, and evaporative cooler installation or replacement in Lochbuie. Air Conditioning and Furnace both qualify as One Stop Permits (no plan review, typically issued within 24 hours); AC/Furnace replacement carries a flat Specialized Permit fee.
Verified 2026-07-06 · Source
Requirements
- Air Conditioning application (One Stop Permit) must state the number of tons and SEER rating
- Furnace application (One Stop Permit) must state the BTU rating
- Evaporative Cooler installation billed as a flat Specialized Permit fee
- Mechanical contractors must hold Town of Lochbuie contractor license (Class M - Mechanical, or Class MP - Mechanical/Plumbing)
Required documents
- RequiredBuilding/Mechanical Permit ApplicationSubmitted via CommunityConnect portal, includes heating contractor registration number field
- RequiredTown of Lochbuie Contractor License (Class M or MP)Required for mechanical contractors performing work in Lochbuie
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| AC / Furnace (Specialized Permit Fee Schedule) | $100.00 each | Town of Lochbuie Fees, updated April 2026, Specialized Permit Fee Schedule item 11 |
| Evaporative Cooler | $50.00 each | — |
| Class M (Mechanical) or Class MP (Mechanical/Plumbing) Contractor Registration | $75.00/year (Class M) or $100.00/year (Class MP), prorated quarterly, plus the $15.00 All Classes Registration Fee | — |
Re-Roof Permit
VerifiedRequired for re-roofing in Lochbuie. Re-Roofs (residential asphalt shingle) qualify as a One Stop Permit (no plan review, typically issued within 24 hours), governed by SAFEbuilt's published Residential Asphalt Shingle Re-Roofing Requirements guide, which cites the 2018 IRC as the current governing code for this specific guide (a different vintage than the live Building Department webpage's 2021 IPC/IECC + 2023 NEC statement — see codesAdopted currency note). Nonstructural re-roofs are billed at a flat Specialized Permit fee.
Verified 2026-07-06 · Source
Requirements
- One Stop Permit application must state manufacturer type/name, number of squares, and roof pitch
- Ice and water shield required from the eaves to 24 inches inside the warm wall
- Where the existing roof has two or more layers of any roof covering, all old material must be removed before re-roofing
- Drip edge required on all edges including rakes; double underlayment required for pitches 2:12 up to 4:12; 2:12 is the minimum shingle pitch
- Damaged/deteriorated vent caps, vents, pipes, and flashings must be replaced; sidewalls must be step-flashed (continuous flashing at sidewalls is not acceptable)
- Contractor must set and secure a ladder for the roof inspection
Required documents
- RequiredBuilding Permit Application — Re-Roof scopeSubmitted via CommunityConnect portal; must include roof pitch, type of shingles, felt type, and number of squares
- OptionalResidential Asphalt Shingle Re-Roofing RequirementsSAFEbuilt-published guide detailing Lochbuie-specific re-roof requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Nonstructural re-roof (Specialized Permit Fee Schedule) | $100.00 each | Town of Lochbuie Fees, updated April 2026, Specialized Permit Fee Schedule item 10 |
Rooftop Solar / Photovoltaic Permit
Required for solar panel installation or replacement in Lochbuie. Governed by SAFEbuilt's Photovoltaic System Submittal Requirements guide (last revised 10.22.2021), which cites '2020 NEC, 2018 International Codes' as the applicable current codes for this specific guide — yet another vintage than the live Building Department webpage's 2021 IPC/IECC + 2023 NEC statement (see codesAdopted currency note). Not listed among the One Stop Permit categories, implying plan review applies.
Reviewed 2026-07-06 · Source
Requirements
- Permit application (emailed to Town or via online portal) fully completed, with valuation based on total contract cost to customer including materials, items, and labor
- Separate plan review required for each building/address requiring a separate permit
- Structural engineer's stamped letter required, stating design to a minimum ground snow load of 30 psf, wind speed of 115 mph Vult, wind exposure C, and Seismic Design Category B, addressing added roof weight and wind load from panels, and roof-connection/embedment type
- Ground-mounted systems require a separate engineer-stamped letter for system support and wind load, using the same 30 psf/115 mph Vult/Exposure C/SDC B design basis
- Electrical plans: four-line diagram (module count, circuit assignment, wire sizes/insulation, conduit sizes, junction boxes, inverter type, combiner panel, disconnect, meter, fuses/breakers, grounding), equipment ampacity/volts/wattage specification, wire/disconnect/fuse sizing calculations (roof-mount systems must use 56-60 degC worst-case ambient temperature for conductor ampacity derating), DC inverter selection calculation, current equipment cut sheets, equipment location plan, and all labeling/directories/plaques
- Building/structural plans: roof layout with panel locations and roof dimensions, fire pathways/setbacks/equipment protection per the IRC or IFC as applicable, roof connection detail matching the engineer's letter and cut sheets, site plan showing equipment location and distances to property lines, and design criteria stated per the current codes
- The color red may not be used anywhere on submitted plans by the applicant's design team — reserved exclusively for the plans examiner's markup
- Zoning compliance is the applicant's responsibility to verify directly with the jurisdiction
- Resubmittals must cloud all changed areas, include a detailed explanation of changes, note any additional costs, and be emailed to coloradoplanreview@safebuilt.com (not directly to the plans examiner)
Required documents
- RequiredBuilding/Electrical Permit Application — Solar/PV scopeEmailed to Town or submitted via CommunityConnect portal
- RequiredStructural Engineer Stamped LetterAddressing added roof weight, wind load, and roof-connection/embedment per the Town's 30 psf/115 mph Vult/Exposure C/SDC B design basis
- RequiredFour-Line Electrical Diagram and Equipment Cut SheetsPer SAFEbuilt's Photovoltaic System Submittal Requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee (Section applies to PV electrical scope) | Electrical Permit fees as charged by the State of Colorado Electrical Board, plus 15% | Same state-board pass-through mechanism as the general Electrical Permit — no PV-specific flat fee found |
| Building Permit Fee (valuation-based, for the structural/roof-mount scope) | Per the general Building Permit Fee Schedule, based on total contract cost to customer | — |
Demolition Permit
Required to demolish a building or structure in Lochbuie. Governed by the Town's Building Division Plan Submittal Checklist for Demolition Permits, a distinct and comparatively light document set relative to new-construction plan review.
Reviewed 2026-07-06 · Source
Requirements
- Complete Building Application
- Contractor's License (if applicable)
- Contractor's Liability insurance, minimum $100,000
- Note from the (county) assessor's office stating all property taxes are paid
- Certificate of asbestos inspection and abatement, if required
- Plans/documents will not be accepted in part — the checklist states plan review will not take place, nor will any partial submittal be held, until all required documents are received
- Applicant must post the issued inspection card in a location visible from the street and is responsible for calling the Building Division to request the required inspection
Required documents
- RequiredDemolition Permit — Building Division Plan Submittal ChecklistTown of Lochbuie form listing all required submittal items
- OptionalCertificate of Asbestos Inspection and AbatementRequired if asbestos is present per inspection findings
- RequiredAssessor's Office Tax-Paid Confirmation LetterConfirms all property taxes are current before permit issuance
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition permit fee | Not separately itemized in the April 2026 Fee Schedule; billed under the general Building Permit Fee Schedule or the $50.00 'no fee specifically indicated' catch-all rate | No line item labeled 'Demolition' was found in the April 2026 Fee Schedule PDF; the Demolition Permit Plan Submittal Checklist itself does not state a fee figure either |
Deck / Patio Cover / Carport Permit
VerifiedRequired for decks, carports, and patio covers in Lochbuie. All three are explicitly listed as 'Plan Review Permit' categories requiring building/planning review; Town-published guides exist for Patio Covers/Carports (with Spanish version) and general Deck Requirements referencing 2018 IRC Section R507 deck provisions (footings, post sizing, fastener/connector specifications).
Verified 2026-07-06 · Source
Requirements
- Online Building Permit Application via CommunityConnect, with site/floor plans showing dimensions, setbacks, and structural details
- Deck footings sized per 2018 IRC Section R507 (footing depth to frost line — 30 inches per the Town's Design Criteria — post-to-footing connection, and fastener/connector corrosion-resistance specifications per Table R507.2.3), per the Town's Deck Requirements guide
- Patio Cover / Carport Guide (with Spanish-language version) available on the Guides and Checklists page
- Setback verification via Weld County's Property Portal required before finalizing placement, particularly for corner lots or PUD-specific setback tables
Required documents
- RequiredBuilding Permit Application — Deck/Patio Cover/Carport scopeSubmitted via CommunityConnect portal with site plan and structural details
- OptionalDeck Requirements GuideTown-published guide referencing 2018 IRC Section R507 deck construction provisions
- OptionalPatio Covers / Carports GuideTown-published guide (English and Spanish versions)
- OptionalStair and Handrail SpecificationsApplicable where the deck includes stairs, per the Town's published specification sheet
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based general schedule) | $33.80 minimum, scaling per the valuation tiers in the April 2026 Town Fee Schedule | No separate flat deck/patio-cover/carport fee was found; billed under the general valuation-based Building Permit Fee Schedule |
| Initial Plan Review Fee | 65% of total permit fees | — |
Water Heater Replacement Permit
VerifiedRequired for water heater installation or replacement in Lochbuie. Qualifies as a One Stop Permit (no plan review, typically issued within 24 hours), billed at a flat Specialized Permit fee distinct from the general valuation-based Building Permit schedule.
Verified 2026-07-06 · Source
Requirements
- One Stop Permit application must state the number of gallons and BTU rating of the water heater
- Plumbing contractor registration number required on the application if installed by a licensed contractor
Required documents
- RequiredBuilding Permit Application — Water Heater scopeSubmitted via CommunityConnect portal, must include gallons and BTU rating
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water Heaters (Specialized Permit Fee Schedule) | $50.00 each | Town of Lochbuie Fees, updated April 2026, Specialized Permit Fee Schedule item 8 |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lochbuie building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.